CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum...

28
Summary - Completed Projects (Category-wise) December-2020, Page-19 CATEGORY Model Sub Model Count Length Cost Toll 34 3189 6176 T+A 21 1047 2225 Annuity 02 24 56 EPC EPC 10 623 1451 Phase I 06 332 250 Phase II 14 1271 735 MPSRSP II 21 1409 1175 MPSRSP III 15 1080 1707 Regular Contract Cash Contract 71 1731 1690 State Funding SHF 30 400 434 BOT Toll 04 310 1683 EPC EPC 05 333 2108 Regular Contract Cash Contract 01 103 78 Toll 01 38 97 T+A 11 467 877 Annuity 36 1070 1609 EPC EPC 09 342 659 MPSRSP II 06 292 220 MPDCSP 39 1527 2977 Building Building Building 10 0 1215 346 15590 27421 Grand Total SH BOT ADB NH MDR BOT ADB Length in KM Cost in Cr., PA-Phy. Achie., FA-Fin. Achie., Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cum. Fin. Progress, CPP-Cum. Phy. Progress, GC: Govt. Contribution, CP: Concession Period.

Transcript of CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum...

Page 1: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Summary - Completed Projects (Category-wise) December-2020, Page-19

CATEGORY Model Sub ModelCount Length Cost

Toll 34 3189 6176

T+A 21 1047 2225

Annuity 02 24 56

EPC EPC 10 623 1451

Phase I 06 332 250

Phase II 14 1271 735

MPSRSP II 21 1409 1175

MPSRSP III 15 1080 1707

Regular Contract Cash Contract 71 1731 1690

State Funding SHF 30 400 434

BOT Toll 04 310 1683

EPC EPC 05 333 2108

Regular Contract Cash Contract 01 103 78

Toll 01 38 97

T+A 11 467 877

Annuity 36 1070 1609

EPC EPC 09 342 659

MPSRSP II 06 292 220

MPDCSP 39 1527 2977

Building Building Building 10 0 1215

346 15590 27421Grand Total

SH

BOT

ADB

NH

MDR

BOT

ADB

Length in KM Cost in Cr., PA-Phy. Achie., FA-Fin. Achie., Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cum. Fin. Progress, CPP-Cum.

Phy. Progress, GC: Govt. Contribution, CP: Concession Period.

Page 2: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Summary - Completed Projects (Model-wise) December-2020, Page-20

Model CATEGORY Sub Model Count Length Cost

109 6146 12722

SH EPC 10 623 1451

NH EPC 05 333 2108

MDR EPC 09 342 659

Phase I 06 332 250

Phase II 14 1271 735

MPSRSP II 21 1409 1175

MPSRSP III 15 1080 1707

MPSRSP II 06 292 220

MPDCSP 39 1527 2977

SH Cash Contract 71 1731 1690

NH Cash Contract 01 103 78

State Funding SH SHF 30 400 434

Building Building Building 10 0 1215

346 15590 27421Grand Total

BOT

EPC

ADBSH

MDR

Regular

Contract

Length in KM Cost in Cr., PA-Phy. Achie., FA-Fin. Achie., Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cum. Fin. Progress, CPP-Cum. Phy.

Progress, GC: Govt. Contribution, CP: Concession Period.

Page 3: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway BOT-Toll Project Completed Page-21

SN Year Name SH NO. Lane Width GC Contractor CP

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

1Hoshangabad – Pipariya –

Pachmari Road22 , 19 & 19A

SL(38.00 KM) +

IL (88KM)35.49

M/s Chetak Enterprises Ltd.,

Nimbaheda29-07-03 - 25-05-05 126.0 57.0

2 Indore – Edlabad Road. 2l 45 Viva Highways Limited. 22/09/2001 30-02-03 16-02-04 203.0 124.0

3 Ujjain - Jhalawad Road IL 22.32Agroh Infrastructure

Developers Pvt. Ltd.16/11/2001 - 19/05/2004 133.7 66.7

462.7 247.7

4 2004-05Dewas - Ujjain - Badnagar -

Badnavar Road18 IL 24.27

M/s R.V. Construction Pvt.

Ltd. Bangalore

5440

Days31/07/2003 - - 28/12/2005 98.3 49.9

98.3 49.9

5Hoshangabad – Harda –

Khandwa Road15 & 26 IL 51.03 M/s Welspon Pvt. Ltd. Baroda

5440

Days20-05-02 - - 10-05-05 185.0 81.0

6 114.0 59.8

299.0 140.8

7Rewa – Shahdol – Burhar –

Amarkantak road8 & 9 53.5 15-09-02 - 05-03-07 246.0 111.3

8 Satna – Maihar – Umaria Road 11 29.1 18-02-05 05-03-07 141.0 53.3

9Jabalpur – Narsinghpur –

Piparia Road22 45.81

M/s Tapiprestressed Products

Ltd. Mr. Patil (9753640887)07/02/2006 02/07/2006 140.0 75.0

10Raisen - Gairatganj -

Rahatgarh Road42 2l 32.77 M/s Welspun Project Ltd 13/03/2006 05/06/2006 101.4 57.7

628.4 297.2

11 2009-10 Mandsaur – Sitamahu Road 58 TL 9.9M/s. Suryavanshi

Infrastructure Pvt. Ltd. Bhopal25 Years 10/07/2007 07/01/2008 - 02/05/2009 44.0 42.3

44.0 42.3

12 Bhopal – Dewas Road 28 4L 81M/s Bhopal DewasCoridor

Pvt. Ltd.,20/03/2008 12/08/2010 141.0 640.0

13Chandpur – Alirajpur – Kukshi -

Badwani Road69 2l 24.11

M/s Keti Developers

Highways Pvt Ltd26/12/2007 15/04/2010 99.3 144.0

14 Indore - Ujjain 4-lane Roads 59 4LPr 26.38% of

ToC

Mahakaleshwar Tollways Pvt.

Ltd.17/09/2008 15/03/2009 17/02/2010 17/02/2010 48.9 298.0

289.2 1082.0

15Bhind – Mihona – Gopalpura

Road50 A 2l 31.17

M/s Essel Bhind Mihona

Gopalpura Toll Road LTD.

Mumbai

20 years 07/08/2009 26/02/2010 27/06/2011 50.9 82.1

2010-11 Sum

2011-12

-

2006-07 Sum

2009-10 Sum

2010-11 25 Years

30/06/2007 -

2005-06

Seoni – Balaghat – Gondia Road

2005-06 Sum

2006-07

IL

M/s Rewa Tollways Pvt. Ltd.

5440

Days -

-

2003-045440

Days -

27

2003-04 Sum

2004-05 Sum

Length in KM Cost in Cr., GC: Govt. Contribution. Premium: Pr., TOC: Toll on COD, CP-Consession Period

Page 4: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway BOT-Toll Project Completed Page-22

SN Year Name SH NO. Lane Width GC Contractor CP

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

16 Labad – Jaora Road 38/52Pr 4.76% of

ToC

M/s. Western M.P. Infra.

Tollways Pvt. Ltd. Mumbai30/08/2007 25/02/2008 06/04/2011 125.0 682.5

17Labad(SH-31)-Manpoor(NH-3)

Road40 Pr Rs. 1.01 Valecha LM Toll Pvt. Ltd, 04/05/2010 27/10/2010 28/02/2012 34.3 200.1

18Chhindwara - Matkuli – Tamia

Road62 2l 38.7 Keti Highway Developers 30/06/2007 29/03/2008 15/04/2011 25/08/2012 112.0 213.3

19 Jaora – Nayagaon Road 52 4L Pr 15.3962M/s. Jaora-Nayagaon Toll

Road Company Pvt. Ltd. Indore20/08/2007 20/10/2007 - 06/05/2012 127.8 730.0

450.0 1907.9

20 Sagar – Damoh Road 61 44.28M/s Essel, Sagar Damoh toll

roads Ltd.26/02/2010 07/03/2012 03/07/2012 68.8 130.3

21 Damoh – Jabalpur 55 82.71

M/s Essel, Damoh-Jabalpur

Toll roads Ltd. Mr.

Dharmendra Singh

(08879655330)

27/02/2010 03/03/2013 101.3 249.6

22 Mhow – Ghatabillod Road 38 4L Pr Rs. 14.58M/s Essel, Mhow-Ghatabillod

toll roads Ltd.23 Years 07/09/2011 12/12/2011 30/03/2012 24.0 177.3

23 Ujjain - Jaora BOT Road 18 2l Pr Rs. 1.01 M/s. Topwarth Tollways

(Ujjain) Pvt. Ltd. Mumbai18 Years 06/05/2010 13/01/2011 19/06/2013 95.2 189.1

289.3 746.2

24Bina – Khimlasa – Malthone

Road61 2l 26.27

Essel, Bina-Khimlasa-

Malthone Toll Roads Ltd.25 Years 07/08/2009 20/02/2010 12/09/2013 37.7 67.3

25 Bhopal Bypass Road 28 4L Pr Rs. 21.00 M/s Transstroy Bhopal Bypass

Pvt. Ltd. Hyderabad15 Years 18/11/2010 17-05-2011 26/05/2013 52.0 305.0

26 Satna – Majhgawan 11 2l VGF (blank)Terminat

ed - - - 40.0 105.0

129.7 477.3

27 2014-15 Bina – Kurwai Sironj 61 2l Pr Rs. 1.06 Telecommunication

Consultant IndiaLtd25 Years 23/11/2010 21/05/2011 15/04/2014 31/07/2014 56.4 107.0

56.4 107.0

28

Jhabua - Jobat - Bagh - Kukshi

Road26 49.00 Grant

M/s Gangotri Enterprises Ltd.

