-I- c/in./ Department of Public Works and Higliways Contract ID : 18LC0182 Cbntract Name : Construction Of 2 STY 6 CL Schcol Building at Little Panay NHS, Panabo City, Davao del Norte Location Of the Contract : Panabo City, Davao del Norte CONTRACT AGREEMENT KNOW ALL MEN BY THESE PIRESENTS: This CONTRACT AGREEMENT, made this J±±L day of and between: of cg meef{ 2018 by (,1Af'\J,tJ The GOVERNMENT OF THE REPUBLIC OF TllE PHILIPPINES through the Department Of Public Works and Highways (DPWH) represented herein by DANIEL A. JARAVATA, OIC-District Engineer, duly authorized for this purpose, with main office address at Kin, 48, Canocotan, Tagum City, hereinafter referred to as the "PROCURING ENTI-TY"; -and- CJEP Builders & Engineering Services, a single proprietorship, organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at 2/F Rm. 202 Valgosons Bldg. City Hall Drive, Brgy. 2-A, Davao City represented herein by CATEVIL S. PLARISAN, Proprietress, duly authorized for this purpose, hereinafter referred to as the "CONTRACTOR;" WITNESSETH: WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under 18LC0182: Cohstructioh of 2 STY 6 CL School Building at Little Panay NHS, Panabo City, Davao del Norte, hereinafter called "the Works," and the PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works at the calculated unit bid prices shown in the attached Bill of Quantities, or a total Contract price of Fifteen Million Four Hundred Fifty-Tv`ro Thousand, Four Hundred Sixty-Five Pesos and 02/loo Centavos only (Php 15,452,465.02). NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto agree as follows: 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority: a. This Contract Agreement b. Documents forming part of the Contract Agreement: DPWH-INFR-51-2016 Page 1 of 6

Transcript of Cbntract Name : Construction Of 2 STY 6 CL Schcol Building ... · Department of Public Works and...

-I- c/in./

Department of Public Works and HigliwaysContract ID : 18LC0182Cbntract Name : Construction Of 2 STY 6 CL Schcol Building at Little Panay NHS, Panabo City, Davao del NorteLocation Of the Contract : Panabo City, Davao del Norte

CONTRACT AGREEMENT

KNOW ALL MEN BY THESE PIRESENTS:

This CONTRACT AGREEMENT, made this J±±L day ofand between:

of cg meef{ 2018 by

(,1Af'\J,tJ

The GOVERNMENT OF THE REPUBLIC OF TllE PHILIPPINES throughthe Department Of Public Works and Highways (DPWH) representedherein by DANIEL A. JARAVATA, OIC-District Engineer, duly authorizedfor this purpose, with main office address at Kin, 48, Canocotan, Tagum City,hereinafter referred to as the "PROCURING ENTI-TY";

-and-

CJEP Builders & Engineering Services, a single proprietorship, organizedand existing under and by virtue of laws of the Republic of the Philippines,with main office address at 2/F Rm. 202 Valgosons Bldg. City Hall Drive, Brgy.2-A, Davao City represented herein by CATEVIL S. PLARISAN,Proprietress, duly authorized for this purpose, hereinafter referred to as the"CONTRACTOR;"

WITNESSETH:

WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute theWorks under 18LC0182: Cohstructioh of 2 STY 6 CL School Building at LittlePanay NHS, Panabo City, Davao del Norte, hereinafter called "the Works," andthe PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTORfor the execution and completion of the Works at the calculated unit bid prices shownin the attached Bill of Quantities, or a total Contract price of Fifteen Million FourHundred Fifty-Tv`ro Thousand, Four Hundred Sixty-Five Pesos and 02/looCentavos only (Php 15,452,465.02).

NOW, THEREFORE, for and consideration of the foregoing premises, the partieshereto agree as follows:

1. In this CONTRACT AGREEMENT, words and expressions shall have thesame meanings as are respectively assigned to them in the Conditions ofContract hereinafter referred to.

2. The following documents shall be attached, deemed to form, and be read andconstrued as part of this CONTRACT AGREEMENT, and shall be interpretedin the following order of priority:

a. This Contract Agreementb. Documents forming part of the Contract Agreement:

DPWH-INFR-51-2016 Page 1 of 6

Contract ID : 18LC0182Department of Public Works and Highways

Contract Name : Construction Of 2 STY 6 CL School Building at Little Panay NHS, Panabo City, Davao del NorteLocation of the Contract : Panabo City, Davao del Norte----....--------.-----------.----..------------.---------.------------.-----------------------.---.--------------.-------------..-.--_._--_-

(1) Notice of Award (NOA) with the Contractor's signed ``conforme"

(2) Contractor's Bid in the Form of Bid, including its Technical andFinancial Proposals, as calculated by the Procuring Entity andconformed to by the Contractor through the NOA,.

