THE CORPORATION OF THE TOWN OF TECUMSEH
Town Council
& Administration
CAPITAL PROJECTS
ROAD TOUR * Original Presented at the special meeting of Council, October 29th, 2016
** Revised to reflect projects
contained in PWES Report
No. 54/16 2017 - 2021 PWES
Capital Works Plan.
NOTES
CAPITAL PROJECTS ROAD TOUR Summary
Item Project Year Location Works WARD
Roads
1 Shawnee - Arbour Phase 2 2016 Arbour Street, St Annes Street, Remie Street Road, Water, Sanitary, Storm 1
2 PWES Water Yard - Asphalt Works 2016 Lacasse PWES Yard Parking Lot Modifications 1
3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED 1 thru 4
4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study 1 thru 4
5 Tecumseh Road CIP 2016/2017 Tecumseh Road & Lesperance Road Road, Water, Sanitary, Streetscape 1
6 CR19/Jamsyl Drive Traffic Signal (County Project) 2017 CR19/Jamsyl Drive intersection Construction 2017 3
7 Traffic Signal Reconstruction 2017 Lesperance Road/Riverside Drive Traffic Signal Reconstruction 1
8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020 1 & 2
9 South Talbot Road Reconstruction & Culvert #46 & #47 2017/2018 Section of STR between CR9 and CR11 Engineering 2017 / Construction 2018 4
10 Tar & Chip Program: Sexton Sideroad 2017 HWY #3 to South Talbot Road Tar & Chip 4
11 8th Concession Road 2017 South Talbot Road to County Road 8 Tar & Chip 4
12 Asphalt Program: Juniper Court 2017 Full Length Mill / Pave 1
13 Clarice Avenue 2017 Full Length Mill / Pave 1
14 Outer Drive 2017 Blackacre Drive to Hwy #3 Mill / Pave 4
15 Mack Court 2017 Full Length Mill / Pave 2
16 Burdick Crescent 2017 Full Length Mill / Pave 1
17 Brouillette Court 2017 Full Length Mill / Pave 1
18 Hebert Street 2017 Westlake Drive to Chornoby Crescent Mill / Pave 3
19 Fasan Drive 2017 Full Length Mill / Pave 4
Sidewalks/Pathways
* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks 1 thru 4
20 Riverside Drive Multi-Use Pathway 2017 Riverside Drive (City Limits to Manning Road) Construct new sidewalks 1
Bridges
21 Pike Creek at County Road 2 (County Project) 2016 Connecting Link - Pike Creek Construction 2016 2
22 Pike Creek at 12th Concession Road (Bridge #1002) 2016 Bridge Structure 1002 - Pike Creek Construction 2016 4
23 East Townline Drain at St Thomas Street (Bridge #1028) 2016 Bridge Structure 1028 - East Townline Drain Minor Repairs 2016 1
24 East Townline Drain at Little River Boulevard (Bridge #1029) 2016 Bridge Structure 1029 - East Townline Drain Minor Repairs 2016 1
25 Pike Creek at Baseline Road (Bridge #1005) 2016 Bridge Structure 1005 - Pike Creek Roadside Safety Improvements 4
26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study 1 thru 4
27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study 1 thru 4
28 East Townline Drain at Desro Drive (Culvert #7) 2017 Culvert Structure 7 - East Townline Drain Removal of Structure (County Project) 3
29 East Townline Drain at Jamsyl Drive (Culvert #8) 2017 Culvert Structure 8 - East Townline Drain Replacement of Structure (County Project) 3
30 Riverside Drive Culvert (Culvert #1) 2017 Culvert Structure 1 - Riverside Drive @ City Limits Abandonment (grouting) 1
31 South Talbot Drain at Holden Road/South Talbot Road (Culvert #46) 2017/2018 Culvert Structure 46 - South Talbot Drain Engineering 2017 / Construction 2018 4
32 Dickson Drain at South Talbot Road (Culvert #47) 2017/2018 Culvert Structure 47 - Dickson Drain Engineering 2017 / Construction 2018 4
33 10th Concession Culvert (Culvert #58) 2017 Culvert Structure 58 - 10th Concession Construction 2017 4
34 10th Concession Culvert (Culvert #60) 2017 Culvert Structure 60 - 10th Concession Construction 2017 4