Luckhnow23/05/2011 25/11/2012 16/01/2015 31/03/2017 95.0 158.0

29

Khandwa - Dedhtalai -

Burhanpur Road49 66.33 Grant

M/s Khandwa Dehtalai-

Burhanpur Pathways India Ltd.28/07/2011 20/04/2012 19/06/2016 127.3 224.4

30

Lakhnadon - Ghasore upto

Seoni Border33 0.54 Grant M/s TCIL, New Delhi 22/09/2011 16/03/2012 30/06/2016 37.9 79.0

260.2 461.4

312017-18 Isagarh - Ashoknagar - Guna 64 - 36.75

M/s ARYAVRAT Tollways Pvt.

Ltd25 Years 05/11/2012 30/08/2013 31/03/2018 31/03/2018 76.2 105.1

76.2 105.1

32

Dewas Bypass Road on BOT

basis, Development of 4/6

lane.

64 4L (blank)M/s IJM Corporation Berhad,

Hydrabad.25 Years 27/02/2017 10/10/2017 - 19.8 267.3

2016-17 Sum

2017-18 Sum

2019-20 -

2013-14 -

2013-14 Sum

2014-15 Sum

2016-17 2l 30 years

-

2012-13

2l 18 Years 07/08/2009

-

2012-13 Sum

2011-12

-

4L

25 Years

2011-12 Sum

Length in KM Cost in Cr., GC: Govt. Contribution. Premium: Pr., TOC: Toll on COD, CP-Consession Period

Page 5: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway BOT-Toll Project Completed Page-23

SN Year Name SH NO. Lane Width GC Contractor CP

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

33Rau - Mhow - Mandleshwar 38 66.33

M/s Mhow Agroh Pathways

Pvt. Ltd.30 years 28/07/2011 18-062012 - 67.4 176.1

34

Gwalior - Jhansi Development

upto Ghongha village uia Bilua

Road on BOT basis.

NA (blank)M/s Gwalior Pathways Pvt.

Ltd. Mhow Indore25 Years 30-06-2017 15-01-2018 - 19.0 67.4

106.2 510.7

3189.4 6175.6Grand Total

2019-20 -

2l

2019-20 Sum

Length in KM Cost in Cr., GC: Govt. Contribution. Premium: Pr., TOC: Toll on COD, CP-Consession Period

Page 6: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway BOT (Toll+Annuity) Projects Completed Page-24

SN Year Name SH NO. Lane GC CP Contractor

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

1 Tikamgarh - Mahrauni 54 2l 1.44 M/s S.V.T. Infrastructure India Pvt. Ltd. Bhopal 16/02/2011 09/09/2011 - 13/07/2013 15.70 29.38

2 Barwani – Palsood – Sendhwa Road 39 4.97M/s Valecha Badwani-Sednwa Tollways Pvt

Ltd Mumbai13/04/2011 13/10/2011 10/02/2012 02/10/2012 56.89 103.99

3 Mandsaur - Pratapgarh-Rajasthan Border 58 1.17M/s. Shukla Global Development Pvt. Ltd.,

Bhopal16/03/2011 16/09/2011 16/09/2012 11.53 19.45

4Sardarpur - Badnawar (Bhesola Choupati) Road

(SH-35)65 4.71 M/s DBL Sardarpur Badnawar Pvt. Ltd. 29/06/2011 16/12/2012 09/05/2012 43.00 84.00

5 Silwali - Sultanganj - Jaisingh Nagar Sagar 20 9.49 DBL Silwani Sultanganj Tollways Ltd. Bhopal 08/09/2011 27/02/2012 - 76.80 121.00

203.92 357.82

6 Semaria – Manikpur 14 2.57 M/s Rewa Pathways Pvt. Ltd 22/03/2011 05/10/2011 04/03/2014 03/04/2014 16.36 34.83

7 Panna - Amanganj - Simariya - Gaisabad 55 5.39 M/s G.V.R. Pvt.Ltd. 05/11/2011 02/05/2012 - 58.00 97.13

8 Paron - Goras Road (SH-23) 4 8.05 M/s Guna-Sheopur Pathway Pvt. Ltd. Mhu 13/04/2012 16/06/2014 36.18 102.00

9 Sehore - Icchawar - Kosmi Road 66 2l 4.41 M/s Ramky Infrastructure Ltd. Hyderabad 22/02/2012 25/03/2014 50.12 89.00

160.66 322.96

10 Datia - Dinara 19 2l 1.62 M/s Dinara Datia D.P.Jain Pathways Pvt.Ltd. 09/05/2012 02/02/2013 20/04/2015 8.93 16.00

11 Thandla - Limdi - To Gujrat Border 64 IL 0.9 M/s Gangotri Thandla Limdi Tollway 19/04/2011 19/10/2011 15-10-14 31.20 56.16

12Unchehra - Nagod - Singhpur - Kalinjar Road SH-

56 56 & 13 2l 8.46 M/s DBL Uchehra Tolway Ltd. Bhopal 24/09/2012 20/11/2012 15-05-14 55.00 115.20

95.13 187.36

13 Ujjain Simhastha By Pass MDR 2l 5.93 M/s Ujjayini Highways Pvt. Ltd., Indore 12/06/2013 02/02/2014 01/02/2015 14.29 98.26

14 Rewa Ring Road 57 4L 3.9 M/s Agroh Infrastructure (P) Ltd. Mhow 17/05/2013 22/02/2014 18/04/2016 9.20 74.20

15 Betul - Sarni - Parasia 45 15.48 M/s Dilip Buildcon 20/05/2013 07/04/2014 11/11/2015 124.10 238.00

16 Damoh - Katni 63 17.76M/s Prakash Asphaltings & Toll Highways

(India) Ltd.04/06/2013 05/06/2014 - 117.11 272.07

17 Gormi - Udotgarh Road 56 IL 3.73M/s VKS Gormi-Udotgarh Corridor Pvt. Ltd..

Bhopal29/09/2012 23/03/2013 10/08/2015 16.77 37.00

18 Ratlam – Sailana – Banswada 927A 2l 5.99M/s Agroh Infrastructure

(P) Ltd. Mhow17/05/2013 09/11/2013 08/11/2015 43.60 118.00

325.07 837.53

19 Guna - Aron Sironj 10 NA M/s Bansal Pathway (Guna-Sironj) Pvt. Ltd. 10/02/2015 23/11/2015 22/11/2017 86.76 190.62

20 Patan - Tendukheda - Rehli Road 21 17.64 M/s Dilip BuildconLtd Bhopal 01/09/2015 10/04/2016 10/04/2018 86.60 219.62

173.36 410.24

21 2018-19 Baretha - Ghoradongri NA 2l 2.93 - M/s VKS Baretha -Ghoda DongariCorridor Pvt

Ltd26-08-14 09-03-15 - 30-04-18 15.10 39.53

15.10 39.53

22 Deharda – Ishagarh 4 IL 2.45 M/s Gangotri Deharda 19/04/2011 19/10/2011 - 32.93 50.57

23 Hata - Fatehpur - Dargawon 23 2l 4.38 M/s Dilip BuildconLtd 10/08/2015 10/04/2016 - 64.42 74.25

97.35 124.82

1070.58 2280.26

2018-19 Sum

2019-20 15 Yrs -

2019-20 Sum

Grand Total

2015-16 Sum

2017-18 2l 15 Yrs -

2017-18 Sum

2014-15 15 Yrs -

2014-15 Sum

2015-16 15 Yrs -

2l

2013-14IL

15 Yrs -

09/09/2011

2013-14 Sum

2012-13 15 Yrs

IL

-

2l

2012-13 Sum

Length in KM Cost in

Cr.,GC: Govt. Contribution, CP: Concession Period.

Page 7: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway EPC Project Completed Page-25

SN Year Name SH NO.Lane

WidthGC Contractor

Date of

Agreement

Appointed

datePCOD FINAL COD Length Cost

1Jabalpur - Patan - Sahapura

Road (Balance Work)15, 22A 6.12 M/s Dilip Buildcon Ltd. 22/07/2015 19/08/2015 08/02/2017 31/03/2017 38.8 88.9

2Neemuch - Manasa CC

Pavement30 24.55 Grant

M/s Eagle Infra India Ltd.

(JV) M/s Madhav Infra

Projects Ltd.

