CARBON PARTNERSHIP FACILITY 1
CARBON PARTNERSHIP FACILITY APRIL 2014 SELLER PARTICIPANT TRAINING
OVERVIEW OF PROGRAM AND CPA LEVEL MONITORING, PREPARATION OF MONITORING REPORTS AND VERIFICATION
CARBON PARTNERSHIP FACILITY 2
Training on CDM Operations Plans and Sub-ERPA Contracting
presented by
Dr. Balasankari
02 April 2014
CARBON PARTNERSHIP FACILITY 3
Training on CDM Operations Plans and Sub-ERPA Contracting
Basic Programme of Activities (PoA) structure
PoA
Coordinating / Managing Entity (CME)
CPA 1Project Owner
CPA 2Project Owner CPA 3
Project Owner
CPA 4Project Owner
CPA 5Project Owner
In some cases, CME itself may be the CPA implementer
CARBON PARTNERSHIP FACILITY 4
Training on CDM Operations Plans and Sub-ERPA Contracting
Basic needs of PoA monitoring
Implementation in line with registered PoA and CPA DD
Measurement of monitoring parameters at the required frequency
Maintenance of hard copy documents / records
Creation and maintenance of electronic database
CARBON PARTNERSHIP FACILITY 5
Training on CDM Operations Plans and Sub-ERPA Contracting
General monitoring data flow diagram
Meter Operator Officer CPA database
ManagerPoA database
CPA level
PoA level
CARBON PARTNERSHIP FACILITY 6
Training on CDM Operations Plans and Sub-ERPA Contracting
Components of effective PoA monitoring
Effective verification of generated project data
Deployment of trained monitoring staff
Creation / maintenance of up-to-date database
“ Both at PoA and CPA level ”
CARBON PARTNERSHIP FACILITY 7
Training on CDM Operations Plans and Sub-ERPA Contracting
Importance of data management systems
An effective data management system must be implemented at PoA and CPA level to:
Provide evidence for CERs generated
Collect and store the monitored data for verification
Avoid duplicate / discrepant records
Ensure quality of data generated
CARBON PARTNERSHIP FACILITY 8
Training on CDM Operations Plans and Sub-ERPA Contracting
Basic requirements of data management system
» Standard format / template across all CPAs
» Generation of unique ID for each record
» Completeness of data collected
» Correctness of data recorded
» Effective conversion from hard copy to electronic copy
» Centralized storage and update
CARBON PARTNERSHIP FACILITY 9
Training on CDM Operations Plans and Sub-ERPA Contracting
PoA level monitoring
A Project manager must be assigned at CME level to carry out the following tasks:
Monitor overall programme execution
Set up project management team
Arrange training for CPA implementers and other stakeholders
Support DOE during verification
Deployment of trained monitoring staff
CARBON PARTNERSHIP FACILITY 10
Training on CDM Operations Plans and Sub-ERPA Contracting
PoA level monitoring
Creation / maintenance of up-to-date database
“ A strong central database is needed for effective PoA implementation”
Must be up to date
Accurate and error free
Easy to retrieve details of CPAs
CARBON PARTNERSHIP FACILITY 11
Training on CDM Operations Plans and Sub-ERPA Contracting
PoA level monitoring
A Database administrator must be assigned at CME level to carry out following tasks:
Prepare templates for data collection / reporting
Collect data from CPAs
Maintain hard copy /soft copy documents collected from CPAs
Create a programme level central electronic database
Creation / maintenance of up-to-date database
CARBON PARTNERSHIP FACILITY 12
Training on CDM Operations Plans and Sub-ERPA Contracting
PoA level monitoring
A Verification officer must be assigned at CME level to carry out following tasks:
Provide CDM training to CPAs
Carry out site inspection to project locations
Inspect monitoring procedures implemented at CPA level
Cross-check data reported and data at project locations
Effective verification of generated project data
CARBON PARTNERSHIP FACILITY 13
Training on CDM Operations Plans and Sub-ERPA Contracting
PoA level monitoring
Documentations required at PoA level
Legal / contract agreement with all stakeholders
MOM of various co-ordination meetings
Operations manuals & training materials
Monitoring data from each CPAs
Monitoring survey reports
CPA inspection reports
CARBON PARTNERSHIP FACILITY 14
Training on CDM Operations Plans and Sub-ERPA Contracting
Best practices in PoA level monitoring
