Catalogodeinversion2012 ingles parte2
-
Upload
lucy-jarrin -
Category
Documents
-
view
213 -
download
0
description
Transcript of Catalogodeinversion2012 ingles parte2
P R O J E C T SMINING
Ecuador is a country that has a great growth potential in the exploration and development of Deposits and minerals. The objective of this sector is to generate a sustainable development with public policies that facilitate, norm and promote investments in extractive activities for Ecuador. The mining sector represents an important source of resources for the development of the nation, as a leveraging factor for the generation of employment, and a factor for a balanced local and regional development.
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Cañar Province
LEVEL OF STUDIES Prospecting Studies. Determination of anomalous zones
Name of the Project | PILZHUM
Technical Data
DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility Studies.The mineralization that exists is an argentiferous galena, gold, lead and zinc. There exist mining works with approximately 600 m of galleries; geologic resources 500.000 ounces of silver.
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S47
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Azuay Province
LEVEL OF STUDIES Prospecting Studies. Determination de anomalous zones
CONTRACTING METHOD Strategic Alliances.
Name of the Project | ANGAS
Technical Data
DESCRIPTION:Geologic exploration, Pre-feasibility studies and Feasibility.Prospect located within three areas of approximately 4.500 hectares each, a high sulfur content system with a potential for gold and silver. Geological Resources of 300.000 ounces of gold.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S
48
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolivar Province
LEVEL OF STUDIES Basic exploration studies in anomalous zones.
Name of the Project| SAN MIGUEL
Technical Data
DESCRIPTION:Geologic exploration, Pre-feasibility studies and Feasibility.Sub-divided into six anomalous zones and within six areas of approximately 5.000 hectares each, mineralization and alteration related to porphyries of copper– molybdenum with a geologic potential of 500 MT/0,6% of copper.
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S49
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Zamora Chinchipe Province
LEVEL OF STUDIES Basic exploration studies in anomalous zones.
Name of the Project | NANGUIPA MOUNTAIN RANGE (MINA REAL)
Technical Data
DESCRIPTION:Advanced Geologic Exploration, Pre-feasibility and Feasibility.Prospect and explore for copper, molybdenum and gold in the mining concession in the Zamora Chinchipe Province located in the southeast of the national territory.
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S
50
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolívar Province
LEVEL OF STUDIES Basic exploration studies in anomalous zones.
CONTRACTING METHOD Strategic Alliances.
Name of the Project | TELIMBELA
Technical Data
DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Prospect and explore for copper, molybdenum in the mining concession of the Telimbela project located in the Bolivar Province.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S51
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Esmeraldas Province
LEVEL OF STUDIES Basic exploration studies in anomalous zones.
Name of the Project | LA TOLA NORTE
Technical Data
DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Evaluate and certify the level of proven and probable reserves in the ferrous sand deposits (titanium – magnetiferous) existing in the coastal zone of the Esmeraldas Province, in order to reach the level of Pre-feasibility, mining conceptual designs for exploitation and the design of the iron and steel plant designs.
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
MIN
ING
PR
OJE
CT
S
52
GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolívar and Los Ríos Provinces
Name of the Project | EL TORNEADO
LEVEL OF STUDIES Basic exploration studies in anomalous zones.
CONTRACTING METHOD Strategic Alliances.
Technical Data
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Prospect and explore for copper, molybdenum and gold in the mining area of El Torneado located in the provinces of Bolívar and Los Ríos which are in the central eastern part of the national territory.
MIN
ING
PR
OJE
CT
S53
Project Summary
NAME LOCATION - PROVINCE DEPOSIT
BEGINNING OF OPERATIONS(Estimated)
AMOUNT OF INVESTMENT
Pilzhum Cañar 2012 UNDETERMINED
Angas Azuay 2012 UNDETERMINED
San Miguel Bolívar 2012 UNDETERMINED
Cordillera de Nanguipa Zamora Chinchipe 2012 UNDETERMINED
Telimbela Bolívar 2012 UNDETERMINED
La Tola Norte Esmeraldas 2012 UNDETERMINED
El Torneado Bolívar and Los Ríos
Gold, silver, plomo and zinc
Gold and silver
Copper
Gold, copper and molybdenum
Copper and molybdenum
Arenas Ferrosas
Gold, copper and molybdenum 2012 UNDETERMINED
TOTAL UNDETERMINED
54
GOVERNING ENTITY Mining ViceministryFINANCING REQUIRED UNDETERMINED.
