Capstone Project (Américo Delgado Fernández)

17
ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda Américo Antonio Delgado Fernández Est. # 801.05.1889 ARCHITECTURAL CONSTRUCTION IS AN ACT :: IT IS PRODUCED WITH THE ACTORS IN MIND Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMÓN CONCRETE PREFABISM IN OUR EVERYDAY STAGE 00

description

This work is oriented towards the study of precast concrete systems. It intends to illustrate the advantages and disadvantages of its use as compared to our traditional means of construction in Puerto Rico, cast-in-place. This investigation serves as the basis of the design of the New Center for the Fine Arts in the Autonomous Municipality of Bayamón, Puerto Rico. Specifically, in the proposed Experimental Theater of Bayamón.

Transcript of Capstone Project (Américo Delgado Fernández)

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    ARCHITECTURAL CONSTRUCTION IS AN ACT :: IT IS PRODUCED WITH THE ACTORS IN MIND

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE00

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: School of Architecture :: UPR-RP :: Capstone Project 2012-2013 Arch. Thomas S. Marvel :: Arch. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Student #: 801.05.1889

    Bayamn Town Hall

    UMU UMU

    UMU

    The proposed is a cultural, institutional and commercial building north of the Central District ofBayamn, Puerto Rico. Its location is in lot (#) and its current caliBication in accordance to theAutonomous Municipality of Bayamn's Territorial Ordinance, of the OfBice of PlaniBication is UMU (UsoMixto Urbano, or Mixed Urban Use).It has been well known that the current mayor of Bayamn, Ramn Luis Rivera, has for many yearsdreamt about building a Center for The Fine Arts, or Great Concert Hall, and to what others have agreedon it being of a regional impact.Bayamn is notorious for its lack of urbanism. Since (a moment in the 1970s) the car became the mainmode of transportation and vast Bields were being developed for housing. It is known as the dormitorycity, or in Spanish, la ciudad dormitorio. Since (1990s) the urban train, or Tren Urbano, was Binishedthe city of Bayamn has promoted work and leisure in its downtown. This proposal intends to serve asan urban connector between the Bus Terminal and the train passengers, with the design of its publicspace .

    NLOCATION PLANSCALE: 1/128" = 1'-0"

    SCALE: 1/64" = 1'-0"SITE PLAN

    01

    02

    05

    12 13

    01

    08

    09

    11

    01"El Cantn" Mall02

    AMA Bus Terminal06Head Start School07

    Estrella del Norte11Parking Building12

    Theater03 "Casa de los Artistas"08 Parking Building0803 08 13

    10

    N

    COMMERCIAL

    NEW VEHICLE CIRCUIT

    AMA BUS TERMINAL

    06

    Masonic Lodge03 Jos Celso Barbosa's House 0804 09

    LEYEND:

    URBAN CONTEXT

    Town Church Municipal Police Dpt.05 10

    03

    04

    03

    03

    04

    02

    06

    05

    01

    07

    01

    40 120! 240!0

    80 240! 4800

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    !

    CONSTRUCTION STAGING

    STAGE 01 STAGE 02 STAGE 03

    ! !

    AB

    C

    D

    AB

    C

    D

    AB

    C

    D

    AB

    C

    D

    TOP VIEW

    ROOFING PARASOL SOLID WALL PANELS

    AB

    C

    D

    FIRST FLOOR

    FIRST FLOOR

    CONFIGURATIONS

    MONUMENTAL ENTRANCE BRISE-SOLEIL

    NORTH ENTRANCE

    AB

    C

    D

    SOUTH ENTRANCE

    VEHICLE ENTRANCE

    VEHICLE ENTRANCE

    20'-0"

    A

    B

    FRONT ELEVATION SECTIONS

    ISOMETRIC

    CONFIGURATIONS

    SOUTH ENTRANCE VEHICLE ENTRANCE

    DESCRIPTION

    A SOUTH 3'ft

    B NORTH 1'-6" ft

    TYPE ORIENTATION DEPTH

    7'-0" 3'-0"

    15'-0

    "

    DESCRIPTION

    CONFIGURATIONS

    LOCATION / USE

    20'-0"

    20'-0

    "

    20'-0"

    VA

    RIES

    DESCRIPTION

    THIS ELEMENT SERVES FOR SHADING AND RAIN COLLECTING. PREFABRICATED INTO FOUR SEPERATE PIECES LATER WELDED TOGETHER AND LIFTED AT THE SITE.

