Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers...

27
Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager

Transcript of Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers...

Page 1: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

Carbon Trust’s Offshore Wind AcceleratorDriving down the cost of offshore wind

Phil de VilliersOffshore Wind Accelerator Manager

Page 2: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

2

Our mission is to accelerate the move to a low carbon economy

We cut carbon now by

Providing specialist advice and finance to

help organisations cut carbon

Setting standards for carbon reduction

We cut future carbon emissions by

Opening markets for low carbon

technologies

Leading industry collaborations to

commercialise technologies

Investing in early stage low carbon

companies

Page 3: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

3

Focus of assessment

– What is required to deliver offshore wind in the UK?

– What does UK Government and industry need to do?

In 2008 Carbon Trust assessed barriers to offshore windOffshore wind power: Big challenge, big opportunity

Note: Report is available on our website: www.carbontrust.co.uk

Page 4: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

UK faces an energy gap and tough renewable energy targetThis requires mass deployment of offshore wind

Installed capacity, projected demand (GW), 2008-2020

% of UK energy from renewables, 2005-2020

Source: Committee on Climate Change, 2008 (based on DECC Energy Model)

0

10

20

30

40

50

60

70

80

90

201520102008

Coal

Gas

Nuclear

Renewables

Projectedpeak demand

2020

Energy gap

15%

2%

1%

2020 target

2005 2010

8x increase required

Page 5: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

5

Current expectation

Optimal site availability

Cost reductions

Achievable goal

Weak commercial returns, high levels

of public subsidy

Stronger commercial returns, lower levels

of public subsidy

Source: Carbon Trust “Offshore wind power: big challenge, big opportunity”, 2008

Increased RD&D critical for delivering cost reduction

£45bn

£14bn

£16bn£75bn

Requires major RD&D

programme, of which OWA is

one component

Page 6: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

6

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

2002 2003 2004 2005 2006 2007 2008 2009 2010

Gunfleet Sands

Robin Rigg

Lynn

Burbo

Barrow

Kentish Flats

Scroby Sands

North Hoyle

Cost per MW installed (€m/MW)

Year

Rhyl Flats

Costs must be reducedOtherwise projects cancelled, UK renewable targets missed

Source: Emerging Energy Research, 2009

Drivers• Rising commodity prices• Bottlenecks in supply chain• Complexity of sites, distance, depth• FX rate volatility

Page 7: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

7Offshore Wind Accelerator

Offshore Wind AcceleratorObjective: Reduce cost of energy by 10% through RD&D

8 developers + Carbon Trust

Focusing on technologies for– Round 2 extensions– Round 3– Scottish Territorial Waters

Total budget ~£40m– £10m for collaborative R&D– Up to £30m for demonstrations– Carbon Trust funds 1/3

Commitment to 2014– Started October 2008

Page 8: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

8

OWA objectivesRequires very targeted RD&D

Focus on commercial outcomes– Reduce cost of energy by 10%– Deliver innovations in time for Round 3 (~2015)

Learn from the capabilities and experiences of each member– Offshore wind, oil and gas, onshore wind

Encourage the best designers to deliver innovations– Engage them on very specific challenges– Let them keep their IP– Look internationally, not just to UK– Engage with other industries for technology transfer

Operate responsively to member needs; manage costs effectively

Page 9: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

9

• Research-focused

• May not meet customer needs

• Customer-focused

• Innovators focus on main challenges

OWA is an example of market-pull innovation

Two approaches to innovationUK offshore wind R&D

customer-driven

Offshore Wind Accelerator

Innovators Market

Technology push

Marketpull

Source: Carbon Trust 2011

Page 10: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

10

RWESSECentricaSPRVattenfall

DONGStatkraftStatoilMainstreamSiemensFluorE.ONSeaEnergyEDPEnecoWarwickFred OlsenMasdarEDFAREG

Round 1 Round 2 STW & Demo Round 3 Total marketDeveloper

60% of UK market is in OWA: big pull for innovatorsOWA developers have 30GW of licensed capacity in UK waters

OWA Stage II partners

58

90

200

415

650

900

975

4%

2,000 4%

2,360 5%

2,408

2,408 5%

2,884 6%

4,396 9%

5,350 11%

5,809 12%

6,015 12%

6,555 14%

0%

0%

1%

1%

5%

2%

1,238 3%

1,809 4%

1,985

2%900

975

325

0

4,185 13%

3,983 12%

3,750 12%

3%

3%

1%

1,733 5%

2,000 6%

2,000 6%

2,250 7%

2,250 7%

0%

3,600 11%

3,600 11%

58

415

913

300

0

360

0

58

453

6%

0%

1%

8%

1,500 26%

16%

5%

0%

26%1,518

1%

7%

158

200

600

252

0

158

498

250

504

2%

7%

3%

0%

2%

2%

2,406 26%

5%

3%

1,430 16%

5%

2,202 24%

90

90

244

0

240

194

10

150

20%

7%

7%

0%

20%

16%

1%

12%

Source: RenewableUK (Jan 2010), The Crown Estate (May 2010)

Page 11: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

11

Yield

Cost of finance

Focus is on areas developers most able to influence

BoP

TurbineO&M

I&C

Page 12: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

Aiming to reduce impact of distance and depth on cost

Note: Cost analysis for <700 W/m2 wind power, where 100% = £97/MWh (2008 assumptions)Source: Carbon Trust “Big Challenge, Big Opportunity” 2008

Wind speed Distance Depth

70

80

90

100

110

120

130

Depth (m)

0-20 20-40 40-6070

80

90

100

110

120

130

Distance to shore (nm)

60+12-30 30-600-1270

80

90

100

110

120

130

800-900

Wind power (W/m2)

