    Cedar Court Grand Hotel - York

    THE CHALLENGE

    CASE STUDY

    SOLUTIONS DELIVERED

    Approved by

    Cedar Court Grand Hotel

    Cedar Court Hotels is Yorkshires largest

    independent hotelier, with four very successful

    four-star properties in Harrogate,

    Hudderseld/Halifax, Leeds/Bradford and

    Wakeeld. But in 2009, the Company purchased

    the iconic North Eastern Railways Headquarters

    in York, one of the great railway buildings of

    England, with the ambition of turning it into a

    luxury hotel.

    The result is Cedar Court Grand Hotel & Spa,

    which opened in May 2010. This historic building,

    which won an architectural award in 1904, has

    been carefully restored to retain all of the

    original features whilst integrating the facilities

    and style of a luxur y property.

    Cedar Court Hotels has worked closely with the

    AA, and it is hoped that when it receives its rating

    later this year (2011) it will become Yorks rst

    ve star hotel.

    ISG technology designed and installed the

    infrastructure to support the telephone, data,

    WiFi, television, audio and CCTV networks

    throughout all areas of the hotel.

    The solution provided the hotel with a exible,

    future proof installation that takes into account

    their particular IT infrastructure needs while

    tting in with constraints of a Grade II listed

    building and the desire for a luxurious ve-star

    nish to all areas of the building.

    ISG technology worked diligently to complete

    the two scheduled phases on time and to enable

    all of the other trades on site to continue working

    to their programme. ISG technology created a

    consolidation box design, allowing rooms and

    oors to be completed in any sequence without

    being dependent upon the other trades or other

    areas of the building. This enabled ISG

    technology to be exible and to work around the

    other trades allowing progress on site to

    continue unrestricted.

    Unique challenges exist within every project,

    especially when working on a Grade II listed

    building. ISG technology has a wealth of

    experience working on listed buildings gained

    from many high prole installations including

    Westminster Abbey, Customs House and English

    Heritage hence ISG technology was able to apply

    this experience to The Cedar Court Grand Hotel.

    ISG technology was chosen to work directly forCedar Court Hotels, providing a full design and

    installation service working in conjunction with

    the building and electrical contractors to deliver

    a solution within budget, with future exibility

    which allowed for a phased installation approach

    throughout the building.

    To maintain the character of the building and to

    provide the desired nish, it was decided that all

    services within the bedrooms would be chased

    into the walls, therefore removing the need forsurface mounted skirting trunking. Using this

    method provides a better nal nish but it

    restricts the future installation of cables within

    the rooms, therefore ISG technology worked with

    Cedar Court Hotels design team to ensure that

    sucient outlets were installed to serve the

    current and future needs of each guest.

    In addition, the cabling in each room needed to

    be installed in two phases. The installation

    needed to be in sequence with the building

    program before the walls were re-plastered.

    John Bulger,

    Senior Project Manager,

    ISG technology

    Working in a Grade II listed building is alwayschallenging especially taking into account the scale

    of the refurbishment and the quality of the nishrequired in a 5-star Hotel.

    John Horvath,

    Group Hotel Director,

    Cedar Court

    ISG technology provided an infrastructure designthat suited the building as well as the technicalbrief. One of ISG technologys Project Managersensured that the project ran smoothly and toschedule.