Decide all templates/formats and procedure to be followed before start of crediting period
Setup regional offices and distribute responsibilities
Have frequent meeting with all stakeholders
Make occasional site visit to project locations
Prepare quality operations manual / training materials on CDM monitoring
CARBON PARTNERSHIP FACILITY 15
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
A Monitoring officer must be assigned at CPA level to carry out following tasks:
Install monitoring equipments as per monitoring plan
Train plant operators on data recording
Prepare reports based on monitored data
Support DOE during verification
Deployment of trained monitoring staff
CARBON PARTNERSHIP FACILITY 16
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
Creation / maintenance of up-to-date database
• Primary records: One record book / register for each monitoring parameter
• Second records: Necessary support documents for each of the monitoring parameter
• Electronic database : Electronic conversion from hard copy records
CARBON PARTNERSHIP FACILITY 17
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
A database administrator must be assigned at CPA level to carry out following tasks:
Create CPA level database
Maintain the hard copy records of data monitoring
Conversion of hard copy data to electronic copy
Submission of monitored data to CME
Creation / maintenance of up-to-date database
CARBON PARTNERSHIP FACILITY 18
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
Best practices in documentationo Mention the date of recording/measurement clearly
o All records must be approved by supervisor/next level authority
o Do not correct / over write documents
o Any corrections made must be approved
o Store all documents/records in one single location
o Do an internal review of documents
CARBON PARTNERSHIP FACILITY 19
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
Other documentations:
• Calibration records for meters
• Lab reports for any tests
• Monitoring sample survey records
• Legal / contract / loan agreements
• Technical specifications
• Operations manual
• Training materials
CARBON PARTNERSHIP FACILITY 20
Training on CDM Operations Plans and Sub-ERPA Contracting
CPA level monitoring
Verification of monitored data can be carried out by Monitoring officer itself
Check for duplicate data
Cross check hard copy data and electronic data
Check for consistency
Effective verification of generated project data
CARBON PARTNERSHIP FACILITY 21
Training on CDM Operations Plans and Sub-ERPA Contracting
Best practices in CPA level monitoring
Use only templates / formats given by CME for data recording
Install equipments only as per type / accuracy stated in PoA and CPA DD
Carry out calibration of equipments at required frequency
Communicate immediately on any issues identified in monitoring to CME
Maintain all project related documents / files in one central location
CARBON PARTNERSHIP FACILITY 22
Training on CDM Operations Plans and Sub-ERPA Contracting
Monitoring Surveys
Calculate sample size as per confidence level and error margin
Study and select suitable sampling method
Design standard template to record survey data
Carry out surveys at PoA level or CPA level as required
Finish the survey in stated time period
CARBON PARTNERSHIP FACILITY 23
Training on CDM Operations Plans and Sub-ERPA Contracting
Monitoring Surveys
Always have 20% additional samples for non-responses
Properly document survey results
Prepare a consolidated report
File all filled in survey template in order
CARBON PARTNERSHIP FACILITY 24
Training on CDM Operations Plans and Sub-ERPA Contracting
Quality control & quality assurance
• Two step quality verification of data to be done
• First quality check by monitoring officer at CPA level
• Second quality check by database administrator / inspection team at PoA level
• CPA level data can also be checked through field inspections by CME
CARBON PARTNERSHIP FACILITY 25
Training on CDM Operations Plans and Sub-ERPA Contracting
Quality control & quality assurance
CPA level check
PoA level check
Monitoring officerCPA database Plant records
ReportsDatabase administratorPoA database
CARBON PARTNERSHIP FACILITY 26
Training on CDM Operations Plans and Sub-ERPA Contracting
Monitoring - Verification - Issuance
CARBON PARTNERSHIP FACILITY 27