08/03/2016 29/03/2016 - 10/09/2017 28.5 104.5

67.3 193.4

3 Sendhwa – Khetiya 36 4.95M/s Ravi Infra Build

Udaipur23/07/2015 04/08/2015 29/04/2017 03-08-17 57.2 112.5

4

Nagda-Dhar-Gujri Road CC

pavement

[PCOD on 04.09.2017]

31 - 29-03-18 69.4 255.3

5Bhopal-Berasia - Sironj 2L

Project23 - 19/12/2017 19/12/2017 106.3 258.6

6Sarangpur - Akodiya - Shujalpur

Road41 2l 26.70 Grant

Ravi Infrabuild Projects

Pvt. Ltd. Udaypur

(Rajasthan)

23/07/2015 04/08/2015 20/04/2017 03/08/2017 38.5 79.1

271.3 705.5

7

Morena-Sabalgarh-Attar Road

(SH-02), [Including

Supplementry Work -

Sabalgarh-Attar on 03.02.2017 ]

2 - 143.33

M/s Rajshyama

Construction Pvt. Ltd.,

Ghaziabad U.P.

02/11/2015 17/11/2015 31/07/2018 31/07/2018 83.9 142.4

8Seoni - Katangi to Maharashtra

Border Road54

M/s Sorathia Velji Ratna

& Co. Vadodra13/02/2017 09/03/2017 31/01/2019 78.3 92.5

9Punasa - Satwas - Kannod CC

Pavement Road 41A

M/s Kalyan Tollways

Indore 26/12/2015 14/01/2016 13/01/2018 77.8 238.4

240.0 473.3

10 2020-21 Majhgawan - Chitrakoot 11 - - M/s Tirupati Buildcon 31/07/2015 17/09/2015 15/09/2019 30/06/2020 43.9 79.0

43.9 79.0

622.6 1451.1

2020-21 Sum

Grand Total

2017-18 Sum

2018-19

2l - -

2018-19 Sum

2016-17 2l

2016-17 Sum

2017-18

2l

24.55 Grant

M/s Eagle Infra India Ltd.

(JV) M/s Madhav Infra

Projects Ltd.

08-03-16 29-03-16

Length in KM Cost in Cr., GC: Govt. Contribution. Premium: Pr., TOC: Toll on COD

Page 8: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPSRSP-I, Phase-I Projects Completed Page-26

SN PKG Name Number Lane CP Contractor

Date of

Agreement Start Date

Completion

Date Length Cost

1 PKG 1Bhopal – Vidisha

Road18 2l 4 YRS

M/s Backbone

Enterprises Limited,

Gujarat

04/02/2015 30/04/2007 36.15 29.2

2Betul – Paratwara

Road43 25/05/2007 67.80 52.77525

3Chhindwara –

Multai RoadNH-69A 25/03/2007 54.40 42.34475

4 PKG 3 Sagar – Bina Road 14 2lM/s PNC Construction

Co. Limited, Agra14/07/2007 71.82 63.54

5Agar – Sarangpur

Road41 30/06/2007 51.00 31.32866

6Khilchipur – Susner

Road14 30/06/2007 51.20 31.12134

332.37 250.31Grand Total

25/10/2004

PKG 2 IL

-

M/s United Limited,

Gurgaon

-

PKG 4 ILM/s. Maducon Project

Ltd. Hyderabad

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress.

Page 9: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPSRSP-I, Phase-II Projects Completed Page-27

SN Package. Name of Road SH NO.

Lane

Width Contractor Start Date

Completion

Date Length Cost

1 BPL PKG 1Morena – Sabalgarh (70 Km), Sabalgarh –

Shyampur (49 Km)2 & 23

M/s KNR Constructions

Limited, Hydrabad22/03/2006 28/02/2009 119.00 68.46

2 BPL Pkg 2 Vidisha – KurwaiM/s Ketan Construction

Limited, Gujarat04/01/2006 24/12/2008 74.60 44.46

3 BPL Pkg 3 Morena - Ambah - Porsa RoadM/s PNC Construction Co.

Limited, Agra01/02/2006 05/06/2008 77.40 43.43

4 BPL PKG 4 Badnawar – Thandla 18M/s JMC Projects (I)

Limited,03/01/2006 15/01/2009 78.80 44.12

5 Khargone – Barwani 26 2l 31/03/2009 85.20 46.73

6 Khargone – Bistan 1 31/03/2009 21.00 11.52

7 Biaora - Maksudangarh - Sironj Road 14 31/03/2010 88.00 44.37

8 Guna - Paron 23 31/03/2010 65.00 39.50

9 Rewa - Bida - Semariya 9 30/09/2008 26.00 12.95

10 Satna - Amarpatan 13 30/09/2008 30.20 20.37

11 JBL PKG 2Seoni-Chhindwara (68.80 Km)

Chhindwara-Nagpur (75 Km)

NH-69A

NH-28B

M/s United Limited,

Gurgaon20/01/2006 31/07/2008 143.80 74.15

12 JBL PKG 3

Tikamgarh – Malhera (57.60 Km), Tikamgarh

– Shahgarh (61.00 Km), Tikamgarh – Orcha

(78.40 Km)

10, 37 & 37M/s Somdatt Builders

Private Limited, New Delhi24/01/2006 30/11/2008 197.90 114.92

13 JBL PKG 4 Jabalpur – Amarkantak 22M/s Sadbhav Engineering

Ltd.. Gujarat 09/04/2006 15/12/2008 221.80 145.76

14 JBL PKG 5 Sagar – Rehli 15

M/s Valecha Engineering

Ltd.,

Mumbai

19/01/2006 16/05/2008 42.20 23.82

1270.90 734.56

M/s Ramky Infrastructure

Ltd. Hyderabad11/04/2006

Grand Total

IL19

BPL PKG 5 M/s Gayatri Project Limited 12/12/2005

IL

BPL PKG 6M/s. Maducon Project Ltd.

Hyderabad 16/12/2005

JBL PKG 1

Length in KM Cost in Cr., CFP-Cum. Finan. Progress.

Page 10: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPSRSP-II, Phase-II Projects Completed Page-28

SN Package. Name SH

Lane

Width Contractor

Date of

Agreement Start Date

Completion

Date Length Cost

1 BPL PKG 1 Shivpuri - Sheopur - Pali RoadM/s Jagdish Prasad Bansal,

Shivpuri- 30/03/2011 143.00 114.66

2 NH-12 Junction-Silwani 21/01/2011 34.80 24.17

3 Bareli - Pipariya Road 21/01/2011 39.00 27.09

4 Gairatganj - Silwani - Gadarwada 21/01/2011 64.40 44.73

5Banher - Chiriya - Pal Road (SH-01),

[Banher To Maharastra Border]05/04/2010 65.00 53.60

6Mandleshwar - Kasrawad - Khargone

Road05/04/2010 45.00 37.10

7 Badwah - DhamnodM/s AyushAjay Agroh Tollways

Pvt. Ltd, Indore14/09/2012 15/12/2009 60.00 54.59

8 Khalghat - Kasrawad RoadM/s Prakash Asphalting Toll

Highways (India) Ltd Mhow 15/12/2011 17.75 18.20

9 Khalghat - Manawar - 15/12/2009 42.00 38.21

10 Birgodra - Ingoriya IL M/s. Dilip Buildcon Ltd., Bhopal 25/04/2011 30.00 4.23

11 Indore - Depalpur M/s DBL Pvt Ltd Bhopal 25/04/2011 33.80 4.65

12 Morena - Ambah-Porsa Road (SH-02) 01/06/2016 50.00 42.07

13Shyampur - Goras Road

(SH-23)IL 01/06/2010 67.00 54.69

14 BPL Pkg 8 Khandwa - KhargoneM/s MSK Project (I) Limited,

Gujarat27/09/2007 05/04/2010 75.00 76.46

15 BPL Pkg 9Budhni - Rehti - Nasrullaganj - Khategaon

RoadM/s NKG Infrastructure Ltd. 24/09/2007 31/01/2011 87.40 77.45

16 BPL Pkg 10Nasrullaganj Koshmi Section Of

Nasrullganj Echhawar-SehoreIL

M/s Chouksey Infra Const.

Comp.- 24/06/2010 20.00 20.46

17 BPL Pkg 11 Ingoriya - Unhel 2lM/s. S.P.C. Infrastructure Pvt.

Ltd. Hyderabad04/02/2010 28/04/2011 24.00 29.10

-

BPL PKG 5 MDR

2l

BPL Pkg 7

SH

M/s Jagdish Prasad Bansal,

Shivpuri

2l

MDR

SH 2l

-

BPL Pkg 2M/s PNC Construction Co.

Limited, Agra26/09/2007

BPL Pkg 3 -

-

BPL PKG 4

Length in KM Cost in Cr., CFP-Cum. Finan. Progress.

Page 11: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPSRSP-II, Phase-II Projects Completed Page-29

SN Package. Name SH

Lane

Width Contractor

Date of

Agreement Start Date

Completion

Date Length Cost

18 JBL Pkg 9Nagod - Jasso - Saleha - Pawai - Mohindra

- Semaria - Amanganj03/04/2011 100.83 80.59

19 JBL Pkg 10 Amanganj - Malhera 09/04/2011 76.86 66.74

20 JBL Pkg 11 Seoni - Chiraidongri Road 2lM/s Sadbhav Engineering Ltd..

Gujarat 26/09/2007 15/02/2010 92.60 81.76

21 JBL Pkg 12 Balaghat - Nainpur ILM/s Montocarlo Construction

Ltd., Gujarat24/09/2007 15/09/2010 80.60 72.29

22 Katni - Barhi - Tala - Jaisinghnagar IL-TL 23/06/2010 70.04 47.19

23 Tala - Shahdol (Chhatisgarh Border) 23/06/2010 69.90 47.09

24 JBL Pkg 14 Lakhnadon - Mandla - Dindori - GhansaurM/s Montocarlo Construction

Ltd. Gujarat02/04/2015 24/10/2007 20/12/2009 151.63 129.99

25 Bela - Govindgarh - Churhat 2l 27/10/2014 08/03/2011 56.65 46.31

26 Rewa - Sirmour - Dabhora IL 08/03/2011 75.75 61.93

27 JBL Pkg 16 Bargawan – Baidhan 2lUdit Ketan Construction Ltd.,

Gujarat15/06/2009 17/03/2011 27.35 39.41

1700.36 1394.75

MDR -

Grand Total

M/s MBL Ifrastructures Ltd.

