Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
RainRoof / ShadeStructure
Performative Parametric Canopy Structures
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 2/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Design Drivers
2. Environment: Shading & Stormwater Management1. Retrofit Opportunities: Re-purpose/ adapt neglected outdoor space
.
’ .
l i
i il i i i ,i , l
i , ll i . i l i , ,
l il i .
i l il i .
il l l i li i
i i i l, ll i l .
i , i i ll.
i i i l
, il l , i i ,i i l .
i
i
l
i l ii i i , i
i ii .
i i i
i i , l i ii ll i i l .
i
i
l
SW 6
Maintain Site-BasedStormwater Detention Systems
Issue: Site-based stormwater diversion anddetention systems must be properly maintainedto be a reliable component of the city’s storm-water infrastructure.
Recommendation: Establish maintenance standards for site-basedstormwater systems, and require property owners toverify compliance.
Benefits Costs
Savings
Environment
Health & Safety
EF 11
Reduce Summer Heat with Cool Roofs
Issue: Light-colored roofs reflect light and heat backinto the atmosphere, thereby cooling buildingsand cities. The building code mandates white roofcoatings, but the standards are not aligned withLEED, which is used by many developers.
Recommendation: Amend specifications for cool roof coatings to alignthem with LEED.
Benefits Costs
Savings
Environment
Cost
Health & Safety
EF 12Reduce Summer Heat withCool, Shady Building Lots
Issue: Unbuilt areas on private building lots make upapproximately one third of New York City’s space.Because these areas are often covered in dark,unshaded pavement, they contribute to the city’sheat island.
Recommendation: Require light-colored pavement, trees or plantingson 50% of the unbuilt areas of building lots.
Benefits Costs
:
il i i li i l l
, i i i i i ll i l.
i il i lil i i l l .
l
i
i
i l lii , li il i
i i . il i ii , li i, i i l .
i i l i li
i .
i
i
lSavings
Environment
Cost
Health & Safety
SW 5Encourage InnovativeStormwater Practices
Issue: Modern stormwater control systems incorporateboth civil engineering strategies, such asunderground detention tanks, and landscape-based strategies, such as green roofs and naturallandscaping. New York City’s regulations, however,do not properly account for the impact oflandscape-based strategies.
Recommendation: Revise stormwater regulations to account forlandscape-based strategies.
Benefits Costs
il l l i li ii i i l
, ll i l .i , i i ll.
i i i l
, il l , i i ,i i l .
i
i
l
i l ii i i , i
i ii .
i i i
i i , l i ii ll i i l .
i
i
l
i i ii l i i
li l ii .
li i i
, ii li .
i
i
l
Executive SummaryFebruary 2010
NYC GREEN
CODESTASK FORCEA REPORT TOMAYORMICHAELR. BLOOMBERG & SPEAKERCHRI STINE C. QUINN
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 3/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
• Create sheltered, shaded outdoor space• Channel rainwater for storage/re-use• Self-supporting structure• Demountable• Effective at multiple scales and orientations:
roof, courtyard, facade• Accommodate irregular sites• Provide a range of design options
Design Precedents:Felix Candela - thin shell concrete structures
Vinoly - Univ. of Chicago Graduate School of BusinessTypology: winter gardens
Design Intent
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 4/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
First Element: RainRoof
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 5/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Early Versions
1.0 Columns and gridpoints (UDF)
2.0 Columns + Panels (Powercopy)
3.0 Columns + Panels + Column Bases
4.0 Columns, Panels, Column Bases+ Water Collection pipes
Each version includes more sophisticated scripts to as-semble the components into the final geometry.
