Page 1: CARMEGEDDON:An Extraordinary Success - Dan Kulka

CARMEGEDDONAn Extraordinary SuccessDan Kulka

Page 2: CARMEGEDDON:An Extraordinary Success - Dan Kulka

A story about• Demolition• Public Outreach• Interagency Cooperation

Lessons learned• Full Freeway Closures • The Design Build Process • Mega Projects

Mulholland Bridge Demo

Page 3: CARMEGEDDON:An Extraordinary Success - Dan Kulka

I-405 Project Scope• 10 Miles Hov Lane• Rebuild 3 bridges• Rebuild 28 ramps• Build18 miles of retaining walls

Page 4: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 5: CARMEGEDDON:An Extraordinary Success - Dan Kulka

• I-405 Project Scope• 10 Miles Hov Lane• Rebuild 3 bridges• Rebuild 28 ramps• Build18 miles of retaining walls

Page 6: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Megiddo, Israel

Page 7: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 8: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 9: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 10: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 11: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 12: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 13: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 14: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 15: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 16: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 17: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 18: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 19: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 20: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 21: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 22: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 23: CARMEGEDDON:An Extraordinary Success - Dan Kulka

• Demolition– Penhall

• Traffic Control– HNTB, LADOT, Caltrans, Statewide

• Public Outreach– Metro

• Emergency Services– LAPD Unified Command

Planning Task Forces

Page 24: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Transportation Management Plan

Page 25: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Possible Detour: Sepulveda Boulevard

Sepulveda Boulevard from National off ramp to Greenleaf on ramp: 10.7 miles

Sepulveda Boulevard at Tunnel1 NB lane, 2 SB lanes

Page 26: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Regional Detour map

Page 27: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Traffic Management Plan

• Close the freeway from I-10 to US 101 (NB) and US-101 to Getty Center Drive (SB)

• Close all connectors feeding into Route 405 in the project area

• Close all on and off ramps in the closed freeway sections

• Detour freeway traffic using freeways (not through Sepulveda Blvd)

• Limit Sepulveda Boulevard traffic to local access only

Page 28: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Regional Alternates

Transportation Management Plan Goal:

Divert at least 50% of the volume to minimize the queue on 405 freeway

Page 29: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Public Outreach

Page 30: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Changeable Message Signs• 3 weekends in June and July 1-15• 40 signs from San Diego to Oregon

border on I-5, SR-99, US-101and on I-10, I-210 and SR-60

• 64 signs in LA and Ventura Counties

Motorist Information

Portable Changeable Message Signs• 46 on freeway network• 35 on city streets• Caltrans Highway Information Network

Local 511 phone and website broadcast the event starting early June

• GPS linked services announcement

Page 31: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Alternate Route CMS/PCMS Deployment

Page 32: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Celebrity Tweets

Page 33: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 34: CARMEGEDDON:An Extraordinary Success - Dan Kulka

• Northbound 405 at Culver dropped 64%

• Southbound 405 dropped 56%

• US 101 near I-405 dropped 40%

• I-10 near I-405 dropped 25%

• LA County dropped 44%

Freeway was opened 17 hours ahead of schedule

Traffic by the Numbers

Page 35: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Are extended full freeway closures better?

Page 36: CARMEGEDDON:An Extraordinary Success - Dan Kulka
Page 37: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Setting Girders at Skriball Bridge

As Built

Freeway closed in one direction for five nights from midnight to 5 am.

Proposed Alternative

Full freeway closure for 12 hours from Friday 10 pm to Saturday 10 am.

Page 38: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Design-Build Promotes Cooperation

• Design-Bid-Build– Completed Transportation Management Plan in the contract

• Design-Build– Transportation Management Plan data sheet in contract – Final Plan is designed to meet specific needs

Page 39: CARMEGEDDON:An Extraordinary Success - Dan Kulka

Mega Projects bring Mega Resources

• Engineering and Planning• Equipment• Materials• Political Momentum• Subcontractors

Page 40: CARMEGEDDON:An Extraordinary Success - Dan Kulka

A story about• Demolition• Public Outreach• Interagency Cooperation

Lessons learned• Full Freeway Closures • The Design Build Process • Mega Projects

Mulholland Bridge Demo

Page 41: CARMEGEDDON:An Extraordinary Success - Dan Kulka

CARMEGEDDONAn Extraordinary SuccessDan Kulka