Kolkata17/12/2007

SH

JBL Pkg 13M/s Vijay Infrastructure Ltd,

Lucknow07/01/2008

IL

JBL Pkg 15M/s Ramky Infrastructure Ltd.

Hyderabad25/01/2008

-

MDR

IL

Length in KM Cost in Cr., CFP-Cum. Finan. Progress.

Page 12: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPSRP-III, Projects Completed Page-30

SN PKG Name SH NO Lane Contractor

Date of

Agreement Start Date

Completion

Date Length Cost

1 PKG-1 Bhind - Ater - Porsa Road 2M/s Gangotri Enterprizes Ltd B-158,

Sector-A Mahanagar- Luknow - 19/07/2011 28-02-15 60.85 86.30

2 PKG-2Mihona - Lahar - Daboh - Bhander - Chirgaon

Road45

M/s Neeraj Gangotri (JV) Luknow

(U.P.)27/07/2011 27/07/2011 24/11/2016 85.70 137.26

3 PKG-3Pichhore-Chanderi-Mungawali-Onder-Kurwai

Road 19

M/s KNR Construction Ltd.,

Hyderabad-500 03328-07-11 28/07/2011 31-01-15 146.50 197.74

4 Manawar-Mangoad Road (Terminated) 38 08-07-13 0.00

5 Sardarpur-Rajgarh-Bagh (Terminated) 35 08-07-13 0.00

6Manawar-Mangod (Bandheri) Road (Balance

Work)38 25-04-16 49.63 178.90

7 Sardarpur - Rajgarh - Bagh (Balance Work) 35 25/04/2016 50.43

8 PKG-5 Agar - Barod-Alot-Jawra Road 41M/s. Montikarlo Construction Pvt.

Ltd. Ahmadabad - 380 00909/07/2011 19/07/2011 25/05/2013 108.70 192.79

9 PKG-6

Pachor - Jeerapur - Machalpur - Soyat Road (SH-

51) 51 M/s Kundu-MG(JV) - 28/07/2011 05/06/2013 86.70 152.18

10 Badi - Baktara - Dobi - Shahganj - Budhni Road 15 05/06/2013 58.78 143.22

11 Udaipura - Silwani 44 05/06/2013 28.58 0.00

12 PKG-8 Rahatgarh - Khurai - Khimlasa Road 42 ILM/s Gangotri Engerprises Ltd.

Lucknow-0628/07/2011 28/07/2011 06/05/2015 47.48 60.33

13 PKG-9 Damoh - Hata - Gaisabad - Semariya Road 47 2l M/s Montecarlo Construction Ltd - 19/07/2011 10/01/2015 62.66 118.93

14 PKG-10Hata-Patera-Kumhari & Raipura-Saliya-

Bahuriband-Sehora Road

M/s NIRAJ-ARSS (JV), Niraj

House, Sunder Baug, Chamber

Mumbai- 400088

24-07-11 27/06/2011 25-10-12 0.00 0.00

15 PKG-10AHata - Patera - Kumhari & Raipura - Saliya -

Bahuriband - Sehora Road (Balance Work)

M/s VIL Limited

B-5/21, Vishal Khand, Gomti

Nager, Lucknow - 226 010

17/06/2013 26/08/2013 12/03/2016 91.28 132.48

16 PKG-11 Amarpatan - Gorsari - Badera Road 13 & MDR M/s Montecarlo Construction Ltd. - 19/07/2011 30/06/2013 46.50 61.81

17 PKG-12Sundara - Singpur - Kothi - Jaitwara -

Birsinghpur - Semaria Road 52 28/07/2011 28/07/2011 09/04/2016 85.29 151.87

18 PKG-13 Sidhi - Beohari Road 55 2l - 29/07/2011 14-04-16 71.29 93.68

1080.37 1707.49Grand Total

M/s Valecha Engineering Ltd.,

Mumbai- 40005308/01/2011 01/08/2011

48

IL

M/s GVR Infra Projects Ltd.,

Chennai

2l

PKG-4 M/s KCC Shivalaya Mumbai DLP 11-07-13 24/06/2011

PKG-4A

M/s KCC Buildcon Pvt. Ltd.&

ShivalayaConstruction Co. Pvt. Ltd.

JV

- 28/11/2013

PKG-7

Length in KM Cost in Cr.,Com Dt.-Completion Date, CFP-Cum. Finan. Progress.

Page 13: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Regular Contracts (Completed Projects) Page-31

SN YEAR Name Lane Number GC Contractor

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

1 Rewa – Link Road 2l 15, 22A 4.36 M/s Udit Infra World, Rewa 31/01/2006 5 4.36

2 Jabalpur - Patan - Shahpura 15 & 22A 14.98 - 28/02/2006 48 14.98

3 2006-07 Mandla - Kanha 11A 19.59 M/s Sanjay Sandhi, Rajnandgaon 30/06/2006 59 19.59

4 Bina – Sironj – Guna 14 & 23 57.26 - -- 144 57.26

5 Katni – Damoh 14 32.33M/s Bansal Pathways (Damoh-Katni) Pvt.

Ltd. --

103 32.33

6 Neemuch - Manasa - Rampura - Bhanpura 31 43.49 31/03/2008 87 43.49

7 Pachore – Shujalpur - Ashta – Kannod 41 & 51 71.9 31/01/2009 127 71.9

8 Chhindwara - Amarwada - Narisnghpur NH-26B 77.51 - 103 77.51

9 Pichhore – Dinara Datia 19 28.29 M/s Udit Dinara Datia Tollyway Pvt. Ltd. 25/05/200952 28.29

10 Katni - Pawai - Amanganj (Balance Work) 10 0 - 05/01/2010 25 28.48

11 Datia - Seondha 19 71.6M/s Gangotri Engerprises Ltd.

Lucknow-0612/01/2010

78 71.6

12 Lukwasa – Isagarh - Chanderi 10 35.43 M/s Balecha Construction 15/03/2009 73 35.43

13 Shujalpur Town 4 Lane 41 - -- 4 8.24

14 Panna Bypass 49 10.76 30/05/2010 5 10.76

15 Amanganj - Pawai - Katni & Panna - Ajayagarh 10 & 47 70.78 01/05/2010108 70.78

16 Hirapur - Bamnora 37 - 15/06/2010 18 9.69

17 Datia Town Portion 4 Lane 19 9.31M/s Tomar Builders and Contractor

Gwalior.31/03/2012

6 9.31

18 Sironj Bypass 2l - 0 - 06/02/2012 10 16.8

19 Chabi -Shahpura - Umariya 11 101 M/s Alok Gupta, Jabalpur 30/06/2011 107 101.03

20 Khamariya - Sultanpur - Naktara 19 23.85 31/05/2011 27 23.85

21 Amanganj Kishangarh Road 10 15/05/2012 13 18.03

22 Badagaon-Saliya Road 14 05/06/2012 8 11.49

23 Rewa - Bida - Semaria Road - 9 03/01/2013 14 16.53

24 Saleha - Selha 2l 52 26/05/2012 7 8.07

25Crush Barrier On Jabalpur Amarkantak (Ghat

Portion)- - 18/09/2013

0 0.989

26 Dhar Town 4 - Lane Cc Road 4L -M/s Rajlaxmi

Const.19/07/2013 18/01/2014

2 9.89

27 Agar - Barod - Alot Bypass 2l - M/S

Rajmal Gorecha& Sons Ratlam03/08/2013 22/02/2014

3 5.84

28 Betul - Desli - Khandwa Road IL 26 98.49M/s Ramky Infrastracutre Limited,

Hydrabad - 21/03/2014

127 100.627

29 Ratlam - Jhabua Road (SH-39A) IL & 2L 39 A & 39 73.91 M/s Chetak Enterprises Ratlam 03/06/2010 03/10/2014 116 91.09

30Rewa - Bida - Semaria Road Juntion

Improvement- - - - --

0 1.01

-

IL

2011-12

IL

- 2012-13

0

2013-14

0

2005-06

-

-

--

IL

2008-09

-

2009-10

2010-11

2l

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress,GC: Govt. Contribution,

Page 14: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Regular Contracts (Completed Projects) Page-32

SN YEAR Name Lane Number GC Contractor

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

31 Four Laning Of Uchelra Town Portion 4L 56 M/S ABC Associates Satna 27/06/2013 26/06/2014 4 9.97

32Widening & Construction Of Cc Road From

Bhopal Naka To Mandiwala Road Ashta Town2l - - - 03/10/2014

2 5.84

33

Widening Of Khandwa Harda, Hoshangabad

Road From Km 0 To 10 (Indira Chowk To Toll

Plaza

4L 26 M/s B.R. Goyal Infrasturcture Indore 12/08/2013 11/05/2014

10 27.44

34Rewa - Sirmour - Dabhora (Sh-9) Four Lane

Km 0.2 To 4.54L 9 08/03/2011

4 15.19

35 Construction of CC drain at Govindgarh Town - - -- 0 1.55

36Construction of H.L. Bridge on Denwa River

(Pipariya Pachmari)4L 19, 19A, 22

M/s Manish Agrawal Engg. & Conslt.