Early Version Progression
V.2
V.3-4
V.5
rainwater outflow
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 6/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
GEOMETRY INPUTS
Point Grid
Funnel/Column
Roof Panel
PARAMETER INPUTS
GEOMETRY OUTPUTS
PARAMETER OUTPUTS
Overall HeightRoof Panel Height
Column Opening RadiusColumn Support Radius
Column CurvatureColumn Base Type
Base WidthBase Type
Support Radius
Curvature
Opening Radius
Height
Height
Structural WeightWater Storage Capacity
Water Collection CapacityOpening Percent (Opacity)
Surface Area
Design Map
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 7/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:Roof panel area
Water storage capacityWater collection capacityShading Percent (for facades)
Geometry:Grid of SupportsRoof PanelsWater-collection tubing to transfer water out of the sys- tem (optional)
Early Version Progression
rainwater outflow
Inputs
Parameter Values:Height and opening sizes for supportsCurvature of supportsHeight of roof panel curveType of base and base parametersWater collection option
Geometry:Four points to define canopy areaReference plane to define direction of supports
INPUTS
OUTPUTS
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 8/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:Roof panel area
Water storage capacityWater collection capacityShading Percent (for facades)
Geometry:Grid of SupportsRoof PanelsWater-collection tubing to transfer water out of the sys- tem (optional)
Early Version Progression
rainwater outflow
Inputs
Parameter Values:Height and opening sizes for supportsCurvature of supportsHeight of roof panel curveType of base and base parametersWater collection option
Geometry:Four points to define canopy areaReference plane to define direction of supports
OUTPUTS
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 9/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:Roof panel area
Water storage capacityWater collection capacityShading Percent (for facades)
Geometry:Grid of SupportsRoof PanelsWater-collection tubing to transfer water out of the sys- tem (optional)
Early Version Progression
rainwater outflow
Inputs
Parameter Values:Height and opening sizes for supportsCurvature of supportsHeight of roof panel curveType of base and base parametersWater collection option
Geometry:Four points to define canopy areaReference plane to define direction of supports
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 10/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 19,500 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 11/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 4 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 19,000 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 12/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 4 ftSupport Radius = autoRoof Panel Height = 6 ftCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 19,700 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 13/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 4 ftSupport Radius = autoRoof Panel Height = 10 ftCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 20,700 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 14/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 4 ftSupport Radius = autoRoof Panel Height = 10 ftCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 20,700 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 15/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .3Base Toggle = Standard BaseBase Side Length = 2 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 19,500 sf
Water storage capacity: 160 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 16/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Inputs
Parameter Values:Height = 27 ftOpening Radius = 4 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .5Base Toggle = Standard BaseBase Side Length =4 ftBase Depth = 2 ftWater Collection = off
Outputs
Parameter Values:
Roof panel area: 19,000 sf
Water storage capacity: 640 ft3
Water collection capacity: 6565 ft3
Shading Percent: 100%
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 17/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Outputs
Parameter Values:
Roof panel area: 61,300 sf
Water storage capacity: 0 ft3
Water collection capacity: N/A
Shading Percent: 85.3%
Inputs
Parameter Values:Height = 3 inOpening Radius = 4 ftSupport Radius = manual - 8 ftRoof Panel Height = 0 ftCurve Ratio = .3Base Toggle = Variable BaseBase Side Length = N/ABase Depth = N/AWater Collection = off
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 18/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Outputs
Parameter Values:
Roof panel area: 57,000 sf
Water storage capacity: 0 ft3
Water collection capacity: N/A
Shading Percent: 78.9%
Inputs
Parameter Values:Height = 3 inOpening Radius = 12 ftSupport Radius = manual - 8 ftRoof Panel Height = 0 ftCurve Ratio = .3Base Toggle = Variable BaseBase Side Length = N/ABase Depth = N/AWater Collection = off
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 19/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Outputs
Parameter Values:
Roof panel area: 61,000 sf
Water storage capacity: 0 ft3
Water collection capacity: N/A
Shading Percent: 78.9%
Inputs
Parameter Values:Height = 3 inOpening Radius = 12 ftSupport Radius = manual - 8 ftRoof Panel Height = 6 ftCurve Ratio = .3Base Toggle = Variable BaseBase Side Length = N/ABase Depth = N/AWater Collection = off
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 20/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.4 Testing
Outputs
Parameter Values:
Roof panel area: 68,000 sf
Water storage capacity: 0 ft3
Water collection capacity: N/A
Shading Percent: 78.9%
Inputs
Parameter Values:Height = 3 inOpening Radius = 12 ftSupport Radius = manual - 8 ftRoof Panel Height = 10 ftCurve Ratio = .3Base Toggle = Variable BaseBase Side Length = N/ABase Depth = N/AWater Collection = off
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 21/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Final Version: RainRoof V.5
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 22/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Feature Request: Seating
Parametric Seating
The request group asked for seating at the base of thesupports to create a more interesting and social land-scape beneath the canopy.
