BY - MADHU SAGAR – 2BV14AT028

CONTEXTUAL STUDY1. LOCATION2. AREA STATEMENT3. ACCESS SYSTEMS4. PRINCIPALOFF-SITE ESTIMATION OF

FACILITIES

PRESTIGE TECH PARK III

BUILT AREA

OPEN

•GROUND COVERAGEo VALENCE – 3382 m2

o VELOCITY – 3149 m2

oVECTOR – 3149 m2 .o MLCP – 3382 m2 .

1. DESIGN DETAILS2. STRUCTURAL DETAILS3. SERVICES

LOCATION : Sarjapur – Marathahalli Outer Ring Road, Bangalore DEVELOPMENT TYPE : IT Park DEVELOPMENT SIZE : 33445 – 35303 m2 . Prestige Tech Park III is located along the "IT Corridor" on Sarjapur – Marathahalli Outer Ring Road, Bangalore. With the region being dedicated to the IT and corporate sector, the location of the 8.15 acre project site is an apt proposition.

• It caters to all the requirements of the IT-industry.• The design evolved to form three independenttowers sited around a central landscaped court thatcoalesce with the surrounding natural scape.• Dictated by the market dynamics and I.T spaceabsorption trends, the towers have been designedwith unobstructed floor plates with segregated coreareas ensuring efficient and functional work spaces.• In contrast to a typical monolithic appearance, thetowers are differentiated, allowing the building’sform and detailing to be legible.• Architect – R. S. P. Architects, Bangalore.

• The development is designed to comply withNational Building Codes (NBC) and standards.• FLOOR LOADING - 400 Kg/sqm with designatedareas strengthened to 1,000 Kg/sqm.• FLOOR TO FLOOR - 4.05 m• FLOOR SCREEDING - Average 65 mm thick IPSflooring shall be provided in all office areas• COLUMN GRID - 10.8 m X 10.8 m c/c.• POWER - The development has a 66KV sub stationwhich receives power supply from dual feeders.• POWER BACK UP - 100 % power back up throughDG Sets.

• There are 3 buildings for work spaces.• There is one MLCP.• There is a common basement to all three buildings.• GROUND COVERAGEo VALENCE – 3382 m2

o VELOCITY – 3149 m2

oVECTOR – 3149 m2 .o MLCP – 3382 m2 .•BUILT : OPEN – 50:50• ENTRY/EXIT TO BASEMENT – 4• 900 cars can be accommodated in MLCP.• The office spaces can be modified as per the occupant.• Every floor may have a pantry or a cafeteria as wished by the occupant.• More than one floor can be rented by the same company.

1. ORGANIZATIONAL PRINCIPAL•CLUSTERED ORGANIZATION•3 buildings for work spaces and 1 MLCP clustered in the site.

2. BUILT MASS STRATEGY•SINGLE BUILDING MASS

3. PUBLIC PRIVATE DISTRIBUTION•LAYERED WITH GRADATION FROM PUBLIC TO PRIVATE.•The entry to the campus is semi-public. Not everyone can visit. Only the staff and people with permission can enter.•In the office buildings, only the ground floor is accessible as common space or lobby for staff as well as visitors.•In each floor, as per the company that rents it, there again is a segregation of spaces as private, semi-private and semi-public within the occupants.

4. ACCESS / APPROACH (PEDESTRIAN)•MULTIPLE ACCESS, CLEARLY DEFINED.

5. VEHICULAR ENTRY AND CIRCULATION•SAME ENTRY AND EXIT.•COMBINED WITH PEDESTRIAN.•One main entry/exit. And 2 other entry/exit.

•HVAC - The development is designed to havecentralized air conditioning system through acombination of Air cooled chillers & watercooled chillers designed to provide anambient temperature of 22 deg C +/- 2 deg C.• SEWERAGE SYSTEM - The development shallhave an underground Sewage treatment plantand the treated water shall be used forcooling, landscaping and flushing purposes.• FIRE FIGHTING AND SUPPRESSION SYSTEM -As per local fire regulations, comprising ofsprinkler system, fire hydrants, hose reels, firealarm system for common areas, smokedetectors for common areas.• FAÇADE - Building façade shall be acombination of Double Glazing, ACP, stonecladding and masonry with plastering andtextured paint.• TOILET FINISHESoFlooring – Vitrified Tiles.oDadoing – Combination of Ceramic TileoCeiling – Metallic Grid False Ceiling• COMMON AREA FINISHESoLobbies – Granite / Artificial MarbleoMain Staircase – Kotah Stone / Granite• RAINWATER HARVESTING - Provision for thesame has been made as per MOEF clearance.

GROUND FLOOR FLOORS 1 - 7 8th FLOOR 9th FLOOR TERRACE

VEC

TOR

AN

D V

ELO

CIT

YV

ALE

NC

E

GROUND FLOOR 1st FLOOR FLOORS – 2, 3, 5, 6, 8, 9 and 11 FLOORS – 4, 7 and 10 TERRACE FLOOR

MLC

P

BUILT SPACEVALENCE - 3382 sq.m.

VELOCITY - 3149 sq.m.

VECTOR - 3149 sq.m.

MLCP - 3382 sq.m.