Page 1 of 3
CAPITAL PROJECTS ROAD TOUR Summary
Item Project Year Location Works WARD
35 10th Concession Culvert (Culvert #62) 2017 Culvert Structure 62 - 10th Concession Construction 2017 4
36 11th Concession Culvert (Culvert #67) 2017 Culvert Structure 67 - 11th Concession Construction 2017 4
Watermains
37 Elevated Water Tower Lighting 2016 Water Tower on Tecumseh Road (east of Lacasse) Installaton of lighting 1
38 Intersection Road 2016 St Anne St to Lesperance Road Replace Existing Watermain 3
39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain 3 & 4
40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study 1 thru 4
41 Mack Court 2017 Mack Court Replace Existing Watermain 2
42 Lacasse Park 2017 Lacasse Park Replace Existing Watermain 1
43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs 1 thru 4
44 Tecumseh Road Watermain 2017 Arlington Boulevard to 530m westerly Abandonment of Watermain 2
Wastewater Projects
45 8th Concession Trunk Sanitary Sewer EA 2016 8th Concession @ Delduca Drive EA to obtain Sanitary Easement 4
46 Dumochelle Street - Outer Drive 2016 Dumochelle Street, Outer Drive Road, Water, Sanitary, Storm 4
47 Pulleyblank-Crowder-Moro 2016/2017 Pulleyblank-Crowder-Moro Road, Water, Sanitary, Storm 4
48 Oldcastle/8th Concession Sanitary FSR/By-Law 2016/2017 Oldcastle Area Engineering Study 4
49 8th Concession Trunk Sanitary & Watermain, Ph1 2016/2017 8th Concession (CR46 to NTR), NTR (8th Con to Oldcastle) Road, Water, Sanitary 4
50 8th Concession Trunk Sanitary & Watermain, Ph2 2016 Oldcastle Road (NTR to Hwy #3) Road, Sanitary 4
51 Cedarwood Sanitary Pump Station 2017 Cedarwood Sanitary PS Repairs 1
52 Sylvestre Sanitary Pump Station 2017 Sylvestre Sanitary PS Repairs 3
53 St Alphonse Sanitary Pump Station 2017 St Alphonse Sanitary Pump Station Repairs 3
54 Sanitary Meter Station #1 (Cedarwood PS) 2017 Cedarwood Sanitary PS Repairs 1
55 Sanitary Meter Station #4 (NTR Flume) 2017 North Talbot Road @ City Limits Repairs 4
56 Sanitary Meter Station #5 (8th Concession Flume) 2017 8th Concession @ City Limits Repairs 4
57 Rossi Drive Sanitary Sewer 2017/2018 Rossi Drive (Pulleyblank to Outer) Road, Water, Sanitary, Storm 4
58 County Road 11 (North) Sanitary Sewer 2017/2019 County Road 11 (North Talbot Road to Hwy 401) Sanitary, CWATS Multi-Use Pathway 4
59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1, 2, 3 Investigations & Repairs 1 thru 3
Storm Sewers
60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary 1 thru 4
61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study 1 thru 3
62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary 1 & 2
Drainage Projects
* Various 2016 Various locations Drainage maintenance under the Drainage Act 1 thru 4
Page 2 of 3
CAPITAL PROJECTS ROAD TOUR Summary
Item Project Year Location Works WARD
Parks & Recreation Projects
63 Lakewood Park Capital Improvements 2016/2017 Manning Road @ Riverside Drive Bridge over Channel / Trail Paving / Exercise Eqp. 2
64 Shawanoe Park 2016 St Gregory Construct New Trail (and Pickleball Courts) 1
65 Multi-Use Sportsplex 2016/2017 McNorton Street Feasibility study update 1
66 Town Hall Trail 2016 McNorton Street & Lesperance Road Construct New Trail 1
Tecumseh Fire & Rescue
67 Training Station at Fire Hall #2 2016 Fire Hall #2 - McCord / Walker Rd Construction of Confined SpaceTraining Facility 4
Planning / Developments
68 Arbour Grove, Valente Townhome Development 2015-2016 Former St. Anne's High School / Carmelita Court Housing/Townhouse Development 1