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 23/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.5 Inputs and Outputs
Outputs
Parameter Values:Water storage capacityWater collection capacityShading Percent (for facades) & roof panel area Material and water weightsTotal weight per square inch on bases
Geometry:Grid of SupportsRoof PanelsWater-collection tubing to transfer water out of the sys- tem (optional)
Inputs
Parameter Values:Height and opening sizes for supportsCurvature of supportsHeight of roof panel curveType of base and base parameters - 3 optionsWater collection option
Geometry:Four points to define canopy areaReference plane to define direction of supports
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 24/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.5 Testing
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 288 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 22,531 lb
Weight per square inch: 1.087 psi
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 18 inSeat Depth = 18 in
Seat Back Thickness = 1 ftBase Depth = 2 ft
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 25/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 18 inSeat Depth = 3 ft
Seat Back Thickness = 1 ftBase Depth = 2 ft
V.5 Testing
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 1152 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 77,444 lb
Weight per square inch: .922 psi
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 26/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 2 ftSeat Depth = 3 ft
Seat Back Thickness = 3 inBase Depth = 2 ft
V.5 Testing
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 1152 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 77,444 lb
Weight per square inch: .922 psi
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 27/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 2 ftSeat Depth = 3 ft
Seat Back Thickness = 3 inBase Depth = 3 in
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 144 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 13,545 lb
Weight per square inch: .163 psi
V.5 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 28/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 2 ftSeat Depth = 3 ft
Seat Back Thickness = 2 ftBase Depth = 3 in
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 144 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 13,545 lb
Weight per square inch: .163 psi
V.5 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 29/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 2 ftSeat Depth = 3 in
Seat Back Thickness = 2 ftBase Depth = 3 in
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 64 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 8553 lb
Weight per square inch: .232psi
V.5 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 30/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Height = 10 ftOpening Radius = 2 ftSupport Radius = autoRoof Panel Height = 6 inCurve Ratio = .2Base Toggle = Circular BaseSeat Back Height = 2 ftSeat Depth = 3 in
Seat Back Thickness = 3 inBase Depth = 3 in
Outputs
Parameter Values:
Roof panel area: 1050 sf
Water storage capacity: 1 ft3
Water collection capacity: 359 ft3
Shading Percent: 100%
Total weight: 4622 lb
Weight per square inch: 8.025psi
V.5 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 31/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
KARL BENGZON, CHAO LUN WANG, REBECCA MARRIOTT, MICHELLE PARK
COLUMBIA BUIDING INTELLIGENCE PROJECT
INTEGRATED DESIGN STUDIO SPRING 2012
1980 LAFAYETTE AVENUE
BRONX, NY 10473
BUILT: 1968
LOT AREA: 354,329 SF
BUILT AREA: 1,012,000 SF
FLOORS: 4
BUILT FAR: 2.98
MAX FAR: 2.43
ZONING: R6
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 32/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 33/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 34/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 35/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 36/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
I d i R i R f V 1 V 4 R i R f V 5 Sh d S V 1 Sh d S V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 37/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Group 2 - Stevenson School
RainRoof is used as a courtyard canopy element aspart of their scheme to redevelop the courtyard, cur-rently an inaccessible space.
Image credits: Karl Bengzon, Chao Lun Wang, Rebecca Marriott, Michelle Park
RainRoof Application
I t d ti R i R f V 1 V 4 R i R f V 5 Sh d St t V 1 Sh d St t V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 38/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
But what about...
Embodied energy?
Product lifecycle?
Materiality?
Construction sequence?
What about all the aspects of the element that deal with time and not just space?
ShadeStructuredraws on experience gained from the RainRoof to pro-duce a more lightweight, inexpensive canopy structure that includes parameters related to constructability.
While the RainRoof addressed some metrics of realapplication (structural and water weight), it focused onadaptability of the element to a wide range of contextswithout considering how the element would actuallybe used in those contexts. This element rethinks theoriginal design intents from scratch. Situ Studio, Solar Pavilions - demountable, “crowd-sourced” construction
with minimal production waste, recyclable materials, low cost
I t d ti R i R f V 1 V 4 R i R f V 5 Sh d St t V 1 Sh d St t V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 39/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Second Element: ShadeStructure
Introduction RainRoof V 1 V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 40/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Self-Supporting Structure: Three-Hinged Arch
The pieces lock together with circular inserts. Option-ally, fabric or non-permeable material can be stretchedacross the top for additional shading, or to direct water into tubes that can run through the center of the as-sembly.
Preliminary grid development:
THREE-HINGED ARCHES
4 ft
8
f t
Design Development
Introduction RainRoof V 1 V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 41/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Fins + Louvers
The fin height is standardized, while the louvers can varyin length and angle. The sizes and lengths of the louverscan be changed, as can certain aspects of the fins.
The entire assembly is easy to manufacture, assemble,and dis-assemble; creates shade; and contributes to aninteresting outdoor environment.
Assemblies of fins plus louvers are then arrayed to
achieve a complete shading system.