Itarsi10/03/2013 04/02/2015

0 7.91

37Widening of Ccroad with drain at sironj town

on Biora maksudangarh-sironj road- - M/s Neelgan construction Bhopal 15/01/2015 01/08/2016

2 4.26

38

Construction of 4 lane CC road at Bhind town

(Santoshi Mata Mandir to Bamba Ki

Puliya)+(Pustak Bazar to Santoshi Mata

Mandir) (0.7+0.6=1.3KM)

4L 2 M/s Jagdish Prasad Sharma, Gwalior 29/12/2014 28/08/2016

1 5.62

39Marimata Junction to Ujjain Road ROB CC

Road2l 27 M/s BR Goyal Infrastructure Indore 10/05/2013 30/06/2015

2 23.32

40 Budhni - Itarsi Road - NH-69 25/02/2014 24/08/2015 35 76.5

41Shahdol - Singhpur - Banjag - Chanda -

Pandariya (Balance Work) IL-TL 9 99.9 06/08/2013 03/10/2015

119 117.76

42Construction Of Four Lane Road

From 0 To 2.2 Of Ujjain - Badnagar - --

2 4.95

43

Construction Of Four Lane C.C. Pavement At

Bhanpura City (Km 126+950 To 128+860) On

Neemuch Rampura Bhanpura Jhalawad Road

Sh-30

M/s K.G. Gupta Infrastructure Pvt. Ltd.

Indore --

2 8.11

44Construction Of Boundary Wall Of Ratlam

Medical College (Length 1926Mt) - --

2 1.84

45Construction of service road from

Mahamrityunjay to Triveni Dwar

M/s Lav Narang 12, Kshapank Marga,

Ujjain10/09/2014 01/08/2016

1 3.82

46 Construction of C.C.Pavement at Rehli Town M/s Shri Shakti Cons. Sagar 23-05-15 08/01/20161 1.54

47Widening of CC pavement in Khandwa town

& approaches of ROB- M/s Vikash Construction Pvt. Ltd 04/11/2016 01/11/2016

0 0.71

48 Seondha Bypass 2l M/s Tomar Builder Cont. Gwalior 10/04/2013 31/01/2017 3 5.72 -

-

NA

- -

2015-16 -

-

M/s Dilip Buildcon

2016-17

-

-

0

0

2014-15

-

--

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress,GC: Govt. Contribution,

Page 15: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Regular Contracts (Completed Projects) Page-33

SN YEAR Name Lane Number GC Contractor

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

49Construction of HL Bridge in KM 144/4,154/4

& 172/8 on jabalpur Amarkantak Rd- M/s Shri Infra space 25/06/2015 31/03/2017

0 19.45

50

Widening of existing carriageway & drain in

KM 101.8 Datia-Seondha Road (Indargarh

town Portion) (SH-19)

- M/s Rakesh Shivhare Dabra Gwalior 04/11/2016 30/06/2017

1 2.49

51 Indawar - Tala-Parasai IL SH-10 & 11M/s Udit Infraworld Pvt. Ltd. & Prakash

Asphalting India Pvt. Ltd. (JV)10/05/2013 09/08/2014

32 71.06

52

Widening of Khandwa Harda Hoshangabad

Road from KM 155/2 to 157 (Seoni Malwa to

Banapura)

4L 15 NA M/s Rajlaxmi Const. Guna 27/08/2013 31/03/2017

3 15.57

53Construction Of RCC drain & RCC pipe drain

along road in Rajoda village- 0 M/s Aqyat Construction, Indore 14/10/2016 31/03/2017

3 1.3

54Construction of Neemanpur-Bhamedi-Iklani

Road- NA M/s Jain Store Bhanpura 06/01/2017 01/08/2017

4 0.92

55

Construction of four lane road Agar City (Km

118+600 toll Plaza to 123 +100 Jail State

Highway)

4L M/s Maruti Constrution Ahemdabad 09/04/2015 07/09/2015 31/10/2017

5 21.69

56Construction of HL Bridge in KM 144/4,154/4

& 172/8 on jabalpur Amarkantak Rd- M/s Shri Infra space 25/06/2015 - 30/04/2018

0 19.45

57Construction of H.L. Bridge on Vidisha -

Kurwai Road (SH-19) in Km 6/2 (Betwa River)- 19 - 29/11/2014 30/04/2017

0 15.34

58Construction of bridge in Ch. 13+250 (Bebus

River) on Sagar - Rehli NA 02/01/2015 02/01/2015 15/03/2018

0 6.75

59

Contruction of Box culvert near koia village at

km 130 on Jabalpur - Narsinghpur-Pipariya &

at km 14 of Gadarwara-Tendukheda Road.

- M/s Nature Construction, Bhopal 17/05/2016 31/03/2017

0 1.34

60Construction of Thua - Nayagaon-Bhairopur

RoadM/s Jain Store Bhanpura 06/01/2017 31/03/2017

2 0.72

61Construction of RCC drain in Bhoma village on

Seoni-Charaidongri Road JabalpurM/s Shubh Construction Jabalpur 14/03/2017 31/07/2018

1 0.38

62Strengthening & improvement of Motinagar

Tili Pathariya Road at Sagar - M/s Ascon Infratech Pvt. Ltd. Chhindwara 21/03/2017 20/06/2018

13 38.21

63Datia Ring Road Construction of KM 0+650 to

1+002l M/s Bonco Contruction Pvt. Ltd Gwalior --

0 3.5

64

Indore (super corridor) Ch. 6+900 to

Gomatgiri (Pitra Parvat) Ch. 10+900 on Indore-

Depalpur road Four lanning.

4L - M/s P.D. Agrawal Infrastructure Indore --

4 23.18

65 14 19.73

2018-19

2019-20

-

Guna-Fategarh- Paron road Permanent Restoration work from Km 31 to Km 60

-

NA

2017-18

NA

0

M/s Shreeji Infraspace, Ahemdabad

-

- NA

2016-17 0

--

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress,GC: Govt. Contribution,

Page 16: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Regular Contracts (Completed Projects) Page-34

SN YEAR Name Lane Number GC Contractor

Date of

Agreement

Appointed

date PCOD FINAL CODLength Cost

66Ramleela Ground to Shamshan Ghat,

Construction of Cement Concrete road. - - M/s Divine India Construction Vidisha --

1 0.94

67Mandla to Bamhriya s/c of Mandla-Kanha

road Upgradation & Construction2l 11A M/s Sanjay Singhi Rajnandgaon (CG) --

12 32.33

68 Itarsi - Dolariya Tigariya - M/s Mahesh Prasad Malviya

Construction Sehore (M.P.) --

0 1.06

69Baihar Mukki - garhi Reconstruction &

upgradation26 M/s Shreeji Infra Structure Jabalpur --

33 48.95

70 Datia bypass road Construction M/s Rajlaxmi Devbuildcon Bhopal 28/06/2018 21/03/2020 8 28.07

71Indore Airport Road to Pithampur

ConstructionM/s H.R. Construction Noida 27/01/2017 30/09/2020

17 39.74

72Persona Majan Nighi turn Section from Km

17.40 to 27.38 Four lanningM/s Shiv Shakti Construction Satna 20/06/2018 31/12/2020

10 34.2

1835 1767.666

- - -

Grand Total

2019-20

0 -

- -- IL

2020-21

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress,GC: Govt. Contribution,

Page 17: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway Fund Projects Completed Page-35

# Name Number Lane ContractorDate of

Agreement

Appointed

datePCOD Final COD Length Cost

1 Damoh - Batiyagarh - Baxwaha - Hirapur (SH-37) 37 IL M/s Dilip Buildcon -

18-09-13 -

03-03-15 71.30 125.10

2Construction of New Bridge at Ch. 67+805 on

Betul-Khandwa Road - -

LoA issued on 18.01.16

to M/s Prafull

Vijayvergiya

Constructions,

Shujalpur & Agreement

signed

31-01-16 -

-

01-07-16 0.00 1.67

3Construction of HL Bridge in KM 26+870, 27+787,

27+887 on Sagar Rehli Road - -

M/s Rajlakshmi

Constructions, Guna03-06-14 04-06-14

- 28-02-17 0.17 7.35

4

Reparing of Guard wall in Ghat Portion on Katni-

Pawai Amanganj road (Sh 10) in Km 50/4 to

51/2, 51/6-8 and 52/4 to 53/4

- - M/s OM Construction

Rewa - -

-

12-08-17 0.88

5

Permanent Restoration work for flood damdge

portion on Rewa-Bida-Simariya road(Sh 9) Km

28+00 to 29+500 and Km 35+400 - -

M/s Udit Infra World,

Rewa14-06-17

- -

13-08-17 0.00 5.06

6 Guna-Aron Sironj Road Km. 39 to 86/6 - - - - - - - 43.60 13.51

7 Guna-Aron Sironj Road Km. 1 to 38 - - - - - - - 38.00 5.59

8 Special repair of Ratlam Jhabua Road (SH-39) 39

-

LoA issued to M/s

Rajlakshmi

Constructions,Devbuild

India Indore

06-02-17

- -

31-12-17 0.00 9.24

9

Construction of CC pavement on and retaining

wall of approach on Dhasan River on tikamgarh-

shahgarh road (Dhasan River Km 32/8)

