CARRIED OUT BY A COMPETENT CONTRACTOR WORKING, …

1
DEAN BURN A7 SOUTH A6106 NORTH (MILLERHILL ROAD) BORDERS RAILWAY A6106 SOUTH (OLD DALKEITH ROAD) DALKEITH COUNTRY PARK A772 GILMERTON ROAD B6392 A720 EDINBURGH CITY BYPASS SHERIFFHALL PARK & RIDE DOBBIES GARDEN CENTRE MELVILLE GATE ROAD TO EDINBURGH CITY CENTRE TO A1, MUSSELBURGH TO M8, GLASGOW TO DALKEITH BORDERS RAILWAY A720 EDINBURGH CITY BYPASS A7 NORTH © Crown copyright and database rights 2019 Ordnance Survey 100046668. 0 SCALE 1:2500 50m 100m 200m N SUMMERSIDE OLD SHERIFFHALL FARMHOUSE B6392 SHERIFFHALL HOUSE CAMPEND NEW BRIDGE CARRYING A720 OVER SHERIFFHALL ROUNDABOUT (BRIDGE 2) NON-MOTORISED USER ROUTE SUBWAY 1 NON-MOTORISED USER ROUTE SUBWAY 2 NON-MOTORISED USER ROUTE SUBWAY 5 NON-MOTORISED USER ROUTE SUBWAY 4 WESTBOUND MERGE SLIP ROAD EASTBOUND DIVERGE SLIP ROAD SUDS POND AND OUTFALL SUDS POND AND OUTFALL SUDS POND SUDS POND NEW ACCESS TO SHERIFFHALL HOUSE AND FARM HOUSE NEW FIELD ACCESS NEW FIELD ACCESS NEW SHARED ACCESS TO SUMMERSIDE PROPERTIES NEW SHERIFFHALL ROUNDABOUT EXTENSION TO EXISTING POND REALIGNED DEAN BURN REALIGNED DEAN BURN RELOCATED BUS STOP MAINTENANCE LAYBY MAINTENANCE LAYBY NEW BRIDGE CARRYING A720 OVER SHERIFFHALL ROUNDABOUT (BRIDGE 1) SUDS POND AND OUTFALL EASTBOUND MERGE SLIP ROAD BORDERS RAILWAY BRIDGE EXTENSION WESTBOUND DIVERGE SLIP ROAD NON-MOTORISED USER ROUTE SUBWAY 3 N EXISTING LEGEND BUILDINGS WOODLAND/TREES WOODLAND GRASSLAND HEDGEROW TREES FLOOD COMPENSATION AREA WATERCOURSE NON-MOTORISED USER ROUTE ROAD CARRIAGEWAY PROPOSED SUDS POND ACCESS TRACK MAINTENANCE LAYBYS EARTHWORKS SLOPES 1 IN 2 FILL 1 IN 3 CUT STEEPENED SLOPES SUDS OUTFALL EXTENSION TO POND HEDGEROW REALIGNED DEAN BURN RETAINING WALL HARD STANDING / CENTRAL RESERVATION Plot Date : File Name : Client N/A V2 A720 SHERIFFHALL ROUNDABOUT FIGURE 5.1 PROPOSED SCHEME LAYOUT CS CS JHD ZM 26/11/19 60572241 S0 Landscape FOR INFORMATION AECOM Glasgow 25 Tyndrum Street Citypoint 2 GA Update CS ZM 25/11/19 First Issue CS ZM 15/08/19 . . . C:\PWWORKING\AECOM_DS02_UK-CLT\[email protected]\DMS17398\60572241-ACM-ELS-SW_GN_000_Z-DR-LV-0011 25 November 2019 13:06:56 +44 (141) 354 5601 +44 (141) 354 5600 P02 P01 1:2500 Drawing Number Rev Plot Date : File Name : Project No. Originator Volume Location THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THE TERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO LIABILITY FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL CLIENT OR FOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND ONLY FOR THE PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED. Date Approved Checked Drawn Internal Project No. Drawing Title Suffix By Revision Details Date Check Project Title Client Suitability Scale @ A1 Zone Purpose of issue Designed Plot Time : SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX IT IS ASSUMED THAT ALL WORKS ON THIS DRAWING WILL BE CARRIED OUT BY A COMPETENT CONTRACTOR WORKING, WHERE APPROPRIATE, TO AN APPROPRIATE METHOD STATEMENT. THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OF ISSUE THAT IT WAS ISSUED FOR AND IS SUBJECT TO AMENDMENT. EXCEPT I ONAL R I SKS RELAT I NG TO THE WORKS ASSOC I ATED W I TH TH I S DRAW I NG ARE I DENT I F I ED BELOW . CONSTRUCTION MAINTENANCE / OPERATION / DECOMMISSIONING / DEMOLITION AECOM Infrastructure & Environment UK Limited Registered in England Registered number: 880328 Registered office: Midpoint, Alencon Link, Basingstoke, Hampshire RG21 7PP Type Role Number www.aecom.com Tel: Fax: NOTES NOT FOR CONSTRUCTION 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DOCUMENTATION. 2. DO NOT SCALE FROM THIS DRAWING, USE ONLY PRINTED DIMENSIONS. 3. ALL CHAINAGES, LEVELS AND COORDINATES ARE IN METRES UNLESS DEFINED OTHERWISE.

