CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but...
-
Upload
richard-lamb -
Category
Documents
-
view
214 -
download
0
Transcript of CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but...
![Page 1: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/1.jpg)
CAUSES OF CHANGEOrder and Spontaneity
![Page 2: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/2.jpg)
Enthalpy and Reactions• Some reactions happen easily, but some others do not.
• Sodium and chlorine readily react to form NaCl when brought together.
• On the other hand, nitrogen and oxygen coexist in the atmosphere we breath without reacting to form the poisonous gas, NO.
• We can use our enthalpy values to HELP to predict whether reactions will occur. If there is a decrease enthalpy of if ΔH is negative, the reaction is more likely to occur.
![Page 3: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/3.jpg)
A New Thermodynamic Property• A few processes are endothermic and still can occur
easily… Why is this??
• Entropy, denoted S, is a measure of the randomness or disorder of a system, and is a thermodynamic property.
• Entropy is NOT a form of energy and has the units of joules per Kelvin, (J/K).
• A process is more likely to occur if it has an increase in entropy (if the __________ is positive).
![Page 4: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/4.jpg)
Factors That Affect Entropy• Diffusion increases the disorder of molecules and thus
increases entropy.
• The more random or disordered a sample is, the higher the entropy is.
• Entropy increases when solutions become more dilute, entropy also increases when pressure is decreased on a gas.
• Why may this be?? __________________________________
___________________________________________________
Why may this be?? The less the solvent, the more the solute can move around.The less the pressure is on a system, the larger the volume.
![Page 5: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/5.jpg)
Phase / Chemical Changes• Entropies can also increase with temperature, but this effect
is not great unless a phase change occurs.
• Entropy can change during a chemical reaction.
• The entropy of a system can increase when the total number of moles of product is greater than the total number of mole of reactant.
• Entropy increases as number of particles increase. Also, increase when a reaction produces more gas particles than the reactants b/c gases are more disordered than liquids or gases.
![Page 6: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/6.jpg)
Formation of Sodium Chloride• As sodium reacts with chlorine to produce NaCl, the entropy
decreases.
• This decrease means what? ______________________.
• Write out this reaction and try to explain this information.
• The reverse reaction (NaCl Na+ + Cl-) increases in entropy because the order lost when a crystalline solid dissociates to form the ions.
![Page 7: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/7.jpg)
Hess’s Law and Entropy• Molar entropy has the same units as molar heat capacity.
What were those units? ________________.
• Molar entropies can actually be calculated using molar heat capacity information.
• What is Hess’s Law??
• We used this law when calculating ΔH of a reaction. We can also apply this to finding the ΔS, or ______________.
![Page 8: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/8.jpg)
Hess’s Law and Entropy• Entropies can be also calculated by using Hess’s Law and entropy
data (such as in Data Table 3, Page 359)
• You can algebraically manipulate the chemical equations similar to as you did when calculating ΔHf°
• When equations are added or subtracted, entropy changes must be added or subtracted. Sound Familiar?
• When equations are multiplied by a constant, the entropies must be _____________________________.
• Atoms and molecules that appear on both sides can be _______________.
![Page 9: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/9.jpg)
Standard Entropy• Standard change in enthalpy was denoted ___________.
• Using this information, what do you think standard entropy is? ____________.
• The enthalpy of an elemental substance is ___________.
• However, the entropy of an elemental substance can have a value other than zero. Also, most entropy values are positive, unlike the sign of most enthalpy values.
![Page 10: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/10.jpg)
Entropy Change of a Reaction• Just as we stated, entropies can be used in Hess’s Law
also.
• To calculate enthalpies we used the following equation:
ΔHreaction = ΔHproducts – ΔHreactants
• To calculate entropies we used the following equation:
ΔSreaction = ΔSproducts – ΔSreactants
![Page 11: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/11.jpg)
Sample Problem• Hess’s Law and Entropy.
• Use Table 4 to calculate the entropy change that accompanies the following reaction.
½H2(g) + ½CO2(g) ½H2O(g) + ½CO(g)
Same 4 rules apply as before:
1. Gather information
2. Plan your work
3. Calculate
4. Verify your results
![Page 12: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/12.jpg)
Sample Problem• Hess’s Law and Entropy.
• Use Table 4 to calculate the entropy change that accompanies the following reaction.
½H2(g) + ½CO2(g) ½H2O(g) + ½CO(g)
1. Gather your information:
Products:
Reactants:
2. Plan your work:
The general rule is ΔSreaction = ΔSproducts – ΔSreactants
![Page 13: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/13.jpg)
Sample Problem
2. Plan your work:
For H2O, S0 = 188.7 J/K*mol
For H2, S0 = 130.7 J/K*mol
For CO, S0 = 197.6 J/K*mol
For CO2, S0 = 213.8 J/K*mol
3. Calculate your work:
ΔS = [(½ mol)(188.7 J/K*mol) + (½ mol)(197.6 J/K*mol)] – [(½ mol)( 130.7 J/K*mol) + (½ mol)(213.8 J/K*mol)]
ΔS = 20.9 J/K
![Page 14: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/14.jpg)
Sample Problem
4. Verify your results
The sum of the standard entropies of gaseous water and carbon monoxide is larger than the sum of the standard entropies of gaseous hydrogen and carbon dioxide. So, the ΔS for the reaction should be
______________.
![Page 15: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/15.jpg)
Third and Final Thermodynamic Property
• Gibbs Free Energy
• Enthalpy and Entropy help to determine spontaneity in a change
• HOWEVER, Gibbs Free Energy is the ULTIMATE DETERMINANT!!
• If ΔG is positive, it is NOT GOING to happen without help• If ΔG is negative, it is will be spontaneous, meaning it will
just happen!!
![Page 16: CAUSES OF CHANGE Order and Spontaneity. Enthalpy and Reactions Some reactions happen easily, but some others do not. Sodium and chlorine readily react.](https://reader036.fdocuments.in/reader036/viewer/2022062515/56649cee5503460f949bb66a/html5/thumbnails/16.jpg)
Start Studying Now• Chapter Test will be on
Wednesday.
• It covers everything we talked about thermo. Review your notes a little each night.
• Know all vocab and how to use all equations.