69 Estates of Lakewood Park Development 2015-2016 South Area of Lakewood Park (Hayes Ave) Housing/Townhouse Development 1
70 MRSPA Lands, Area Specific DC 2017 Location Specific - Development Lands Dev. Lands, SWM Facility, Ph1 Valente/Zohil 3
MRSPA Lands, Area Specific DC Continued… 2017 Westlake Drive, CR 22 Westlake Dr. Extension, CR22 Flyoff improvements 3
71 Tecumseh Hamlet Secondary Plan Lands 2017/2018 Banwell Corridor, SWM facilities wrt upper LR SWM Study Facility and Improvement Studies 3
72 Proposed New Employment Lands 2017/2018 8th Concession Rd, Between Highway 401 and CR 46 Justification for Additional Land in Settlement Area 4
73 Delduca Industrial Subdivision 2017/2018 8th Concession Rd, Between CASO Tracks and NTR Industrial Development 4
Page 3 of 3
¬«64
¬«8¬«
¬«
¬«
¬«
¬«
ROADS
SIDEWALK/PATHWAY PROJECT
WATER PROJECTSWASTEWATER PROJECTSSTORM PROJECTS
BRIDGES¬«
¬« PARKS & RECREATION¬« PLANNING/DEVELOPMENT
¬«68
¬«7
¬«37¬«2
¬«42
¬«5
¬«51
¬«24
¬«23
¬«20
¬«16
¬«13
¬«17
¬«12
¬«30
¬«54 ¬«62
¬«65¬«66
¬«1
¬«*
MANN
INGLESPERANCE
LACASSE
DILLON
TECUMSEH
RIVERSIDE
LANOUE
ST THOMAS
COUNTY RD 22
LITTLE RIVER
ARBOUR
GRAC
E
MICHAEL
GAUTHIER
ST PIERRE
REVLAND
WILLIAM
CHENE
DESRO
BARRY
ST GREGORYS
CENTENNIALWOODRIDGE
RENAUD
MCNORTON
LEMIRESHAWNEE
WESTLAKE
KEITH
CLAPPPOISSON
GREE
N VA
LLEY
SOUTHFIELD
HEBERT
BEDELL
OLIVER
FIRST
ST DENIS
SYLVESTRE
NORTHFIELD
CHORNOBY
OAKPARK
ORCHARD
LABUTE
HAYES
KIMBERLY
JACIE
SHAW
NDUBE
CORT
INA
EVERGREEN
BRENDA
HORWOOD
AMBERLY
CEDARWOOD
PAPINEAU
HEATHERGLEN
BAILLARGEON BRUN
ELLE
SOMERVILLE
PERCY
JAMES
MEANDERROXBURY
LESSARD
APPLETREE
DOVE
WOOD
PARKLAND
HAWK
AMANDA
JELSO
RYEGATE
SHELLEY
CARDINAL
VALENTE
MEADOWLAND
HARVEST
CALVARY
KENNY
SHANNON
PRIM
ROSE
WEDGEWOOD
BORDER
DONA
LDA
SALICH
MICKAILA
LACHANCE
SIMARD
MULBERRY
JASPER
CATALINA
CORONADO
WINCLARE
VILLA
GE G
ROVE
VERONICA
RIDEAU
PAISLEY
SHAWNEE
DILLON
WOODRIDGE
BRENDA
LITTLE RIVER
ST PIERRE
SYLV
ESTR
E
MICH
AEL
JAMES
WARD 1 2 0 1 72 0 1 7C a p i t a l P r o j e c t s C a p i t a l P r o j e c t s
R O A D TO U RR O A D TO U R
µ
CAPITAL PROJECTS ROAD TOUR WARD 1
Item Project Year Location Works
Roads
1 Shawnee - Arbour Phase 2 2016 Arbour Street, St Annes Street, Remie Street Road, Water, Sanitary, Storm
2 PWES Water Yard - Asphalt Works 2016 Lacasse PWES Yard Parking Lot Modifications
3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED
4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study
5 Tecumseh Road CIP 2016/2017 Tecumseh Road & Lesperance Road Road, Water, Sanitary, Streetscape
7 Traffic Signal Reconstruction 2017 Lesperance Road/Riverside Drive Traffic Signal Reconstruction
8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020
12 Asphalt Program: Juniper Court 2017 Full Length Mill / Pave
13 Clarice Avenue 2017 Full Length Mill / Pave
16 Burdick Crescent 2017 Full Length Mill / Pave
17 Brouillette Court 2017 Full Length Mill / Pave
Sidewalks/Pathways
* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks
20 Riverside Drive Multi-Use Pathway 2017 Riverside Drive (City Limits to Manning Road) Construct new sidewalks
Bridges
23 East Townline Drain at St Thomas Street (Bridge #1028) 2016 Bridge Structure 1028 - East Townline Drain Minor Repairs 2016
24 East Townline Drain at Little River Boulevard (Bridge #1029) 2016 Bridge Structure 1029 - East Townline Drain Minor Repairs 2016
26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study
27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study
30 Riverside Drive Culvert (Culvert #1) 2017 Culvert Structure 1 - Riverside Drive @ City Limits Abandonment (grouting)
Watermains
37 Elevated Water Tower Lighting 2016 Water Tower on Tecumseh Road (east of Lacasse) Installaton of lighting