    THIS ELEMENT SERVES FOR SHADING AND AS A KEY MARKER FOR ENTRANCES IN SOUTH-NORTH AXIS. IT IS IMPLEMENTED IN THE MEDIUM AUDITORIUM AS UNDERNEATH VEHICLES PASS THRU.

    THIS ELEMENT SERVES FOR THE CONTINUANCE OF THE FACADES PROVIDING RYTHM IN SPACES THAT SHOULD SERVE LITTLE PURPOSE FOR LIGHT.

    01 02

    03

    20'-0"

    15'-0

    "

    8"

    8"

    SHADING DEVICE PANELS

    AB

    C

    D

    SOUTH ENTRANCE

    VEHICLE ENTRANCE

    DESCRIPTION

    THIS IS THE MOST USED ELEMENT THROUGHOUT THE PROPOSAL. IT IS USED AS A UNIFYING ELEMENT BETWEEN THE THREE BUILDINGS. ITS PURPOSE IS TO PROVIDE SUN SHADING, AND CONTINUANCE OF FACADE.

    04

    02

  • 4See Detail 1 See Detail 2

    9 1020'-0"

    10'-0"10'-0"

    5" 5"5"

    18"

    18"

    12"

    6"

    Louver

    BB

    AA

    2'-6"

    2'-7"

    5"5"

    2'-6"

    5"1'-

    6"

    9 1020'-0"

    10'-0"10'-0"

    Louver

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    TYPICAL PREFAB CONCRETE LOUVERS SCALE: 1 1/2" = 1'-0"

    SCALE: 3/8" = 1'-0"

    SECTION AA

    FRONT ELEVATION

    SCALE: 3/8" = 1'-0"

    See Detail 3

    See Detail 4

    Louver

    2'-6"

    2'-7"

    5"5"

    2'-6"

    5"1'-

    6"

    SECTION BBSCALE: 3/8" = 1'-0"

    WM 3 1/2" x 3 1/2"

    Drip

    1/2" Steel Rod

    #3 Vertical

    1/2" Steel Rod

    Rafter

    Vertical Pre-Fab ConcreteFin

    Vertical Pre-Fab Concrete Louver

    1/2" Steel Rod

    Anchor Plates

    3 1/2" 5"

    Drip

    WM 3 1/2" x 3 1/2"

    #3 Vertical

    #3 Continuos- Bont

    1/2" diam. SleeveVertical Pre-Fab Concrete Louver

    3 1/2" 5"

    1/4" X 1/4" Chamfer

    #3@12"OC Welded to #3 Vertical

    #3 Vertical

    Louver Edge

    Louver Edge

    Anchor Plates

    5"

    18"

    5"

    Louver Edge#3@12"OC Welded to #3 Vertical

    #3 Vertical

    Louver Edge

    5"

    18"

    DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4

    ORIENTATION

    MODULE ANORTH-EAST MODULE B

    SOUTH-WEST

    03

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    O

    THIRD FLOOR

    Wood plank flooring

    slope

    Recessed flashing!throughout (typ.)

    STAGE

    FIFTH FLOOR F.F.E.= 45.00 ft.

    FOURTH FLOOR F.F.E.= 36.00 ft.

    F.F.E.= 27.00 ft.

    SECOND FLOOR F.F.E.= 15.00 ft.

    GROUND FLOOR F.F.E.= 00.00 ft.

    ROOF LEVELF.F.E.= 54.00 ft.

    BALCONY

    BALCONY

    BALCONY

    ROOF LEVELF.F.E.= 60.00 ft.

    ROOF LEVELF.F.E.= 63.00 ft.

    Underside of !Gypsum ceil ing Board (5/8")!

