![Page 1: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/1.jpg)
CATION UNIT (R-4610 A/B)
RELIABILITY ISSUES
MUHAMMAD REHAN KHANMAINTENANCE ENGINEER
![Page 2: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/2.jpg)
2
FGC
GT/ HRSG
STG
IA/ PA
DEMIN II DEMIN I/ WWTU I
RW
CT II
![Page 3: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/3.jpg)
CATION UNIT (R-4610 A/B)
TOP SHOWER NOZZLES
![Page 4: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/4.jpg)
CATION UNIT (R-4610 A/B)
PERFORATED PLATE
FILTRATION NOZZLES
![Page 5: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/5.jpg)
CATION UNIT (R-4610 A/B)
![Page 6: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/6.jpg)
HEADER
SPARGERS
RESIN BEDANGLE IRON
CATION UNIT (R-4610 A/B)
LUG PLATES
HEADER SUPPORTS
![Page 7: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/7.jpg)
OPERATIONS:CATION REGENRATION CYCLE
1. Operations 24 hours approx.2. Small Backwash 15 min3. Draining 10 min4. Dosing (5% HCl) 65 min5. Rinsing (PW) 45 min6. Slow Rinsing (RW) 25 min
• Backwash after 15 regenerations
![Page 8: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/8.jpg)
ORIGINAL METULLURY
HEADERSS321
SPARGERSSS321 WITH METALLIC MESH
ANGLE IRONCS RUBBER LINED
U-CLAMPS, NUT/STUD/BOLTSSS321
![Page 9: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/9.jpg)
CORROSION ON SS321 METALLIC MESH SPARGERS
CORROSION ON HEADER AND SOCKETS
CORROSION ON CS HEADER SUPPORT
CORROSION ON SS321 METALLIC SPARGERS
![Page 10: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/10.jpg)
UPGRADED METULLURY
HEADERSS16L
ANGLE IRONSS316 RUBBER
LINED
U-CLAMPS, NUT/STUD/BOLTSSS316
SPARGERS SS16l WITH NYLON MESH
![Page 11: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/11.jpg)
FAILURE ANALYSIS
![Page 12: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/12.jpg)
RUBBER LINING DAMAGED
BENT ANGLE IRON
LOOSE U-CLAMPS DUE TO CORROSION
RUPTURED MESH
![Page 13: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/13.jpg)
MARKER OBSERVATIONS
Missing U-clamps of Spargers
Main Header U-clamp dislodgement
Missing Nuts / lose bolts
Severely corroded Nuts and Bolts
Broken socket weld / Sparger
Leaching near weld joints and base metal
Ruptured Mesh
Sparger Angle iron support found dislodged
Dislodged / loose Spargers
Bent distributor Header / Angle Iron Support
Damaged rubber lining
![Page 14: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/14.jpg)
Aug-09 Aug-09 Oct-09 Nov-09 Feb-10 Nov-10
Feb-11 Apr-11 Oct-11 Jan-12 Nov-12 May-13 Aug-13
MO
DIF
ICA
TIO
N
Oct-10
CATION UNIT A (R-4610A) HISTORY PROFILE SINCE COMMISSIONING
![Page 15: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/15.jpg)
Jul-09 Aug-09 Jan-10 Feb-10 May-10 Aug-10 Nov-10
Jan-11 Feb-11 Nov-11 Jan-12 Jul-13
CATION UNIT B (R-4610B) HISTORY PROFILE SINCE COMMISSIONING
Dec-09
MO
DIF
ICA
TIO
N Dec-12 Sep-13
Sep-10
![Page 16: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/16.jpg)
MARKER
OBSERVATIONSR-4610 A
BEFORE MODIF.
AFTERMODIF.
Missing U-clamps of Spargers 5 2
4 0 Main Header U-clamp dislodgement
5 3 Missing Nuts / lose bolts
1 1 Severely corroded Nuts and Bolts
3 1 Broken socket weld / Sparger
4 1 Leaching near weld joints and base metal
0 1 Ruptured Mesh
Sparger Angle iron support found dislodged 1 0
Dislodged / loose Spargers 6 4
Bent distributor Header / Angle Iron Support 2 1
Damaged rubber lining 4 0
![Page 17: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/17.jpg)
MARKER
OBSERVATIONSR-4610 B
BEFORE MODIF.
AFTERMODIF.
Missing U-clamps of Spargers 7 2
7 0 Main Header U-clamp dislodgement
1 1 Missing Nuts / lose bolts
1 1 Severely corroded Nuts and Bolts
5 3 Broken socket weld / Sparger
4 2 Leaching near weld joints and base metal
5 1 Ruptured Mesh
Sparger Angle iron support found dislodged 1 0
Dislodged / loose Spargers 11 5
Bent distributor Header / Angle Iron Support 0 2
Damaged rubber lining 6 3
![Page 18: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/18.jpg)
MARKER OBSERVATIONS REASON
Missing U-clamps of Spargers
CORROSION
Main Header U-clamp dislodgement
Missing Nuts / loose bolts
Severely corroded Nuts and Bolts
Broken socket weld / Sparger
Leaching near weld joints and base metal
Ruptured Mesh
Sparger Angle iron support found dislodged
Dislodged / loose Spargers
HYDRAULIC IMPACT
Bent distributor Header / Angle Iron Support
Damaged rubber lining
![Page 19: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/19.jpg)
ACTION TAKEN/ TO BE TAKEN REASON
•Metallurgy has been upgraded to SS316l • Inspection Frequency is defined to be 6 months
CORROSION
• Additional supports to be installed
HYDRAULIC IMPACT
![Page 20: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/20.jpg)
OPERATION’S OVERVIEW
1. Operations 24 hours approx.2. Small Backwash 15 min3. Draining 10 min4. Dosing (5% HCl) 65 min5. Rinsing (PW) 45 min6. Slow Rinsing (RW) 25 min
• Backwash after 15 regenerations
![Page 21: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/21.jpg)
OPERATION’S OVERVIEW
1. Operations 24 hours approx.2. Backwash after 15 regenerations
![Page 22: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/22.jpg)
2 kg-F/cm2
PASCAL’S PRINCIPLE
38,000 kg-F
![Page 23: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/23.jpg)
BENT ANGLE IRON SUPPORT
![Page 24: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/24.jpg)
Angle IronSS 316
EXISTING
U ClampSS 316
Bolted Arrangement
![Page 25: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/25.jpg)
REPLACING ANGLE IRON WITH C-CHANNEL3”
3”
L3x3x5/16
2”
2”
6”
C6x10.5X5/16
Ixx = 1.51 in4 Ixx = 15.2 in4
Load (w) is constantLength (l) is constantElastic Modulus (E) is same
= 10 in Angle Iron
in C-Channel
= 1/10 in Angle Iron
in C-Channel
![Page 26: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/26.jpg)
![Page 27: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/27.jpg)
PROPOSED
C-ChannelSS 316(bolted)
H-BeamSS316(bolted)
U ClampsSS 316
Bolted Arrangement
![Page 28: Cation unit reliability issues & modification](https://reader035.fdocuments.in/reader035/viewer/2022062303/556d2057d8b42a540c8b4d55/html5/thumbnails/28.jpg)