Cariboo Connector ProgramA Long-term vision to expand Highway 97 between Cache Creek and Prince George to four lanes
This project is part of the Ministry of Transportation's This project is part of the Ministry of Transportation's Cariboo Connector Program Cariboo Connector Program –– Phase OnePhase One
Please feel free to view Please feel free to view the following information the following information by using the arrow keys by using the arrow keys
Questions? DonQuestions? Don’’t hesitate to ask a Ministry t hesitate to ask a Ministry representativerepresentative
NEXT SLIDE
PREVIOUS SLIDE
APPROXIMATE VIEWING TIME: 10 MINUTES
Presentation OutlinePresentation Outline
What is the Cariboo What is the Cariboo Connector?Connector?
Program PurposeProgram Purpose
Delivery StrategyDelivery Strategy
Phase One ProjectsPhase One Projects
Program Level Program Level ActivitiesActivities
What is the Cariboo Connector?What is the Cariboo Connector?
The Cariboo Connector is not a project The Cariboo Connector is not a project …… itit’’s a s a ProgramProgram
ItIt’’s a longs a long--term vision to expand Highway 97 term vision to expand Highway 97 between Cache Creek and Prince George to four between Cache Creek and Prince George to four Lanes over an extended timeframeLanes over an extended timeframe
Projects on Highway 97 are prioritized on their own Projects on Highway 97 are prioritized on their own merit, and are consistent with the longmerit, and are consistent with the long--term visionterm vision
Program Program PurposePurposeThe provincial economy The provincial economy is doing well, due in large is doing well, due in large part to northern activity part to northern activity in the following sectors:in the following sectors:
Oil and GasOil and GasForestryForestryMiningMiningTourismTourismManufacturing & TradeManufacturing & Trade
Cariboo Connector ProgramA Long-term vision to expand Highway 97 between Cache Creek and Prince George to four lanes
The expanding northern The expanding northern economy makes our economy makes our
region more dependent on region more dependent on the Cariboo Connector to the Cariboo Connector to
move people and goodsmove people and goods
Growing volumes of heavy Growing volumes of heavy industrial traffic and RVindustrial traffic and RV’’s s
are driving the need for are driving the need for additional lanes to additional lanes to maintain speed & maintain speed &
efficiencyefficiency
Critical Provincial LinkCritical Provincial LinkHighway 97:Highway 97:The Cariboo ConnectorThe Cariboo Connector
•• is the only transis the only trans--provincial, northprovincial, north--south south highwayhighway
•• is the key link between is the key link between Northern BC and the Northern BC and the rest of the provincerest of the province
•• connects the rest of BC connects the rest of BC to Highway 16 and the to Highway 16 and the Port Of Prince RupertPort Of Prince Rupert
The Cariboo Connector Is The Cariboo Connector Is Building OpportunityBuilding Opportunity
Future northern economic growth will Future northern economic growth will require diversificationrequire diversification
By 2013 the Pine Beetle epidemic will By 2013 the Pine Beetle epidemic will have major economic impact on have major economic impact on communitiescommunities
An improved transportation network will An improved transportation network will attract more manufacturing and tourismattract more manufacturing and tourism
AsiaAsia--Pacific growth provides opportunity Pacific growth provides opportunity for transportation as an industryfor transportation as an industry
Investments in the Port Of Prince Rupert Investments in the Port Of Prince Rupert will provide opportunities for container will provide opportunities for container sorting facilitiessorting facilities
Program Delivery StrategyProgram Delivery Strategy$200$200--million allotted to Phase Onemillion allotted to Phase One
Phase One is now underway, and will continue for Phase One is now underway, and will continue for the next five yearsthe next five years
The current focus is on congested sections near The current focus is on congested sections near communities, and on identified safety issuescommunities, and on identified safety issues
Projects previously in development have been Projects previously in development have been upgraded to include fourupgraded to include four--laninglaning
For example, if a passing lane was originally planned, that sectFor example, if a passing lane was originally planned, that section ion will now be fourwill now be four--lanedlaned
Phase One Phase One ProjectsProjects
Simon Fraser Bridge to Sintich RdSimon Fraser Bridge to Sintich Rd
Old Cariboo Highway to Red RockOld Cariboo Highway to Red Rock
PlettPlett Road, south of StonerRoad, south of Stoner
Quesnel to Dog Prairie Rd Quesnel to Dog Prairie Rd