• The office spaces can be modified to use specific to the occupants i.e., segregation of semi-private and private offices, conference room, pantry etc.• The concentration of services is very efficient.• The fire exits, fire extinguishers are all sufficient.• A separate service lift other than 6 common elevators, makes serving and distribution easier without hindrance to the staff and visitors.• A particular office can rent the whole floor or part of a floor or more than one floor or the whole building.

• The location of the TECH PARK is very inconvenient to public transport users, as there are no bus stations or metro stations nearby. Only means of transportation is private vehicle or taxi or transport made available by the employer.

VERTICALCIRCULATION

LIFTS

STAIRS

TOILETS LADIES

GENTS

ELECTRICAL ROOM

D.G. ROOM

SERVICE LIFT

OFFICE SPACE

PASSIVE SPACE

V SEM – B.ARCH

V SEM – B.ARCH

SHEET NO.

1

LIVE CASE STUDY ON IT PARK : 1- PRESTIGE TECH PARK III, BENGALURU ; 2- SELECT CITY WALK, NEW DELHI

SELECT CITY WALK MALL

BUILT : OPEN

BUILT AREA

OPEN AREA

RETAIL (56%)

OFFICE (11%)

HOTEL (11%)

MULTIPLEX (9%)

RECREATIONALSPACES (9%)SERVICES (4%)

• LOCATION - Saket District Centre, South Delhi • ARCHITECTS- TEVATIA CHAUHAN & SHARMA ARCHITECTS

(P) LTD.• COMPLETED in 2007• PLOT AREA - 15884 m2 .• TOTAL FLOOR AREA – 62,862.32 m2 .• LANDSCAPED PLAZA of 8992 m2 .• COMMERCIAL AREA – 24,281 m2 .• RETAIL AREA (MULTIPLEX AND MALL) – 8,498.3 m2 .• CLIENT – SELECT INFRASTRUCTURE.• VEGETATION – SHRUB COVER + TROPICAL TREES (>10m)• TOPOGRAPHY – 45m ASL / No contours.• CLIMATE – HOT AND HUMID / 45deg – 12deg / ppt 154cm.SITE PLAN AND ITS ORGANIZATION

•Linear organization.•Organization of spaces in a linear fashion along the 20 m wide corridor•L shaped planning with a public plaza in front which compliment each other

CIRCULATION PATTERN•Major parking in the basement.•Entrance to the basement in the front.•Linear pedestrian circulation.

SERVICES•2 entries and 5 fire exits are provided.•3 level basement parking is provided.•The placement of the entry to the basement is such that it also acts as drop-off without hindering the entry to the basement.•3 escalators are provided.•Service corridors are also provided at the rear side of citywalk.•A 20 m wide service lance is provided at the rear side which also acts as surface parking.

MULTIPLEX•There are 6 screens.•2 of the 6, are gold class.•Other 4 screens are above the gold class screens.•The main entry is through the bridge on the first floor which connects mall and multiplex building.•The ground floor entry can also be used for gold class entry.

PUBLIC PLAZA•A frontage of over 250m overlooking a public plaza with pedestrian pathways extending into 4 acres of green space.•Special features – open air theatres, water bodies, fountain and breathtaking landscaping.

SPECIFICA TIONS1. Type of the Construction : RCC Frame structure2. External Finish Cladding : Granite, Texture paint, Composite metal3. Internal Wall Finish : Plaster with desired paint finish, ceramic tiles for the toilet.4. Flooring : Marble, Granite Slabs, Vitrified Tiles5. Doors : Shutters of ply with TW frames and fire proof door wherever required.6. Windows : Aluminium Sections7. Electrification : Adequate provision for electric outlet, TV andTelephone Points.

PROPOSED AREA STATEMENT•BASEMENTS =41578.5(3L VLS)+6075(3L VLS =47653.5 SQ.M •GROUND FLOOR =9622.345+ 1756.46(MULTIPLEX) =11378.81 SQM •FIRST FLOOR =10803.323+2012.72 (MULTIPLEX) =12816.043 SQ.M •SECOND FLOOR =6568.06 SQ.M •THIRD FLOOR =2921.226 SQM •FOURTH FLOOR =2776.216 SQM •FIFTH FLOOR =2467.621 SQM •SIXTH FLOOR =2268.241 SQM •SEVENTH FLOOR =1948.80 SQM •FOYER LVL AREA IN MULTIPLEX= 825.29 SQ.M•TOTAL WITHOUT BASMENTS =43970.307 SQM •TOTAL WITH BASEMENTS =91623.807 SQM

• Being a high end commercial complex the grand plaza in front make it accessible to diverse segment of people. • Hierarchy and strong interrelationship of spaces plaza-cooridors , atriums-shops. • Excellent servicing by rear side service lane and service corridors along the back.

Built-up space / open space activities ratio = 4 acres / 2 acres = 3:1

• No scope for informal shopping, more of contemporary less conventional essences. • Do not provide unbiased opportunity.

SITE CONTEXT• Bus stop- Khirki Village, 100m• Malviya nagar metro station -1km• IGI airport-15.6 km• DLF place mall-200 m• MGF metropolitan mall-100 m• Qutub minar-3.7 km

1 YOUTH

2 FAMILY AND TRADITION

3 ACCESSORIES

4 CORRIDOR

5 SERVICES

6 TERRACE