Training on CDM Operations Plans and Sub-ERPA Contracting
Stakeholders in monitoring to issuance
Collect data and submit
to CME
CPA implementer
Prepare monitoring
report
CME
Publish MR and site
verification
DOE
Issuance of CERs
UNFCCCReceive &
Pay for CERS
WB
1
2
3
4
5
6
CARBON PARTNERSHIP FACILITY 28
Training on CDM Operations Plans and Sub-ERPA Contracting
Step by step process in monitoring to issuance
Preparation of monitoring report (MR)
Hiring a DOE
Publishing of MR in UNFCCC site by DOE
Site visit and verification by DOE
Preparation of Draft Verification Report (DVR) by DOE along with • Corrective Action Required (CARs)• Clarifications (CLs)• Future Actions Required (FARs)
CARBON PARTNERSHIP FACILITY 29
Training on CDM Operations Plans and Sub-ERPA Contracting
Step by step process in monitoring to issuance
Response to DOE comments by CME
Review of CME responses by DOE
Finalizing Verification Report by DOE
Submission of issuance request to UNFCCC
Final review by UNFCCC and issuance of CERs
CARBON PARTNERSHIP FACILITY 30
Training on CDM Operations Plans and Sub-ERPA Contracting
Preparation of monitoring reportsStep 1:Consolidate the monitored data for the monitoring period
Step 2:List the documents/proofs for the monitored data
Step 3 :Calculate the CERs for the monitoring period
Step 4:Get the latest monitoring report format from CDM website
Step 5:Update the details in monitoring report
Step 6 :Cross check details/process stated in monitoring report with registered PoA and CPA DD
CARBON PARTNERSHIP FACILITY 31
Training on CDM Operations Plans and Sub-ERPA Contracting
Monitoring report - DOs & DONTs Confirm the first and last date of the reported
monitoring period
Provide detailed timeline of activities carried out
Add foot notes wherever required to provide supporting information
Mention any deviations from monitoring plan clearly with explanations
Explain in detail the CME level and CPA level monitoring done
CARBON PARTNERSHIP FACILITY 32
Training on CDM Operations Plans and Sub-ERPA Contracting
Monitoring report - DOs & DONTs
x Change the start date of crediting period
x Alter the format of CDM monitoring report
x Provide data without support documents
x Revise tools or methodologies referred
CARBON PARTNERSHIP FACILITY 33
Training on CDM Operations Plans and Sub-ERPA Contracting
What if deviations happen during implementation ?
Case 1:
• Minor changes like temporary deviation from monitoring plan, different accuracy levels of equipments, measurement locations, etc.
o DOE conducting the verification may assess the impact of changes.
o CERs may be deducted if there is significant impact in ER calculation
CARBON PARTNERSHIP FACILITY 34
Training on CDM Operations Plans and Sub-ERPA Contracting
What if deviations happen during implementation ?
Case 2:
• Major changes like project design or capacity or technology, crediting period, permanent change in monitoring plan, etc...
o PDD must be revised and Prior approval must be obtained from UNFCCC before issuance
o CER issuance will be very much delayed (minimum of another 6 months)
CARBON PARTNERSHIP FACILITY 35
Training on CDM Operations Plans and Sub-ERPA Contracting
Preparation for site verification
Arrange training on verification to all stakeholders
Prepare of list of documents for verification
Check for all database at CME and CPA level
Keep all support documents ready
CARBON PARTNERSHIP FACILITY 36
Training on CDM Operations Plans and Sub-ERPA Contracting
DOE Site verification process
• Kick-off meeting at CME office• Audit of documents at CME office• Site visit to CPA project locations• Inspection of equipments• Inspection of meters installed• Audit of documents at the CPA
implementer office• Check of monitoring practices• Other CDM requirements• Closure meeting at CME office
CARBON PARTNERSHIP FACILITY 37
Training on CDM Operations Plans and Sub-ERPA Contracting
Verification to Issuance - Time frame
• DOE uploads documents in UNFCCC website
• Request for Issuance kept in waiting queue (4 weeks)
• Completeness Check (1 week)
• Information and Reporting Check (3 weeks)
• Issuance kept for public review (4 weeks)
• Issuance of CERs
CARBON PARTNERSHIP FACILITY 38
Training on CDM Operations Plans and Sub-ERPA Contracting
Questions & Discussions