Transcript of CARRIED OUT BY A COMPETENT CONTRACTOR WORKING, …

DEAN BURN

A

7

S

O

U

T

H

A6106 N

OR

TH

(M

ILLE

RH

ILL R

OA

D)

BO

RD

ER

S R

AILW

AY

A

6

1

0

6

S

O

U

T

H

(

O

L

D

D

A

L

K

E

I

T

H

R

O

A

D

)

DALKEITH COUNTRY PARK

A

7

7

2

G

I

L

M

E

R

T

O

N

R

O

A

D

B

6

3

9

2

A

7

2

0

E

D

I

N

B

U

R

G

H

C

I

T

Y

B

Y

P

A

S

S

SHERIFFHALL

PARK & RIDE

DOBBIES GARDEN

CENTRE

M

E

L

V

I

L

L

E

G

A

T

E

R

O

A

D

T

O

E

D

I

N

B

U

R

G

H

C

I

T

Y

C

E

N

T

R

E

T

O

A

1

,

M

U

S

S

E

L

B

U

R

G

H

TO M8, GLASGOW

TO

D

A

LK

E

IT

H

B

O

R

D

E

R

S

R

A

IL

W

A

Y

A720 EDIN

BURGH CITY B

YPASS

A

7

N

O

R

T

H

© Crown copyright and database rights 2019 Ordnance Survey 100046668.

0

SCALE 1:2500

50m 100m 200m

N

SUMMERSIDE

OLD

SHERIFFHALL

FARMHOUSE

B

6

3

9

2

SHERIFFHALL

HOUSE

CAMPEND

NEW BRIDGE CARRYING A720OVER SHERIFFHALL ROUNDABOUT(BRIDGE 2)

NON-MOTORISEDUSER ROUTESUBWAY 1

NON-MOTORISEDUSER ROUTESUBWAY 2

NON-MOTORISEDUSER ROUTESUBWAY 5

NON-MOTORISEDUSER ROUTESUBWAY 4

WESTBOUNDMERGE SLIP ROAD

EASTBOUNDDIVERGE SLIP ROAD

SUDS PONDAND OUTFALL

SUDS PONDAND OUTFALL

SUDSPOND

SUDSPOND

NEW ACCESS TO SHERIFFHALLHOUSE AND FARM HOUSE

NEW FIELD ACCESS

NEW FIELDACCESS

NEW SHARED ACCESS TOSUMMERSIDE PROPERTIES

NEW SHERIFFHALLROUNDABOUT

EXTENSION TO EXISTING POND

REALIGNED DEAN BURNREALIGNEDDEAN BURN

RELOCATED BUS STOP

MAINTENANCELAYBY

MAINTENANCELAYBY

NEW BRIDGECARRYING A720OVER SHERIFFHALLROUNDABOUT(BRIDGE 1)

