catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin...
Transcript of catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin...
PORTABLE LABORATORY
For high voltage tests
We o�er a unique service throughout Spain, a mobile laboratory for checking high voltage electrical material at the customer facilities, at the
substations at wind farms, hydroelectric power plants, solar parks, etc.
ENG
0 - 100 kV portable
Equipment which can be tested includes:
Tests conducted by our technical operators in accordance with the
applicable UNE standards for each.
On site testsInsulating stick current leakage tests, threshold
and voltage tests in voltage absence
detectors.
NEW!Sending report of the
inspection and technical assessment in situ.
Issue of reports
Insulating stick current leakage tests.
Threshold voltage tests in voltage absence detectors.
Test voltage trials for insulating gloves of all classes: CL I, CLII, CLIII, CLIV.
WE CONDUCT
Insulating sticks and rescue sticks in accordance with UNE EN 50508
NO 1221/LE2354
Insulating matting in accordance with UNE EN 61111
Insulating platforms in accordance with UNE EN 204001
Voltage detectors in accordance with UNE EN 61243-1
Insulating gloves in accordance with UNE EN 60903
Portable equipment for earthing in accordance with UNE EN
Insulating ladders UNE-EN 131
ACCREDITED BY
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
FREESTANDING SACKSfor elevation of materials
Freestanding sacks for elevation of materials to nacelleThe interior mechanical system prevents the detachment of
the canvas, permitting the handling of the equipment contained in the sack.
ENG
Own manufacture.
CE marking. Working load limit 250 kg.
When unfolded, the canvas sacking remains taut, permitting access to the di�erent equipment located within.
Can be folded for transportation when empty.
Lower cover of sack has outer layer of plywood, which can be replaced to guarantee long service life.
Lower anchorage for connection with the retained line.
Upper anchorage in two positions to guarantee access to the capsule sack.
Made of high resistance 900 g/m2 canvas.
Yellow �nish for high visibility.
With retrore�ective tape for high visibility in poor light.
SPECIFICATIONS OF THE DEVICE
Can be folded for transportation when
empty.
Easy-to-foldWorking load limit 250 kg.
Load capacity
kg
Has lower anchorage for connection with the
retained line.
Lower anchorage
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
SAFETY LINESInstallation Maintenance
Installation and maintenance of horizontal, vertical safety lines and anchor points.
Protects workspaces with risk of falls from a height of more than two metres, generating safe working protocols.
ENG
ACCREDITATIONS
PROJECTS
Access ladders to wind towers.Protection of silos in companies from the paper industry.Protection of maintenance zones in slaughterhouses.
Installation of vertical fall arrest systemsGantry crane sliding rails.
Building roo�ng for the installation of solar panels.
Maintenance of building roo�ng.
Tanker loader.
Installation of horizontal fall arrest systems
Tesicnor has a computer programme for the management of the safety line maintenance.
ADDED VALUE
Safety Line
We have the necessary training to ensure the correct installation and maintenance of these systems.
We install and distribute the leading names in the sector.
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
NON-DESTRUCTIVE TESTS ON OWN CREATIONS
Liquid penetrant inspection of welds
Ultrasonic testingDimensional control
Magnetic particle inspection
INSPECTIONElevation
equipment
Verification of the correct conditions of use and resistance of the load elevation elements. A particularly important activity
in the case of large or heavy loads, as given their characteristics, the presence of operators is required
underneath the radius of action.
ENG
DEVELOPMENTS
Inspection of own creations Inspection in the wind sector Inspection in the paper industry
INSPECTION SHEETSTesicnor has speci�c sheets for the inspection of:
Steel cable slings
Steel chain slings
Flat slings
Round slings
Swivel eye bolts
Pin and nut shackles
Hoisting pulleys
Rocker arms
DEVICE
Anti-intruder protection in wind turbines and industrial installations, with double security: magnetic tape and security bolt.
ENG
Excellent anti-intruder resistance. The lock does not have any accessible exterior elements which can be handled.
There are two security devices, magnetically coded exterior tape and interior bolt with security head.
Door secured to the frame with MI 6 security bolt. The door is secured to the wind turbine frame, making leverage of the door more di�cult.
Permits opening from interior.
Does not require electrical power, lock is activated with the natural magnetic �eld.
