CASE STUDY Mabey Gives Atton Hotel A Lift With A Custom ... · Mabey Gives Atton Hotel A Lift With...

2
To find a depot near you, visit mabey.com. T: (800) 956-2239 | [email protected] Mabey Gives Atton Hotel A Lift With A Custom Buck Hoist Design LOCATION Miami, Florida SPECS System 160 Propping System PURPOSE Support buck hoist construction elevator CASE STUDY MABEY SYSTEM: System 160 soldiers and propping

Transcript of CASE STUDY Mabey Gives Atton Hotel A Lift With A Custom ... · Mabey Gives Atton Hotel A Lift With...

Page 1: CASE STUDY Mabey Gives Atton Hotel A Lift With A Custom ... · Mabey Gives Atton Hotel A Lift With A Custom Buck Hoist Design To find a depot near you, visit mabey.com. T: (800) 956-2239

To find a depot near you, visit mabey.com. T: (800) 956-2239 | [email protected]

Mabey Gives Atton Hotel A Lift With A Custom Buck Hoist Design

LOCATION Miami, Florida

SPECS System 160 Propping System

PURPOSE Support buck hoist construction elevator

CASE STUDY

MABEY SYSTEM:

System 160 soldiers and

propping

Page 2: CASE STUDY Mabey Gives Atton Hotel A Lift With A Custom ... · Mabey Gives Atton Hotel A Lift With A Custom Buck Hoist Design To find a depot near you, visit mabey.com. T: (800) 956-2239

Mabey Gives Atton Hotel A Lift With A Custom Buck Hoist Design

To find a depot near you, visit mabey.com. T: (800) 956-2239 | [email protected]

The ChallengeSafety Guys, a full service safety ser-vices management contractor in Ft. Lauderdale, Florida, were contracted to manage site safety on the 12-sto-ry, 275-room Atton Hotel project in Miami. They discovered the standard hoist system, used to transport crew and equipment from floor to floor, could not operate safely because the lower floor balcony extensions inter-fered with the path of the hoist cars. Because of these extended floors, the buck hoists could not get close enough to the structure to make it safe for operation.

The SolutionSafety Guys were well-acquainted with the flexibility and unique features of Mabey’s structural shoring systems from past experience and asked if Mabey could help to make the buck hoist functional and safe to use.

Mabey engineers reviewed the project. Because the construction elevator would have to be installed on top of existing elevated floors, it was determined that the hotel’s lower floors and basement would need to be reinforced with System 160 shor-ing to increase their capacity to keep the site safe. Mabey’s design then

called for a propping tower to support the platform extensions that connect-ed from the hoist car to the building.

The Result Once the lower floors were propped and the bridges were installed, crews were able to safely use the construc-tion elevator to move materials from the hoist car into the building.

Mabey’s design proved to be a du-rable, time-saving solution because System 160 is versatile and can be configured to fit various applications — yet is strong enough for high-load capacities. The alternative would have been much more time-consuming as Safety Guys would’ve had to build a lumber framework towering over 80 feet high to support the platforms. Mabey’s steel shoring was a much more durable, safer alternative. Safety Guys’ dedication to safety and ex-perience in the field — together with Mabey’s engineering expertise and versatile shoring — created an inno-vative solution to solve a problem and resulted in a new application for System 160. We call that a win-win!

For more case studies or informa-tion on our products and services, please visit www.mabey.com.

Mabey Inc.A Leader In Shoring, Bridging and Construction Rentals

[email protected]

Solution-based application evolves from innovative use of Mabey structural propping

CASE STUDY: Atton Hotel Elevator Support