    Lightweight concrete for!roof drainage

    Metal Create flooring

    2"x2" Ceramic Tile Flooring on Concrete Slab

    Wood plank flooring

    Skylight

    Acoustical Panel System

    Metal Create flooring

    Metal Create flooring

    Acoustical Panel System

    HVAC Ducts

    8"8'-

    4"8"

    8'-4"

    8"11

    '-4"

    6"14

    '-6"

    9'-0"

    3'-6"

    14'-6

    "

    N

    1" diam. Steel Rod

    3"diameter S.S. Rail ing

    1" Steel Metal Stiffner Plate

    1' Steel Column filled with Concrete

    1" Steel Metal Stiffner Plate

    1" Steel Metal Stiffner PlatePre-Cast Concrete Parasol

    WALL SECTIONSCALE: 1/2" = 1'-0"

    04

    1 10!!

    0 5

    Reflective Pool

    Anonized Aluminum!Curtain Wall Window

    1/4" Solar Grey ! Safety Glass!

    Dx A/C Machine

    3" PVC Tube

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    Foyer

    STRUCTURE

    'MODULE A'

    PREFAB PANELS

    SKIN

    'MODULE B'

    ROOF

    INTERIOR ELEMENTS

    PRECAST PARASOL

    PRECAST LOUVERS

    05

    EXPLODED AXONOMETRICSCALE: 1/8" = 1'-0"

    5 15! 30!0

  • WALL SECTION

    NEW PLAZA URBAN TRAIN STATIONAMET BUS STATION'EL CANTN MALL' EXPERIMENTAL THEATER VEHICLE CIRCUITVEHICLE CIRCUITGENERAL PARKING 'ESTRELLA DEL NORTE'

    CONCRETE PREFABISM IN OUR EVERYDAY STAGE Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMN

    SCALE: 1/64" = 1'-0"SECTION Z-Z

    ARQU 6311 :: School of Architecture :: UPR-RP :: Capstone Project 2012-2013 Arch. Thomas S. Marvel :: Arch. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Student #: 801.05.1889

    06

    20 60! 120!!

    0

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    FIRST FLOOR PLAN

    SCALE: 1/32" = 1'-0"

    20 60! 120!!

    0

    !

    Classrooms

    Classroom

    Administrative Stor

    age

    Reception

    Classrooms

    Classroom

    Stor

    age!

    Box

    Offic

    e

    Lounge

    Storage

    Conf

    eren

    ce

    Tick

    ets

    Stor

    age

    Service!

    FoyerFoyer

    Storage

    Security

    Secretary

    Dire

    ctor

    's

    Dire

    ctor

    's

    Coat

    Mechanical

    Tel/ComElec. Closet

    Electrical Room

    Electrical Room

    Cistern & Pump Room

    Electrical Room

    Chiller Room

    Caf

    Store

    Orch

    estra

    Pit

    Production Space

    Administrative

    Loading Dock

    Service

    Kitchen

    X

    X

    Y

    Y

    Z

    Z

    DX

    DX

    CHIL

    LERS

    MECHANICAL DIAGRAM / AHU's

    01

    AIR HANDLING UNITS (ROOF)

    AIR HANDLING UNITS (FIRST FLOOR)

    N

    A/C ZONING DIAGRAM

    0101

    0102

    0103

    0104 CLASSROOMS/OFFICES/PRACTICE ROOMS

    ZONE GRAND THEATER/LOBBY/PRODUCTION SPACE/STAGE SUPPORTAUDITORIUM

    EXPERIMENTAL THEATERZONE

    ZONE

    ZONE

    DX

    Galle

    ry /

    New

    s Are

    a

    07

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    FIRST FLOOR PLAN

    SCALE: 1/32" = 1'-0"

    20 60! 120!!

    0

    N

    ADA DIAGRAM

    01

    ELEVATORS

    ADA THEATER SEATING

    RAMPS

    BATHROOMS

    PATHS

    MEANS OF EGRESS

    01 INTERIOR PASSAGEWAY

    PATH/DOORS

    EXTERIOR PASSAGEWAY

    EGRESS STAIRS

    X

    X

    Y

    Y

    Z

    Z

    ClassroomsClassrooms

    ClassroomTe

    l/Com

    Elect

    rical

    Orhestra!