SUDS PONDAND OUTFALL

EASTBOUNDMERGE SLIP ROAD

BORDERS RAILWAYBRIDGE EXTENSION

WESTBOUND DIVERGESLIP ROAD

NON-MOTORISED USER ROUTESUBWAY 3

N

EXISTINGLEGEND

BUILDINGS

WOODLAND/TREES

WOODLAND

GRASSLAND

HEDGEROW

TREES

FLOOD COMPENSATION AREA

WATERCOURSE

NON-MOTORISED USER ROUTE

ROAD

CARRIAGEWAY

PROPOSED

SUDS POND

ACCESS TRACK

MAINTENANCE LAYBYSEARTHWORKS SLOPES1 IN 2 FILL 1 IN 3 CUTSTEEPENED SLOPES

SUDS OUTFALL

EXTENSION TO POND

HEDGEROW

REALIGNED DEAN BURN

RETAINING WALL

HARD STANDING / CENTRAL RESERVATION

Plot D

ate :

File N

am

e :

Client

N/A

V2

A720 SHERIFFHALL

ROUNDABOUT

FIGURE 5.1

PROPOSED SCHEME

LAYOUT

CS CS JHD

ZM 26/11/19

60572241 S0

Landscape

FOR INFORMATION

AECOM

Glasgow

25 Tyndrum Street

Citypoint 2

GA Update CS

ZM

25/11/19

First Issue CS

ZM

15/08/19

.

.

.

C:\P

WW

OR

KIN

G\A

EC

OM

_D

S02_U

K-C

LT

\C

HR

IS

TIN

E.S

TA

NN

AG

E@

AE

CO

M.C

OM

\D

MS

17398\60572241-A

CM

-E

LS

-S

W_G

N_000_Z

-D

R-LV

-0011

25 N

ovem

ber 2019 13:06:56

+44 (141) 354 5601

+44 (141) 354 5600

P02

P01

1:2500

Drawing Number

Rev

Plot D

ate :

File N

am

e :

Project No. Originator Volume

Location

THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THE

TERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO

LIABILITY FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL

CLIENT OR FOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND

ONLY FOR THE PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED.

DateApprovedCheckedDrawn

Internal Project No.

Drawing Title

Suffix

By

Revision Details Date

Check

Project Title

Client

Suitability

Scale @ A1 Zone

Purpose of issue

Designed

Plot T

im

e :

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX

IT IS ASSUMED THAT ALL WORKS ON THIS DRAWING WILL BE

CARRIED OUT BY A COMPETENT CONTRACTOR WORKING, WHERE

APPROPRIATE, TO AN APPROPRIATE METHOD STATEMENT.

THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OF ISSUE THAT IT WAS

ISSUED FOR AND IS SUBJECT TO AMENDMENT.

EXCEPTIONAL RISKS RELATING TO THE WORKS ASSOCIATED WITH THIS

DRAWING ARE IDENTIFIED BELOW.

CONSTRUCTION

MAINTENANCE / OPERATION /

DECOMMISSIONING / DEMOLITION

AECOM Infrastructure & Environment UK Limited

Registered in England Registered number: 880328

Registered office: Midpoint, Alencon Link,

Basingstoke, Hampshire RG21 7PP

Type Role Number

www.aecom.com

Tel:

Fax:

NOTES

NOT FOR CONSTRUCTION

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALLOTHER RELEVANT DOCUMENTATION.

2. DO NOT SCALE FROM THIS DRAWING, USE ONLY PRINTEDDIMENSIONS.

3. ALL CHAINAGES, LEVELS AND COORDINATES ARE INMETRES UNLESS DEFINED OTHERWISE.