(3) Bidding Documents with Bulletins

(4) Specifications

(5) Drawings

(6) Special Conditions of Contract (SCC)

(7) General Conditions of Contract (GCC)

(8) Performance-Security

(9) Integrity pledge under Department Order No, 86, series of 2013

(10) Other Documents(a) Construction Methods

(b) Construction Schedule in the form of PERT/CPM D.iagram orPrecedence Diagram and Bar Chart with S-Curve, or otherapproved tools of project scheduling, and Cash Flow.

(c) Manpower Schedule

(d) Equipment Utilization Schedule

(e) Construction Safety and Health Program initially approvedby the Head of the Procuring Entity

(f) Contractor's All Risk Insurance (CARI)

3. In consideration of the payments to be made by the PROCURING ENTITY tothe CONTRACTOR as hereinafter mentioned, the CONTRACTOR herebycovenants with the PROCURING ENTITY to execute and complete the Worksand remedy any defects therein in conformity with the provisions of thisCONTRACT AGREEMENT in all respects.

4. In consideration of the execution and completion of the Works by theCONTRACTOR, the PROCURING ENTITY hereby covenants to pay theCONTRACTOR the unit prices in the CONTRACTOR's Calculated Bid, as appliedto the actual quantities accomplished as certified by the PROCURING ENTITYunder the provisions of this CONTRACT AGREEMENT, at the times and inthe manner prescribed by this CONTRACT AGREEMENT.

_--...--.---------------------.----------------.~--------------------------------------------------------------.-.-------------.-----------------.--

DPWH-INFR-51-2016 Page 2 of 6

Department of Public Works and HighwaysContract ID : 18LC0182Contract Name : Construction of 2 SIY 6 CL Schcol Building at Little Panay NHS, Panabo City, Davao del NorteLocation Of the Contract : Panabo City, Davao del Norte-...---.-------------------.-.-----------------..-.----.------------------------------.----------------------------------------.-------------.---

The following items and quantities are included in the scope of work:

J

Item ho, beseription Lhit Quantity unit Price (P) Total Airount (I)

PARTI fAcnlTns FOR "E ENGINEERA.1.1(8) Provision of fleid offlce for the Engineer (Rental Basis) mo. 4.67 27,730.19 129,499.99

PA RT 1[ OTHER GENEiIAL REQLmEM Ei\rrs

a.3 Pemits and aearances Lump sum 1.00 32,375.00 32,375.00

a.5Project Billboard/Sisnboard Bmboard (DPWH), each 3.00 3,885.00 11,655.00Billboards fcoA1, Sidnacies and Banicades

a.7(2) Occupational Safety and Health Program Lump sum 1.00 129,500.00 129,500.00

a.9 Mobilbatton/Demobilillion Lump sum 1.00 116,550.00 116,550.00

PARTA EAR"WORKS803(i)a Structure Excavation Cu.in. 275.61 443.55 122,246.82

804(1)a Embankment from Structure Excavation Cu.in. 139.67 186.36 26,028.90

804(4) Grave» Pl'l Ch.in. 53.12 1,278.67 67,922.95

PART B I.LAin AND REINloRCED coi€REiE woRrs

900(1)cl Structural Concrete (Ready Mix, aass A, 28 Days) Cu.in. 227.36 7,126.32 1,620,240.12

900(2)cStructural Concrete (Ready Mb{, aass a, 28 Days), Cu,in. 33.67 7,511.54 252,913.55Slab on ffl

REli\roRCDx= sTEEi902(1)a Reinforcing Steel, Grade 40 kgs. 33,097.04 76.08 2,518,022.80

902(1)b Reinforcing Steel, Grade 60 kgs. 19,846.96 71.87 I,426,401.02

ioRMwoRles a FALSEwoRies903(2) Fbms and fabeworfes Sq.in. 1,461.06 797.71 1,165,502.17

PART C FREHlive1000(1) Soil Posoning li. 49.00 528.57 25,899.93

1046(2)a2150 mm CHB Non Load Bearing (mcludlng ReinforcingSteen Sq.m' 676.29 1,221.77 826,270.83

1010(4) Wooden Doors and Windows Lump sum 1.00 155,400.00 155,400.00

1006(6) Steel Doors and Frames Lump sum 1.00 19,425.00 19,425.00

1009(1)a Jatousie W indow Sq.in. 28.80 2,023.44 58,275.07

1005(5) Steel Windows (Casement) Lump sum 1.00 271,950.00 271,950.00

1005(6) window Accessory Lump sum 1.00 142,450.00 142,450.00

1004(2) Finishing Hardware (Locksets, Hinges) Lump sum 1.00 88,275.00 88,275.00

1003(17) Carpentry and Joinery Works Lump sum 1.00 38,850.00 38'850.00

1021(1)c Cfment floor finish (with Floor Hardener) Sq.in. 608.00 430.72 261,877.76