40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study
42 Lacasse Park 2017 Lacasse Park Replace Existing Watermain
43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs
Wastewater Projects
51 Cedarwood Sanitary Pump Station 2017 Cedarwood Sanitary PS Repairs
54 Sanitary Meter Station #1 (Cedarwood PS) 2017 Cedarwood Sanitary PS Repairs
59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs
Storm Sewers
60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary
61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study
Page 1 of 2
CAPITAL PROJECTS ROAD TOUR WARD 1
Item Project Year Location Works
62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary
Drainage Projects
* Various 2016 Various locations Drainage maintenance under the Drainage Act
Parks & Recreation Projects
64 Shawanoe Park 2016 St Gregory Construct New Trail (and Pickleball Courts)
65 Multi-Use Sportsplex 2016/2017 McNorton Street Feasibility study update
66 Town Hall Trail 2016 McNorton Street & Lesperance Road Construct New Trail
Planning / Developments
68 Arbour Grove, Valente Townhome Development 2015-2016 Former St. Anne's High School / Carmelita Court Housing/Townhouse Development
Page 2 of 2
¬«15
¬«44
¬«8
¬«41
¬«
¬« ¬«
ROADS
WATERMAINSSTORM SEWERS
BRIDGES¬«
¬« PARKS & RECREATION
¬«69
¬« PLANNING/ DEVELOPMENT
¬«63
¬«21
¬«62
Beachgrove Golf and Country Club
LAKEWOOD PARK
GREEN ACRES PARK
LESSOR SOCCER FIELDS
LAKEWOOD PARK
PEACE PARK
DRESDEN PARK
DORSET PARK
PETER CECILE PARK
ST. MARK'S BEACH PARK
SCULLEY BEACH PARKEDGEWATER BEACH PARK
BRIGHTON BEACH PARK
MANN
ING
RIVERSIDE
TECUMSEH
HAYES
ARLIN
GTON
CADA
ST M
ARK'S
ST GREGORYS
PENT
ILLY
EDGE
WATE
R
KENSINGTON
GRAN
T
FAIR
WAY
DORSET
DRESDEN
DAVID
ESTATE
GORD
ON
ESSE
X
BRIG
HTON
WARW
ICK
ALOHA
COVE
RUTLAND
DERB
Y
JASON
BURLINGTO
N
LEXH
AM
CHRISTY
MARI
NE
CLOVELLY
STARWOOD
SOUTHWIND
TALT
HORP
EREGE
NT
COLL
IER
LAKE
WOO
D LENORE
BEACH GROVE
JEFF
REY
TUSCANY
MEI-LIN
CARI
TAS
VILLAGE GROVECEDAR
ROST
REVO
R
WILLOW
OAKF
IELD
CAMB
RIDG
E
CANT
ERBE
RRY
BRIG
HTON
DAVID
TECUMSEH
CLOVELLY
WARD 220 1 720 1 7
C ap i t a l P r o j e c ts C ap i t a l P r o j e c ts R O A D TO U RR O A D TO U R µ
CAPITAL PROJECTS ROAD TOUR WARD 2
Item Project Year Location Works
Roads
3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED
4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study
8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020
15 Asphalt Program: Mack Court 2017 Full Length Mill / Pave
Sidewalks/Pathways
* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks
Bridges
21 Pike Creek at County Road 2 (County Project) 2016 Connecting Link - Pike Creek Construction 2016
26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study
27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study
Watermains
40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study
41 Mack Court 2017 Mack Court Replace Existing Watermain
43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs
44 Tecumseh Road Watermain 2017 Arlington Boulevard to 530m westerly Abandonment of Watermain
Wastewater Projects
59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs
Storm Sewers
60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary
61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study
62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary
Drainage Projects
* Various 2016 Various locations Drainage maintenance under the Drainage Act
Parks & Recreation Projects
63 Lakewood Park Capital Improvements 2016/2017 Manning Road @ Riverside Drive Bridge over Channel / Trail Paving / Exercise Eqp.