-

-

M/s Srigan

Constructions Sagar15-06-17

- -

31-03-18 0.00 1.51

10CC pavement on approach of bridge on Kaatan

River at 55/8 Tikamgarh -Melhera road - -

M/s Pushpendra Singh

Sagar 15/06/2017 - -

10-02-18 0.00 1.50

Length in KM Cost in Cr.,

Page 18: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway Fund Projects Completed Page-36

# Name Number Lane ContractorDate of

Agreement

Appointed

datePCOD Final COD Length Cost

11Reconstruction of Box culvert in km 11/8 on

Garhi-Chilpi (CG) Border Road (SH_26)-

-

M/s Belekar

Construction Balaghat05-04-18

- - 04-07-18 0.00 0.72

12Re-construction of box culvert in KM. 11/8 on

Garhi-Chilpi (CG Border)Road (SH-26). - -

M/s Belekar

Construction Balaghat26/04/2018

- - 25/10/2018 0.00 0.72

13 Strengthening of Seoni bypass length 16.30 Km. - -

M/s Sanjay Singhi26/04/2018 - -

31/12/2018 16.30 13.47

14

Neemach-Manasa road (SH-30) of Manasa town

(In the Jurisdiction of Nagar Palika Manasa),

Construction of Cement Concrete pavement 4-

lane road CH 27+070 to 28+890 - 4L

M/s S.K Totla

Infrastructure 11/09/2018 - - 31-09-2019

1.82 7.56

15 B.T. Renewal work of Balaghat-Baihar Road - - M/s S.R. Traders - - - - 25.00 4.84

16

B.T. Renewal work of Datia 4 lane Road - -

M/s Awasthi Concrete

Udhyog ShardaVihar

Colony Datia - - - -

5.75 2.22

17B.T. Renewal work of Rani Rupmati Approach &

Nilkantha Approach Road. - - M/s Balaji Infrast. - - - - 3.75 0.45

18 CC pavement on approach of bridge on Dhasan

River at a Km 53/6 on Tikamgarh - Melhera road - -

M/s Pushpendra Singh

Sagar 15/06/2017 - - 31/03/2018

0.00 2.04

19Construction of Amanganj Town Portion on

Panna - Amanganj Simariya Road - - - 28/12/2016 - - 15/11/20174.00 6.76

20Special repair work in ghat Km 9+00 to 15+00

and Km 25, 27 on Amarpatan - Gorsarai road - - - - - - - 0.00 2.10

21Construction of Guna - Ashoknagar Ishagarh road - -

M/s Runway

Infrastructure Guna 14/12/2016 - - 13/06/20171.96 5.30

22 Balaghat - Baihar 26 2l - - - - 07/12/2014 66.70 122.97

23Lebad - Ghatabillod

1A 2l M/s PD Agrawal Indore - - - 28/07/20145.29 18.64

24 Shahganj - Barkheda (State Highway) SH 2l M/s Dilip Buildcon - - - 26/04/2014 18.70 40.00

Length in KM Cost in Cr.,

Page 19: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

State Highway Fund Projects Completed Page-37

# Name Number Lane ContractorDate of

Agreement

Appointed

datePCOD Final COD Length Cost

25

Repair & Overlay Work Of Gandhi Sagar

Sanctuary Portion & Renewal Work Of Gandhi

Sagar Dam Portion Of Manasa - Rampura -

Bhanpura - Jhalawad 30 IL

M/S Rajlakshmi

Construction, Guna - 19/06/2013 - 01/12/2014 34.76 14.02

26B.T. Renewal work of Raisen - Gairatgang Road

- - M/s A.K. Shivhare - - - - 50.40 9.70

27B.T. Renewal work of Barwani - Chikalda Road

- - M/s Pravin Choudhry - - - - 4.20 0.85

28B.T. Renewal work of Barwani - Bavangaja Road

- - M/s Balaji Infrast. - - - - 6.40 1.28

29

Bhudhni-Rehti - Nasrullaganj-Khategaon Road

Construction of Drain and development work of

Nasrulla ganj Town Portion- -

M/s Amjad Ali Sehore 06/04/2018 - - 31-09-2019 2.40 8.03

30Balance work of Construction of RCC drain on

Rahatgarh-Khurai-Khimlasa Road (SH-42) - -

M/s Rana Construction

company Silori18/12/2019 - - 30/11/2020 0.00 1.08

Grand Total 400.50 434.16

Length in KM Cost in Cr.,

Page 20: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

National Highway BOT Projects Completed Page-38

#Completed

in YearName NH No. Lane GC CP Contractor

Date of

Agreement

Appointed

datePCOD Final COD Length Cost

1 2013-14 Gwalior - Bhind -

Etawah Road (NH-92)

NH 92 2L+PS 27 14 Yrs

M/s M.P.

Highways Pvt. Ltd.

New Delhi

13/12/2010 07/06/2011 - 31/01/2013 107.5 314.5

2 2015-16Rewa To Hanumana

MP/UP Border (NH-7)NH 30 4L+PS Premium25 Years

M/s Vindhyanchal

Expressway Pvt.

Ltd.

25/01/2012 20/02/2013 07-02-13&28-03-16 - 89.3 736.7

3 2016-17

NHDP IV - Biaora-

Rajasthan Border (NH-

12) 2L+PS

NH 52 2L + PS 62.49 26 years

M/s Agroh Biaora

Tollways Pvt. Ltd.

Mhow

26/07/2013 02/08/2014 28/05/2016 08/05/2017 61.0 221.0

4 2019-20

Mangawan- Chakghat

MP/UP border NH-27

4L+PS [BALANCE

WORK]

NH 135 4L+PS 47 25 Years

M/s Bansal

Pathway

Mangawan-

Chakghat Pvt. Ltd.,

Bhopal

(Substitute

Concessionaire)

27/04/2012 15/04/2013 20/05/2019 28/05/2019 52.1 410.7

Grand Total 309.9 1682.9

Length in KM Cost in Cr., GC: Govt. Contribution, CP: Concession Period.

Page 21: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

National Highway EPC Projects Completed Page-39

PKG

Completed

in Year Name NH NO. Lane Contractor

Date of

Agreement

Appointed

date PCOD Final CODLength Cost

1

Jabalpur Bypass -

Barela section Km

477/6 of NH7 to Km

22/8 of NH 12A

12A

M/s Dilip Buildcon Ltd,

PCOD issued to

17.02.17

42100 42154 17/02/2017 06/09/2017 21.85 331.5

2

Rewa - Sidhi (Pkg-1)

From KM 2/8 to 33/2

and Km55/4 to 83/4

2L+PS

75EM/s Dilip Buildcon Ltd,

Bhopal31/12/2014 20-01-15 - 30/09/2016 57.80 259.25

3

Mandla - Chilpi upto

MP/CG border Km

89/6 to Km 192/4 (PKG

3)

12A M/s Dilip Buildcon Ltd 42227 16-12-15 25/08/2017 25.09.17 92.50 638.93

4

Shahdol-Anooppur

upto MP/CG border

section KM 142/2 to

245/10 (PKG III)

M/s Dilip Buildcon Ltd,

PCOD issued to

17.02.17

09/04/2015 30/05/2015 17/02/2017 20/09/2018 91.80 508.04

5 2018-19

Katni - Umariya section

Km 0 to Km 68/4 (PKG

I)

M/s Kalthia

Engineering and

Construction Ltd-M/S

Patel Infrastructure

Pvt Ltd. (JV)

08/04/2015 01/07/2015 14/04/2018 15/03/2019 69.10 369.84

333.05 2107.56

2016-17

NH 2L + PS

2017-18

78

Grand Total

Length in KM Cost in Cr., GC: Govt. Contribution, CP: Concession Period.