Lexington Road to 148 Mile Lexington Road to 148 Mile
FletcherFletcher’’s Field, south of Williams s Field, south of Williams LkLk
Wright Station Curves, Lac La Hache Wright Station Curves, Lac La Hache
Horse Lake Road, 100 Mile HouseHorse Lake Road, 100 Mile House
CargyleCargyle CurvesCurves
Cache Creek to Highway 99Cache Creek to Highway 99
Simon Fraser Bridge to Sintich RoadSimon Fraser Bridge to Sintich RoadNew twoNew two--lane bridge northboundlane bridge northboundRehabilitate existing 2Rehabilitate existing 2--lane bridge lane bridge southboundsouthboundReconstruct Queensway Reconstruct Queensway InterchangeInterchange44--lane Highway 97 to Sintich Roadlane Highway 97 to Sintich RoadDesignDesign--Build contract deliveryBuild contract deliveryActivities this year:Activities this year:
Stakeholder ConsultationStakeholder ConsultationDetermine Property RequirementsDetermine Property RequirementsUndertake Engineering WorkUndertake Engineering WorkBegin Procurement ProcessBegin Procurement Process
Completion: 2009Completion: 2009
Old Cariboo Highway to Red RockOld Cariboo Highway to Red RockNew, stateNew, state--ofof--the art Weigh the art Weigh Scale facilityScale facilityThree km of fourThree km of four--laning laning adjoining the scaleadjoining the scalePublic input requested for Public input requested for site evaluationsite evaluationActivities this year:Activities this year:
Public and stakeholder Public and stakeholder consultationconsultationEvaluation of four potential sitesEvaluation of four potential sitesDesign work and cost estimatingDesign work and cost estimatingSite selectionSite selection
Completion 2007Completion 2007
Plett Road, South Of StonerPlett Road, South Of Stoner35 km south of Prince George35 km south of Prince George
ThreeThree--km sectionkm section
Capacity increasing to four Capacity increasing to four laneslanes
Contract awarded to Contract awarded to Integrated Contractors Ltd.Integrated Contractors Ltd.
Completion 2006Completion 2006
Quesnel to Dog Prairie RoadQuesnel to Dog Prairie RoadFunctional design Functional design underway from existing underway from existing fourfour--lane section to Dog lane section to Dog Prairie Road Prairie Road
Functional design will Functional design will identify construction identify construction prioritypriority
Project tendered 2008Project tendered 2008Completion 2009Completion 2009
Lexington Road to Likely RoadLexington Road to Likely RoadBetween Williams Lake and 150 MileBetween Williams Lake and 150 Mile
Capacity increasing to four lanesCapacity increasing to four lanes
Intersection improvementsIntersection improvements
Design assignment underwayDesign assignment underway
One intersection built in 2006One intersection built in 2006
Rest of construction to begin within Rest of construction to begin within five yearsfive years
Completion in 2011Completion in 2011
FletcherFletcher’’s Fields FieldSouth of Williams LakeSouth of Williams Lake
TwoTwo--kilometre sectionkilometre section
Capacity increasing to Capacity increasing to four lanesfour lanes
Contract awarded to Contract awarded to PeterPeter’’s Bros.s Bros.
Construction Construction underwayunderway
Completion this fallCompletion this fall
Horse Lake RoadHorse Lake Road100 Mile House100 Mile House
Intersection improvement Intersection improvement projectproject
Design underwayDesign underway
CostCost--shared with District shared with District of 100 Mile Houseof 100 Mile House
Completion fall 2007Completion fall 2007
Wright Station Curves near Wright Station Curves near Lac La HacheLac La Hache
17 km north of 17 km north of Lac La HacheLac La Hache
Poor safety historyPoor safety history
Capacity increasing Capacity increasing to four lanesto four lanes
Alignment Alignment improvementsimprovements
Engineering Engineering underwayunderway
Currently planning Currently planning delivery timingdelivery timing
Improve alignmentImprove alignmentIncrease capacity to four lanesIncrease capacity to four lanesDesign to begin in 2007Design to begin in 2007Construction in 2008Construction in 2008
Cargyle Curves South of ClintonCargyle Curves South of Clinton
Cache Creek to Highway 99Cache Creek to Highway 99
Extensive consultation Extensive consultation required with required with stakeholders, including stakeholders, including the Bonaparte Bandthe Bonaparte Band
Delivery timelines to Delivery timelines to evolve through evolve through consultation consultation
Program Activities AheadProgram Activities Ahead
Stakeholder consultationStakeholder consultation
Corridor planningCorridor planning
Establish priorities for future Establish priorities for future phasesphases
Provide options to Provide options to government for future government for future investment levelsinvestment levels
Cariboo Connector ProgramA Long-term vision to expand Highway 97 between Cache Creek and Prince George to four lanes