CAPTIVA POLE ACCIDENT April 23, 2015

Transcript of Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041...

Page 1: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

CAPTIVA POLE ACCIDENT April 23, 2015

Page 2: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

OUTAGE STATISTICS 0041 R0130 opens, interrupting service to 1,904

customers

0411 Partial restoration to 177 customers

1201 Interrupt 177 customers to reattach jumpers

1219 Restore service to all customers

Page 3: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation
Page 4: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

TIMELINE 0041 System Operations receives signal from R0130

indicating lockout, causing interruption of service to 1,904 customers

0041 System Operations dispatches two crews to investigate (crews 562 & 547)

0110 System Operations calls out two additional crews (556 & 557)

0145 Crew 562 starts patrolling behind the 0130

0152 Crew 562 finds location of pole accident

Page 5: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

TIMELINE (CONT.)

0210 System Operations contacts duty supervisor (Freddie Hernandez) to organize restoration activities

0211 Two additional LCEC crews called (565 & 585)

0245 Warehouse contacted with material list

0251 Tree crews contacted for support

0300 LCEC crews start partial restoration efforts by opening switch D0060 and cutting jumpers at pole where F2121 is located

Page 6: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

ACCIDENT LOCATION

Broken Pole

Page 7: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

TIMELINE (CONT.)

0411 System Operations closes R0130 and restores power to 177 customers

0430 Crews start removing damaged pole and prepping site for installation of new pole

0700 Warehouse arrives with pole and material, and assists with traffic control

1130 Tree work is completed, pole is set, and conductor is reinstalled

Page 8: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

TIMELINE (CONT.)

1201 System Operations opens R0130 to make up permanent jumpers

1218 LCEC crew closes D0060

1219 System Operations closes R0130, restoring power to remaining customers

Page 9: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

ACTUAL ACCIDENT

Page 10: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

D0060 BLADE ISOLATION POINT, NORTH OF THE ACCIDENT

Page 11: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

CUT JUMPERS, EAST OF THE ACCIDENT

Page 12: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

TRAFFIC ISSUES

Page 13: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

RESTORATION EFFORTS

Page 14: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

RESTORATION EFFORTS

Page 15: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

JUMPER RECONNECTED

Page 16: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

POLE REPLACED, CUSTOMERS’ SERVICE RESTORED

Page 17: Captiva Pole Accident - LCEC Pole... · 2016. 5. 2. · April 23, 2015 . O UTAGE S TATISTICS 0041 R0130 opens, interrupting service to 1,904 customers 0411 ... site for installation

IMPACT OF EVENT One C&M duty

supervisor

Six linemen

Two warehousemen

Six tree trimmers

Four buckets

One line truck and semi trailer

One 45-3 concrete pole, six insulators, six sleeves, 100 feet of 336 conductor

Approximately 190 man-hours

Estimated cost – $11,000

SAIDI impact 5.88 minutes 30% of the YTD SAIDI

on 4/23/2015