Case Study 18-0188 PGCPS - Accokeek Academy

1
Accokeek, MD A multi campus K8 school in Prince George’s County, Maryland needed additional classrooms to accommodate their growing student population. Modular Genius was contracted to design and install a Modular Classroom Building to meet their needs. Modular Genius, a leader in modular construction for schools, of space needed for their students. Ten additional temporary classrooms with restrooms totaling 10,164 sq. ft. would pro- vide the needed space to properly educate their students. Se- curity was an important requirement for the school. The stand alone Portable Classroom included a fenced in walking path that led the students from the main building to the Modular Classroom Building. Modular Genius provided turnkey modular construction services including engineering, foundation, utility ADA aluminum decks & ramps per code were completed to ensure maintenance free access to the new building. The K8 School saved time and money by contracting Modular Genius to provide all the services needed to complete the project.

Transcript of Case Study 18-0188 PGCPS - Accokeek Academy

Page 1: Case Study 18-0188 PGCPS - Accokeek Academy

Accokeek, MD

A multi campus K8 school in Prince George’s County, Maryland needed additional classrooms to accommodate their growing student population. Modular Genius was contracted to design and install a Modular Classroom Building to meet their needs.

Modular Genius, a leader in modular construction for schools,

of space needed for their students. Ten additional temporary classrooms with restrooms totaling 10,164 sq. ft. would pro-vide the needed space to properly educate their students. Se-curity was an important requirement for the school. The stand alone Portable Classroom included a fenced in walking path that led the students from the main building to the Modular Classroom Building. Modular Genius provided turnkey modular construction services including engineering, foundation, utility

ADA aluminum decks & ramps per code were completed to ensure maintenance free access to the new building. The K8 School saved time and money by contracting Modular Genius to provide all the services needed to complete the project.