“Fin”: adjusts inwidth, length, anddegree of curvature
Louvers: adjust in thick-ness, angle, and length;
can be turned on and off
Length
Width
Curvature
Rotating the componentassembly by differentamounts generates newgeometries.
Component Development
Introduction RainRoof V 1 V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 42/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
AUTO-GENERATED GRID LAYOUT
OUTPUT GEOMETRY:
AssembliesGrid of Points
OUTPUT PARAMETERS:
Shading PercentBoard-feet of LouversArea of Fins
INPUT GEOMETRY:
Base Point XYZ Planes
INPUT PARAMETERS:
Number of FinsArch LengthArch CurvatureFin ThicknessLouver Length, Thickness,and AngleMaterial
Length
Curvature
Angle
Thickness
Number of Fins
Design Map
Introduction RainRoof V 1 V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 43/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.1 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin Area
Louver Board Feet
Geometry:Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness
Geometry:
Base PointPoints List XYZ Planes
INPUTS
OUTPUTS
Introduction RainRoof V 1 - V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 44/100
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.1 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin Area
Louver Board Feet
Geometry:Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness
Geometry:
Base PointPoints List XYZ Planes
OUTPUTS
Introduction RainRoof V 1 - V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 45/100
Introduction RainRoof V.1 V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.1 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin Area
Louver Board Feet
Geometry:Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness
Geometry:
Base PointPoints List XYZ Planes
Introduction RainRoof V 1 - V 4 RainRoof V 5 ShadeStructure V 1 ShadeStructure V 2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 46/100
Introduction RainRoof V.1 V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Louvers
Outputs
Parameter Values:
Shading Percent: 0%
Fin Area: 275 sf
Louver Board Feet: 0 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = offLouver Angle = N/ALouver Length = N/ALouver Thickness = N/A
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 47/100
Introduction RainRoof V.1 V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Louvers
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 275 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 48/100
Introduction RainRoof V.1 V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Louvers
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 275 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 90 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 49/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Fins
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 348 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 8 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 50/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Fins
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 184 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 2 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 51/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Fins
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 242 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 52/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Component Testing: Fins
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 219 sf
Louver Board Feet: 1529 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .8Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 53/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.1 Testing
Outputs
Parameter Values:
Shading Percent = 59%
Fin Area = 491 sf
Louver Board Feet = 1529 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 4 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 4 ftLouver Thickness = 3/8 in
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 54/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 41%
Fin Area = 639 sf
Louver Board Feet = 2293 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 6 ftLouver Thickness = 3/8 in
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 55/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 0%
Fin Area = 639 sf
Louver Board Feet = 0 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = offLouver Angle = N/ALouver Length = N/ALouver Thickness = N/A
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 56/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 41%
Fin Area = 610 sf
Louver Board Feet = 2293 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 6 ftLouver Thickness = 3/8 in
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 57/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 54%
Fin Area = 610 sf
Louver Board Feet = 3058 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 58/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 54%
Fin Area = 530 sf
Louver Board Feet = 3058 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .8Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 59/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent = 54%
Fin Area = 625 sf
Louver Board Feet = 3058 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 3/8 in
V.1 Testing
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 60/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Final Version: ShadeStructure V.2
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 61/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Adaptive Grid Development
Triangular Grid
80% overlap
Square Grid0% overlap
Pentagonal Grid20% overlap
Hexagonal Grid0% overlap
Octagonal Grid45% overlap
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 62/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin AreaLouver Board Feet
Geometry: Adaptive Grid Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness Material (wood or aluminum)
Geometry:Base Point XYZ Planes
INPUTS
OUTPUTS
PLAN VIEW
ELEVATION
CLOSE-UP
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 63/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin AreaLouver Board Feet
Geometry: Adaptive Grid Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness Material (wood or aluminum)
Geometry:
Base Point XYZ Planes
OUTPUTS
PLAN VIEW
ELEVATION
CLOSE-UP
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 64/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Inputs and Outputs
Outputs
Parameter Values:Shading PercentFin AreaLouver Board Feet
Geometry: Adaptive Grid Fin + Louver Assemblies (5 UDFs)
Inputs
Parameter Values:Number of StrutsArch LengthArch Curve RatioFin WidthLouvers (on/off)Louver Angle, Length, and Thickness Material (wood or aluminum)
Geometry:
Base Point XYZ Planes
PLAN VIEW
ELEVATION
CLOSE-UP
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 65/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 14%
Fin Area: 2212 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 3Arch Length = 4 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 66/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 9%