Name of the Project | FIRST MINING TENDER
NAME LOCATION -PROVINCE
POTENCIAL G_M
FGM INTRUSIVE
FGM VOLCANIC
FGMMETAMORPHIC
ALLUVIAL ENVIRONMENTMETALIC
N° EVIDENCES (OCCUR)MM
LEVEL OFSTUDIES
La Sofía Province of Sucumbíos Medium Medium - High Medium Medium - Low Partially Favorable
Partially Favorable
6 Prospection
Magdalena Province of Imbabura High Medium Medium - High Medium - Low 0 Prospection
Río Jalligua Province of Cotopaxi High Medium - Low High Medium - Low Partially Favorable 0 Prospection
Balzapamba Province of Bolívar High Medium - High Medium Medium - Low Not Favorable 10 Prospection
Alao Provincia of Chimborazo Medium - High Medium - Low Medium Medium Partially Favorable 7 Prospection
Purubin Province of Cañar High Medium - High Medium Medium - Low Not Favorable 10 Prospection
San Miguelde Cuyes
Provinces of Morona Santiago and Azuay
Medium - High Medium Medium Medium - High Totally Favorable 5 Prospection
Paccha Province ofEl Oro High Medium - High Medium Medium - Low Partially Favorable 6 Prospection
YacuambiProvince of Zamora Chinchipe
High Medium - Low Medium - High Medium - Low Partially Favorable 1 Prospection
Namirez AltoProvince of Zamora Chinchipe
High High Medium - Low Medium - Low Not Favorable 2 Prospection
Note: All existing minig rights inside de mining tender will be entirely respected.
MIN
ING
PR
OJE
CT
S55
Name of the Project | FIRST MINING TENDER Projects Location
La Sofía
Magdalena
Río Jalligua
Balzapamba
Alao
Purubin
San Miguel de Cuyes
Paccha
Yacuambi
Namirez Alto
MIN
ING
PR
OJE
CT
S
56
P R O J E C T SOIL
Ecuador strives to e�ciently exploit its energy resources by promoting the exploration of new oil and gas �elds, as well as investment in the re�ning of crudes, with the objective of guaranteeing autonomy in the consumption of derivates.
LEVEL OF STUDIES Certi�cation of Reserves (Ryder Scott) Basic Engineering studies (Mustang Engineering International)
Technical Data
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED USD 500´000.000
Financial Indicators
GOVERNING ENTITY Petroamazonas EPSCOPE AND LOCATION Francisco de Orellana Province
Name of the Project | EXPLORATION AND PRODUCTION OF HYDROCARBONS IN THE APAIKA AND NENKE FIELDS OF BLOCK 31
DESCRIPTION:Produce approximately 30,000 BOPD, of 15 to 17 °API, incorporating 60 MMbls.
OIL
PR
OJE
CT
S
58
LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves in the Charapa �eld.
Technical Data
CONTRACTING METHOD Direct Investment. Contracting with international public companies.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY Secretariat for HydrocarbonsSCOPE AND LOCATION Sucumbios Province.
Name of the Project | EXPLORATION AND PRODUCTION OF THE CHARAPA BLOCK
DESCRIPTION:Exploration and development of non-drilled structures in the northern sector of the Eastern Basin of Ecuador. In this area there are wells in production and prospects to be developed.
OIL
PR
OJE
CT
S59
LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves.
