C&B Model Systems & Preparation
Transcript of C&B Model Systems & Preparation
![Page 1: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/1.jpg)
Some Model Systems
Crown & Bridge Model Preparation
Construct Crown & Bridge Structures 510B Ver1 20091
![Page 2: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/2.jpg)
System 2000Zeiser Model System
DVA Model System Pindex Model SystemConstruct Crown & Bridge Structures 510B Ver1 2009 2
![Page 3: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/3.jpg)
Construct Crown & Bridge Structures 510B Ver1 20093
![Page 4: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/4.jpg)
A commonly used C&B Model System
Zeizer Model System
Construct Crown & Bridge Structures 510B Ver1 20094
![Page 5: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/5.jpg)
Construct Crown & Bridge Structures 510B Ver1 20095
![Page 6: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/6.jpg)
Construct Crown & Bridge Structures 510B Ver1 20096
![Page 7: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/7.jpg)
Model Preparation
Construct Crown & Bridge Structures 510B Ver1 2009 7
![Page 8: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/8.jpg)
The C&B model is the foundation for the finished prosthesis and needs to be constructed with the utmost care and attention to detail. Loss of Margin integrity or compromised adjacent teeth are not accepted in the dental laboratory.
Construct Crown & Bridge Structures 510B Ver1 20098
![Page 9: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/9.jpg)
Segmentation of the Model
Construct Crown & Bridge Structures 510B Ver1 2009 9
![Page 10: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/10.jpg)
Preparation of the Die
Ditching or trimming the die defines the position of the margin and acts as a guide to gingival contour when the restoration is being waxed.
Excessive trimming does not give the correct emergence profile and may lead to an over-contoured or bulky crown.
Ditching the Die
Construct Crown & Bridge Structures 510B Ver1 200910
![Page 11: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/11.jpg)
Preparation of the Die
Acts as an aid to positively identify the margin when waxing.
Margin Liner
Construct Crown & Bridge Structures 510B Ver1 200911
![Page 12: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/12.jpg)
This is necessary with die-stone materials. The hardener seals the die and adds strength to the margin area. This helps prevent ‘chipping’ of the working model.
Some hardeners act as a 3µm die spacer as well.
Preparation of the Die
Hardening
Construct Crown & Bridge Structures 510B Ver1 200912
![Page 13: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/13.jpg)
This can be done before or after hardening depending on the products the laboratory use. Undercuts need to be removed otherwise the wax pattern and crown cannot be easily removed from the model.
Blockout Undercuts
Preparation of the Die
Construct Crown & Bridge Structures 510B Ver1 200913
![Page 14: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/14.jpg)
Die spacer is needed to provide space for the luting agent (cement) during cementation of the finished crown.
When applying the die spacer over the preparation leave the area 1mm above the margin line free of spacer.
This is to ensure close adaptation of the crown and cement (or luting agent). It is important there is no disintegration and dissolution of the luting agent at the margin.
Die Spacer7 µm thickness different colours
Construct Crown & Bridge Structures 510B Ver1 200914
![Page 15: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/15.jpg)
Die Spacer
The ideal space for the cement is suggested at 20µm to 40µm for each wall. So the internal diameter of the crown may be 40 µm to 80 µm larger than the prepared tooth.
There needs to be space otherwise the restoration will not seat properly. Each dentist and laboratory have their own standard thickness within this specified range.
10 µm thickness different colours
Construct Crown & Bridge Structures 510B Ver1 2009 15
![Page 16: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/16.jpg)
Multiple layers of die spacer can be applied to gain the required thickness.
20 µm thickness different colours
Die Spacer
Construct Crown & Bridge Structures 510B Ver1 200916
![Page 17: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/17.jpg)
In this case the laboratory may be allowing 3 µm extra thickness from their die hardener.
17 µm using two layers
Die Spacer
Construct Crown & Bridge Structures 510B Ver1 200917
![Page 18: C&B Model Systems & Preparation](https://reader034.fdocuments.in/reader034/viewer/2022051520/577cc9fb1a28aba711a51b30/html5/thumbnails/18.jpg)
Construct Crown & Bridge Structures 510B Ver1 2009
The Finished C&B Model
18