Fin Area: 2552 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 3Arch Length = 5 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 67/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 6%
Fin Area: 2878 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 3Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 68/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 10%
Fin Area: 2878 sf
Louver Board Feet: 10314 ft
Inputs
Parameter Values:Number of Struts = 3Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 6 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 69/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 13 %
Fin Area: 2878 sf
Louver Board Feet: 13770 ft
Inputs
Parameter Values:Number of Struts = 3Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 70/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 24%
Fin Area: 1475 sf
Louver Board Feet: 4590 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 4 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 71/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 15%
Fin Area: 1701 sf
Louver Board Feet: 4590 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 5 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 72/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 11%
Fin Area: 1918 sf
Louver Board Feet: 4590 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 73/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 17%
Fin Area: 1918 sf
Louver Board Feet: 6876 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 6 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 74/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 22%
Fin Area: 1918 sf
Louver Board Feet: 9180 ft
Inputs
Parameter Values:Number of Struts = 4Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Aluminum
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 T ti
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 75/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 33%
Fin Area: 1843 sf
Louver Board Feet: 5737 ft
Inputs
Parameter Values:Number of Struts = 5Arch Length = 4 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 T ti
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 76/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 21%
Fin Area: 2127 sf
Louver Board Feet: 5737 ft
Inputs
Parameter Values:Number of Struts = 5Arch Length = 5 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 T ti
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 77/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 15%
Fin Area: 2399 sf
Louver Board Feet: 5737 ft
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 in
Material = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 78/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 23%
Fin Area: 2398 sf
Louver Board Feet: 8595 ft
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 6 ftLouver Thickness = 5/8 in
Material = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 79/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 80/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 81/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 82/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 83/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .4Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 84/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V 2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 85/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .4Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 86/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 60 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 87/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 90 degLouver Length = 8 ftLouver Thickness = 5/8 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 88/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
V.2 Testing
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 1/4 in
Material = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 89/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
g
Inputs
Parameter Values:Number of Struts = 5Arch Length = 6 ftArch Curve Ratio = .6Fin Width = 8 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 inMaterial = Wood
Outputs
Parameter Values:
Shading Percent: 30%
Fin Area: 2398 sf
Louver Board Feet: 11475 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 90/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
g
Outputs
Parameter Values:
Shading Percent: 42%
Fin Area: 2213 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 6Arch Length = 4 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 91/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
g
Outputs
Parameter Values:
Shading Percent: 27%
Fin Area: 2552 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 6Arch Length = 5 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 92/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent: 19%
Fin Area: 2878 sf
Louver Board Feet: 6885 ft
Inputs
Parameter Values:Number of Struts = 6Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 93/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent: 29%
Fin Area: 2878 sf
Louver Board Feet: 10314 ft
Inputs
Parameter Values:Number of Struts = 6Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 6 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 94/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent: 39%
Fin Area: 2878 sf
Louver Board Feet: 13770 ft
Inputs
Parameter Values:Number of Struts = 6Arch Length = 6 ftArch Curve Ratio = .3Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 95/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Number of Struts = 8Arch Length = 4 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Outputs
Parameter Values:
Shading Percent: 59%
Fin Area: 2868 sf
Louver Board Feet: 9174 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 96/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Number of Struts = 8Arch Length = 5 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Outputs
Parameter Values:
Shading Percent: 38%
Fin Area: 3315 sf
Louver Board Feet: 9174 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 97/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 4 ftLouver Thickness = 5/8 inMaterial = Wood
Outputs
Parameter Values:
Shading Percent: 27%
Fin Area: 3751 sf
Louver Board Feet: 9174 ft
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 98/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent: 40%
Fin Area: 3751 sf
Louver Board Feet: 13762 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 6 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
V.2 Testing
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 99/100
COLUMBIA BUILDING INTELLIGENCE PROJECT SPRING 2012 CAROLINE S. LEBAR
Outputs
Parameter Values:
Shading Percent: 54%
Fin Area: 3751 sf
Louver Board Feet: 18349 ft
Inputs
Parameter Values:Number of Struts = 8Arch Length = 6 ftArch Curve Ratio = .2Fin Width = 4 inLouvers = onLouver Angle = 0 degLouver Length = 8 ftLouver Thickness = 5/8 inMaterial = Wood
Introduction RainRoof V.1 - V.4 RainRoof V.5 ShadeStructure V.1 ShadeStructure V.2
7/31/2019 CBIP Element Final Review
http://slidepdf.com/reader/full/cbip-element-final-review 100/100