Planning / Developments
69 Estates of Lakewood Park Development 2015-2016 South Area of Lakewood Park (Hayes Ave) Housing/Townhouse Development
Page 1 of 1
¬«38
¬«
¬«
¬«
¬«
ROADS
WATERMAINS
WASTEWATER PROJECTSSTORM SEWERS
BRIDGES¬«
¬«28
¬«53
¬«71¬« PLANNING / DEVELOPMENT
¬«39
¬«70 ¬«6¬«18
¬«29
¬«52
¬«71¬«70
MANN
ING
LESPERANCE
COUNTY RD 42
HEBERT
COUNTY RD 22
BANWELL
SHAWNEE
GOUIN
COUNTY RD 43
CORBI
SYLVESTRE
INTERSECTION
DESRO
ST ALPHONSE
ARBOUR
JAMSYL
RENAUD
LANOUE
ST ANNE
WESTLAKE
DIMU
SHIFF
12TH
CON
CESS
ION
MAISONNEUVE
CHORNOBY
DESLIPPE
CHARLENE
MECONIMURRAY
SHIELDS
STRAWBERRY
SOUTHFIELD
NORTH PACIFIC FUNARO
POISSON
WILDBERRY
DOCHERTY
11TH
CON
CESS
ION
CANDLEWOOD
CORT
INA
CALVARY
ST AGNES
NORTHFIELD
LE BOEUF
EUGENI
CARMELITA HEAT
HERG
LEN
ODESSA
LESSARD
VICKERY
BROUILLETTE
RYEGATE
KAVANAGH
GREEN
ROXANNE
CARDINAL
HOLMES
ELDERBERRY
EMMA MARIA
ST MARTIN
CHAMP
SOUTH PACIFIC
MAYRAND
BORDER
DEMARSEMICKAILA
FIELDCREST
ST ANNE
SHAWNEE
ST ANNE
SHIELDS
SHAWNEE
WARD 32 0 1 72 0 1 7
C a p i t a l P r o j e c t s C a p i t a l P r o j e c t s R O A D T O U RR O A D T O U R
µ
CAPITAL PROJECTS ROAD TOUR WARD 3
Item Project Year Location Works
Roads
3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED
4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study
6 CR19/Jamsyl Drive Traffic Signal (County Project) 2017 CR19/Jamsyl Drive intersection Construction 2017
18 Asphalt Program: Hebert Street 2017 Westlake Drive to Chornoby Crescent Mill / Pave
Sidewalks/Pathways
* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks
Bridges
26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study
27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study
28 East Townline Drain at Desro Drive (Culvert #7) 2017 Culvert Structure 7 - East Townline Drain Removal of Structure (County Project)
29 East Townline Drain at Jamsyl Drive (Culvert #8) 2017 Culvert Structure 8 - East Townline Drain Replacement of Structure (County Project)
Watermains
38 Intersection Road 2016 St Anne St to Lesperance Road Replace Existing Watermain
39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain
40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study
43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs
Wastewater Projects
52 Sylvestre Sanitary Pump Station 2017 Sylvestre Sanitary PS Repairs
53 St Alphonse Sanitary Pump Station 2017 St Alphonse Sanitary Pump Station Repairs
59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs
Storm Sewers
60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary
61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study
Drainage Projects
* Various 2016 Various locations Drainage maintenance under the Drainage Act
Planning / Developments
70 MRSPA Lands, Area Specific DC 2017 Location Specific - Development Lands Dev. Lands, SWM Facility, Ph1 Valente/Zohil
MRSPA Lands, Area Specific DC Continued… 2017 Westlake Drive, CR 22 Westlake Dr. Extension, CR22 Flyoff improvements
71 Tecumseh Hamlet Secondary Plan Lands 2017/2018 Banwell Corridor, SWM facilities wrt upper LR SWM Study Facility and Improvement Studies
Page 1 of 1
¬«
¬«
¬«
¬«14
¬«10
¬«25
¬«11
¬« ¬« ¬«
¬«22
¬«23
¬«67
¬«72
¬«39
¬«
¬«
¬«
¬«
¬«
ROADSSIDEWALK/PATHWAYS