Zinc-coated to protect against weathering.
SPECIFICATIONS OF THE DEVICE
WIND TURBINE LOCK with security bolt and magnetic tape
Exterior view Interior view Cross-section
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
GRID GUARDS to prevent ice falling
on vehicles
Protective grids to prevent ice that is detached from the wind turbines falling on vehicles below. Protection of the roof and
front of the vehicle.
ENG
Own manufacture..
Does not require implementation of any legalisation in the MOT to permit driving with the system folded up on the roof of the vehicle.
Rapid assembly of the guard on the vehicle, without the need for any special tools, or modi�cations to the vehicle chassis.
Once the guard has been installed on the vehicle, it can be opened out and folded up by one person alone, as the front guard has two gas cylinders which assist the operator.
The system has a high level of resistance as it has successfully passed tests intended for earthmoving equipment: UNE EN 115231 and 1365 joules of impact. The absorbed energy on front and upper impact is even higher. The standard requires 700 joules and the system withstood 2351 joules during the tests.
Economically viable, as the only expenditure is on the system itself. No resources are required for legalisations, drafting of individual projects, etc.
SPECIFICATIONS OF THE DEVICE
01
02
03
04
Designed in accordance with UNE 115231/2001.
Absorbed energy above 700 joules.
Impact test with absorbed energy equal to 2351 joules.
Does not require special legalisation in the MOT to permit driving with the system folded up.
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
ANCHOR DEVICES MODEL PAZ03/AW
This anchor device complies with the safety requirements laid out in the European standard UNE EN 795: 2012 Class A for anchor devices
and UNE EN 50308:2008.
ENG
The installation date must be recorded for regular
inspection, at least annually, by a competent
operator.
Permits connection of standard and wide
opening carabineer.
ConnectionMaximum number of
users: 2.
UsersSwivel and hinge.
Anchor pointMaximum permitted
load.
25 kN
Length of connection ring: 400 mm.
Fastening with clamp for 80x80 pro�le (please enquire about other measurements).
M6 tightening torque: 9 Nm.
MI 2 tightening torque: 20 Nm. (Apply Loctite 270 in assembly).
ISO 7379 10x16 torque: 2 Nm (Apply Loctite 270 in assembly).
M20 tightening torque: 170 Nm. (Supplied with the torque applied).
Engraved aluminium sheet clearly attached to the carabineer.
Any device lacking this identi�cation must be immediately replaced.
SPECIFICATIONS OF THE DEVICE
kN
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
ANCHOR POINTS for wind turbines
Anchor points specifically for wind turbines, compliant to UNE EN 50308: 2005.
ENG
Designed for point load of 20 kN in any direction without breaking.
Can be used by two people.
Own manufacture. Designed in accordance with UNE EN 50308:2005 and UNE EN 795: 2012.
Working load limit 25 kN. Designed for point load of 20 kN.
Swivel and hinge anchor point, permits correct orientation in any direction.
Option to assemble directly on M20 bolt, or using base plate with two MI 0 bolts. Please enquire for other measurements.
62 mm opening of ring. This allows easy connection of two standard or wide-opening carabineers.
Manufacture in zinc-coated F114 steel, ring painted yellow and with plate identifying maximum permitted load.
Identi�cation plate with: manufacture, model, serial number, working load limit and applicable standards.
SPECIFICATIONS OF THE DEVICE
kN
ELEVATION EQUIPMENT Design, construction and certification
Design of specific solutions for handling loads.Study and personalised design, adapted to both the element to be
handled and the operating process.
ENG
CERTIFICATION
PRELIMINARY TESTPerformance of tests and measurements,
prior to start-up of the equipment in accordance with applicable standards.
C-hooks for piping Rocker arms for speci�c applications
Stock bench and elevation rocker arm
Leveling and extraction bench
Instructions for use, assembly, dismounting,
maintenance and cleaning.
User manualCE and speci�cations
plate.
MarkingDeclaration of
conformity.
CompliancePreparation de
technical construction �le.
File
DEVELOPMENTS
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Handles to facilitate access to wind turbinesTesicnor designs, constructs and assembles fastenings
adapted to the con�guration of the wind turbine. Made in
accordance with UNE EN 50308, these are an aid during
ascension as they o�er a safe grip in areas with a risk of falling.
