Foundry in Štore, Slovenia

Producing steel parts mostly for the railway industry

Big energy consumer

Project is in operation for over 6 months

FACTS ABOUT THE COMPANY

Case Study

Page 3: Case study "Power Quality System Improvement"

OUR SOLUTION – BETTER POWER QUALITY SYSTEM

Case Study

The parameters which are monitored are energy, active power, reactive power, currents, voltages and phase angles

MODBUS polling of relevant data registers from ISKRA low-end instruments (20 MC330 and 24 MC350) through a serial to ethernet converter (MI488)

Relevant measurements monitored from 5 ethernet-enabled network recorder instruments of type MC750

23 low power radio C2/C100 wireless (868MHz) units distributed throughout the factory for monitoring energy consuption of crucial large electrical energy consumers via pulse outputs

23 electrical energy meters with pulse outputs for crucial large energy consumers (of type MC330 and WS1302)

Complete installation with CT mounting on all installed equipment

Centralized dedicated MiSMART server within the company LAN

Wireless C2/C100 monitoring of company gas, water and compressed air consumption

Page 4: Case study "Power Quality System Improvement"

TOPOLOGICAL SCHEME

Case Study

Page 5: Case study "Power Quality System Improvement"

Business case

KEY USER BENEFITS

Remote and centralized key electrical parameter data monitoring (Energy, active power, reactive power, currents, voltages, phase angles) with special emphasis on energy

Instruments are placed on strategic big energy consuming locations throughout the factory (electric furnaces, robots, cranes, …) aswell as in the central transformer station

Real time information on the operation of installed equipment Excel data export capability for regulator reporting Better and faster maintenance planning according to historic data offered by the system Quicker response to failures aswell as failure analysis Better supervision over energy losses within the factory Option to simply extend the system to other location and yet more measurement points

Page 6: Case study "Power Quality System Improvement"

Business case

APPLICATION INSIGHT

Page 7: Case study "Power Quality System Improvement"

Business case

APPLICATION INSIGHT

Page 8: Case study "Power Quality System Improvement"

Why Iskra

Save your MONEY

Save your money and prevent

costly damage with our

equipment

Save your time searching for

complete solution. We

offer all you need to manage your

project

We are the most flexible and

friendly company you ever worked with (personal

managers, compromise on delivery terms &

prices)

Save your TIME

Experience FLEXIBILITY

Experience CONVINIENCE

All the information

about your PQ is available on one

click at your device with our

user friendly software

Page 9: Case study "Power Quality System Improvement"

Power Quality Management

Equip yourself better. Manage your Power Quality better. Better Choice- Iskra