Technical Data
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Sucumbíos Province
Name of the Project | EXPLORATION AND PRODUCTION OF THE LAGO AGRIO BLOCK
DESCRIPTION:Exploration and development of the Lago Agrio �eld, with the possibility of increasing by 40 MMbls the hydrocarbon reserves.
OIL
PR
OJE
CT
S
60
LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, drilling of wells.
Technical Data
CONTRACTING METHOD Direct Investment. International Tenders. Contracting with international public companies.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY Secretariat for HydrocarbonsSCOPE AND LOCATION South-East of Ecuador (Morona Santiago, Pastaza and part of Napo Provinces).
Name of the Project | EXPLORATION AND PRODUCTION IN THE SOUTH-EAST OF ECUADOR
DESCRIPTION:Exploration and development of 21 blocks. Possibility of �nding 690 MMbls of OOIP, 5 blocks have seismic 2D data, and only one block has wells.
OIL
PR
OJE
CT
S61
LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves of the Pacoa Field. Seismic interpretations of the block inland as well as o�-shore.
Technical Data
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Santa Elena Province
Name of the Project | EXPLORATION AND PRODUCTION OF BLOCK 01 – PACOA FIELD
DESCRIPTION:Exploration in Block 1 has a total area of 400,000 Hectares (onshore and o�-shore).
OIL
PR
OJE
CT
S
62
LEVEL OF STUDIES There are 1.593,87 km of seismic 3D, an evaluation has been made of reservoirs, correlations with existing wells, AVO studies, seismic stratigraphy and the identi�cation of approximately 72 prospects.
Technical Data
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Guayas Province
Name of the Project | EXPLORATION AND PRODUCTION OF BLOCK 05 – CUENCA PROGRESO
DESCRIPTION:Exploration of Block 05, Progreso basin, located on the Ecuadorian Coast, the OOIP in 4 structures is of 221 MMbls.
OIL
PR
OJE
CT
S63
LEVEL OF STUDIES Seismic 2D studies, de�nition of potential areas for the accumulation of methane hydrates.
Technical Data
CONTRACTING METHOD Strategic Alliances.
FINANCING REQUIRED UNDETERMINED.
Financial Indicators
GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION O�-Shore
Name of the Project | OFF COAST EXPLORATION: METHANE HYDRATES
DESCRIPTION:Investigation to ratify the existence of methane hydrates. A preliminary evaluation carried out based on seismic information determines an area of 5.381 km with methane hydrates, calculating the following resources:Optimistic scenario: 779,11Tcf (trillion cubic feet), and a conservative scenario: 112,19Tcf.In the event of ratifying the existence of these resources of gas hydrates, it will be convenient to develop the adequate technology for exploitation and development in the generation of energy.
OIL
PR
OJE
CT
S
64
LEVEL OF STUDIES Feasibility Basic Engineering
Technical Data
CONTRACTING METHOD Tenders with �nancing International Tenders Contracting with international public companies.
FINANCING REQUIRED USD 280´000.000
Financial Indicators
GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Guayas and Azuay Provinces
Name of the Project | PIPELINE PASCUALES - CUENCA
DESCRIPTION:Construction of a multiple-product pipeline of 210 km, from the Pascuales terminal in the province of Guayas to the Chaullabamba terminal in Cuenca, Azuay Province. Pumping stations in Pascuales, El Chorrillo, La Troncal and the necessary intermediate stations to be determined in the hydraulic design of the pipeline.
OIL
PR
OJE
CT
S65
LEVEL OF STUDIES Basic Engineering (April 2012)
Technical Data
CONTRACTING METHOD Strategic Alliances. Tenders with �nancing. Contracting with international public companies.
FINANCING REQUIRED USD 12.800’000.000
Financial Indicators
GOVERNING ENTITY Re�nería del Pací�co Eloy AlfaroSCOPE AND LOCATION Manabí Province
Name of the Project| REFINERÍA DEL PACÍFICO
DESCRIPTION:The project contemplates the design and construction of a re�nery with a processing capacity of 300 thousand barrels of crude oil per day, with a deep conversion technology, required for the production of gasoline, diesel, LPG and petrochemical currents. Additionally, it contemplates facilities for the supply of electric energy, water, crude oil and the transport of products and marine installations. Furthermore, the re�nery must generate all of the electric power it needs, and will contribute with approximately 115 MW of electricity to the electric network connected to the National Interconnected System.
