CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

13

description

Presentation by Alastair Martin, managing frector, Flextricity Ltd at the CBI's energy conference. London, October 2009.

Transcript of CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Page 1: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd
Page 2: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd
Page 3: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

0

10,000

20,000

30,000

40,000

50,000

60,000

Tran

smis

sio

n s

yste

m d

em

and

(MW

)

Saturday 3rd January 2009

France

OCGT (gasoil)

Pumped Storage

Wind

Hydro

Oil

CCGT (gas)

Coal

Nuclear

Nuclear power station failed at 16:34;632MW generation lost

STOR call received at 16:38Flexitricity started generation in same minute; full power by 16:43

Day peak 17:15 - 17:20

STOR cease received at 17:46

Page 4: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Who participates?

• Standby generators

– Premium power

– Fossil fuel

– Critical infrastructure

• Load reduction

– Disruption is not tolerated

• Combined Heat and Power

– Variation to schedule

– Use of thermal storage

Page 5: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Who participates?

• Retail

• Water

• Banking

• Datacentres/communications

• Logistics and cold storage

• Events/leisure

• District heating

• Waste processing

• Horticulture

Page 6: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

What do they want?

1. Respect for core business processes

– This is still an optional activity

2. Money

3. Reliability

4. Emissions reduction

– At national level

Page 7: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

£0

£10,000

£20,000

£30,000

£40,000

£50,000

£60,000

Energy Partner gross revenue

Energy Partner costs

An

nu

al r

eve

nu

e/c

ost

Export capacity costs

Triad maintenance costs

STOR maintenance costs

Triad fuel costs

STOR fuel costs

STOR availability

Electricity generated

Triad benefit

STOR utilisation

Money

• Area: East Midlands

• Capacity: 1MW firm

• Type: standby generator

• Run hours: 50-60 hours/year

Page 8: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Ener

gy p

rice

Run hours

Page 9: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Reliability

Page 10: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

A neglected standby generator

It doesn’t

do this any

more

Page 11: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd

Emissions

System Uncertainty 2005Response & Reserve

0

1000

2000

3000

4000

5000

6000

7000

0.5

2.5

4.5

6.5

8.5

10.5

12.5

14.5

16.5

18.5

20.5

22.5

Lead Time (Hours)

Req

uir

em

en

t (M

W)

Occasional Response Standing Reserve System Length

Free Headroom Ad. Spinning Requirement Warming Requirment

System Uncertainty + Response

Static plant

Spinning plant

Warming

System Uncertainty 2025

Response & Reserve

0

2000

4000

6000

8000

10000

12000

0.5

2.5

4.5

6.5

8.5

10.5

12.5

14.5

16.5

18.5

20.5

22.5

Lead Time (Hours)

Req

uir

em

en

t (M

W)

Occasional Response Standing Reserve System Length

Free Headroom Ad. Spinning Requirement Warming Requirment

System Uncertainty + Response

Spinning plant

Static plant

Warming

Page 12: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd
Page 13: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd