Case 1:13cv-07552-VSB Document 54 Filed - Stanford...

67
Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 1 of 67 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF NEW YORK ) In re PRETIUM RESOURCES INC. ) Case No.: 13-CV-7552 (P00) SECURITIES LITIGATION ) ) CLASS ACTION ) This Document Relates To: All Actions SECOND CONSOLIDATED AMENDED CLASS ACTION COMPLAINT Lead Plaintiff, Gary Martin and Sandra Lee Reyes-Troyer, and Plaintiff Michael Yeo (collectively, "Plaintiff'), individually and on behalf of all other persons similarly situated, by its undersigned attorneys, for its complaint against defendants, alleges the following based upon its members' personal knowledge as to themselves and their own acts, and information and belief as to all other matters, based upon, inter al/a, the investigation conducted by and through its attorneys, which included, among other things, a review of the defendants' public documents and announcements made by defendants, United States Securities and Exchange Commission ("SEC") filings, System for Electronic Document Analysis and Retrieval ("SEDAR") 1 filings, wire and press releases published by and regarding Pretium Resources, Inc. ("Pretium" or the "Company"), analysts' reports and advisories about the Company, and information readily obtainable on the Internet. Plaintiff believes that substantial evidentiary support will exist for the allegations set forth herein after a reasonable opportunity for discovery. 1 SEDAR is the Canadian system used for electronically filing most securities related information.

Transcript of Case 1:13cv-07552-VSB Document 54 Filed - Stanford...

Page 1: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 1 of 67

UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF NEW YORK

)

In re PRETIUM RESOURCES INC. ) Case No.: 13-CV-7552 (P00) SECURITIES LITIGATION )

) CLASS ACTION

)

This Document Relates To: All Actions

SECOND CONSOLIDATED AMENDED CLASS ACTION COMPLAINT

Lead Plaintiff, Gary Martin and Sandra Lee Reyes-Troyer, and Plaintiff Michael Yeo

(collectively, "Plaintiff'), individually and on behalf of all other persons similarly situated, by its

undersigned attorneys, for its complaint against defendants, alleges the following based upon its

members' personal knowledge as to themselves and their own acts, and information and belief as

to all other matters, based upon, inter al/a, the investigation conducted by and through its attorneys,

which included, among other things, a review of the defendants' public documents and

announcements made by defendants, United States Securities and Exchange Commission ("SEC")

filings, System for Electronic Document Analysis and Retrieval ("SEDAR") 1 filings, wire and

press releases published by and regarding Pretium Resources, Inc. ("Pretium" or the "Company"),

analysts' reports and advisories about the Company, and information readily obtainable on the

Internet. Plaintiff believes that substantial evidentiary support will exist for the allegations set forth

herein after a reasonable opportunity for discovery.

1 SEDAR is the Canadian system used for electronically filing most securities related information.

Page 2: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 2 of 67

NATURE OF THE ACTION

1. This is a federal securities class action on behalf of a class consisting of all persons

other than defendants who purchased Pretium securities between June 11, 2013 and October 22,

2013, inclusive (the "Class Period"), seeking to recover damages caused by defendants' violations

of the federal securities laws and to pursue remedies under the Securities Exchange Act of 1934

(the "Exchange Act").

2. Pretium is an exploration and development company that was formed in 2010 for

the acquisition, exploration and development of precious metal resource properties in the

Americas. The Company's main mineral project - and its only project currently in development

- is the Brucejack Project, an advanced stage exploration project located in north-western British

Columbia.

3. Since December 2010, Pretium has maintained that it "is creating value through

gold," and has touted the Brucejack Project as a high-production, high grade resource, with the

potential to become a very profitable underground mining operation. The Company's future

hinges on proving the economic feasibility of mining the gold and silver resources located at the

Brucejack Project.

4. In November 2012, as part of its ongoing development efforts, Pretium released

very positive results from a mineral resource estimate prepared by Snowden Mining Industry

Consultants ("Snowden") for the Valley of the Kings zone (the "VOK") of the Brucejack Project

(the "2012 Resource Report"). The 2012 Resource Report estimated that the VOK contained

indicated gold resources of 16.1 million tons at a grade of 16.4 grams per ton ("g/t") and inferred

gold resources of 5.4 million tons at a grade of 17.0 g/t. Both the amounts and the grade of the

indicated and inferred gold resources supported the view that continued exploration and

development of the Brucejack Project ultimately would be very profitable.

2

Page 3: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 3 of 67

5. Determined to substantiate the 2012 Resource Report, Pretium devised the Valley

of the Kings Bulk Sample Program (the "Program"), which was intended to test certain areas of

mineralization in order to confirm the accuracy of projected mineral resources. The Program

consisted of two elements: (1) excavation of a 10,000 ton representative bulk sample from the

VOK (the "Bulk Sample"); and (2) a 15,000-meter underground drill program. In late 2012,

Pretium engaged Strathcona Mineral Services Ltd. ("Strathcona"), a highly respected mining

consulting firm, as the Independent Qualified Person ("QP") to oversee and report on the Bulk

Sample Program.

6. The Company announced that Strathcona would prepare a report at the end of the

Bulk Sample Program after all data was compiled and reviewed. However, instead of waiting for

a complete assessment, Pretium immediately began to condition the market by releasing

preliminary assay results from underground drilling in the Bulk Sample area in May 2013. The

Company's reports that it "intersected visible gold and confirm[ed] the projection of high-grade

gold mineralized domains" created the false impression that the Bulk Sample Program was sure to

verify Snowden's resource model and the 2012 Resource Report.

7. In June 2013, Defendants similarly misled investors by releasing a positive

Feasibility Study, which highlighted "average annual production of 425,700 ounces of gold over

the first 10 years and 321,500 ounces of gold over the life of mine" and "mine life of 22 years

producing an estimated 7.1 million ounces of gold." The Feasibility Report, which was based on

the still-unsubstantiated 2012 Resource Report, bolstered the view that the Brucejack Project

would be a high-grade, high-production mine that could be mined using less expensive, bulk

mining techniques. This was significant, because the lower operating costs and high production

associated with a bulk mining operation suggested that Brucejack had a net present value of over

3

Page 4: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 4 of 67

$2 billion and would generate an internal rate of return of approximately 42.9%. Absent the ability

to bulk mine Brucejack, the value of the mine would be significantly lower. Following this

disclosure, Pretium's stock price continued to climb.

8. However, Strathcona, as the Independent QP with complete access to the data

underlying the 2012 Resource Report, as well as the Bulk Sample Program, knew that Pretium

was presenting a distorted view of the Brucejack Project. According to the Company's press

releases, Strathcona began recommending that Pretium correct its public disclosures regarding the

2012 Resource Report soon after underground drilling began and even before any results from the

Bulk Sample were processed. As the independent QP, Strathcona also would have reviewed the

Feasibility Study before it was publicly available. Thus, by no later than June 11, 2013, the start

of the Class Period, Strathcona urged Pretium to disclose to investors that the 2012 Resource

Model was not accurate and that the Brucej ack Project would not be a high-grade, high-production

mining operation as the Company claimed. The Company's press release on that same day omitted

any information regarding any concerns raised by Strathcona and failed to provide any other data

that would have given investors a more balanced perception of Brucejack.

9. As the Bulk Sample was processed and assay results deviated significantly from

what Snowden's model predicted - in some instances showing grades and quantities well below

the thresholds necessary for mining to be economically feasible - Strathcona advised Pretium to

tell investors that "the resource model was not panning out." Instead, Defendants withheld this

information and continued to release only drilling results, highlighting that "[assays from the

Program continue to confirm the projection of high-grade gold mineralized domains, and visible

gold continues to be encountered."

4

Page 5: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 5 of 67

10. Then, in July 2013, the Company announced the discovery of the Cleopatra Vein,

an extreme grade mineralization deposit that had been projected by the 2012 Resource Report.

Although Pretium had been aware of the Cleopatra Vein's existence for some time, the Company

immediately began reporting drilling results from this high grade deposit, attempting to convince

the market that the results derived from this narrow vein were somehow representative of the entire

VOK.

11. Thereafter, Defendants tried to manipulate the Program so that the Bulk Sample

would test more material from the gold-rich Cleopatra Vein and less from other areas, which

contained only lower-grade, less-economically viable material. Specifically, in July 2013, Pretium

announced that "[planning is underway with [Strathcona] to increase the portion of the bulk

sample tonnage testing the higher grade blocks...," which had been discovered in the Cleopatra

vein. In addition, Defendants expanded underground drilling and continued to drill perpendicular

to and along the strike of the Cleopatra Vein, increasing the frequency of high-grade intercepts

and then announcing the results. By attempting to tilt the Bulk Sample and expanding drilling to

emphasize the Cleopatra Vein, Defendants sought to rig the outcome of the Program.

12. However, despite the Company's representations, Strathcona was not on board with

Pretium's attempt to shift the Program mid-stream and pressed Defendants to make full disclosure.

Defendants failed to heed Strathcona's advice, and instead continued to present an unbalanced,

distorted picture of the Brucejack Project, misleading investors to believe that the 2012 Resource

Model and the Feasibility Study accurately predicted a high-grade, high production mine that could

be mined using bulk mining methods.

13. When Strathcona could not be convinced to change course, Pretium reassigned

Strathcona's responsibilities for the Program to Snowden, basically allowing Snowden to verify

5

Page 6: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 6 of 67

its own model. Specifically, on October 3, 2013, Pretium announced that "[Snowden] independent

Qualified Persons are responsible for the review and sign-off of the milling and processing

component of the Program."

14. On October 9, 2013, the conflict between Defendants and Strathcona finally was

revealed when the Company disclosed that Strathcona had abruptly resigned from the engagement.

Defendants also revealed for the first time that "Lilt is expected that approximately 4,000 ounces

of gold will be produced in total from the material excavated for the Program, as defined by the

Valley of the [2012 Resource Report] for that area of the Valley of the Kings." This amount was

nearly 24% less than the 5,248 ounces initially projected by the 2012 Resource Report.

Stratchona's resignation, in conjunction with the decrease in the total quantity of gold, was the

first signal to the market that the Bulk Sample Program was not confirming the 2012 Resource

Report, causing Pretium's shares to decline $2.07 per share, or over 30%, to close at $4.70 per

share on October 9, 2013.

15. Thereafter, on October 22, 2013, the Company issued a press release explaining the

reasons for Strathcona's resignation. Specifically, the Company was forced to reveal that

Strathcona had advised the Company that:

ITihere are no valid gold mineral resources for the VOK Zone, and without mineral resources there can be no mineral reserves, and without mineral reserves there can be no basis for a Feasibility Study

[S]tatements included in all recent press releases [by Pretium] about probable mineral reserves and future gold production [from the Valley of the Kings zone] over a 22-year mine life are erroneous and misleading.

16. In an effort to cushion the impact of this disclosure, Pretium criticized Strathcona's

conclusions as premature and claimed that Strathcona should have waited for the Program to be

complete, even though the Company itself had been announcing favorable drilling results for

months. Moreover, while withholding the actual assay results from the sample tower, the

6

Page 7: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 7 of 67

Company contended that "Pretium management and Snowden also share significant concerns that

the sampling tower approach for the Valley of the Kings deposit may be flawed." The Company

reiterated that "[a] total of 4,000 ounces of gold were projected to be produced ... from the material

excavated for the Program," again omitting necessary context, namely that the 2012 Resource

Model projected that over 5,000 ounces of gold would be produced from the Bulk Sample.

Irrespective of these attempts to backtrack from the Program, Pretium shares declined $1.27 per

share, or over 27%, to close at $3.36 per share on October 22, 2013.

17. Since then, Pretium has continued to insist that the 2012 Resource Report has been

confirmed, and that the Company has "increased confidence" in the value of the Brucejack Project.

However, these assertions are belied by additional information provided by Strathcona, as well as

by actual data from the Bulk Sample and the revised resource estimate released by the Company

in December 2013, which demonstrate that the Company deliberately manipulated the Program

and selectively disclosed only positive drilling results in order to keep Pretium's stock price

artificially inflated.

18. First, on November 25, 2013, in an interview with The Northern Miner,

Strathcona's founder and president, Graham Farquharson finally had an opportunity to explain

Strathcona's position that the Program did not validate Snowden's model or the resource estimates

in the 2012 Resource Report. As Farquharson stated in the interview:

[T]he main item was that we found the bulk sample program, which was composed of different phases (underground drilling, underground geological mapping, and the results of the sample tower), the main objective of all that was validation of the resource model that Snowden had prepared in November of 2012.

That was the basis for the feasibility study that Pretium did in June of this year, which suggested it was going to a be a big mine producing 425,000 ounces of gold a year for the next ten years, within a 22 year mine life. All that was based on the Snowden model, which had 16 million tonnes with a grade of 16 grams per tonne

7

Page 8: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 8 of 67

in the indicated category and a further quantity in the inferred category—and we didn't find that.

And Pretium didn't rind that, when they did all the underground drilling and geological mapping and the results from the sample tower and so on, so we told them on several occasions that they should be alerting the world that the resource model was not panning out. The whole objective of the bulk sample program was to confirm whether or not the resource model was valid and we said it wasn't.

19. Farquharson further explained that results from the Program were skewed by the

discovery of the Cleopatra vein, which is high grade, but very narrow, and "not representative of

the rest" of the VOK. By increasing the tonnage from the crosscut that intersected the Cleopatra

Vein, the Bulk Sample seemed to be of a higher grade and higher production value than could

realistically be achieved. In reality, as Farquharson stated, "[Strathcona] told Pretium that, from

all the drilling they've done - and it's a heck of a lot of drilling - and with the sample tower results

and so on, none of those come anywhere close to finding a grade of 16 grams per tonne, which is

what allows bulk-mining methods."

20. Farquharson confirmed that Strathcona repeatedly told Pretium that "they should

be alerting the world that the resource model was not panning out," but "they've been slow to

accept that, because it does make a big change from what they've been telling the markets.

But we're absolutely convinced that if this is what the results indicate, then you should tell the

world." When Pretium declined to do so, Strathcona "gave a lengthy letter to Pretium with [its]

reasons for withdrawing." To date, Pretium has not provided investors with a complete copy of

that letter.

21. Second, notwithstanding Pretium's criticisms of Strathcona and its assertion that

the Program itself was flawed, the fact remains that Defendants were receiving data from the Bulk

Sample at the same time they were releasing drilling results, which painted a very different picture

Page 9: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cv-07552-VSB Document 54 Filed 07/23/14 Page 9 of 67

of Brucejack and which were necessary to understand the significance of the "high-grade

intercepts" the Company was reporting. For example, the first 2,167 tonnes sent through the

sample tower yielded only 145 ounces of gold at a grade of approximately 2 grams per ton, which

is well below the S grams per ton threshold considered to be economically viable to mine even

using the more expensive, non-bulk mining methods. Defendants withheld those negative results

until the Company announced Strathcona's resignation. However, anticipating that the Bulk

Sample ultimately might not confirm the 2012 Resource Report, Pretium expanded the drilling

program and exploited the discovery of the Cleopatra Vein, flooding the market with selectively-

disclosed, favorable information ahead of any report on the Bulk Sample. Defendants' omission

of information regarding, inter al/a, the Bulk Sample results and Strathcona's ongoing concerns

about the feasibility of mining Brucejack using bulk mining methods, as well as their

representations that Strathcona actually remained on board with the Program, particularly with the

Company's excessive drilling of the Cleopatra Vein, was materially misleading.

22. Third, despite Pretium's claims to the contrary, the revised resource estimate

prepared by Snowden in December 2013 (the "2013 Resource Report") demonstrates that the 2012

Resource Model was not accurate, and Pretium manipulated the Bulk Sample Program to obtain

the desired outcome, thereby keeping its stock price artificially inflated. Specifically, the grading

for every mineral resource estimate for the Bulk Sample from the 2012 Resource Report

nevertheless has been revised downward in the 2013 Resource Report. In fact, three of the five

reported crosscuts are now estimated to contain low-grade material that is not considered

economically feasible to mine. The remaining two crosscuts, which comprise nearly half the total

tonnage from the Bulk Sample and which indicate high grade material, intersect the Cleopatra

9

Page 10: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 10 of 67

Vein, illustrating the extent to which the milled results are skewed by over-inclusion of material

from that one source.

23. Overall, the average grade has declined from an estimated 15.84 g/t in the 2012

Resource Report to 12.20 g/t in the 2013 Resource Report, well below the 16 g/t required for bulk

mining, and the total amount of gold in the VOK has been revised from an estimated 5,248 ounces

to 4,096 ounces, a decrease of approximately 22 percent from the 2012 Resource Report. These

disparities reveal that the Program not only failed to validate the 2012 Resource Report, but that

Snowden had to make adjustments to its model to account for high-grade, narrow veins, like

Cleopatra, which were not representative of the VOK overall, and which, as Strathcona explained,

would not generate large enough quantities at high enough grades to justify bulk mining at

Brucej ack.

24. Unable to maintain the façade that the Brucejack Project contains the quantities of

high grade material touted by the Company, the 2013 Resource Report concedes, "There are less

tonnes at a higher grade in the December 2013 Mineral Resource above a S g/t AUEq cut-off

than in the November 2012 estimate," which is exactly what Strathcona had been telling Pretium

all along. As Mr. Farquharson explained in the Northern Miner interview, "ITihey will not have

a mine producing 425,000 oz. a year for the next 20 years, as they have been advertising so

far." Thus, the 2013 Resource Report demonstrates that the Brucejack Project is not the high-

grade, high-production resource that Defendants have portrayed; rather, it will be more expensive

to mine with non-bulk methods and unlikely to achieve the 42.9% rate of return that Defendants

have promoted. Defendants had data from the Bulk Sample beginning in at least June 2013 and

therefore knew, months before Strathcona's resignation, that the 2012 Resource Model was not

"panning out."

10

Page 11: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 11 of 67

25. Thus, throughout the Class Period, Defendants made false and/or misleading

statements and/or omitted material information about the Company's business, operations, and

prospects. Specifically, Defendants made false and/or misleading statements and/or failed to

disclose that, inter al/a: (1) as early as June 2013, the results from the Bulk Sample Program were

not confirming the 2012 Resource Report as expected; (2) Defendants had received unfavorable

results from the Bulk Sample, which indicated that the quantities and grades of material were lower

than estimated by the 2012 Resource Report, but chose to disclose only positive drilling results

showing "high-grade gold mineralized domains and visible gold," despite knowledge of

contradictory information; (3) Strathcona raised issues concerning the 2012 Resource Report,

which formed the basis for the Company's Feasibility Study, and urged Defendants to disclose

that the 2012 Resource Report overestimated the quantity and quality of economically-viable

resources; (4) Pretium altered the Program by over-sampling from the Cleopatra Vein and

expanding drilling to conceal the fact that the Bulk Sample was not confirming the 2012 Resource

Report; (5) Strathcona was not on board with Pretium's efforts to change the Program midstream;

and (6) Brucejack would not be a high-grade, high-production mine that would produce 425,000

ounces of gold a year for the next ten years with a 22-year mine life, as Defendants had advertised.

In addition, Pretium touted Stratchcona as its Independent Qualified Person in its public filings

and press releases from late 2012 until October 2013, when Strathcona abruptly resigned, without

disclosing that Strathcona disagreed with the 2012 Resource Model and told Pretium that its press

releases were erroneous and misleading.

26. As a result of Defendants' wrongful acts and omissions, and the precipitous decline

in the market value of the Company's securities, Plaintiff and other Class members have suffered

significant damages.

11

Page 12: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 12 of 67

JURISDICTION AND VENUE

27. The claims asserted herein arise under and pursuant to Sections 10(b) and 20(a) of

the Exchange Act, 15 U.S.C. §§ 78j(b) and 78t(a), and Rule lOb-S promulgated thereunder by the

SEC, 17 C.F.R § 240.10b-5. This Court has jurisdiction over the subject matter of this action

pursuant to 28 U.S.C. §§ 1331 and 1337, and Section 27 of the Exchange Act, 15 U.S.C. § 78aa.

28. Venue is proper in this District pursuant to Section 27 of the Exchange Act, and 28

U.S.C. § 1391(b). Pretium securities are traded within this District and many of the acts and

practices complained of occurred in substantial part herein.

29. In connection with the acts alleged in this complaint, Defendants, directly or

indirectly, used the means and instrumentalities of interstate commerce, including, but not limited

to, the mails, interstate telephone communications, and the facilities of the national securities

markets.

30. The Court has specific and/or general jurisdiction over each of the Defendants

based on their respective contacts with the U.S. Defendants communicated to U.S. investors in

Pretium common stock through press releases and conference calls and, as a registered user under

the Exchange Act. Pretium made periodic filings with the SEC on Forms 40-F and 6-K.

31. Further, Defendants' conduct outside of the U.S. caused Pretium's shares to be

artificially inflated and had a negative effect on Pretium shareholders in the U.S. Defendants

caused Pretium to issue news releases and reports that were disseminated by Marketwire and

Yahoo! Finance, were available on the SEC's and Pretium's website and were accessible in the

U.S.

32. Venue is proper because Pretium's common shared traded on the New York Stock

Exchange in this district throughout the Class Period and Defendants made materially false and

12

Page 13: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 13 of 67

misleading representations to investors that were disseminated to investors in this district and in

the U.S.

PARTIES

33. Lead Plaintiff is comprised of members Gary Martin and Sandra Lee Reyes-Troyer.

As set forth in the Certifications previously filed in this Action, incorporated by reference herein,

each of Lead Plaintiff's members purchased Pretium securities at artificially inflated prices during

the Class Period and was damaged upon the publication of the alleged corrective disclosures. Each

of Lead Plaintiff's members purchased Pretium securities on the New York Stock Exchange.

34. Plaintiff Michael Yeo, as set forth in his Certification previously filed in this Action,

incorporated by reference herein, purchased Pretium securities at artificially inflated prices during

the Class Period and was damaged upon the publication of the alleged corrective disclosures.

Plaintiff Yeo purchased Pretium securities on the New York Stock Exchange.

35. Defendant Pretium is a corporation organized under the laws of the state of Canada,

maintaining its principal place of business at 570 Granville Street, Suite 1600, Vancouver, British

Columbia, Canada V6C 3P1. Pretium's common stock trades on the New York Stock Exchange

("NYSE") under the ticker symbol "PVG."

36. Defendant Robert A. Quartermain ("Quartermain") has served as the Company's

President, Chief Executive Officer and Director at all relevant times. Quartermain has over 35

years of experience in the mining industry and was the president of Silver Standard Resources Inc.

("Silver Standard"), the predecessor of Pretium, from 1985-2010 through the period of its

increased exploration and focus on the Brucejack Project. According to Pretium's website,

Quartermain has an "intimate working knowledge" of the Brucejack Project. Quartermain also

has a degree in geology and a Master of Science degree in mineral exploration.

13

Page 14: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 14 of 67

37. Quartermain signed the Company's public filings and made materially false and

misleading statements in press releases, reports and on public conference calls throughout the

Class Period, including reports and certifications filed with the SEC.

38. Throughout the Class Period Quartermain received an annual base salary of $400,000

and was subject to an employment agreement whereby he received an annual performance bonus

of 0.25% of the annual increase in Pretium's market capitalization, provided the market

capitalization increased by 10% or more. (See Pretium MD&A for the Six Months Ended June 20,

2013).

39. Defendant Peter de Visser ("Visser") has served as the Company's Chief Financial

Officer at all relevant times. Visser is a former partner of a Vancouver accounting firm which

provided services to the mining community, for 25 years. Visser also acted as a Chief Financial

Officer and consultant to mining companies. According to Pretium's website, Visser is a

Chartered Accountant.

40. Defendant Kenneth C. McNaughton ("McNaughton") has served as the Company's

Vice President and Chief Exploration Officer at all relevant times. McNaughton is a professional

geological engineer with over 30 years of experience in developing and leading mineral

exploration programs. Prior to joining Pretium he was the Senior Vice President of Exploration

for Silver Standard, where he was responsible for all exploration programs since 1991 (including

the Brucejack Project). According to Pretium's website, McNaughton holds a Bachelor of Applied

Science degree and a Master of Applied science degree in geological engineering.

41. By virtue of Quartermain and McNaughton's previous positions at Silver Standard,

which Pretium acquired the Brucejack Project from, they have intimate knowledge all aspects of

the Brucejack Project.

14

Page 15: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 15 of 67

42. The defendants referenced above in ¶J 36 through 40 are referred to herein as the

"Individual Defendants." The Individual Defendants, because of their positions with the

Company, possessed the power and authority to control the contents of Pretium's press releases,

reports to the SEC and SEDAR, Pretium's periodic reports to investors, and presentations to

securities analysts, money and portfolio managers and institutional investors, i.e., the market.

43. Each of these Defendants was provided with copies of the Company's press

releases and other public representations about the Brucejack Project alleged herein to be

misleading prior to or shortly after their issuance and had the ability and opportunity to prevent

their issuance or cause them to be corrected. Because of their positions and access to material non-

public information about Pretium and the Brucejack Project, each of the Individual Defendants

knew, or at least recklessly disregarded that the adverse material facts specified herein had not

been disclosed to and were being concealed from the public and that positive representations which

were being made about the Company's operations at the Brucejack Project were then materially

false and misleading.

DUTY TO DISCLOSE KNOWN TRENDS AND UNCERTAINTIES

44. SEC regulations require that Management's Discussion and Analysis of Financial

Condition and Results of Operations ("MD&A") included in a company's quarterly and annual

financial statements, such as the MD&A included in the Company's 6-K's filed with the SEC

during the Class Period comply with item 303 of Regulation S-K.

45. SEC Regulation S-K (27 CFR 229. 10) requires that every registration statement,

annual report or quarterly report "Management's Discussion and Analysis of Financial Condition

and Results of Operations" ("MD&A"), drafted in compliance with Item 303 of Regulation S-K.

The MD&A requirements are intended to provide material historical and prospective textual

15

Page 16: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 16 of 67

disclosures which enable investors and other users to assess the financial condition and results of

operations of the company, with particular emphasis on the company's prospects for the future

46. Item 303 of SEC Regulation S-K (17 C.F.R. 229.303) together with SEC Staff

Accounting Bulletin No. 101 required Defendants to disclose in the MD&A section of its

registration statement, quarterly reports, and annual reports quarterly filings "unusual or infrequent

transactions, known trends, or uncertainties that have had, or might reasonably be expected to

have, a[n] . . . unfavorable material effect on revenue, operating income or net income and the

relationship between revenue and the costs of the revenue."

47. To determine if a transaction, known trend, or uncertainty must be included in the

MD&A, the SEC has stated that companies should determine whether a trend, demand,

commitment, event, or uncertainty is presently known to management, and whether it is reasonably

likely to have a material effect on the registrant's financial condition or results of operations.

48. The SEC describes the purposes of MD&A in Financial Reporting Release 36

("ERR 36"):

The Commission has long recognized the need for a narrative explanation of the financial statements, because a numerical presentation and brief accompanying footnotes alone may be insufficient for an investor to judge the quality of earnings and the likelihood that past performance is indicative of future performance. MD&A is intended to give investors an opportunity to look at the registrant through the eyes of management by providing a historical and prospective analysis of the registrant's financial condition and results of operations, with a particular emphasis on the registrant's prospects for the future.

This requirement was reaffirmed in SEC Staff Accounting Bulletin No. 101, Revenue Recognition in Financial Statements, Dec. 1999.

49. Defendants were required to disclose but did not, in their quarterly reports filed

during the Class Period, the uncertainty that the Brucejack Project did not contain the quantities

and/or grades of material that could be mined efficiently using bulk mining methods with

associated lower operating costs, and that the 2012 Resource Report was therefore inaccurate. In

16

Page 17: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 17 of 67

particular, Defendants stated: "The Brucejack Project ... will be a 2,700 [tons per day

underground mining operation over a 22-year life-of-mine," and that investors could expect

"[average annual production of 425,700 ounces of gold over the first 10 years and 321,500 ounces

of gold over the life of mine." The fact that the drilling reviewed by Strathcona and Pretium during

the Class Period demonstrated that the Brucej ack Project could not be mined efficiently using bulk

mining methods and that the metrics in the 2012 Resource Report could not be achieved constituted

an uncertainty that "might reasonably be expected to have, a[n] ... unfavorable material effect on

revenue...and therefore Pretium was required to disclose it pursuant to Item 303.

SUBSTANTIVE ALLEGATIONS

Pretium Is Formed To Develop The Brucelack Prolect

50. Pretium is an exploration and development company that was formed by Defendant

Quartermain for the acquisition, exploration and development of precious metal resource

properties in the Americas. On October 28, 2010, Pretium acquired a 100 percent interest in the

Brucejack Project, along with the Snowfield Project and other associated assets, from Silver

Standard Resources Inc. ("Silver Standard") for an aggregate acquisition price of $450 million,

consisting of a cash payment of $233,020,000 and the issuance of a total of 36,163,333 common

shares of Pretium.

51. Pretium proudly proclaims in its public disclosures that it "is creating value through

gold." Presently, the Company's business is focused exclusively on exploration and development

efforts related to the Brucejack Project. Pretium anticipates that "in the absence of additional

mineral projects, the Company will be solely dependent upon the Brucejack Project for its revenue

and profits."

52. As the Company also has acknowledged, it currently has limited financial resources

and generates no operating revenue. As explained in its 2012 Annual Report, "In the future,

17

Page 18: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 18 of 67

[Pretium's] ability to continue exploration, and development and production activities, if any, will

depend on [the Company's] ability to obtain additional external financing. Any unexpected costs,

problems or delays could severely impact [Pretium's] ability to continue exploration and

development activities."

53. Thus, Pretium faces a difficult challenge: It must demonstrate that the Brucejack

Project contains sufficient resources in order to attract and retain investors, otherwise it will be

unable to finance continued exploration that may lead to development of a potentially profitable

gold mine.

The 2012 Resource Report Supports Pretium's Plans For The Brucelack Prolect

54. Following the exploration activities completed by Silver Standard, Pretium

developed a drilling program focused on the Valley of the Kings area ("VOK") of the Brucejack

Project, which was believed to contain high grade materials. In November 2012, the Company

retained Snowden to prepare an updated mineral resource estimate for the VOK based, in part, on

the results from the expanded drilling program (the "2012 Resource Report").

55. In the case of the VOK, the data was considered "highly skewed," meaning that

high grade mineralization and the majority of the metal were located in less than 5 percent of the

data. To address the variances in the data, Snowden separated the lower grade and higher grade

populations and then employed an estimation technique known as Multiple Indicator Kriging in

order to calculate resource estimates for the VOK as a whole. This statistical methodology is

considered non-standard and challenging to apply, and as a result, has been utilized with less

frequency in the industry to perform estimates for operating mines. Because the Multiple Indicator

Kriging Method assumes that gold is continuous throughout, the risk of an estimate being

inaccurate is heightened by the use of this method in a veiny deposit such as the VOK.

18

Page 19: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 19 of 67

56. In addition, because Snowden's model assumed that gold was continuous

throughout, it supported the Company's claims that the Brucejack Project could be mined using

bulk mining methods. Bulk mining involves excavation of large quantities of material without any

attempt to segregate high-grade portions from low-grade portions. 2 In general, bulk mining is

associated with lower operating costs and high production, which contribute to overall

profitability' In contrast, selective mining targets high grade ore and leaves lower grade material

behind .4 This usually entails the use of a much more expensive stoping system and high

exploration and development costs in searching for ore. 5 Selective methods are more appropriate

where the valuable sections of the deposit are rather large, comparatively few in number, and

separated by relatively large volumes of waste, as was the case with the Brucejack Project. 6 Yet,

if the Company was unable to establish that it could mine Brucejack utilizing bulk mining methods,

the economic viability of the mine would be called into serious question.

57. On November 20, 2012, the Company issued a press release announcing Snowden' s

estimates and the filing of the 2012 Resource Report. Specifically, Pretium advised investors that

for the VOK, Indicated Mineral Resources, which are defined as that part of a mineral resource for

which quantity, grade, and other characteristics can be estimated at a level of confidence sufficient

to support mine planning and evaluation of economic viability, increased by 66 percent from prior

2 See McGraw-Hill Dictionary of Scientific and Technical Terms, 6th Edition (2003); see also The Mindat Mineral and Gem Directory ("Mindat. org "), available at http://www.mindat.org/glossary/bulk mining.

See, e.g., William Lacy, "An Introduction to Geology and Hard Rock Mining," Rocky Mountain Mineral Law Foundation: Science and Technology Series, available at https://www.nnmlforg/scitech/lacy/lacy.htm.

See McGraw-Hill Dictionary of Scientific and Technical Terms, 6th Edition (2003); see also Mindat.org, available at http://www.mindat.org/glossary/selective mining.

See Mindat. org, available at http://www.mindat.org/glossary/selective_mining .

6 Jd

19

Page 20: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 20 of 67

estimates, to 8.5 million ounces of gold at a cut-off grade of 5 grams of gold equivalent per tonne.

The cut-off grade of 5 grams of gold equivalent per tonne was significant, because it represented

the minimum grade required in order for material to be considered economically feasible to mine.

In addition, Snowden's resource model found that both Indicated Mineral Resources and Inferred

Mineral Resources contained high grade, economically-viable material, estimated at 16.4 g/t for

Indicated Mineral Resources and 17.0 g/t for Inferred Mineral Resources. Achieving 16.4 g/t was

significant, as the cutoff for mining via less expensive, bulk mining methods was 16 g/t.

58. The 2012 Resource Report was an invaluable asset if the Company hoped to

develop the Brucejack Project, but only if Snowden's findings could be confirmed. Armed with

these favorable results, the Company announced that it would move forward with a bulk sample

program, which would substantiate Snowden's estimates and demonstrate the continuity of high-

grade gold mineralization in the VOK, thereby justifying the use of bulk mining methods at a lower

operating cost.

Pretium Launches The Bulk Sample Program

59. Pretium specifically intended that the Bulk Sample Program would corroborate

Snowden's modeling and the estimates contained in the 2012 Resource Report. The Bulk Sample

Program consisted of two inter-dependent parts. First, a 10,000 ton bulk sample (the "Bulk

Sample") would be excavated from the VOK and subjected to various testing, both onsite through

a sample tower and offsite through a processing mill. Based on Strathcona's criteria, the Bulk

Sample was supposed to be selected from an area consistent with the mineralized domains

analyzed in the 2012 Resource Report and representative of the VOK overall. Second,

approximately 15,000 meters of underground drilling would be completed in the same area. Both

the testing of the Bulk Sample and the drilling results were expected to support Snowden's

projections of the grade, content, and feasibility of mining the Brucejack Project.

20

Page 21: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 21 of 67

60. On January 9, 2013, Pretium officially announced that Strathcona had been engaged

as the Qualified Person "to oversee and report on the 10,000-tonne bulk sample from the Valley

of the Kings." Strathcona is extremely reputable and was the same company who had confirmed

that Bre-X Minerals Ltd., a Calgary-based mining company, had defrauded investors by falsifying

data in connection with a gold mine in Indonesia. 7 The announcement further stated that

"[p]lanning is underway with Strathcona on the work required to be completed prior to excavating

the bulk sample, the procedures for excavating the bulk sample and the sampling protocols."

61. According to Dr. Robert Cameron, a mining engineer and expert in Geostatistics

and Mineral Resources and Ore Reserves,' Strathcona's role on the Brucejack Project was intended

to be distinct from Snowden's. Snowden acted as the engineer, creating the resource model that

estimated the mineral grade and content and the method that could be used to extract the resources

based upon information provided by Pretium. In contrast, Strathcona, as the independent

geologist, would be more "hands on," conducting its own visual inspections and testing at the site.

Additionally, Stratchona had greater access to data concerning the 2012 Resource Report and the

Feasibility Study, as well as the results from the Bulk Sample Program, than what was released to

the public.

In the late 1990's, Bre-X Minerals touted a project in Indonesia, called the Busang Project, as the single largest gold deposit in human history. In 1997, Strathcona's report conclusively proved that the Busang Project was a fraud, as Bre-X introduced placer gold into core samples after drilling. See http ://goldinvestingnews . coml3 852 1/pretium-comes-out-ahead-after-bullc-sample-controversy.html. 8 Dr. Robert E. Cameron has over 30 years of experience in geostatistical analysis of ore reserves, computerized mine planning, mine design, computerized studies for mine production optimization, ultimate pit limit optimization, mine efficiency studies, equipment selection and utilization and operations research. He has completed geostatistical estimations or resource and reserve reviews or audits on over 300 properties worldwide during his career. Dr. Cameron holds B.S., M.S., and Ph.D. degrees in Mining Engineering from the University of Utah and wrote his M. S. thesis on the geostatistical analysis of coal quality and his Ph.D. thesis on the development of the oil shale industry in Utah.

21

Page 22: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 22 of 67

62. The presence of an independent geologist, known as an Independent Qualified

Period ("QP") is critical, especially since the enactment in Canada of National Instrument 43-101,

the series of mining rules that were introduced in Canada after the Bre-X scandal. National

Instrument 43-101 ("NI 43-101") was developed by the Canadian Securities Administrators and

established standards for all public disclosures an issuer makes of scientific information

concerning mineral properties/rights. 9

63. "The idea behind 43-101 was to improve investor confidence by forcing mining

companies to meet very specific guidelines when reporting reserves and estimates. The QP

provides independent verification of a company's data. A miner cannot report a 43-101 compliant

resource estimate for a deposit until a QP has pored over and vouched for the drill results." 10

Additionally, pursuant to NI 43-101 if a company discloses scientific or technical information

about a mineral project or property the company must include the name and relationship to the

company of the qualified person. NI-43-101 Section 3.1

64. The lynchpin of the QP is independence: because of a company's own self-

interested reasons for wanting to report positive results concerning a mineral deposit, an

independent QP's opinions and findings are presumed to be unbiased and fact-based. Thus,

Strathcona would lend credibility to Snowden's analysis and Pretium's claims concerning the

value of the Brucejack Project.

65. On March 5, 2013, in a press release announcing its results for the fourth quarter of

2012 and the entire fiscal year, the Company provided an update on the status of the Brucejack

Project. Specifically, the Company reiterated the mineral resource estimates from the 2012

See http://web.eim.org/standards/MenuPage.efm?seetions 177,18 1&menu229 NT 43-101 available at: http://web.eim.org/standards/doeuments/Bloek484Doe111.pdf.

"See http://www.bloomberg.com/news/20 13-11-1 1/pretium-deelining-amid-doubts-on-gold-projeet.html

22

Page 23: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 23 of 67

Resource Report, stating that "High-grade gold resources in the Valley of the Kings (5.0 g/t gold-

equivalent cut-off now total: 8.5 million ounces of gold in the Indicated Mineral Resource category

(16.1 million tonnes grading 16.4 grams of gold per tonne); and 2.9 million ounces of gold in the

Inferred Mineral Resource category (5.4 million tonnes grading 17.0 grams of gold per tonne)..

The Company's year-end financial statements also reiterated that Strathcona was the independent

qualified person hired to confirm the 2012 Resource Report.

66. On May 10, 2013, the Company issued a press release announcing first quarter

2013 results, and thereafter, on May 13, 2013, the Company filed a Form 6-K with the SEC

annexing as exhibits its Condensed Consolidated Interim Financial Statements for the three months

ended March 31, 2013 and Management Discussion and Analysis for the three months ended

March 31, 2013. Regarding its exploration and mining operations, the Company stated in the press

release and in the Form 6-K, in relevant part:

2013 Exploration Programs

We have completed the access ramp to the Valley of the Kings from the West Zone at the targeted 1345-meter level of the 426600 cross-section, and have outlined the Bulk Sample Program and associated drilling atthe Valley of the Kings beginning later this month (see news release dated May 8, 2013). In addition to targeting an area of mineralization for the bulk sample, the current ramp alignment will allow acceleration of production development as it will be used to provide initial access to the Valley of the Kings and multiple headings for excavation of the planned production declines.

Approximately 15,000 meters of underground drilling will be completed, in support of the Bulk Sample Program, at 7.5-meter and 15-meter centres along 120 meters of strike length and at 15- meter centres vertically for 60 meters above and 60 meters below the 1345-meter level of the Valley of the Kings. We will develop and install supporting infrastructure, cross cut the Valley of the Kings along section 426600, develop the north drill drift and commence the underground drill program later this month. The drill program will commence prior to excavating the bulk sample and run concurrently with the excavation of the bulk sample.

23

Page 24: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 24 of 67

Strathcona Mineral Services Ltd. of Toronto has been engaged as the independent Qualified Person to oversee and report on the 10,000-tonne bulk sample from the Valley of the Kings. Excavation of the bulk sample is scheduled to begin in early June. Planning is continuing with Strathcona Mineral Services on the work required to be completed prior to excavating the bulk sample, the procedures for excavating the bulk sample and the sampling protocols. The final report on the bulk sample is expected later in the year after the compilation of all data.

Feasibility Study

A feasibility study on the high-grade gold opportunity at Brucejack is ongoing, and mine planning is now well underway based on the November 20, 2012 Mineral Resource estimate (see news release dated November 20, 2012.) The Brucejack feasibility study is being advanced with an operating rate of 2,700 tonnes per day, with long-hole stoping and cemented paste backfill chosen for the mining method. Stopes will be mined using a combination of longitudinal and transverse mining, depending on zone width and orientation. Cemented paste tailings will be prepared in a paste plant located on surface and then pumped underground for distribution to the stopes.

As part of the feasibility study, we have completed locked cycle metallurgical testwork. The average locked cycle recoveries for combined gravity and flotation for the Valley of the Kings composites were 98.3% for gold and 92.5% for silver.

The feasibility study for the Brucejack Project is expected to be completed in the second quarter of 2013.

67. On May 8, 2013 Pretium announced that the underground ramp that was built to

access the VOK was completed and that drilling would begin later in the month. Drilling and

excavations would occur concurrently. Pretium reiterated that Strathcona was engaged as the

independent Qualified Person to oversee and report on the 10,000-tonne bulk sample, and stated

that "results from drilling will be reported as they are received."

68. Within a few weeks, Pretium announced that the first underground drilling hole

"intersected visible gold and confirms the projection of high-grade gold mineralized domains."

Indeed, the assay results from the drilling showed gold at a grade of 21.57 g/t, indicative of a high-

quality resource. Additional favorable drilling results were released throughout June 2013, again

24

Page 25: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 25 of 67

appearing to substantiate that, as predicted, the Brucejack Project contained high quantities of high

grade material.

69. On May 28, 2013, the Company issued a press release, which was subsequently

filed on Form 6-K with the SEC on May 31, 2013, announcing that "Initial Valley of the Kings

Underground Drill Hole Confirms Projection Of Mineralized Domains." The May 28, 2013 Press

Release stated, in relevant part:

Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to report that the first underground hole drilled as part of the Valley of the Kings bulk sample program intersected visible gold and confirms the projection of high-grade gold mineralized domains. (See Table I below for assays.)

Selected highlights from hole VU-01 include:

• 21.57 grams of gold per tonne over 12.00 meters, including 388 grams of gold per tonne over 0.50 meters and 99.7 grams of gold per tonne over 0.50 meters;

• 8.38 grams of gold per tonne over 2.00 meters, including 31.10 grams of gold per tonne over 0.40 meters.

Pilot hole VU-Ol was drilled horizontally through the center of the Valley of the Kings section 426600 cross-cut at the 1,345-meter level, and intersected the interpreted mineralized domains.

70. The May 28, 2013 Press Release also explained the Bulk Sample Program and

indicated that "[assay results from underground drilling will be reported as they are received,"

whereas Strathcona's report on the Program was not expected until "later in the year after

compilation of all data." Thus, Defendants deliberately devised a protocol that would withhold

certain data that was necessary to properly interpret the meaning of the preliminary drilling results.

Absent full disclosure, investors were given a false impression of the accuracy of the 2012

Resource Report and the likelihood that the Brucejack Project would be a high production, high

grade mine as Snowden's resource model projected.

25

Page 26: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 26 of 67

The Feasibility Study Is Announced, And The Class Period Begins

71. Defendants compounded their deliberate distortion of the Brucejack Project when,

on June 11, 2013, Pretium announced completion of the Feasibility Study and Technical Report

on the Brucejack Project (the "Feasibility Study"). The Feasibility Study utilized the 2012

Resource Report as the basis for its economic analysis of the costs and potential rates of return in

continuing development of the VOK and the Brucejack Project, even though the Bulk Sample

Program was still underway and the 2012 Resource Report had not been verified.

72. Specifically, the June 11, 2013 Press Release stated: "The mine is planned to

operate with a processing rate of 2,700 tonnes per day and mine a total of 9.6 million tonnes of ore

for the first 10 years at an average mill feed grade of 14.2 grams gold per tonne." According to

the Feasibility Study, investors could expect "Mine life of 22 years producing an estimated 7.1

million ounces of gold." Utilizing this rate of production, which could only be achieved using

bulk mining methods, the Feasibility Study projected initial capital costs of approximately $660

million, with operating costs of approximately $156 million per ton milled. Based upon the

assumption of a high-production, high-grade bulk mining operation, as reflected in the 2012

Resource Report, the Brucejack Project was projected to yield an estimated 42.9% Internal Rate

of Return and over $2 billion Net Present Value at a 5% discount rate, once again boosting investor

confidence in the value of this mine. However, if selective mining needed to be utilized for

production, the rate of return could have been substantially lower.

73. However, Strathcona did not support Defendants' portrayal of the prospects for the

Brucejack Project. Thus, by June 11, 2013, when Defendants announced the Feasibility Study,

the disagreement between Pretium and Strathcona would have surfaced, and the reasons for

Strathcona's concerns that the 2012 Resource Model was "not panning out" would have been

known to Defendants. The Class Period begins on that date.

26

Page 27: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 27 of 67

74. The determination that the Class Period commences on June 11, 2013 is based on,

among other things, Pretium's October 22, 2013 Press Release, as well as the analysis of Dr.

Cameron, who reviewed the Company's press releases, technical reports, and other publicly

available information concerning the Brucejack Project. Pretium's October 22, 2013 press release

revealed that prior to its resignation, Strathcona criticized the Snowden model, because based on

its own inspections, Strathcona found that "[flhe infrequent high-grade intercepts reported in

[Pretium's] press releases have been shown in the underground exposures of the [Bulk Sample

Program] to usually be of very narrow width and associated with narrow geological structures that

occasionally have mineable continuity ...," meaning that it would not be possible to extract the

amounts and grades of gold out of the ground using bulk mining methods as the 2012 Resource

Report predicted. The October 22, 2013 press release also indicated that Strathcona began to raise

objections very early on, based upon "approximately 20% of the underground drilling results, no

assay results from the sample tower and no results from production."

75. Based on his knowledge and expertise in reviewing and auditing over 300 mining

properties worldwide, Dr. Cameron has concluded that "the disagreement between Pretium and

Strathcona likely arose when drilling results started coming in and [were] being reported," which

began on May 28 and June 6, 2013. According to Dr. Cameron, Pretium and Strathcona would

have had the drilling results at least four or five days before the press releases were issued and as

the independent QP responsible for the Bulk Sample Program, Strathcona would have discussed

these results with Pretium before they were released. Furthermore, Dr. Cameron believes that the

diagrams accompanying the June 6, 2013 Press Release show that excavation was almost complete

by that time. Moreover, Strathcona would have conducted underground visual inspections and

other preliminary testing, such as grab samples, at the same time that drilling first began.

27

Page 28: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 28 of 67

76. Dr. Cameron further explains that "Strathcona should have had access to the draft

copy of the report prior to the official release of June 11, 2013. The Feasibility Study indicated

that Brucej ack was expected to be a high-grade, high-production mine processing 2,700 tonnes per

day, with a mine life of 22 years producing an estimated 7.1 million ounces of gold. Graham

Farquharson, the president of Strathcona, has stated that Strathcona does not agree with this

conclusion. Strathcona undoubtedly would have advised Pretivm that it disagreed with the

Feasibility Study prior to this June 11, 2013 announcement."

77. Thus, by June 11, 2013, when the results of the Feasibility Study were announced,

Strathcona's position was clear: " ...there are no valid gold mineral resources for the VOK Zone,

and without resources there can be no mineral reserve, and without mineral reserves there can be

no basis for a Feasibility Study." The fact that Strathcona, the geologist onsite, who had access to

undisclosed information (e.g., underground inspections, drilling data, and preliminary assessments

of the Bulk Sample) directly contradicted Pretium's assessment of the Brucejack Project was

material information that should have been disclosed to investors.

78. According to Pretium's June 19, 2013 Press Release, material from the Bulk

Sample began to be processed through the sample tower during the week of June 23, 2013. At this

time, Strathcona alerted Pretium that the early assay results did not confirm the 2012 Resource

Report. Whereas the 2012 Resource Report predicted large areas of continuously mineable

material, the assay results showed smaller, localized, high-grade deposits surrounded by more non-

mineable waste. Contrary to Pretium's assurances that Brucejack would be a high-grade, high-

production mine, this finding was consistent with Strathcona's view that Brucejack could not be

mined in bulk, but would require extraction of material at a slower rate using more expensive,

selective methods.

28

Page 29: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 29 of 67

79. According to Pretium's July 23, 2013 Press Release, "Underground drilling for the

Program [was] on schedule, with a total of 135 drill holes now completed or in progress comprising

approximately 10,675 meters. Approximately 15,000 meters of underground drilling in 190 holes

will be completed as part of the [Bulk Sample Program." Thus, with approximately 70% of the

drilling complete, Strathcona's concerns were most definitely known to Defendants by this time.

80. Strathcona believed that selective disclosure of only preliminary drilling results,

which highlighted high-grade intercepts and confirmation of mineralized domains, was misleading

to investors, especially because the Bulk Sample was not yielding the results Pretium hoped.

Strathcona continued to object, challenging Snowden's model and the estimates contained in the

2012 Resource Report and insisting that the analysis of the data did not support Pretium's claims

that the Brucejack Project was a high production, high grade resource that would produce 7.1

million ounces of gold over 22 years with a net present value of $2.7 billion and 42.9% internal

rate of return. Strathcona encouraged Pretium to be forthcoming to investors, but Pretium ignored

Strathcona's advice and plowed ahead.

The Bulk Sample Program Is Altered To Exploit The Discovery Of The Cleopatra Vein

81. Then, in July 2013, the Company announced the discovery of the Cleopatra Vein

in the VOK. The Cleopatra Vein is a narrow, but very rich mineralized deposit believed to contain

very high-grade gold. It was discovered during excavation of an area projected to contain extreme

grade mineralization in the 2012 Resource Report. The high-grade drilling results that

accompanied this announcement all came from the Cleopatra Vein, which the Company already

knew existed, based upon the 2012 Resource Report which showed this area of extreme grade

mineralization. At this point, investors only knew about the favorable drilling results, which

continued to confirm the Company's statements about the value of the Brucejack Project.

Defendants did not disclose that the early assay results from the bulk sample tower deviated so

29

Page 30: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 30 of 67

significantly from the estimates set forth in the Resource Model that Strathcona was urging that

they be disclosed. Instead, based only on the "bonanza" results reported from Cleopatra, Pretium

seemed to be on the verge of confirming the 2012 Resource Report, as well as the Feasibility

Study, which would allow the Company to move forward with exploration and development.

82. Unbeknownst to investors, it was exactly at this juncture that Pretium sought to

capitalize on the "discovery" of the Cleopatra Vein and conceal any contradictory results that could

potentially derail the Brucejack Project. Pretium expanded its drilling program in the Cleopatra

Vein, essentially digging deeper into the same narrow area and along the strike line, a method

considered unreliable precisely because it hits the same high-grade material over and over, creating

a misleading impression about the size and extent of the area, which in this case, was not

representative of the VOK overall.

83. On July 23, 2013, after selectively disclosing still more favorable drilling results,

Pretium announced, "Planning is underway with [Strathconaj to increase the portion of the bulk

sample tonnage testing the higher grade blocks in the Indicated Mineral Resource estimate to the

east of the 426600E cross-cut and decrease the portion of the bulk sample tonnage to the west of

the 426600E cross-cut." In other words, Pretium wanted to test more material from the Cleopatra

Vein, which it already knew was extremely high-grade. Moreover, Pretium wanted investors to

believe that Strathcona was on board with this plan to test more material from the Cleopatra Vein,

when, in actuality, Strathcona not only disagreed, but was insisting that Pretium disclose that the

Bulk Sample Program did not support its claims about the Brucejack Project.

84. In addition, on September 9, 2013, the Company reported that the underground

drilling aspect of the Program had been expanded from 15,000 meters to 16,500 meters, and that

"[approximately 10,000 meters of underground exploration drilling is expected to be completed

30

Page 31: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 31 of 67

in addition to the 16,500 meters of drilling included in the Program," all of which was

perpendicular to and along the strike of the Cleopatra Vein. This expansion of the drilling program

was intended to mitigate the impact of testing results from the Bulk Sample, which at that point,

were not substantiating the 2012 Resource Report. By flooding the market with positive drilling

results, which unbeknownst to investors, contained disproportionate sampling from the narrow,

high-grade Cleopatra Vein, Pretium perpetrated the false belief that the Brucejack Project still had

the potential to be a high-production, high-grade bulk mining operation.

Stnithcona Abruptly Resigns, And The Truth Is Revealed

85. The first warning signs that neither the Bulk Sample Program nor the Brucejack

Project were living up to expectations appeared in a press release issued on October 3, 2013. On

that day, Pretium announced Snowden's expanded role, which would now include responsibility

for reviewing and signing off on the processing of the Bulk Sample, which would be sent to an

offsite mill for further analysis. Prior to this announcement, Strathcona was charged with

overseeing the Bulk Sample Program. The significance of this change would soon be apparent.

86. Then, on October 9, 2013, just six days after this announcement, Pretium was

forced to announce that Strathcona had resigned from the Brucejack Project. Pretium also revealed

for the first time that "approximately 4,000 ounces of gold will be produced in total from the

material excavated for the Program, as defined by the [2012 Resource Report]." However, based

upon Snowden's model, over 5,000 ounces of gold should have been produced from the Bulk

Sample. On this news, Pretium shares declined $2.07 per share or over 30%, to close at $4.70 per

share on October 9, 2013. The trading volume for that day was over 3.5 million shares, well in

excess of the average trading volume of approximately 600,000 shares per day for that period.

31

Page 32: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 32 of 67

87. It took Pretium nearly two more weeks before investors had any information

concerning the reasons for Strathcona's withdrawal. In a press release issued on October 22, 2013,

the Company revealed that Strathcona advised Pretium that:

ITihere are no valid gold mineral resources for the VOK Zone, and without mineral resources there can be no mineral reserves, and without mineral reserves there can be no basis for a Feasibility Study

[S]tatements included in all recent press releases [by Pretium] about probable mineral reserves and future gold production [from the Valley of the Kings zone] over a 22-year mine life are erroneous and misleading.

88. The Company also was forced to acknowledge that Strathcona advised: "The

infrequent high-grade intercepts reported in the press releases have been shown in the underground

exposures of the bulk sample program to usually be of very narrow width (0.5 meters) and

associated with narrow geological structures that occasionally have mineable continuity as in the

case of the Cleopatra Vein." In other words, Strathcona did not believe that the favorable drilling

results were indicative of a high-production, high grade resource as the Company had promoted,

because those results were obtained from narrow areas, like the Cleopatra Vein, which were

infrequent and could not be mined using bulk mining methods. In addition, as Pretium was well

aware, Strathcona did not consider the Cleopatra Vein representative of either the VOK or the

Brucejack Project overall. Thus, Strathcona believed that Pretium's disclosures were per se

misleading, because they created the misimpression that the Bulk Sample Program was

substantiating the 2012 Resource Report based on selective disclosure of drilling results, while

withholding negative data from the sample tower and underground inspections.

89. On this news, Pretium shares declined a further $1.27 per share, or over 27%, to

close at $3.36 per share, trading at a volume of over 5.5 million shares, on October 22, 2013.

90. Pretium immediately attempted to back-track from the Bulk Sample Program,

criticizing Strathcona for reaching its conclusions prematurely and for insisting that public

32

Page 33: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 33 of 67

disclosure was necessary before all the data was compiled. Additionally, the Company suddenly

revealed that "Pretium management and Snowden also share significant concerns that the sampling

tower approach for the Valley of the Kings deposit may be flawed," and that the "true test" of the

2012 Resource Report would have to await reconciliation of all results after processing of the Bulk

Sample was complete. However, it was Pretium that had decided to report results from

underground drilling as they were received. Once Pretium began to report these favorable results,

Pretium was required to disclose all information qualifying these results, including the fact that

the firm that it touted as its independent QP had been specifically urging it for months to disclose,

inter al/a, that the results from the Bulk Sample Program did not verify the 2012 Resource Report.

Stratchona, as a seasoned and respected QP, knew that failure to disclose this information was

materially misleading to investors and requested that Pretium disclose it promptly.

91. Moreover, given the significance and role of the independent Qualified Person, the

existence of the disagreement between Strathcona and Pretium was itself a material fact that

Defendants were duty-bound to disclose. Defendants' omission of this material fact from all public

statements concerning the Brucejack Project was intentionally misleading.

Stnithcona Speaks Out

92. On November 25, 2013, investors finally had an opportunity to hear from

Strathcona. In an interview with The Northern Miner, Graham Farquharson, founder and CEO of

Strathcona, provided more detail concerning the reasons for Strathcona'a withdrawal and its

opinion of the Brucejack Project.

93. Specifically, Farquharson stated in the interview:

[T]he main item was that we found the bulk sample program, which was composed of different phases (underground drilling, underground geological mapping, and the results of the sample tower), the main objective of all that was validation of the resource model that Snowden had prepared in November of 2012.

33

Page 34: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 34 of 67

That was the basis for the feasibility study that Pretium did in June of this year, which suggested it was going to a be a big mine producing 425,000 ounces of gold a year for the next ten years, within a 22 year mine life. All that was based on the Snowden model, which had 16 million tonnes with a grade of 16 grams per tonne in the indicated category and a further quantity in the inferred category and we didn 'tfind that.

And Pretium didn't find that, when they did all the underground drilling and geological mapping and the results from the sample tower and so on, so we told them on several occasions that they should be alerting the world that the resource model was not panning out The whole objective of the bulk sample program was to confirm whether or not the resource model was valid and we said it wasn't

94. Farquharson clarified that Strathcona's withdrawal did not have to do with

disagreement over sampling methodologies, or assessment of the total amount of gold extracted

from the Bulk Sample. On the contrary, according to Farquharson, Strathcona withdrew because,

at every stage of the Bulk Sample Program (underground drilling, underground mapping, tower

sampling), it was clear that when taking into consideration all the available data, the results were

far below what had been projected in 2012 Resource Report.

95. Farquharson explained that the total mineral amounts in the Bulk Sample were

skewed by the over-inclusion of material from the Cleopatra Vein and were "not representative of

the rest" of the VOK. Moreover, while that vein itself is of very high grade, it is too narrow to be

mined with the bulk mining processes envisioned by Pretium. As Farquharson clarified:

[W]hat did happen in the bulk-sample program is that a new vein was discovered called the "Cleopatra" vein. It's a narrow vein but high grade, and a different geological occurrence than what was anticipated. The Cleopatra vein is not something that could be mined using bulk-mining methods, at 2,700 tonnes a day and soon. It's high-grade material, but it's a narrow vein that you could only mine at a slow rate. The good grades in that vein do not substantiate or corroborate the initial resource model, which was based on big dimensions, big stopes and the grade of 16 grams per tonne.

34

Page 35: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 35 of 67

96. Likewise, Strathcona told Pretium that none of the results supported the Company's

claims that the Brucejack Project could ever be a high-production, high grade, bulk mining

operation:

We told Pretium that, from all the drilling they've done - and it's a heck of a lot of drilling - and with the sample tower results and so on, none of those come anywhere close to finding a grade of 16 grams per tonne, which is what allows bulk-mining methods.

* * *

[T]here is an excellent chance that they could have a small-tonnage, high-grade gold mine. But they will not have a mine producing 425,000 oz. a year for the next 20 years, as they have been advertising so far.

97. Farquharson's viewpoint is bolstered by the milling results for the 4265 85E cross-

cut portion of the Bulk Sample, which did not include material from the Cleopatra Vein. When

milled, this cross-cut had a grade of only 4 g/t, which was about one-third of what Snowden had

projected from that cross-cut. Significantly, this grade was below the critical S g/t threshold, which

was required to be met in order to be economically feasible to drill, and well below the 16 g/t that

was recommended for bulk mining methods to be worthwhile.

98. According to Farquharson, Strathcona repeatedly encouraged Pretium to be honest

about the Brucejack Project's potential, but "they've been slow to accept that, because it does

make a big change from what they've been telling the markets. But we're absolutely convinced

that if this is what the results indicate, then you should tell the world." When Pretium declined to

do so, Strathcona "gave a lengthy letter to Pretium with [its] reasons for withdrawing." To date,

Pretium has not provided investors with a complete copy of that letter.

35

Page 36: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 36 of 67

99. Farquarshon explained, "We recommended to the company that it publicly disclose

some of our observations.. .When they decided not to it was time to walk away." 11 To be sure,

Farquarshon considers the facts that it pointed out to Pretium to be material. As clarified in

published reports, "[Farquharson's] beef with Pretium centres on when it is appropriate to disclose

material facts. "12

The 2013 Resource Report Reveals The Extent Of Pretium's Fraud

100. Despite Pretium's claims to the contrary, the revised resource estimate prepared by

Snowden in December 2013 (the "2013 Resource Report") demonstrates that Pretium omitted

material information and manipulated the Bulk Sample Program to keep its stock price artificially

inflated.

101. Specifically, even after processing the Bulk Sample through the mill, three of the

five crosscuts, which represent more than half of all the material excavated, yielded only 618

ounces of gold at a grade below 5 g/t, the threshold for material to be considered economically

feasible to mine. More than 60% of the gold produced by the Bulk Sample - 3,642 ounces at a

grade of 39.35 g/t - came from crosscut 426615E, which intersects the Cleopatra Vein. Thus, as

Strathcona advised, Pretium found infrequent, narrow veins containing high-grade mineralization,

surrounded by tons of low-grade, non-economically viable waste. As a result, the total estimated

amount of gold based upon the Bulk Sample crosscuts has been revised from 5,248 ounces in the

2012 Resource Report to 4,096 ounces in the 2013 Resource Report, a decrease of approximately

22 percent. This change in potential output substantially affects the overall profitability of the

See Strata hona speak out on B.C. mining spat. Available at: http://www.stoekhouse.eon/opinionlmovers-shakers/20 13/ 1O/24/eonsultant-reveals-why-it-away-from-pretium-s-%28t-p.

' 2 1d.

36

Page 37: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 37 of 67

Brucejack Project, which was predicated on lower operating costs and higher production

associated with bulk mining.

102. Specifically, according to Dr. Robert Cameron, although the milled results from the

Bulk Sample yielded an average grade of 17.88 grams per ton, it is now apparent that those results

are heavily influenced by sampling from the Cleopatra vein. As Dr. Cameron explains:

The results (gold content) of the bulk sample were positively skewed by Pretivm in what appears to be an intentional oversampling of the Cleopatra vein. By August 1, 2013 Pretivm announced they were revising the sampling program to increase tonnage along the high grade Cleopatra vein and reduce the quantity of low grade tonnage to the west. These modifications would result in increasing the amount of gold they would be able to announce after processing in the bulk sample in full at the Montana mill.

103. In Dr. Cameron's opinion, "The bulk sample taken from crosscut 426615 was

completed along what appears to be the strike of the high grade Cleopatra Vein [see 2013 Resource

Report at pg. 90 figure 14.6]. As a result, the average grade and recovered ounces of the bulk

sample do not reflect typical results expected in other areas of the property as the high grade

material was 'oversampled' in the program."

104. Moreover, according to Dr. Cameron, the 2013 Resource Report suggests that the

Bulk Sample Program was indeed biased as Strathcona concluded:

Despite the fact that the mined results from the sample exceeded expectations from the November 2012 report, Snowden revised both the grade and quantities downward in the bulk sample area in their December 2013 report, so that the resource model does not match the milled results from the bulk sample. Basically, it can be implied that they made adjustments to the resource model because they recognized that gold content of the Bulk Sample was skewed by Cleopatra Vein and the design/execution of the bulk sampling program by Pretivm.

105. In fact, based on Dr. Cameron's analysis, it appears that much of the data from the

Bulk Sample, such as chip samples and channel samples, is excluded from the calculation of the

37

Page 38: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 38 of 67

revised resource estimates in the 2013 Resource Report, demonstrating conclusively that the Bulk

Sample Program failed to validate the 2012 Resource Report as Pretium intended.

106. Furthermore, a review of the data from the underground drilling program illustrates

why selective disclosure of high grade intercepts also was misleading. The 2013 Resource Report

shows drilling of multiple holes from multiple directions in very small areas, especially around the

Cleopatra Vein. As Dr. Cameron explains:

The underground drilling direction was used to explain why investors needed to wait for the final milling for any information, yet they would release "good" drilling results completed along strike as significant intercepts. Drilling either along strike or down-dip of a vein is considered unreliable and as potentially misleading to investors in the industry.

107. Essentially, when the Bulk Sample failed to produce the desired results, Pretium

responded by digging deeper into the Cleopatra Vein, repeatedly announcing that they struck gold,

instead of telling investors that, as Strathcona argued, the resource model was not "panning out."

108. Thus, the revisions to the resource model in the 2013 Resource Report reveal that,

among other things, the Bulk Sample Program failed to validate the 2012 Resource Report and

was so skewed by Defendants' over-sampling of the Cleopatra Vein that it was not even considered

statistically useful in calculating the revised resource estimates. Moreover, Pretium has been

forced to acknowledge that the Brucejack Project is unlikely to become the high production, high

grade resource that has been touted to investors.

MATERIALLY FALSE AND MISLEADING STATEMENTS MADE DURING THE CLASS PERIOD

109. The Class Period begins on June 11, 2013, when Pretium issued a press release

announcing results from the Feasibility Study.

110. On June 11, 2013, the Company announced that a positive feasibility study had

been completed for the Brucejack High-Grade Gold Project, stating in relevant part:

38

Page 39: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 39 of 67

VANCOUVER, BRITISH COLUMBIA--(Marketwired - June 11, 2013) - Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to announce a positive National Instrument 43-101-compliant Feasibility Study for the high-grade gold and silver resources identified to date at its 100%-owned Brucejack Project ("Brucejack" or the "Project") in northern British Columbia. The Feasibility Study was prepared by Tetra Tech.

Highlights (base case using US$1,350/oz gold, US$20/oz silver and exchange rate ofUS$/C$: 1)

• Valley of the Kings Probable Mineral Reserves of 6.6 million ounces of gold (15.1 million tonnes grading 13.6 grams of gold per tonne) and West Zone Proven and Probable Mineral Reserves of 700,000 ounces of gold (3.8 million tonnes grading 5.8 grams of gold per tonne);

• Average annual production of 425,700 ounces of gold over the first 10 years and 321,500 ounces of gold over the life of mine;

• Base Case pre-tax Net Present Value (5% discount) of US$2.7 billion;

• Base Case pre-tax Internal Rate of Return of 42.9%, with payback estimated at 2.1 years;

• Mine life of 22 years producing an estimated 7.1 million ounces of gold;

• Estimated project capital cost, including contingencies, of US$663.5 million;

Average operating costs of C$156.46/tonne milled over mine life.

111. The June 11, 2013 Press Release further stated: "The mine is planned to operate

with a processing rate of 2,700 tonnes per day and mine a total of 9.6 million tonnes of ore for the

first 10 years at an average mill feed grade of 14.2 grams gold per tonne."

112. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that: (1) there was an ongoing dispute between Strathcona

and the Company concerning, among other things, Snowden's resource model and the validity of

the 2012 Resource Report, which formed the basis for the Feasibility Study; and (2) Defendants

39

Page 40: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 40 of 67

were withholding other information reviewed by Strathcona (e.g., inspections and sampling),

indicating that the 2012 Resource Report was inaccurate and that the Brucejack Project would not

be a high-grade, high-production mine that would process 2,700 tons per day and produce 7.1

million ounces of gold over 22 years with a net present value of $2.7 billion and a 42.9% internal

rate of return, which Strathcona was urging Defendants to disclose.

113. On June 26, 2013, the Company issued a press release, which was subsequently

filed on Form 6-K with the SEC on June 28, 2013, announcing the filing of its "NI 43-101

Feasibility Study and Technical Report for the Brucejack Project," and annexing the Feasibility

Study as an exhibit thereto.

114. The Feasibility Study stated: "The Brucejack Project, located in northwestern

British Columbia, will be a 2,700 t/d underground mining operation with a 22-year life-of-mine."

The Feasibility Study also reiterated the mineral resource reserves estimated by Snowden in the

2012 Resource Report. The Feasibility Study further indicated, "The underground mine design

supports the extraction of 2,700 t/d of ore via transverse longhole open stoping (LHOS) and

longitudinal LHOS," which describes a bulk mining methods.

115. The Feasibility Study states that "[for the 22-year [life-of-mind] and 18.99 Mt of

mine plan tonnage, the following pre-tax parameters were calculated: 42.9% internal rate of return

(IRR); 2.1 year payback on the US$663.5 million initial capital; and US$2,687 million net present

value (NPV) at 5% discount rate."

116. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that: (1) there was an ongoing dispute between Strathcona

and the Company concerning, among other things, Snowden's resource model and the validity of

the 2012 Resource Report, which formed the basis for the Feasibility Study; and (2) Defendants

40

Page 41: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 41 of 67

were withholding other information reviewed by Strathcona (e.g., inspections and sampling),

indicating that the 2012 Resource Report was inaccurate and that the Brucejack Project would not

be a high-grade, high-production mine that would process 2,700 tons per day and produce 7.1

million ounces of gold over 22 years with a net present value of $2.7 billion and a 42.9% internal

rate of return, which Strathcona was urging Defendants to disclose.

117. On July 23, 2013, the Company issued a press release announcing the discovery of

the Cleopatra Vein, which was subsequently filed on Form 6-K with the SEC on July 24, 2013,

entitled, "Discovery Of The Cleopatra Vein In The Valley Of The Kings And Continuation Of

Bulk Sample Program." The July 23, 2013 Press Release also selectively disclosed results from

underground drilling. Specifically, the Company stated, in pertinent part:

Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to report the discovery of the Cleopatra Vein within the Valley of the Kings and additional underground drill results from the Valley of the Kings Bulk Sample Program (the "Program") currently underway. (See Table 1 below for assays.)

Selected drill highlights include:

• Hole VU-009 intersected 2,567 grams of gold per tonne uncut over 5.8 meters, including 9,200 grams of gold per tonne uncut over 0.5 meters, 7,180 grams of gold per tonne uncut over 0.5 meters, 10,500 grams of gold per tonne uncut over 0.5 meters and 1,765 grams of gold per tonne uncut over 0.5 meters;

• Hole VU-013 intersected 2,560 grams of gold per tonne uncut over 0.54 meters;

• Hole VU-023 intersected 1,405 grams of gold per tonne uncut over 0.5 meters;

• Hole VU-025 intersected 2,600 grams of gold per tonne uncut over 0.5 meters;

• Hole VU-032 intersected 4,030 grams of gold per tonne uncut over 0.5 meters: and

41

Page 42: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 42 of 67

• Hole VU-053 intersected 27,000 grams of gold per tonne uncut over 0.5 meters.

Holes VU-009, VU-013, VU-023 and VU-025 noted above were drilled on section 426615E as part of the Program, along strike of the newly discovered Cleopatra Vein. Holes VU-032 and VU-053 noted above were drilled to test the newly discovered Cleopatra Vein along strike above the 1345-meter elevation.

118. The Company also described the discovery of the Cleopatra Vein and indicated that

"[a]dditional underground drilling and excavating [was] underway to test the extent of the

Cleopatra Vein."

119. The reporting of drilling results from the Cleopatra Vein was false or misleading

and/or omitted material information, because Defendants failed to disclose that: (1) the Cleopatra

Vein was a narrow geological structure that was not representative of the VOK overall; and (2)

drilling results in the Cleopatra Vein did not demonstrate that the Brucejack Project would be a

high-grade, high-production mine that would process 2,700 tons per day and produce 7.1 million

ounces of gold over 22 years with a net present value of $2.7 billion and a 42.9% internal rate of

return; (3) drilling had been expanded in the Cleopatra Vein in order to conceal the fact that the

Bulk Sample was not yielding favorable results, thus perpetuating the false impression that the

Brucejack Project was the high-grade, high-production resource projected by the 2012 Resource

Report; and (4) Strathcona was not on board with Pretium's plan to expand drilling and test more

material from the Cleopatra Vein, because doing so would skew the Bulk Sample results.

Moreover, the presentation of drilling results was misleading, because it omitted information

concerning the Bulk Sample results and other data, which demonstrated that Brucejack could not

be mined utilizing bulk mining methods.

120. With respect to the Bulk Sample Program, the Company stated: "Planning is

underway with Strathcona Mineral Services Ltd. ("Strathcona"), the independent Qualified Person

42

Page 43: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 43 of 67

for the Program, to increase the portion of the bulk sample tonnage testing the higher grade blocks

in the Indicated Mineral Resource estimate to the east of the 426600E cross-cut and decrease the

portion of the bulk sample tonnage to the west of the 426600E cross-cut."

121. This statement was false and misleading and/or omitted material information,

because Defendants failed to disclose that Strathcona was not on board with any plans to change

the testing of the Bulk Sample, and in fact, had been pressuring Pretium to make full disclosure of

the Bulk Sample results so that investors would know that the resource model was not "panning

out." The statement also was false and misleading, because it deliberately withheld results from

the Bulk Sample, which demonstrated that the 2012 Resource Report did not accurately project

the quantities and grade of material in the VOK, and which indicated that the Brucejack Project

would not be a high-grade, high- production mine that would process 2,700 tons per day and

produce 7.1 million ounces of gold over 22 years with a net present value of $2.7 billion and a

42.9% internal rate of return. Instead, Defendants were attempting to test more material from the

Cleopatra Vein in order to skew the results of the Bulk Sample Program. Furthermore, the

statement omitted information about Defendants' ongoing disagreement with Strathcona and

Strathcona's criticism of the 2012 Resource Report, which given Strathcona's role as the

independent QP and access to information, was material to investors.

122. On August 1, 2013, the Company issued a press release, which was subsequently

filed on Form 6-K with the SEC on August 5, 2013, reporting Second Quarter 2013 results and

updating investors on the status of the Brucejack Project. The Company reiterated information

from prior press releases concerning mineral resource estimates and the expectation that the

Brucejack Project would be a high-production, high-grade mine. The Company also repeated the

results from the Feasibility Study, namely that Brucej ack was expected to achieve "average annual

43

Page 44: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 44 of 67

production of 425,700 ounces of gold over the first 10 years and 321,000 ounces of gold over the

life of the mine" and would have a "[m]me life of 22 years producing an estimated 7.1 million

ounces of gold.

123. Defendants' statements concerning the Feasibility Study were false and misleading

and/or omitted material information, because they failed to disclose that: (1) there was an ongoing

dispute between Strathcona and the Company concerning, among other things, Snowden's

resource model and the validity of the 2012 Resource Report, which formed the basis for the

Feasibility Study; and (2) Defendants were withholding other data demonstrating that the 2012

Resource Report was inaccurate and that the Brucejack Project would not be a high-grade, high-

production mine that would process 2,700 tons per day and produce 7.1 million ounces of gold

over 22 years with a net present value of $2.7 billion and a 42.9% internal rate of return, despite

strong recommendations from Strathcona that such information should be disclosed.

124. With respect to the Bulk Sample Program, the August 1, 2013 Press Release stated:

Planning is underway with Strathcona Mineral Services Ltd ("Strathcona '), the independent Qualified Person for the Program, to increase the portion of the bulk sample tonnage testing the higher grade blocks in the Indicated Mineral Resource estimate to the east of the 426600E cross-cut and decrease the portion of the bulk sample tonnage to the west of the 426600E cross-cut. Bulk sample material excavated to date, approximately 7,000 tonnes, has been processed through the sample tower and is being transported offsite.

Strathcona Mineral Services Ltd. of Toronto has been engaged as the independent Qualified Person to oversee and report on the 10,000-tonne bulk sample from the Valley of the Kings.

125. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that Strathcona was not on board with any plans to change

the testing of the Bulk Sample, and in fact, had been pressuring Pretium to make full disclosure of

the Bulk Sample results so that investors would know that the resource model was not "panning

44

Page 45: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 45 of 67

out." These statements also were false and misleading, because they deliberately withheld results

from the Bulk Sample, which demonstrated that the 2012 Resource Report did not accurately

project the quantities and grade of material in the VOK, and which indicated that the Brucejack

Project would not be a high-grade, high- production mine that would process 2,700 tons per day

and produce 7.1 million ounces of gold over 22 years with a net present value of $2.7 billion and

a 42.9% internal rate of return. Instead, Defendants were attempting to test more material from

the Cleopatra Vein in order to skew the results of the Bulk Sample Program. Furthermore, these

statements omitted information about Defendants' ongoing disagreement with Strathcona and

Strathcona's criticism of the 2012 Resource Report, which given Strathcona's role as the

independent QP and access to information, was material to investors.

126. With respect to the Cleopatra Vein, the August 1, 2013 Press Release stated:

"[Flurther underground drilling will be carried out targeting similar feeder structures. In addition,

planning is underway for a surface drilling program, following completion of the Bulk Sample

Program, to expand the Valley of the Kings resources and test the Cleopatra Vein to surface and

for similar feeder structures."

127. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that: (1) the Cleopatra Vein was a narrow geological

structure that was not representative of the VOK overall; (2) drilling results in the Cleopatra Vein

did not demonstrate that the Brucejack Project would be a high-grade, high-production resource

that would process 2,700 tons per day and produce 7.1 million ounces of gold over 22 years with

a net present value of $2.7 billion and a 42.9% internal rate of return, despite strong

recommendations from Strathcona that such information should be disclosed; (3) drilling had been

expanded in the Cleopatra Vein in order to conceal the fact that the Bulk Sample was not yielding

45

Page 46: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 46 of 67

favorable results, thus perpetuating the false impression that the Brucejack Project was the high-

grade, high-production resource projected by the 2012 Resource Report; and (4) Strathcona was

not on board with Pretium's plan to expand drilling and test more material from the Cleopatra

Vein, because doing so would skew the Bulk Sample results.

128. On August 15, 2013, the Company issued a press release announcing, "Pretium

Resources Inc.: Bulk Sample Program Continues to Confirm Projection of Mineralized Domains."

The August 15, 2013 Press Release stated, in relevant part:

Pretium Resources Inc. (TSX: PVG)(NYSE :PVG) ("Pretivm") is pleased to report additional underground drill results from the Valley of the Kings Bulk Sample Program (the "Program") currently underway. Assays from the Program continue to confirm the projection of high-grade gold mineralized domains, and visible gold continues to be encountered (See Table 1 below for assays.)

129. This statement was false and misleading and/or omitted material information,

because Defendants: (1) created the false impression that the drilling results provided confirmation

of the findings in the 2012 Resource Report; (2) withheld other information from the Bulk Sample

Program, including negative results from the sample tower, which demonstrated that the 2012

Resource Report was not accurate and that the Brucejack Project would not be able to process

2,700 tons per day and produce 7.1 million ounces of gold over 22 years with a net present value

of $2.7 billion and a 42.9% internal rate of return, despite strong recommendations from Strathcona

that such information should be disclosed; and (3) failed to disclose on ongoing dispute with

Strathcona, which raised concerns about the Company's disclosures regarding the economic

viability of the Brucejack Project. Moreover, the presentation of underground drill results was

misleading, because it omitted information concerning the Bulk Sample results and other data,

which demonstrated that Brucejack could not be mined utilizing bulk mining methods.

130. With respect to the Bulk Sample Program, the Company disclosed:

46

Page 47: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 47 of 67

The excavation of the four cross-cuts and one lateral drift planned for the 10,000-tonne bulk sample is nearing completion. Based on available tonnage under the legislated 10,000-tonne bulk sample limit, the lateral drift will now be excavated from 426615E to 426645E crosscuts, with any additional available tonnage to be a drift excavated from 426555E to 426585E crosscuts (in lieu of a drift from 426585E to 426615E crosscuts as originally planned). Bulk sample material excavated to date, approximately 8,600 tonnes, has been processed through the sample tower and is being transported offsite.

* * *

The 1345-meter level, centered at the 426600E cross-section of the Valley of the Kings, was selected as the bulk sample location based on Strathcona's requirements that the bulk sample be excavated from an area representative of the (a) drillhole density that informs the Indicated Mineral Resource, (b) average grade of the Indicated Mineral Resource and the global resource for the Valley of the Kings, (c) proportion of low-grade, high-grade and extreme grade populations in the overall Indicated Mineral Resource and (d) style of stockwork gold mineralization characteristic of the Valley of the Kings.

131. These statements were false and misleading, because Defendants failed to disclose

that (1) they had altered the Bulk Sample Program in order to test more material from the Cleopatra

Vein and similar areas, so that the Bulk Sample would produce more favorable results; and (2)

Strathcona did not agree that more material should be excavated from the Cleopatra Vein as part

of the Bulk Sample Program, because doing so would skew the results.

132. With respect to the Cleopatra Vein, the August 15, 2013 Press Release stated:

"Additional underground drilling and excavating is underway to test the extent of the recently-

discovered high-grade Cleopatra Vein in the Valley of the Kings ... Following the completion of

the Bulk Sample Program, a surface drill program is planned to expand the Valley of the Kings

resources and test the Cleopatra Vein to surface and for similar feeder structures." The Company

again reiterated that "Strathcona Mineral Services Ltd. ("Strathcona") had been engaged as the

independent Qualified Person to oversee and report on the 10,000-tonne bulk sample for the

Program.

47

Page 48: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 48 of 67

133. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that: (1) the Cleopatra Vein was a narrow geological

structure that was not representative of the VOK overall; (2) drilling results in the Cleopatra Vein

did not demonstrate that the Brucejack Project would be a high-grade, high-production resource

that would process 2,700 tons per day and produce 7.1 million ounces of gold over 22 years with

a net present value of $2.7 billion and a 42.9% internal rate of return, despite strong

recommendations from Strathcona that such information should be disclosed; (3) drilling had been

expanded in the Cleopatra Vein in order to conceal the fact that the Bulk Sample was not yielding

favorable results, thus perpetuating the false impression that the Brucejack Project was the high-

grade, high-production resource projected by the 2012 Resource Report; and (4) Strathcona was

not on board with Pretium's plan to expand drilling and test more material from the Cleopatra

Vein, because doing so would skew the Bulk Sample results..

134. On September 9, 2013, the Company issued a press release announcing that

"Underground Drilling Continues To Intersect High-Grade Gold." The September 9, 2013 Press

Release stated, "Assays from both Program and non-Program exploration underground drilling

continue to confirm the projection of high-grade gold mineralized domains, with numerous

intersections encountering gold grading over 1,000 grams per tonne." The September 9, 2013

Press Release included "selected drill highlights," which reported on "15 high-grade gold

intersections."

135. These statements were false and misleading and/or omitted material information,

because Defendants: (1) created the false impression that the drilling results provided confirmation

of the findings in the 2012 Resource Report; (2) withheld other information from the Bulk Sample

Program, including negative results from the sample tower, which demonstrated that the 2012

48

Page 49: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 49 of 67

Resource Report was not accurate and that the Brucejack Project would not be able to process

2,700 tons per day and produce 7.1 million ounces of gold over 22 years with a net present value

of $2.7 billion and a 42.9% internal rate of return, despite strong recommendations from Strathcona

that such information should be disclosed; and (3) failed to disclose an ongoing dispute with

Strathcona, which raised serious concerns regarding the economic viability of the Brucejack

Project. Moreover, the presentation of drilling results was misleading, because it omitted

information concerning the Bulk Sample results and other data, which demonstrated that Brucejack

could not be mined utilizing bulk mining methods.

136. With respect to the Bulk Sample Program, the September 9, 2013 Press Release

indicated that the 10,000 ton bulk sample had been fully excavated and processed through the

sample tower. Furthermore, the Company stated that "[d]ue to the projected time to complete

assaying of the samples from the sample tower, Strathcona's report on the Program is now

expected in early 2014 after compilation of all data."

137. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that: (1) information from the Bulk Sample that was already

available to Defendants indicated that the 2012 Resource Model was not "panning out" and that

the Brucejack Project would not be able to process 2,700 tons per day and produce 7.1 million

ounces of gold over 22 years with a net present value of $2.7 billion and a 42.9% internal rate of

return; and (2) there was an ongoing dispute with Strathcona and the Company concerning, among

other things, the validity of the 2012 Resource Report, and Strathcona was insisting that the

Company correct its prior disclosures, which was the real reason why Strathcona's report would

be delayed.

49

Page 50: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 50 of 67

138. With respect to the Cleopatra Vein, the Company disclosed that the drilling

program had been expanded, explaining:

Underground exploration drilling is currently testing high-grade mineralization to the west, east and below the bulk sample location. Approximately 10,000 meters of underground exploration drilling is expected to be completed in addition to the 16,500 meters of drilling included in the Program, with approximately 6,500 meters completed to date.

The surface drill program at the Valley of the Kings has commenced with the first drill mobilized to site and targeting high-grade mineralization in the Valley of the Kings to the west of the bulk sample location. A second drill will be on site shortly and will follow-up on high-grade intersections at the eastern extent of the Valley of the Kings. A total of 5,000 meters is currently planned for the surface drill program.

139. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that drilling had been expanded in the Cleopatra Vein in

order to conceal the fact that the Bulk Sample was not yielding favorable results, thus perpetuating

the false impression, despite Strathcona's objections, that the Brucejack Project was the high-

grade, high-production resource projected by the 2012 Resource Report. Moreover, the

presentation of drilling results from the Cleopatra Vein was misleading, because it omitted

information concerning the Bulk Sample, as well as other data, which demonstrated that the

Brucejack Project could not be mined utilizing bulk mining methods.

140. On September 23, 2013, the Company issued a press release announcing further

results from the VOK project exploration, stating in relevant part:

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 23, 2013) - Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to report additional underground drill results from the Valley of the Kings Bulk Sample Program (the "Program") currently underway, as well as additional exploration drilling in the Valley of the Kings extending beyond the area of the Program. Assays from both Program and non-Program exploration underground drilling continue to confirm the projection of high-grade gold mineralized domains, with numerous intersections

50

Page 51: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 51 of 67

encountering gold grading over 1,000 grams per tonne. (See Table 1 below for assays.)

141. These statements were false and misleading and/or omitted material information,

because Defendants: (1) created the false impression that the drilling results provided confirmation

of the findings in the 2012 Resource Report; (2) withheld other information from the Bulk Sample

Program, including negative results from the sample tower, which demonstrated that the 2012

Resource Report was not accurate; and (3) failed to disclose on ongoing dispute with Strathcona,

which raised serious concerns regarding the economic viability of the Brucejack Project. The

presentation of this information was also misleading, because it omitted information concerning

the Bulk Sample results and other data, which demonstrated that Brucejack could not be mined

utilizing bulk mining methods.

142. On October 3, 2013, the Company issued a press release announcing that,

"Processing Underway for Bulk Sample Material." The Company stated in relevant part:

Bulk Sample Processing

All of the excavated material from the Program has been sampled with a sample tower at Brucejack. The material not designated for assaying (comprising approximately 10,000 tonnes) is being shipped to a custom mill in Montana, where processing is now underway ... Gold recoveries are expected to average approximately 90%. Total processing is expected to take approximately 10 weeks and be completed in the fourth quarter. The amount of gold and silver produced by the mill will be reported over this period.

The Company stated that "Snowden Mining Industry Consultants' independent Qualified Persons

are responsible for the review and sign-off of the milling and processing component of the

Program" and then reiterated that "Strathcona Mineral Services Ltd. ("Strathcona") has been

engaged as the independent Qualified Person to oversee and report on the 10,000-tonne bulk

sample for the Program."

51

Page 52: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 52 of 67

143. These statements were false and misleading and/or omitted material information,

because Defendants failed to disclose that Strathcona was not on board with any plans to change

the testing of the Bulk Sample so that more material would be tested from the Cleopatra Vein, and

in fact, had been pressuring Pretium to make full disclosure of the Bulk Sample results so that

investors would know that the resource model was not "panning out." These statements also were

false and misleading, because it deliberately withheld results from the Bulk Sample, which

demonstrated that the 2012 Resource Report did not accurately project the quantities and grade of

material in the VOK, and which indicated that the Brucejack Project would not be a high-grade,

high- production mine that would process 2,700 tons per day and produce 7.1 million ounces of

gold over 22 years with a net present value of $2.7 billion and a 42.9% internal rate of return.

Instead, Defendants were attempting to test more material from the Cleopatra Vein in order to

skew the results of the Bulk Sample Program. Furthermore, these statements omitted information

about Defendants' ongoing disagreement with Strathcona and Strathcona's criticism of the 2012

Resource Report, which given Strathcona's role as the independent QP and access to information,

was material to investors. Defendants also failed to disclose that Snowden's role was expanded in

an effort to mitigate the impact of Strathcona's impending resignation.

144. In touting Strathcona as Pretium's independent Qualified Person in press releases

throughout the Class Period and in deciding to disclose information concerning the Brucejack

Project and the Cleopatra Vein, Defendants were duty bound to update investors with material

information concerning Strathcona's opinions. Defendants' failure to do so rendered all

subsequent statements which referenced Stratchona's role on the BruceJack Project false and

misleading.

52

Page 53: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 53 of 67

LOSS CAUSATION

145. Defendants' wrongful conduct, as alleged herein, directly and proximately caused

the economic losses suffered by Plaintiffs.

146. On October 9, 2013, Pretium shocked investors when it announced that Strathcona

had abruptly resigned from the Brucejack Project. The announcement of Stratchona's resignation

signaled to the market there was a serious dispute between Strathcona and Pretium regarding the

results of the Bulk Sample Program.

147. On October 9, 2013, Pretium also revealed for the first time that "Lilt is expected

that approximately 4,000 ounces of gold will be produced in total from the material excavated for

the Program, as defined by the Valley of the [2012 Resource Report] for that area of the Valley of

the Kings." This amount was nearly 24% less than the 5,248 ounces initially projected bythe 2012

Resource Report.

148. Following this adverse news, Pretium shares declined $2.07 per share or over 30%,

to close at $4.70 per share on October 9, 2013. The trading volume for that day was over 3.5

million shares, well in excess of the average trading volume of approximately 600,000 shares per

day for that period. Thus, this served as a corrective disclosure to the market that Pretium's prior

claims as to the nature and extent of the gold that could be mined in the VOK were false and/or

misleading.

149. It took Pretium nearly two more weeks before investors had any information

concerning the reasons for Strathcona's withdrawal. In a press release issued on October 22, 2013,

the Company revealed that Strathcona advised Pretium that:

[T]here are no valid gold mineral resources for the VOK Zone, and without mineral resources there can be no mineral reserves, and without mineral reserves there can be no basis for a Feasibility Study

53

Page 54: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 54 of 67

[S]tatements included in all recent press releases [by Pretium] about probable mineral reserves and future gold production [from the Valley of the Kings zone] over a 22-year mine life are erroneous and misleading.

150. In addition, the Company was forced to acknowledge that Strathcona advised:

"The infrequent high-grade intercepts reported in the press releases have been shown in the

underground exposures of the bulk sample program to usually be of very narrow width (0.5 meters)

and associated with narrow geological structures that occasionally have mineable continuity as in

the case of the Cleopatra Vein." Thus, investors were finally alerted to the fact that (i) the Bulk

Sample Program had yielded negative results that did not confirm the 2012 Resource Report, as

the Company had intended; and (ii) Strathcona was never on board with Pretium's distorted

presentation of the Brucejack Project as a high-grade, high-production resource that would process

2,700 tons per day and produce 7.1 million ounces of gold over 22 years with a net present value

of $2.7 billion and a 42.9% internal rate of return, and in fact, had told Pretium that its disclosures

were misleading.

151. On this news, Pretium shares declined a further $1.27 per share, or over 27%, to

close at $3.36 per share, trading at a volume of over 5.5 million shares, on October 22, 2013.

ADDITIONAL SCIENTER ALLEGATIONS

152. The Individual Defendants, as directors and/or officers of Pretium during the Class

Period, are liable as direct participants in all of the wrongs complained of herein. Through their

positions of control and authority, these Defendants were in a position to, and did, control all of

the Company's false and misleading statements and omissions, including the contents of SEC

filings and press releases, as set forth herein.

153. As alleged herein, Defendants acted with scienter in that they knew, or at least

recklessly disregarded, that the public documents and statements issued or disseminated by

Defendants in the name of the Company were materially false and misleading; they knew that such

54

Page 55: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 55 of 67

statements or documents would be issued or disseminated to the investing public; and they

knowingly and substantially participated or acquiesced in the issuance or dissemination of such

statements or documents as primary violations of federal securities laws. The state of mind of

Pretium's senior management, including the Individual Defendants, is imputed to Pretium.

154. Because the Brucejack Project is the Company's only project in development, and

because the Company's future is wholly dependent on that project's advancement, the Individual

Defendants cannot credibly claim that they were unaware of, inter al/a, (1) Strathcona's critique

of the Resource model and disagreement with Pretium; (2) Strathcona's view of the Company's

press releases as erroneous and misleading; (3) Strathcona's insistence that data other than

favorable underground drilling results be disclosed; (4) the existence of contradictory data

demonstrating that the 2012 Resource Report was inaccurate; (5) changes to the Bulk Sample

Program that resulted in over-sampling the Cleopatra Vein, thereby skewing the results; and (6)

revisions to the 2012 Resource Report demonstrating that the Brucejack Project would not be a

high production, high grade resource, that would process 2,700 tons per day and produce 7.1

million ounces of gold over 22 years with a net present value of $2.7 billion and a 42.9% internal

rate of return, as the Company advertised.

155. A strong inference of scienter is supported by the following facts that demonstrate

Defendants' conscious disregard, or at least reckless disregard for the truth of their representations:

a) all of the Individual Defendants had extensive experience in the mining industry (fflJ); b)

Pretium was a single project company and all of the company's future revenues would be derived

from the mining of the Brucejack Project; and c) Defendants changed the Bulk Sample Program

to over-sample the Cleopatra Vein despite Strathcona's insistence to the contrary.

55

Page 56: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 56 of 67

156. In addition, with respect to Defendant Quartermain, besides a base salary,

Quartermain was also subject to an employment contract with Pretium whereby he was entitled to

an annual performance bonus of 0.25% of the annual increase in the market capitalization of the

Company (provided the increase in market capitalization was 10% or more). See Pretium Form

40F for the fiscal year ended December 31, 2013 filed with the SEC on March 31, 2014. This

highly unusual compensation structure supports an inference of scienter, in that it provides a strong

incentive to prop up Pretium's stock price, thereby increasing the total dollar value of all of

Pretium's outstanding shares, resulting in increased compensation for Defendant Quartermain.

NO SAFE HARBOR

157. The statutory safe harbor provided for forward-looking statements under certain

circumstances does not apply to any of the allegedly false statements pleaded in this complaint

because Defendants' false and misleading representations and/or omissions concerned present

and/or historical facts about the BruceJack Project and negative trends that had occurred and

continued.

158. Many of the specific statements pleaded herein were not identified as "forward-

looking" statements when made. To the extent there were any forward —looking statements, there

were no meaningful cautionary statements identifying the fact that Pretium' s own Qualified Person

disavowed them.

159. Alternatively, to the extent that the statutory safe-harbor does apply to any forward-

looking statements pleaded herein, Defendants are liable for those false forward-looking

statements because at the time each of those forward-looking statements was made, that particular

speaking knew that the particular forward looking statement was materially misleading, and/or the

forward-looking statement was authorized and/or approved by an executive at Pretium who knew

that those statements were false when made.

56

Page 57: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 57 of 67

EFFICIENT MARKET

160. The market for Pretium's securities was an efficient market during the Class Period

for the following reasons, among others:

(a) Pretium's stock met the requirements for listing, and was listed and actively

traded on the NYSE, a highly efficient automated market;

(b) Asa regulated issuer, Pretium filed period public reports with the SEC and/or

NYSE;

(c) Pretium regularly communicated with investors via established market

communication mechanisms, including through regular dissemination of press

releases on the national circuits of major news wire services and through other

wide-ranging public disclosures such as communications with the financial

press and other similar reporting services;

(d) Pretium was followed by securities analysts including BMO Capital Markets,

RBC Capital Markets, Citibank and CIBC and other brokerage and research

firms who wrote research reports about the Company, and these reports were

distributed widely;

(e) Pretium met the SEC requirements to file an S-3 registration statement during

the Class Period;

(f) According to Pretium's Form 6-K filed with the SEC on November 8, 2013

Pretium had a weighted average of 99,774,627 common shares outstanding for

the nine months ended September 30, 2013.

(g) On average, approximately 2.3% of Pretium's 99,774,627 outstanding shares

were traded on a weekly basis during the Class Period;

57

Page 58: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 58 of 67

(h) Unexpected material news concerning Pretium was rapidly reflected in

Pretium's share price.

161. Based upon the foregoing, the market for Pretium's securities promptly digested

current information regarding Pretium from all publicly available resources and reflected such

information in Pretium's share price.

APPLICABILITY OF PRESUMPTION OF RELIANCE: AFFILIATED UTE

162. Neither Plaintiff nor the Class need prove reliance - either individually or as a class

- because under the circumstances of this case, which involve omissions of material fact as

described above, positive proof of reliance is not a prerequisite to recovery, pursuant to the ruling

of the United States Supreme Court in Affiliated Ute Citizens of Utah v. United States, 406 U.S.

128; 92 S. Ct. 1456; 31 L. Ed. 2d 741; 1972 U.S. LEXIS 163; Fed. Sec. (1972). All that is

necessary is that the facts withheld be material in the sense that a reasonable investor might have

considered the omitted information important in deciding whether to buy or sell the subject

security.

PLAINTIFF'S CLASS ACTION ALLEGATIONS

163. Lead Plaintiff brings this action as a class action pursuant to Federal Rule of Civil

Procedure 23(a) and (b)(3) on behalf of a Class, consisting of all those who purchased or otherwise

acquired Pretium securities during the Class Period (the "Class"); and were damaged upon the

revelation of the alleged corrective disclosures. Excluded from the Class are defendants herein, the

officers and directors of the Company, at all relevant times, members of their immediate families

and their legal representatives, heirs, successors or assigns and any entity in which defendants have

or had a controlling interest.

164. The members of the Class are so numerous that joinder of all members is

impracticable. Throughout the Class Period, Pretium securities were actively traded on the NYSE.

58

Page 59: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 59 of 67

While the exact number of Class members is unknown to Lead Plaintiff at this time and can be

ascertained only through appropriate discovery, Lead Plaintiff believes that there are hundreds or

thousands of members in the proposed Class. Record owners and other members of the Class may

be identified from records maintained by Pretium or its transfer agent and may be notified of the

pendency of this action by mail, using the form of notice similar to that customarily used in

securities class actions.

165. Lead Plaintiff's claims are typical of the claims of the members of the Class as all

members of the Class are similarly affected by defendants' wrongful conduct in violation of federal

law that is complained of herein.

166. Lead Plaintiff will fairly and adequately protect the interests of the members of the

Class and has retained counsel competent and experienced in class and securities litigation.

Plaintiff has no interests antagonistic to or in conflict with those of the Class.

167. Common questions of law and fact exist as to all members of the Class and

predominate over any questions solely affecting individual members of the Class. Among the

questions of law and fact common to the Class are:

. whether the federal securities laws were violated by defendants' acts as alleged

herein;

. whether statements made by defendants to the investing public during the Class

Period misrepresented material facts about the business, operations and management of

Pretium;

. whether the Individual Defendants caused Pretium to issue false and misleading

financial statements during the Class Period;

59

Page 60: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 60 of 67

. whether defendants acted knowingly or recklessly in issuing false and

misleading financial statements;

. whether the prices of Pretium securities during the Class Period were artificially

inflated because of the defendants' conduct complained of herein; and

. whether the members of the Class have sustained damages and, if so, what is

the proper measure of damages.

168. A class action is superior to all other available methods for the fair and efficient

adjudication of this controversy since joinder of all members is impracticable. Furthermore, as the

damages suffered by individual Class members may be relatively small, the expense and burden

of individual litigation make it impossible for members of the Class to individually redress the

wrongs done to them. There will be no difficulty in the management of this action as a class action.

169. Lead Plaintiff will rely, in part, upon the presumption of reliance established by the

fraud-on-the-market doctrine in that:

. defendants made public misrepresentations or failed to disclose material facts

during the Class Period;

. the omissions and misrepresentations were material;

. Pretium securities are traded in efficient markets;

the Company's shares were liquid and traded with moderate to heavy volume

during the Class Period;

the Company traded on the NYSE, and was covered by multiple analysts;

the misrepresentations and omissions alleged would tend to induce a reasonable

investor to misjudge the value of the Company's securities; and

60

Page 61: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 61 of 67

. Plaintiff and members of the Class purchased and/or sold Pretium securities

between the time the defendants failed to disclose or misrepresented material facts and the

time the true facts were disclosed, without knowledge of the omitted or misrepresented

facts.

170. Based upon the foregoing, Plaintiff and the members of the Class are entitled to a

presumption of reliance upon the integrity of the market.

COUNT I

(Against All Defendants For Violations of Section 10(k) And Rule lOb-S Promulgated Thereunder)

171. Lead Plaintiff repeats and realleges each and every allegation contained above as if

fully set forth herein.

172. This Count is asserted against Defendants and is based upon Section 10(b) of the

Exchange Act, 15 U.S.C. § 78j(b), and Rule lOb-S promulgated thereunder by the SEC.

173. During the Class Period, Defendants engaged in a plan, scheme, conspiracy and

course of conduct, pursuant to which they knowingly or recklessly engaged in acts, transactions,

practices and courses of business which operated as a fraud and deceit upon Plaintiffs and the other

members of the Class; made various untrue statements of material facts and omitted to state

material facts necessary in order to make the statements made, in light of the circumstances under

which they were made, not misleading; and employed devices, schemes and artifices to defraud in

connection with the purchase and sale of securities. Such scheme was intended to, and, throughout

the Class Period, did: (i) deceive the investing public, including Plaintiffs and other Class

members, as alleged herein; (ii) artificially inflate and maintain the market price of Pretium

securities; and (iii) cause Plaintiffs and other members of the Class to purchase Pretium securities

61

Page 62: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 62 of 67

at artificially inflated prices. In furtherance of this unlawful scheme, plan and course of conduct,

defendants, and each of them, took the actions set forth herein.

174. Pursuant to the above plan, scheme, conspiracy and course of conduct, each of the

Defendants participated directly or indirectly in the preparation and/or issuance of the quarterly

and annual reports, SEC filings, press releases and other statements and documents described

above, including statements made to securities analysts and the media that were designed to

influence the market for Pretium securities and options. Such reports, filings, releases and

statements were materially false and misleading in that they failed to disclose material adverse

information and misrepresented the truth about Pretium's finances and business prospects.

175. Further, Defendants were required to disclose the material negative trends that

negatively affected to the Company's operations in the Company's MD&A. Item 303 of SEC

Regulation S-K, 17 C.F.R. §229.303(a)(3)(ii), required Pretium to "[d]escribe any known trends

or uncertainties" that Pretium "reasonably expects will have a material. . unfavorable impact

on.. .revenues or income from continuing operations." Instruction 3 to paragraph 303(a) provides

that Pretium's "discussion and analysis shall focus specifically on material events and uncertainties

known to management that would cause reported financial information not to be necessarily

indicative of future operating results of future financial condition." 17 C.F.R. § 229.303(a)

instruction 3.

176. By virtue of their positions at Pretium, defendants had actual knowledge of the

materially false and misleading statements and material omissions alleged herein and intended

thereby to deceive Plaintiffs and the other members of the Class, or, in the alternative, defendants

acted with reckless disregard for the truth in that they failed or refused to ascertain and disclose

such facts as would reveal the materially false and misleading nature of the statements made,

62

Page 63: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 63 of 67

although such facts were readily available to defendants. Said acts and omissions of defendants

were committed willfully or with reckless disregard for the truth. In addition, each defendant knew

or recklessly disregarded that material facts were being misrepresented or omitted as described

above.

177. Information showing that defendants acted knowingly or with reckless disregard

for the truth is peculiarly within defendants' knowledge and control. As the senior managers and/or

directors of Pretium, the Individual Defendants had knowledge of the details of Pretium's internal

affairs.

178. The Individual Defendants are liable both directly and indirectly for the wrongs

complained of herein. Because of their positions of control and authority, the Individual

Defendants were able to and did, directly or indirectly, control the content of the statements of

Pretium. As officers and/or directors of a publicly-held company, the Individual Defendants had a

duty to disseminate timely, accurate, and truthful information with respect to Pretium's businesses,

operations, future financial condition and future prospects. As a result of the dissemination of the

aforementioned false and misleading reports, releases and public statements, the market price of

Pretium securities was artificially inflated throughout the Class Period. In ignorance of the adverse

facts concerning Pretium's business and financial condition which were concealed by defendants,

Plaintiffs and the other members of the Class purchased Pretium securities at artificially inflated

prices and relied upon the price of the securities, the integrity of the market for the securities and/or

upon statements disseminated by defendants, and were damaged upon the publication of the

alleged corrective disclosures.

179. During the Class Period, Pretium securities were traded on an active and efficient

market. Plaintiffs and the other members of the Class, relying on the materially false and

63

Page 64: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 64 of 67

misleading statements described herein, which the defendants made, issued or caused to be

disseminated, or relying upon the integrity of the market, purchased shares of Pretium securities

at prices artificially inflated by defendants' wrongful conduct. Had Plaintiffs and the other

members of the Class known the truth, they would not have purchased said securities or would not

have purchased them at the inflated prices that were paid. At the time of the purchases by Plaintiffs

and the Class, the true value of Pretium securities were substantially lower than the prices paid by

Plaintiffs and the other members of the Class. The market price of Pretium securities declined

sharply upon public disclosure of the facts alleged herein to the injury of Plaintiffs and Class

members.

180. By reason of the conduct alleged herein, defendants knowingly or recklessly,

directly or indirectly, have violated Section 10(b) of the Exchange Act and Rule lOb-5

promulgated thereunder.

181. As a direct and proximate result of defendants' wrongful conduct, Plaintiffs and the

other members of the Class suffered damages in connection with their respective purchases and

sales of the Company's securities during the Class Period, upon the disclosure that the Company

had disseminated false financial statements to the investing public.

COUNT II

(Violations of Section 20(a) of the Exchange Act Against The Individual Defendants)

182. Lead Plaintiff repeats and realleges each and every allegation contained in the

foregoing paragraphs as if fully set forth herein.

183. During the Class Period, the Individual Defendants participated in the operation

and management of Pretium, and conducted and participated, directly and indirectly, in the conduct

64

Page 65: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 65 of 67

of Pretium's business affairs. Because of their senior positions, they knew the adverse non-public

information regarding Pretium.

184. As officers and/or directors of a publicly owned company, the Individual

Defendants had a duty to disseminate accurate and truthful information with respect to Pretium's

financial condition and results of operations, and to correct promptly any public statements issued

by Pretium which had become materially false or misleading.

185. Because of their positions of control and authority as senior officers, the Individual

Defendants were able to, and did, control the contents of the various reports, press releases and

public filings which Pretium disseminated in the marketplace during the Class Period concerning

Pretium's financial prospects. Throughout the Class Period, the Individual Defendants exercised

their power and authority to cause Pretium to engage in the wrongful acts complained of herein.

The Individual Defendants therefore, were "controlling persons" of Pretium within the meaning

of Section 20(a) of the Exchange Act. In this capacity, they participated in the unlawful conduct

alleged which artificially inflated the market price of Pretium securities.

186. Each of the Individual Defendants, therefore, acted as a controlling person of

Pretium. By reason of their senior management positions and/or being directors of Pretium, each

of the Individual Defendants had the power to direct the actions of, and exercised the same to

cause, Pretium to engage in the unlawful acts and conduct complained of herein. Each of the

Individual Defendants exercised control over the general operations of Pretium and possessed the

power to control the specific activities which comprise the primary violations about which Plaintiff

and the other members of the Class complain.

187. By reason of the above conduct, the Individual Defendants are liable pursuant to

Section 20(a) of the Exchange Act for the violations committed by Pretium.

65

Page 66: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 66 of 67

PRAYER FOR RELIEF

WHEREFORE, Lead Plaintiff demands judgment against defendants as follows:

A. Determining that the instant action may be maintained as a class action under Rule

23 of the Federal Rules of Civil Procedure, and certifying Lead Plaintiff as the Class representative;

B. Requiring defendants to pay damages sustained by Plaintiffs and the Class by

reason of the acts and transactions alleged herein;

C. Awarding Plaintiffs and the other members of the Class prejudgment and post-

judgment interest, as well as their reasonable attorneys' fees, expert fees and other costs; and

D. Awarding such other and further relief as this Court may deem just and proper.

DEMAND FOR TRIAL BY JURY

Lead Plaintiff hereby demands a trial by jury.

Dated: July 23, 2014

POMERANTZ LLP

By: /s/JereniyA. Lieberman Jeremy A. Lieberman Michele S. Carino 600 Third Avenue, 20th Floor New York, New York 10016 Telephone: 212-661-1100 Facsimile: 212-661-8665 E-mail: jaliebermanpomlaw.com

[email protected]

POMERANTZ LLP Patrick V. Dahlstrom 10 South LaSalle Street, Suite 3505 Chicago, IL 60603 Telephone: 312-377-1181 Facsimile: 312-377-1184 E-mail: [email protected]

66

Page 67: Case 1:13cv-07552-VSB Document 54 Filed - Stanford …securities.stanford.edu/filings-documents/1051/PVG00_01/2014723_r... · Case 1:13cv-07552-VSB Document 54 Filed 07/23 ... an

Case 1:13cvM7552VSB Document 54 Filed 07/23/14 Page 67 of 67

THE ROSEN LAW FIRM, P.A. Laurence M. Rosen Phillip C. Kim Sara Fuks Kevin Koon-Pon Chan 275 Madison Avenue, 34th Floor New York, New York 10016 Telephone: 212-686-1060 Facsimile: 212-202-3827 E-mail: lrosenrosenle gal. com

pkimrosenlegal.com kchanrosenlegal.com

Co-Lead Counsel for Plaintiffs and the Putative Class

67