    Activity Room Reception

    Stage!

    Prac

    tice

    Prac

    tice

    Prac

    tice

    ClassroomClassroom

    Prac

    tice

    Prac

    tice

    Prac

    tice

    Stage!Stage! Con

    cess

    ions S

    tora

    ge

    Stage!

    Stage!

    Storage!

    Kitchen

    08

    SECOND FLOOR PLAN

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    THIRD FLOOR PLAN

    SCALE: 1/32" = 1'-0"

    20 60! 120!!

    0

    N

    X

    X

    Y

    Y

    Z

    Z

    030102

    04

    0104

    04

    04

    05

    05

    05

    05

    01

    05

    02

    05

    05

    02

    03 04

    01

    05

    05

    05

    CONNECTIONS A/C PUMP ROOM CISTERN

    0101

    0102

    0103

    0104

    0105

    PUMP ROOM - CISTERN

    POTABLE CISTERN & FIRE SYSTEM (UNDERGROUND)

    COLD WATER PUMP

    MECHANICAL CLOSETS

    UNDERGROUND CHILLER CONNECTION

    ELECTRICAL / TELECOMMUNICATIONS

    0101

    0102

    0103

    0104

    0105

    ELECTRIC GENERATOR

    SWITCHING UNIT

    ELECTRICAL CLOSET

    TELECOM. CLOSET

    TRANSFORMER ELECTRICAL/DATA

    TELECOM.

    Rehearsal

    Practice

    Tel/ComElectrical

    Reception

    Stage!

    PracticePractice

    PracticePractice

    PracticePracticePracticePractice

    09

  • XX

    Y

    Y

    Z

    Z

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    FOURTH FLOOR PLAN

    SCALE: 1/32" = 1'-0"

    20 60! 120!!

    0

    A B C

    2726

    2524

    2322

    2120

    190101

    1817

    1516

    1413

    1211

    1009

    0807

    0605

    010104

    0302

    0101

    D E F G H I

    J LK M N O

    P Q R S T U

    V W W X

    STRUCTURAL DIAGRAM

    01

    01

    01

    LOAD WALLS

    BEAMS

    TRUSSES

    20'x20' Floor Space

    MODULAR GRID DIAGRAM

    Tel/ComElectrical

    10

    N

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    SECTION X-X

    EAST ELEVATION

    SCALE: 1/16" = 1'-0"

    SCALE: 1/16" = 1'-0"

    "The World is our Stage" Shakespeare

    11

    10 30 60!!

    0

    10 30 60!!

    0

  • SECTION Y-Y

    SCALE: 1/16" = 1'-0"

    SOUTH ELEVATION

    SCALE: 1/16" = 1'-0"

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    C E N T R O D E B E L L A S A R T E S D E B A Y A M N

    "The theater is so endlessly fascinating because it's so accidental. It's so much like life."

    - Arthur Miller

    12

    10 30 60!!

    0

    10 30 60!!

    0

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE13

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE14

  • ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE15

  • Architecture / drama and space :: CENTER FOR THE FINE ARTS AUTONOMOUS MUNICIPALITY OF BAYAMNCONCRETE PREFABISM IN OUR EVERYDAY STAGE

    ARQU 6311 :: Escuela de Arquitectura :: UPR-RP :: Primer Semestre 2012-2013 Arq. Thomas S. Marvel :: Arq. Cristina A. Cardalda

    Amrico Antonio Delgado Fernndez Est. # 801.05.1889

    PROCESS MODEL

    16

    FINAL MODEL

    SCALE: 1/32" = 1'-0"

    SCALE: 1/32" = 1'-0"

    BOARD 0.pdfBOARD 01BOARD 02BOARD 03BOARD 04BOARD 05BOARD 06BOARD 07BOARD 08BOARD 09BOARD 10BOARD 11BOARD 12BOARD 13BOARD 14BOARD 15BOARD 16