700-800

<700 900+

CoE as % typicalnear-shore site

Page 13: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

13

Steering Committee

Carbon Trust Management Team

Innovators, designers

Innovators, designers

Innovators, designers

Innovators, designers

OWA partners

Carbon Trust

3rd party contractors

125+ people

500+ companies

Technical Working Group

Technical Working Group

Technical Working Group

Wake Effects AccessFoundations

Technical Working Group

Electrical

Research performed within Technical Working GroupsInnovation is provided by third-parties

Page 14: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

14

Many companies engaged by OWA to deliver innovation

Wake effects DevelopersDesigners Fabricators InstallersElectrical systems O&M

Foundations

Page 15: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

15

2010 2011 2012 2013 2014

Foundations

Wake Effects

Electrical

ATL

New area 1

New area 2Com

mon

R&

D

Demo proj. 1

Selected Demo proj. 2

Selected Demo proj. 3

Selected Demo proj. 4

Selected Demo proj. 5

ETC

Dis

cre

tion

ary

p

roje

cts

Common

Partner “A” participationOther Partners’ Projects

Two types of activity: Common R&D and Discretionary ProjectsPartners opt-in to participate in Discretionary Projects

Page 16: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

16

Some important stakeholders for OWA

Funders

WTG OEMs

Finance community

Innovators, designers

R&D institutes F

W E

A

OWA

Page 17: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

17

OWA focuses on strengthening economics of offshore wind

Offshore wind returns

YieldOPEXCAPEX

Wake effects

AccessFoundation

sElectrical systems

Fin

an

cin

g c

osts

Four technology areas, selected on basis of detailed analysis of over 70 technical barriers

Page 18: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

18

Most of UK licenced capacity is in 20-60m depths

Source: Crown Estate 2009

560

5,060

3,660

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Round 1, 2 and 3potential installedcapacity (MW)

Depth (m)

60-70

50-60

40-50

30-40 6,220

20-30 6,260

10-20 1,340

0-10 580

835

5,880

6,050

Round 3

Round 2

Round 1

Foundations

Page 19: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

19

Turbine installation rates will need to increase dramatically Number of turbines installed per year 2003 - 20201

1,0001,000

900

700

500500

400400333300

218150

673330302021

202020192018201720162015201420132012201120102009200820072006200520042003

1. Number of turbines calculated from actual and forecast installed capacity figures, assuming 3MW turbines 2003 – 2013, and 5MW turbines from 2014Source: Carbon Trust “Offshore wind power: big challenge, big opportunity”, 2008; Carbon Trust analysis 2010

One new turbineinstalled per day

2.5 new turbines installed per day

One new turbineinstalled every 11 days

Over 6,000 turbines to beinstalled over 10 years

Modelled

Actuals

Foundations

Page 20: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

20

Fabrication

Foundations research area focuses on 30-60m

Shortlist Finalists

Keystone

Gifford / BMT /Freyssinet

SPT Offshore

MBD

Airbus A320

Source: Carbon Trust Offshore Wind Accelerator 2010, IHC

IHC

Foundations

Current focus

Installation

Demonstration

Page 21: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

21

Electrical systems opportunity: higher voltage arrays

Electrical Systems

Current priorities

Engaging cable suppliers to deliver higher voltage cables

Optimising design of switchgear, transformers

BenefitImproved reliabilityLower losses

Source: Carbon Trust Offshore Wind Accelerator 2010

Page 22: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

22

Next steps

Develop more accurate wake effects models

Develop tools to optimise layouts

Measurement campaign to reduce data collection costs

More accurate models are being developedIncreases wind farm yields and reduces financing costs

0.4

0.5

0.6

0.7

0.8

0.9

1

1.1

1.2

1 2 3 4 5 6 7 8Column

No

rmal

ised

Po

wer

Model A

Model B

Model C

Model D

Model Db

Model Ea

Model Ec

Model F

Model F Stable

UpWind

Measured Data

Upper 25%

Low er 25%

Coloured lines represent different

models or model variants

Wake Effects

Source: Carbon Trust Offshore Wind Accelerator 2010

Page 23: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

23

New technologies required to implement optimal strategies

Access competition to increase availability and safetyOver 450 designs entered

Challenge: improve access in tough metocean conditions

Vessels

Transfer systems

Launch & recovery systems

Source: Carbon Trust Offshore Wind Accelerator 2010

Access Systems

Page 24: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

24

Some excellent R&D is being performed in EuropeExamples

Denmark – Risø

Germany – RAVE, Fraunhofer

Netherlands – ECN, FLOW

Norway – NOWITECH

Sweden – Vindforsk III

UK – ETI, NAREC

Page 25: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

25

Greater collaboration is neededReduce duplication, increase efficiency

4

4

5

5

7

8

10

15

23

0 5 10 15 20 25

Ecosystem

Wind resource assessment

Turbine development

Grid integration

Foundations

Wake effects

Access / O&M

Electrical systems

Floating wind turbine

No. projects

Source: Carbon Trust analysis 2010

OWA focus area

Page 26: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

26

We are focusing our RD&D efforts on the needs of end users

Cost reduction in site conditions applicable to EU market

RD&D is essential for driving down cost of offshore wind

Strengthens economic returns

Reduces financing costs

Reduces costs to consumers

Accelerates deployment

Greater collaboration would benefit everyone

Avoids duplication and reinvention

Conclusions

Page 27: Carbon Trust’s Offshore Wind Accelerator Driving down the cost of offshore wind Phil de Villiers Offshore Wind Accelerator Manager.

27

Phil de VilliersOffshore Wind Accelerator [email protected]