Page 22: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Major District Roads Projects Completed Page-40

SN Sub Model Year Name Lane GC CP Contractor

Date of

Agree. App. Date PCOD Final CODLength Cost

1Bamkhalfata - Dogawa - via -

Borawa - Sarvardevla Road3.58307 31-03-14 24 33.63

2Beed - Mundi - Devala - Khutala -

Atoot Nvda 4.30362 31-03-14 28 45.35

3 Betul - Athner 4.42876 M/s BVSR Ltd., Hyderabad 29-03-14 35 45.35

4Bijwad - Kusmaniya - Haran -

Deepgaon Road 10.8593

M/s GVR Infra Projects Ltd.,

Chennai31-03-14 76 109.08

5 Gadrawada - Tendukhera 5.9085M/s BVSR Constructions Pvt.

Ltd., Hyderabad31-03-14 32 50.67

6 Garakota-Rehli – Deori (MDR) 6.22652 PATH Infratech 28-10-13 49 72.98

7 Harda - Chhipaner 3.76124 M/s BVSR Ltd., Hyderabad 29-03-14 29 38.57

8 Kataphod - Nachalbor Road 8.67075M/s GVR Infra Projects Ltd.,

Chennai31-03-14 60 90.95

9Punasa - Mundi - Singhagi (Thermal

Power Plant) Road & Singhaji

Bridge Approach

2.0133 M/s Dilip Buildcon Ltd. Bhopal 31-03-14 13 24.45

10 Rehli - Gorjhamar 2.28348 PATH Infratech 28-10-13 18 28.27

11 Sausar - Mohgaon - Mordongri 5.44126 31-03-14 30 58.2

12Sonapipari - Umreth - Monari -

Ambah4.49024 31-03-14 24 43.73

13 A.B.Road Majarkhedi Bamari 1.72544M/s Agroh Infrastructure

Ltd. Mhow24.12.12 01.05.13 02-08-14 12.61 17.31

14 Kurawar Eklera Talain 4.68235 21-08-14 39.22 49.89

15Nh-86 Junction (Tyonda)-

Ganjbasoda4.51282 21-08-14 37.80 46.03

16Devgularjod to Arandiyajod BOT

(Annuity) Road (MDR)5.44793

M/s D.P. Jain and

Company Inftrastructure

Ltd. Nagpur30-04-14 34.96 57.83

17 Alirajpur - Jobat Road 4.40048M/s Agroh Infrastructure Ltd.

Mhow24.12.12 01.05.13 02-08-14 32 45.31

18Ankiya - Barkheda - Dongargaon -

Nazirabad Road1.24162

M/s KCC Lateri Expressway,

New Delhi21-08-14 10 14.13

19 Bawangaja - Pati - Bokrata 4.55784M/s Agroh Infrastructure Ltd.

Mhow02-08-14 33 46.87

-

-

M/s BVSR Constructions Pvt.

Ltd., Hyderabad

2014-15

M/s KCC Lateri

Expressway, New Delhi - -

- -

Annuity

2013-14

IL

15 Yrs

M/s DBL Bamkhalfata-

Dogawa Tollways Ltd Bhopal

-

Length in KM Cost in Cr., Com Dt.-Completion Date,GC: Govt. Contribution, CP: Concession Period.

Page 23: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Major District Roads Projects Completed Page-41

SN Sub Model Year Name Lane GC CP Contractor

Date of

Agree. App. Date PCOD Final CODLength Cost

20Dariyapur – Jasondhi – Maharashtra

Border0

M/s D.P. Jain and Co.

Infrastructure Ltd., Nagpur17/01/2012 07/12/2012 17-10-14 16 21.16

21 Intkhedi - Raslakhedi Road 1.11507M/s KCC Lateri Expressway,

New Delhi21-08-14 9 11.52

22Jaora - Piplodha - Jalandharkheda

& Piploda Sailana5.80809

M/s. D.B.L. Jaora-Sailana

Tollways Ltd., Bhopal 28-06-14 42 60.03

23 Lateri Anandpur - Bhagawantpur 2.69814M/s KCC Lateri Expressway,

New Delhi21-08-14 23 24.47

24 Neemuch - Javad - Nayagaon Road 2l 2.89511M/s. D.B.L. Jaora-Sailana

Tollways Ltd., Bhopal28-06-14 21 30.86

25 Phoolsagar – Niwas Shalpura 0

M/s Madhav ( Phoolsagar

Niwas Shahpura corridor)

Highways Pvt. Ltd., Vadodara

(Gujarat)

07/03/2013 28/08/2013 18-02-15 84 156.9

26 Pipaliya - Manasa 6.26293M/s D.P. Jain and Company

Inftrastructure Ltd. Nagpur30-04-14 40 63.21

27Raipuriya - Paitalvad - Bamaniya

Road2.49802

M/s. D.B.L. Jaora-Sailana

Tollways Ltd., Bhopal28-06-14 18 25.73

28Salsalai - Gulana - Bolai Railway

Station Road2l 3.00914

M/s D.P. Jain and Company

Inftrastructure Ltd. Nagpur30-04-14 19 31.03

29 Singhana - Chikalda Road 2.22624M/s Agroh Infrastructure Ltd.

Mhow02-08-14 16 23.43

30 Soyat - Pidawa 0.85878M/s. D.B.L. Jaora-Sailana

Tollways Ltd., Bhopal28-06-14 6 8.78

31 Ashapur – Khalwa – Singhot 17-10-14 42 56.9

32 Badwah - Katkut Road 17-10-14 24 34.99

33Mangawan - Baikunthpur Road

MDR

M/s KCC Roads Construction

Pvt Ltd Delhi 23/03/2013 20/01/2014 19-04-16 19 26.29

34 Nagda - Gogapur (Mahidpur) RoadM/s. D.P. Jain & Company

Nagpur15/10/2013 11/04/2014 10-04-15 15 40.58

35Pondi - Maharajpur - Parasmaniya

Road MDR 19-04-16 25 31.42

36Sijhata – Hinoti – Malgaon –

Khamariya – Ater19-04-16 32 43.56

20/01/2014

-

IL

- -

IL0

M/s D.P. Jain and Co.

Infrastructure Ltd., Nagpur17/01/2012 07/12/2012

M/s KCC Roads Construction

Pvt Ltd Delhi

-

2014-15 -

Annuity

IL

15 Yrs

2015-16

23/03/2013

Length in KM Cost in Cr., Com Dt.-Completion Date,GC: Govt. Contribution, CP: Concession Period.

Page 24: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Major District Roads Projects Completed Page-42

SN Sub Model Year Name Lane GC CP Contractor

Date of

Agree. App. Date PCOD Final CODLength Cost

37 2012-13 Sitamau - Basai-Suwasara Road 3.69

M/s. D.B.L. Sitamau-

Suwasara Tollways Pvt. Ltd.,

Bhopal

05/12/2011 19/03/2012 28-03-13 35 54.26

38 Bahari - Hanumana Road 7.5GVR Infra

Project Ltd., Chennai15/11/2011 12/05/2012 31-03-14 49 106.7

39Mundi - Punasa - Sulgoan-Sanawad

Road8.28

M/s DBL Mundi-Sanawad

Tollways Pvt Ltd Bhopal 05/12/2011 19/03/2012 15-05-14 68 124.77

40 Waraseoni To Lalbarra 0M/s MBL Ifrastructures Ltd.

New Dehli07/12/2011 04/06/2012 03-06-14 18 42.51

41 Ashoknagar - Vidisha Road 5.04M/s DBL Ashoknagar-Vidisha

Tollway Ltd Bhopal.22/03/2013 29/10/2013 26-07-14 36 87.06

42 Damoh - Patharia - Garhakota 0M/s Concast Infratech Ltd. &

M/s Roman Infratech Ltd (JV)08/12/2011 24/07/2012 23-07-14 41 71.88

43 Sehora - Majhgawan - Silodi Road 6.03

M/s M/s Madhav (Sehora-

Silodi corridor)Highway

Pvt.Ltd., Vadodara

12/11/2012 09/05/2013 30-08-14 40 92.65

44 Umari - Phoop - Pratappura RoadM/s S & P Infrastructures &

Developers New Delhi05/01/2012 20/06/2012 19-06-14 43 75.29

45Sheopur - Baroda - Khuwajapur

Road

M/s VKS Sheopur-Baroda-

Kuhajapur Corridor Pvt. Ltd.

Bhopal

11/06/2012 06/12/2012 16-04-15 32 61.8

46Tikamgarh - Jatara - Palera -

NowgaonIL M/s Dilip Buildcon Ltd. Bhopal 12/11/2013 08/08/2014 26-05-15 76 107.34

47 2016-17 Datia - Bhander Road 3.8M/s D.P. Jain and Company

Inftrastructure Ltd. Nagpur30/11/2011 26/06/2012 21-07-17 29 52.83

48 Toll 2013-14 Manawar – Singhana kukshi Road 27.32 30 yearsM/s Agroh Infrastructure Pvt

Ltd Mhow 14/03/2012 12/10/2012 06-05-13 38 96.73

1575.95 2583.28Grand Total

T+A

2013-14

2l2014-15

0

2015-16

2l

IL

-

15 Yrs

Length in KM Cost in Cr., Com Dt.-Completion Date,GC: Govt. Contribution, CP: Concession Period.