Own manufacture High level of resistance and long-lasting
Fixed anchor pointOwn design and construction. Design option with �xed anchor
point.
Distances studied: If more than one handle is required to ensure adequate support for the body,
these must be installed at a distance of 1 metre.
Shape: Flat and rounded, and able to prevent hand from slipping.
Free space: There must be a minimum free space for hands between the handle and any other part of the structure of 60 mm.
REQUIREMENTS AND SPECIFICATIONS OF THE SYSTEM
Standard 50308. Handles with the same resistance as an anchor point.
Areas with a risk of falling: These must be installed in areas with a risk of falling and where it is not possible to install guard rails.
Logical position: In relation to the body and placed in the correct direction to provide support.
Minimum length: 0.15 metres.
INIT
IA
L SITUATION
HANDLE INSTALLED
REAR
VIE
W
ENG
Spill collector with built-in and floating channelsSpill container/collector for oil from the wind turbine gearbox
to the ground via pipe. Prevents oil spills in piping from
reaching the ground and causing environmental damage.
DESIGNED FOR
ALSTOMGAMESA
GENERAL ELECTRICVESTAS
SPECIFICATIONS OF THE SYSTEM
Manufactured in 630 g PVC.
Permits direct drainage of oil accumulated in the collector to a suitable recipient.
Mounted at height, not touching the ground, thereby preventing friction and external damage.Anti-puncture
resistance
System uses neodymium magnets. These keep the collector in position as it extends around the tower.Assembly by one operator alone.
Assembly in any environment, given that as it does not touch the ground, uneven ground is not an obstacle.
Quick and easy to assemble
Internal structure made of aluminium.
Aluminium provides a rigid and lightweight structure.
Weight of less than 25 kg.
Lightweight
ENG
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
PORTABLE CRANE for elevation of loads
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Davit for raising loads to intermediate platforms of the wind turbine.
ENG
Working Load Limit (WLL).
ConnectionThe portable crane is connected to the connection �ange of the tower sections.
100 kg
Tower connection �ange
Equipment weight.
Divided into three pieces of: 2.5, 6 and 4.5 kilogrammes.
13 kg
Own manufacture.
Strenx 700 MC steel (high elastic limit).
CE marking.
Compliant to Directive 2006/42/EC of the European parliament and of the Council.
SPECIFICATIONS OF THE DEVICE
With interior foam casing for parts.
Transport backpack
PORTABLE CRANE for elevation of loads
Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
Perimeter guard rails at the entrance
to wind turbine
Perimeter protective system for access ladders to the wind turbine, designed and tested in accordance with UNE EN ISO
14122-3 section 7.3 and UNE EN 50308 section 4.4.
Has side plate for filling gaps. Hot-dipped galvanised finish and non-slip surface.
ADAPTABLE ANCHORSAllow guard rails to be adapted to a large variety of wind turbine models.
AdaptabilityDesign can be adapted to customer
requirements.
VersatileDesign valid for di�erent wind
turbine models.
SafetyEnsures safety when entering or
exiting the wind turbine.
ENG
SPECIFICATIONS
Own manufacture.
Anti-corrosion resistance Hot-dipped galvanised �nish, 85 microns.UNE EN ISO 14122-3/UNE EN 50308: Designed and tested in accordance with UNE EN ISO 14122-3 section 7.3 and UNE EN 50308 section 4.4. Tests performed by Cemitec, Cetena Foundation.
Guaranteed safety: When entering or leaving the tower, and while opening the door.
Competitive price: In manufacture and assembly.
”
DIS
Polígono Mocholí Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)
www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41
SELLINGSale and distribution of Personal and Collective Protection Equipment, as well as professional advice regarding the products more appropriates for
your necessities.Descenders
Anti-fall arresters
Harness
SERVICES
RENTINGWe rent Personal Protection Equipment.
PPE REVIEWVisual and functional inspection of the PPE for
the work at height.
Signals
LifelinesHelmets and lanyards
Our brands
Tesicnor distributes material for the Personal and Collective protection equipment; in all economic sectors but we are specialised in the wind
energy area.We o�er a wide range of products from first labels.
DISTRIBUTION AND SUPPLY