1027(1) Cement Plaster Fhth Sq.in. 1,352.57 212.91 287,975.68

1051(5) Metal Rathg in 153.00 2,708.50 414,400.50

1003(1)al Celfing (fiber Cemented on Metal Frame) Sq.in. 377.60 1,268.94 479,151.74

1038(1) Reflective msufatidn Sq.in. 371.20 209.32 77,699.58

1018(1) Glazed Tiles and Trims Sq.in. 30.00 1,510.83 45,324.90

1018(2) ungbed Tiles Sq.in. 27.00 1,247.04 33,670.08

1032(1)a Painting Wori{s (Masonry/Cethg) Sq.in. 2,684.87 361.75 971,251.72

1032(1)b Painting Works Owood) Sq.in. 142.32 318.47 45,324.65

1032(1)c Painting Works (SteeD Sq.in. 1,006.83 485.55 488,866.31

1033(1) Metal Deck Panel lm. 354.38 1,096.28 388,499.71

1016(i)b Waterproofing (Lfa uid) Sq.in. 113.02 687.49 77,700.12

Department of Public Works and HighwaysCont].act ID : 18LC0182Contract Name : Construction of 2 STY 6 CL Schcol Building at Little Panay NHS, Panabo City, Davao del NorteLocation of the Contract : Panabo City, Davao del Norte

Roof nAMlrlG a RoomlG WoRKs

1014(1)blPrepalnted Metal sheets, Long span, Comugated Type Sq.in. 371.20 802.39 297,847.17a ,5TTTm ttTk,

1013(2)alFabricated Metal Rcofing Accessory (Ridge rolD 0.6mmthk.

lm 38.76 334.11 12,950.10

1013(2)a2Fabricated Metal Rooflng Accessory (Plashing) 0.6mmtnk. 'm 26.03 248.77 6,475.48

1047(2)a Structural Steel, Trusses kgs. 3,413.54 87.26 297,865.50

1047(2)b Structural Steel (Pilriins and Fascfa Frames) kgs. 6,857.52 94.41 647,418.46

1047C7)a hfetar Structu res Accessories, ton:s kgs. 186.32 208.51 38,849.58

1047(6) Metal Structures Accessories, Steel Plates kgs. 654.20 98.98 64,752.72

1047(7)b Metal Structures Accessorfes, Sag Rod kgs. 175.82 73.65 12,949.14

1047(4) Metal Structures Accessorfes, Cross Bracing kgs. 615.81 73.60 45,323,62

1047(3)c Metal Structures Accessorfes, Turn Bucke each 52.00 249.04 12,950.08

1047(10) Metal Structu res Accessorfes Lump sum 1.00 116,550.00 116'550.00

PLUM BIIve Are sAI\DTARv vroRKs

1001(8) Sewer une Works Lump sum 1.00 25'900.00 25,900.00

1002(24) Coid Water Line works Lump sum 1.00 16,187.50 16,187.50

1001(9) Storm Drainage and Downspoiit Lump sum 1.00 116,550.00 116,550.00

*1002(4) Plumbing FDctures Lump sum 1.00 225,788.65 225,788.65

±001{11) Septk: Vaut Lump sun 1.00 155,400.00 155,400.00

1001(6) Catcri Basin Lump sum 18.00 2,518.06 45,325.08

1201(1) Water Pumping System Lump sum 1.00 64,750.00 64,750.00

PART D ELECTRrmL wORies

1100(10) Conduits, Boxes and ffitings (Electrfeal Roughth) Lump sum 1.00 51,800.00 51,800.00

1101(33) Wires and Wiring Devises Lump sum 1.00 89,355.00 89,355.00

1102(1) Panelboard with Main & Branch Breakers Lump sum 1.00 31,080.00 31,080.00

1103(1) nohtlng Plxtures and Lamps Lump sum 1.00 45,325.00 45,325.00

1208(1) Fire Am System Lump sum 1.00 25,900.00 25,900.00

1200(2)c osc«uting Ceirmg Fan set 24.00 7,823.96 187,775.04

TO1'AL 15,45Z,465.02

5. The CONTRACTOR warrants that he has not given nor promised to give anymoney or gift to any employees of the ENTITY (or any Philippine GovernmentInstrumentally) to secure the contract.

6. The CONTRACTOR shall pay taxes in full and on time and that failure to do sowill entitle the Government to suspend payment for the services delivered bythe contracting party.