Page 25: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Major District Roads, EPC Projects Completed Page-43

SN Year Name Lane Contractor

Date of

Agreement

Appointed

date PCOD Final CodLength Cost

1 Mandla to Pindari ILDilip Buildcon Ltd.,

Bhopal21-02-17 33.15 258.93

2 Salimanabad to Vilayatkalan IL & 2LM/s. Dilip Buildcon

Ltd, Bhopal 21-02-17 73.18 0.00

3Badnagar - Sundrabad - Khasrodkala -

Unhel28/03/2017 51 205.62

4Sunderabad – Runiza - Khachrod Road

& Runija Satrunda28/03/2017 44 0

5 Bichiya - Samnapur - Dindori 10-09-17 53.42 0.00

6 Bailkhedu - Saroud 10/09/2017 13 0

7Suraiya - Simariya - Badhiya Kheda -

Padariya Dhamni Singori15/10/2015 10/09/2017 13 0

8 Dhaneta - Rakhi - Sahajpur 15-10-15 10/09/2017 14 112.033

9 2019-20 Garra - Waraseoni - Tumsar Road 2lM/s Kalyan Toll

Infrastructure Limited- - (blank) 47 82.29

342.04 658.87

15-10-15

Grand Total

2016-17 18-08-15

26-08-15

- IL

Dilip Buildcon Ltd.,

Bhopal24-08-15

2017-18

M/s Shivalaya

Construction

company Pvt. Ltd.

New Delhi

22/09/2015

Length in KM Cost in Cr., Com Dt.-Completion Date,GC: Govt. Contribution, CP: Concession Period.

Page 26: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPDCSP Projects Completed Page-44

SN PKG Name Lane Contractor

Date of

Agreement

Appointed

date PCOD Final CODLength Cost

1 Katni-Vijayraghavgarh-Barhi 2lM/s, Gannon Dunkarlay and

Company Mumbai 02-12-16 23-09-17 51.40 118.65

2 Rani - Durgawati Samadhi - 23/09/2017 21.13 42.24

3 Tilwara - Chargaon & Gotegaon 02/12/2016 23/09/2017 46.18 87.02

4Maksudanganj Najeerabad &

Najeerabad Maksudangarh 10-06-17 31.23 64.54

5 Berasia-Najeerabad 10-06-17 30.68 55.48

6 Vidisha Berasia & Vidisha Berasia 10-06-17 36.85 71.53

7 Sanawad Khargone 20-08-15 18-05-17 66.00 122.60

8 Rajpur Khetiya 20-08-15 18-05-17 42.18 82.82

9 Ashoknagar Thubon 30-08-17 30.00 55.00

10Bharsula Chainpur Vijaypur

Dhanrawad 30-08-17 20.00 36.62

11 Pachawali Rannod & Rannod Pichhore 30-08-17 60.62 110.14

12 Shajapur Bercha 2l 09/12/2017 16.44 35.41

13 Mahidpur Panvihar Jeevaji Nagar 09/12/2017 31.94 54.54

14 Dewas Newari 09/12/2017 26.78 48.09

15Shajapur - Dupada - Kanad - Pachlana -

Pilwas - Nalkheda Road 09/12/2017 53.99 85.97

16 Damoh - Hindoriya - Patera 23/10/2017 26.40 47.82

17 Nirtala - Mandi-Bamora 23/10/2017 24.90 45.81

18 Bandri - Jaruwakheda 23/10/2017 24.93 47.91

19 Prithvipur - Niwari 2l 10/11/2017 22.57 47.79

20 Ajaygarh - Toriya - Bariyapur 27/11/2015 10/11/2017 23.92 46.86

21 Palera - Baldeogarh 27-11-15 10/11/2017 38.40 75.05

-

10-09-15

24-11-15

05/12/2015

27-11-15

M/s Madhav Infraproject Ltd.

Gujarat

M/s Khurana Engineering

-

M/s, GannonDunkarlay and

Company Mumbai

M/s KCC Buildcon Pvt. Ltd.

Gurgaon

M/s GHV (India) Pvt Ltd

Mumbai

M/s Prakash Asphalting & Toll

Highway Ltd- M/s Path Wagad

(JV) Pvt. Ltd., Indore

M/s. Ganon Dunkarly & Co.

Ltd., New Delhi

M/s Madhav Infraproject Ltd.

Gujarat

IL

2l

IL

IL

IL

08-H

14-N

17-Q

13-M

15-O

09-I

10-J

Length in KM Cost in Cr., CFP-Cum. Finan. Progress.

Page 27: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

ADB Assisted MPDCSP Projects Completed Page-45

SN PKG Name Lane Contractor

Date of

Agreement

Appointed

date PCOD Final CODLength Cost

22 Depalpur Betama 10-03-18 20.12 40.15

23 Kanvan Mangod 10-03-18 47.43 77.56

24 Mhow - Simrol Road 10/03/2018 15.54 29.07

25 Sanwer - Khsipra Road 15/09/2015 10/03/2018 18.62 39.74

26 Hathnapur Anwalighat Salkanpur 28-09-15 31-01-18 28.18 51.15

27 Tawa Bridge Itarasi Mandi 28/09/2015 31-01-18 11.15 21.56

28 Itarsi - Dolariya Tigariya

M/S. Sorathia Velji Ratna & Co.-

M/S Kunal Structure India Pvt.

Ltd.(VRS JV-KSIPL) (JV), Gujarat

28-09-15 31/01/2018 25.70 44.36

29 01-A Mahua Chuwahi Road.(PKG-A) 2l M/s Dilip Buildcon Pvt. Ltd. 07/12/2015 48.90 129.70

30 02-B Chitrangi - Kasar Road.(PKG-B) ILM/s Madhav Infra Projects-

Chetak Enterprises Limited (JV)20/06/2016 39.93 89.99

31 03-C Dabra - Bhitrawar Road IL/2L M/s KNR Construction Ltd. 14/03/2017 62.40 144.20

32 04-D Ujjain - Maksi Road .(PKG-D) 2l M/s Dilip Buildcon Pvt. Ltd. 28/12/2015 36.50 93.88

33 06-F Persauna - Mahua upto Barkha Road

M/s Montecarlo Limited and

M/s Shreeji Infrastructure India

Pvt. Limited (MCL-SHPL) (JV)

16/01/2017 67.20 129.00

34 07-G Rewa - Bankuiya-SemariyaM/s Prakash Asphalting & Toll

Highway (I) Ltd.31-08-16 33.47 70.84

35 11-K Sidhi-Tikhri-31.85km (MDR-45-02), 95.77 174.80

36 05-E Hardua - Chakghat Road M/s Gangotri EnterprisesLtd. 01/09/2015 15/05/2018 92.26 162.13

37 Mohana Pohri 25/10/2018 60.00 116.58

38 Mohanpur Behat Mau & Behat Mau 25/10/2018 51.65 96.33

39Murar Chitora , Murar Chitora & Gata

Amayan 25/10/2018 45.81 84.18

1527.13 2977.11

-

-

15-09-15

-

M/s Ranjeet Buildcon Ltd

Gujarat

M/S. Sorathia Velji Ratna & Co.-

M/S Kunal Structure India Pvt.

Ltd.(VRS JV-KSIPL) (JV), Gujarat

M/s KNR Construction ,

Hydrabad

-

-

Grand Total

-

IL

IL

16-P

18-R

12-L

01/09/2015

09/09/2015

Length in KM Cost in Cr., CFP-Cum. Finan. Progress.

Page 28: CATEGORY Model Sub Model Count Length Cost BOT EPCmprdc.gov.in/rdccompleted.pdf · 2016-17 Sum 260.6 461.4 25 Years 2016-17 2l - - 2012-13 2l 18 Years 07-08-09 - 2012-13 Sum 2013-14

Infrastructure Developement Projects Completed Page-46

SN Name of Building Department Name of Agency PCOD Final COD Cost CFP

1 TRC Mandla M.P.Tourism DepartmentM/s Nitin Barsainya 2283,Madan

Mahal, Jabalpur (MP) - - 1.69 1.69

2 NMC BhopalM.P. State Electronic

Development Corporation

M/s Kumar Colonisers Pvt. Ltd.

HIG101,Vijay Stambh Zone-1 MP

Nagar Bhopal (MP) -

- 17.50 16.25

3 MPRDC Building MPRDC

M/s Kumar Infratech &

Construction Pvt.Ltd. HIG 101

Vijay Stambh Zone-1 MP Nagar

Bhopal (MP) -

25/01/2014 19.28 17.65

4 Crystal IT Park, Indore (Balance Work) Audyogik Kendra Vikas Nigam SOM Project Pvt.Ltd. New Delhi -

15/04/2014 88.00 87.18

5

Renovation work for VVIP Suites,

office space etc. in Madhyanchal

New Delhi

General Administration

Department

MTD Enterprises Bhopal//Voyants

Solution Pvt. Ltd -

- 2.30 1.76

6 Shramodaya Vidhyalaya at Bhopal MPRDC M/s P.D. Agrawal - 15/06/2018 58.11 55.00

7 “Madhyalok”, Vashi, Navi Mumbai - M/s SOM Project Pvt.Ltd. New

Delhi31/03/2018 - 73.74 73.74

8Ratlam (R) Medical College and

hospital building ConstructionMPRDC

M/s Malani Construction

Company, Rajkot Gujrat - - 295.36 280.64

9Shahdol(S) Medical College and

hospital building ConstructionBuilding

M/s Dee Vee Projects Ltd. Korba,

Chattisgarh - - 303.27 302.84

10Vidisha (V) Medical College and

hospital building Construction -

M/s Yashnand Engineering &

Contractors. Ahemdabad, Gujrat -

25/08/2020 355.95

Grand Total 1215.20 836.75

Length in KM Cost in Cr.,CFP-Cum. Finan. Progress.