CASE STUDY - Firefly Hybrid Power · 2019. 5. 28. · lighting and perimeter lighting. Situated...

4
1,634l weekly diesel fuel saving for Midas Construction CASE STUDY For more information or to discuss details of your project please email sales@fireflyhybrid power.com or call Firefly on +44 (0)800 091 4090.

Transcript of CASE STUDY - Firefly Hybrid Power · 2019. 5. 28. · lighting and perimeter lighting. Situated...

  • 1,634l weekly diesel fuel saving for Midas Construction

    CASE STUDY

    For more information or to discuss details of your project please email sales@fireflyhybrid power.com or call Firefly on +44 (0)800 091 4090.

    mailto:sales%40fireflyhybridpower.com?subject=Case%20Study%20PDF%20Enquiry

  • Web: www.fireflyhybridpower.com Phone: +44 (0)800 091 4090 E-mail: [email protected]

    The project

    The solution

    Client:

    Products provided:

    Average weekly results:

    The challenge

    Midas Construction were awarded an £11 million build project to construct student accommodation in Cardiff. The three-floor de-velopment boasts 281 rooms including more than 115 self-contained studio apartments as well as a number of modern kitchens. Around 100 Midas staff were working on site over the year.

    • CYGNUS 3 Hybrid

    Power Generator

    • GLOW Remote Fleet

    Management Platform

    • 1634 litres of fuel saved

    • 4.0 tonnes of CO2 emissions cut

    • 15h of silent hybrid power daily

    Cygnus® 3 paired with a 150 kVA diesel generator. The hybrid power system was set on a timer to provide completely silent power over-night, whilst automatically switching the diesel generator on and off.

    Over a 4-month period, Cygnus® 3 ran for over 74% of time deliver-ing over 2,500 hours of silent power. This in turn saved over 34,000 Litres of diesel fuel, equating to over 91 Tonnes of CO2 emissions.

    The project was located within the city immediately adjacent to both residential and commercial buildings. Whilst the office and welfare cabins opposite the site were connected to mains power, Midas need-ed power on site for the crane, heating within the crane cab, aviation lighting and perimeter lighting. Situated adjacent to the site was a recording studio, which was aggrieved by the 24hr noise of the diesel generator running.

    Midas Construction were also keen to find ways of reducing operating costs and the carbon footprint of site operations.

    https://www.fireflyhybridpower.com?utm_source=CaseStudyPDFmailto:sales%40fireflyhybridpower.com?subject=Case%20Study%20PDF%20Enquiry

  • Web: www.fireflyhybridpower.com Phone: +44 (0)800 091 4090 E-mail: [email protected]

    Project gallery

    Very quiet, so useful for the neighbouring properties as running a conventional generator would have been a distur-bance, especially during the night. Spare capacity during the day was used at night for lighting on the perimeter lane and to power the site security system. Proved very useful and did what it said it would.

    Andrew Merritt, Site Manager, Midas Construction

    https://www.fireflyhybridpower.com?utm_source=CaseStudyPDFmailto:sales%40fireflyhybridpower.com?subject=Case%20Study%20PDF%20Enquiry

  • Address:5 Cairn Court, East Kilbride, Glasgow, G74 4NB, UK

    Contact:Phone: +44 (0)800 091 4090Email: [email protected]: www.fireflyhybridpower.com