CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred...

17
CC Kick-Off CC Kick-Off Meeting Meeting Grenoble 24-25/1/2002 Grenoble 24-25/1/2002

Transcript of CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred...

Page 1: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

CC Kick-Off CC Kick-Off MeetingMeeting

Grenoble 24-25/1/2002Grenoble 24-25/1/2002

Page 2: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

CC: PartnersCC: Partners

• VERIMAG (Oded Maler)• ETH Zurich (Manfred Morari)• Lund (Anders Rantzer)• PARADES (Alberto SV)• CWI (Jan van Schuppen)• ABB (Eduardo Gallestey)• EDF (C.-M. Fallinower)• Siena (Alberto Bemporad)

Page 3: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

CC: GoalsCC: Goals• Develop new techniques for

(computer-aided) control systems design.

• Complex, heterogeneous systems, hybrid dynamics.

• Case-studies (engine control, power production, power transmission).

• Tools (optimization based, reachability based).

Page 4: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

MotivationMotivation• Modern complex systems have different

components• They cannot be all described using the

same mathematical formalism• Nor solved using the same techniques• This is already done by practitioners

without theoretical coverage• Combination of control and verification

techniques

Page 5: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

Work-PackagesWork-Packages• SC: Survey of Hybrid Control• CH: Control of Hybrid systems• RM: Reachability-based Methods• TL: Tools• AA: Automotive Applications• PP: Power Production and

Transmission

Page 6: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

Package inter-dependencePackage inter-dependence

Page 7: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

SC: Survey of Control (1)SC: Survey of Control (1)Many different application domains of control,

each characterized by:• Economic importance• Type of models and techniques (speed,

coupling of variables, precision of models)• Dominating culture (CS, control, specific

engineering)• Relevance of theoretical results• Use of computers in design and

implementation

Page 8: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

SC: Survey of Control (2)SC: Survey of Control (2)• Investigating questions related to the

implementation of controllers by complex hardware/software system

• Unified models to describe both physical systems and their digital controllers (themselves expressed in a variety of formalisms).

Page 9: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

CH: Hybrid Control (1)CH: Hybrid Control (1)In general, extensions of various

results and techniques from control to treat systems with discontinuities (switching systems, piecewise-linear systems, etc.)

Covers mostly the intentions of partners ETH, Lund and CWI

Page 10: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

CH: Hybrid Control (2)CH: Hybrid Control (2)• System-theoretic foundations (minimal

realization of piecewise-linear systems)• Identification of piecewise-affine systems• Controller synthesis via (mixed integer-

linear) optimization, model-predictive control

• Control on polytopes• Optimization of switching for discrete-time

systems

Page 11: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

RM: Reachability Methods RM: Reachability Methods (1)(1)

Adaptation of discrete verification techniques to continuous and hybrid systems. Essentially computing everything that can happen to a system under all admissible disturbances and controls.

The main effort of Verimag in the project

Page 12: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

RM: Reachability Methods RM: Reachability Methods (2)(2)

• New techniques for non-linear systems• Representation of non-convex polyhedra• Goal reachability and optimality• Strategies for differential games• Combination of simulation and verification• Abstraction techniques for treating large

systems

Page 13: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

AA: Automotive ApplicationsAA: Automotive ApplicationsA case-study concerning the design of

engine controllers. Models have inherent non-linear and hybrid aspects (sparks, driver commands) and need new design methods.

Current models are too complex for current tools and will motivate their improvement.

Provided by PARADES (affiliated with MM)

Page 14: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

Power GridsPower GridsA case-study about the modeling and

analysis of power grids that need to transport power according to varying demand.

Provided by ABB in collaboration with ETH

Page 15: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

Power PlantsPower PlantsTwo case-studies provided by EDF:

• Water level controller for a nuclear plant

• Optimization of combustion in a fossil power plant. Essentially switching between different choices of actutors.

Page 16: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

TL: ToolsTL: Tools• Implementing the developed

algorithms• Hysdel: the ETH tool for optimization-

based verification and synthesis• d/dt : Verimag’s tool for reachability

analysis• Connection with Simulink (?)

Page 17: CC Kick-Off Meeting Grenoble 24-25/1/2002. CC: Partners VERIMAG (Oded Maler) ETH Zurich (Manfred Morari) Lund (Anders Rantzer) PARADES (Alberto SV) CWI.

SummarySummary

It will be very nice if we fulfill some percentage of these promises and this will constitute a real contribution to control system design.