CASE STUDY FOR GROUND IMPROVEMENT USING PVD
Khem chand Gurjar2013CE10351
![Page 2: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/2.jpg)
Introduction
• To develop a new port at Gangavaram located
at about 15 kms south of Visakhapatnam Port, AP.
• Back up facilities for coal and iron ore storage and stacking and handling facilities.
![Page 3: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/3.jpg)
Site Description
Port facilities • Coal storage– 12m high
• Iron ore storage– 10m high
![Page 4: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/4.jpg)
Soil Profile
• As a part of the project, 8 Nos boreholes were taken to ascertain the design parameters.– Dredged Sand (0.2-0.3m thick)– Marine Clay with Shells (1-3m thick)– Soft Marine Clay (7-15m thick)
• The safe bearing capacity of the existing soil was worked out as 3 T/m² which was very low to take the loads.
![Page 5: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/5.jpg)
![Page 6: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/6.jpg)
PVD Design• Depth : 10m to 18m• Spacing : (Triangular pattern)– 1m c/c in below the stack – 1.5m c/c in in other area
![Page 7: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/7.jpg)
Consolidation period For 1.5 m spacing : 174daysFor 1m spacing : 65 days
Sand mat 300 mm thickHorizontal Drainage System
Geotextile and band drains laid horizontally connecting these pipes
![Page 8: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/8.jpg)
Post Treatment Assessment
• The instruments as Piezometers, Settlement Recorders, Inclinometers were installed to assess the post treatment performance of the adopted method of treatment.
• The readings were taken every 4 days when loading started, continued for a month after final preload height is achieved. The frequency was later extended to 7 days.
![Page 9: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/9.jpg)
Pore water pressure
1 m c/c : 55-65%1.5 m c/c : 30-40%
![Page 10: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/10.jpg)
Settlement
Settlement with time
![Page 11: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/11.jpg)
Analysis
To determine the ultimate settlement they used two method– Asaoka Method:– Hyperbolic method:
![Page 12: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/12.jpg)
Asaoka Method
![Page 13: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/13.jpg)
![Page 14: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/14.jpg)
Conclusion• With the application of the load the pore pressure
increased and dropped down slowly with time. The pore pressure variation indicated about 55–60% dissipation.
• The Degree of consolidation based on Asaoka Method was evaluated as 78–115% whereas based on Hyperbolic method it was evaluated as 32–70%.
• Hyperbolic Method is more comparable with the Pore Pressure Dissipation Results. Further the results obtained with theoretical slope of hyperbola as 1.00 are more closer to the predicted by pore water pressure analysis.
![Page 15: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/15.jpg)
Reference
Case study for ground improvement using PVD with preloading for coal & iron ore stackyard
• Pallavi Bhosle, Sohams Foundation Engg. Pvt. Ltd., Navi Mumbai–400614, India.E-mail: [email protected]
• V.V. Vaishampayan,MD, Sohams Foundation Engg. Pvt. Ltd., Navi Mumbai–400614, India.E-mail: [email protected]
![Page 16: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/16.jpg)
THANK YOU
![Page 17: Case study on pvd](https://reader030.fdocuments.in/reader030/viewer/2022020203/588b27991a28abed688b5df7/html5/thumbnails/17.jpg)
ANY QUESTIONS