7. The CONTRACTOR shall likewise regularly present within the duration of thecontract, tax clearance from BIR as well as a copy of its income and businesstax returns duly stamped and received by the BIR and duly validated with tax

payments made thereon.

8. The CONTRACTOR shall comply with a valid instruction of the ENTITY and

proceed expeditiously and without delay, however, a slippage of more than 30days from the original schedule due to the fault of the former would result anon-payment, cancellation of contract, blacklisting of the erring contractor andthe entry of new contractor who will finish the project.

DPWH-INFR-51-2016 Page 4 of 6

Contract ID : 18LC0182Department of Public Works and Highways

Contact Name : Construction of 2 Sl.Y 6 CL School Building at Little Panay NHS, Panabo City, Davao del NorteLocation Of the Contract : Panabo City, Davao del Nor[e--..._----.-------.------------------------------------.---------------..----------------------.------.---------------.-------.-------..

ACKNOWLEDGEMENT

REPUBLIC OF THE PHILPPINES)

BEFORE ME, as the Notary Public for and within the City of Tagum, personallyappeared:

NIDANIEL A. JARAVATAOIC-District Engineer

CATEVIL S. PLARISANProprietress

COMM. TAX CERT. NO. _DATE/PLACE ISSUE_D_

27015502 January 8, 2018-Tagum city

oqoi`co3 jowory 4, 2o`8 -Dav@o cfty

Known to me to be the same person who executed the foregoing instrument whichconsists of six (6) pages, including this page, on which this Acknowledgement iswritten and acknowledged to me that the same is their free and voluntary act anddeed.

WITNESS MY HAND AND SEAL, thisCity of Tagum, Philippines.

Notary Public:

g\sl

DPWH-INFR-51-2016

otcEmBEfz

ir2018 in the

ATrj'.JCh+'3`T'L'.H`r'£`}T£`rl!j`rnBtR.E.R\,-,.+'

u.:i Dt.fi.-Tr,+. ;I, ..'u<u

Pc,, in '`=,,'L,:`

i'` 1o 2,., J`./r ,,., '1

lap `o f`i36" 0.. (\`-t `[9

PTfi Wo OC17tJ9d9 010`119.

Page 5 of 6

Department Of Public Works and HighwaysContract: ID : 18LC0182Contract Name = Construction Of 2 STY 6 CL Schcol Building at Little Panay NHS, Panabo City, Davao del NorteLmation of tl.e Contract : Panabo City, Davao del Norte--------------------.------------------.---..---------------------.-------------..--------------..-.------..-----------.------------.-----------

IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, monthand year first above written.

Witnessed by:

ueRAst.-AGENIAccountant Ill

CONTRACTOR=Represented by:

•---------..---------------------..---------.------.--------.---------..-------.----------.------..------.---------.---------..-------.-.-----

DPWH-INFR-51-2016 Page 6 of 6

Special Conditions Of the Contract

GCC Clause1.19 The Intended Completion Date is May 15, 2019.

1.24 The Procuring Entity= Department of Public Works and Highways, Davaodel Norte District Engineering Office, Tagum City

1.25The Procuring Entity's Representative= Daniel A[ Jaravata, OIC-District Engineer, Davao del Norte District Engineering Office-Kin, 48,Taoum City

1.26

The Site Located at Davao del Norte with the Contract ID No.=18LC0182= Construction`Of 2 STY 6 CL School Building at Little PanayNHS, Panabo City, Davao del Norte and is defined in Drawings No:

1.30 The Stait Date= December 27, 2018- 140 C.D,1.33 The Works consist of Completion of 2 Storey 6 Classroom School Building

2.2If different dates are specified for completion of the Worits by sectionrsectional completion'?, these dates should be listed here:

5.1The Procuring Entity shall give possession of the Site to the Contractor on

6.5The Contractor shall employ the following Key Personnel= ProjectEngineer, Materials Engineer (DPWH Accredited), Foreman and Safety andHealth Officer (Certified by DOLE).

7.4c No further instructions.10.0 The Site Investigation Reports are: None12.3 No further instructions.

12.5

Permanent Structures: Fifteen (15) yearsBuildings of types 4 (steel, iron, concrete, or masonry constructionwith walls, ceilings, and permanent partitions of incombustible fireresistance)

29,1 No dayworks are applicable to the contract.34.3 • . . . - . , . . , -, -.

39,1 The amount of the advance payment is 15% of the contract price.

40.2 Materials and equipment delivered on the site but not completely put inplace shall be included for payment.

50.1The date by which the As-Built Drawings and/or Operating andMaintenance Manuals are required is upon completion date.

50.2The amount to be withheld for failing to supply the As-Built Drawingsand/or Operating and Maintenance Manuals by the date required is Php-1,545,246,50