OIL
PR
OJE
CT
S
66
Project Summary
NAME LOCATION - PROVINCE TYPE OF PROJECT STARTING DATE OF
CONSTRUCTION (Estimated)AMOUNT OFINVESTMENT
Exploration and production of hydrocarbons of the Apaika and Nenke �elds of Block 31
Orellana Exploitation of crude oil 2012 $ 500’000.000
Exploration and production of the Charapa Block
Sucumbíos Exploitation of crude oil 2012
Exploration and production of the Lago Agrio Block
Sucumbíos Exploitation of crude oil 2012
Exploration and productionin the Southeast of Ecuador
Southeast Ecuador Exploitation of crude oil 2012
Exploration and productionof Block 01 - Pacoa Field
Santa Elena Exploitation of crude oil 2012
Exploration and productionof Block 05 - Cuenca Progreso
Guayas Exploitation of crude oil 2012
O�-shore Exploration:Methane Hydrates
Ecuadorian Coast Exploration 2012
UNDETERMINED
UNDETERMINED
UNDETERMINED
UNDETERMINED
UNDETERMINED
UNDETERMINED
Pipeline Pascuales - Cuenca Guayas and AzuayDistillates petroleumproducts transport 2012 $ 280’000.000
Re�nería del Pací�co Manabí Re�ning 2012 $ 12.800’000.000
TOTAL $ 13.580’000.000
67
P R O J E C T STELECOMMUNICATIONS
By means of the creation of the Ministry of Telecommunications and of the Information Society, on August 13, 2009, the State recognized the need of guaranteeing to all Ecuadorians, an equal access to the Technologies of Information and Communication, taking over the responsibility of assuring the creation of a solid base for the transition of our country towards the information society.
GOVERNING ENTITY Ministry of Telecommunications and the Society of Information SCOPE AND LOCATION Everywhere in Ecuador
Name of the Project | DIGITAL TELEVISION (DTV)
DESCRIPTION:Implementation of the national network RTVECUADOR public TV station with the standard of terrestrial
LEVEL OF STUDIES Feasibility Studies
Technical Data
FINANCING REQUIRED USD 23´000.000
Financial Indicators
CONTRACTING METHOD Tenders with �nancing. Contracting with international public companies.
TE
LE
CO
MM
UN
ICA
TIO
NS
PR
OJE
CT
S69
GOVERNING ENTITY Ministry of Telecommunications and the Society of Information SCOPE AND LOCATION City of Quito
Name of the Project | NATIONAL CENTER FOR PUBLIC DATA
DESCRIPTION:Implementation of the National Center for Public Data, principal and alternate, that includes civil and technological infrastructure, that will permit the Ecuadorian State to have available a National Center for Public Data, that will provide technological information and communication services in a standardized manner, guaranteeing their e�ciency, con�dentiality, integrity, availability, compliance and reliability; optimizing the technological investment of the State and facilitating the implementation of electronic government.
LEVEL OF STUDIES Pre-feasibility Study.Technical Data
CONTRACTING METHOD Direct Investment
FINANCING REQUIRED USD 70´000.000
Financial Indicators
TE
LE
CO
MM
UN
ICA
TIO
NS
PR
OJE
CT
S
70
Project Summary
NAME LOCATION - PROVINCE DESCRIPTION
START DATE OFCONSTRUCTION
(Estimated)AMOUNT OF INVESTMENT
Digital Television Quito, Guayaquil and Cuenca
RTVECUADOR NationalNetwork
July 2012 $ 23’000.000
National Center forPublic Data Quito National Center
for Public Data March 2012 $ 70’000.000
TOTAL $ 93‘ 000.000
71