WATERMAINSWASTEWATER PROJECTSSTORM SEWERS
DRAINAGE PROJECTS
BRIDGES¬«
¬« PLANNING / DEVELOPMENT¬« FIRE & RESCUE
¬«49
¬«19¬«9¬«31
¬«32
¬«46 ¬« ¬« ¬« ¬«47
¬« ¬« ¬«46
¬« ¬«50
¬«55¬«56
¬« ¬« ¬« ¬«57¬« ¬«58
¬«73
¬«33
¬«36¬«34¬«35
Tecumseh
Windsor
Lakeshore
EssexAmherstburg
MANN
ING
HIGHWAY 3
WALK
ER
COUNTY RD 8
SOUTH TALBOT
MALDEN
HOWA
RD
COUNTY RD 46
HOLD
EN
SNAK
ESEXTON
BASELINE
HIGHWAY 401
NORTH TALBOT
OLDC
ASTL
E
COUNTY RD 42
9TH
CONC
ESSI
ONCOUNTY RD 34
10TH
CON
CESS
ION
12TH
CON
CESS
ION
11TH
CON
CESS
ION
BLACKACREO'
NEIL
ROSSIMORO
12TH
CON
CESS
ON
RUSTON
HENN
IN
BRENDANOLYMPIA
ODESSA
HIGHWAY 401HIGHWAY 401
9TH
CONC
ESSI
ON
HIGHWAY 401HIGHWAY 401
HIGHWAY 401
HIGHWAY 401
HIGHWAY 401HIGHWAY 401
WARD 420 1 720 1 7
C ap i t a l P r o j e c ts C ap i t a l P r o j e c ts R O A D TO U RR O A D TO U R µ
CAPITAL PROJECTS ROAD TOUR WARD 4
Item Project Year Location Works
Roads
3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED
4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study
9 South Talbot Road Reconstruction & Culvert #46 & #47 2017/2018 Section of STR between CR9 and CR11 Engineering 2017 / Construction 2018
10 Tar & Chip Program: Sexton Sideroad 2017 HWY #3 to South Talbot Road Tar & Chip
11 8th Concession Road 2017 South Talbot Road to County Road 8 Tar & Chip
14 Asphalt Program: Outer Drive 2017 Blackacre Drive to Hwy #3 Mill / Pave
19 Fasan Drive 2017 Full Length Mill / Pave
Sidewalks/Pathways
* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks
Bridges
22 Pike Creek at 12th Concession Road (Bridge #1002) 2016 Bridge Structure 1002 - Pike Creek Construction 2016
25 Pike Creek at Baseline Road (Bridge #1005) 2016 Bridge Structure 1005 - Pike Creek Roadside Safety Improvements
26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study
27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study
31 South Talbot Drain at Holden Road/South Talbot Road (Culvert #46) 2017/2018 Culvert Structure 46 - South Talbot Drain Engineering 2017 / Construction 2018
32 Dickson Drain at South Talbot Road (Culvert #47) 2017/2018 Culvert Structure 47 - Dickson Drain Engineering 2017 / Construction 2018
33 10th Concession Culvert (Culvert #58) 2017 Culvert Structure 58 - 10th Concession Construction 2017
34 10th Concession Culvert (Culvert #60) 2017 Culvert Structure 60 - 10th Concession Construction 2017
35 10th Concession Culvert (Culvert #62) 2017 Culvert Structure 62 - 10th Concession Construction 2017
36 11th Concession Culvert (Culvert #67) 2017 Culvert Structure 67 - 11th Concession Construction 2017
Watermains
39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain
40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study
43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs
Wastewater Projects
45 8th Concession Trunk Sanitary Sewer EA 2016 8th Concession @ Delduca Drive EA to obtain Sanitary Easement
46 Dumochelle Street - Outer Drive 2016 Dumochelle Street, Outer Drive Road, Water, Sanitary, Storm
47 Pulleyblank-Crowder-Moro 2016/2017 Pulleyblank-Crowder-Moro Road, Water, Sanitary, Storm
48 Oldcastle/8th Concession Sanitary FSR/By-Law 2016/2017 Oldcastle Area Engineering Study
49 8th Concession Trunk Sanitary & Watermain, Ph1 2016/2017 8th Concession (CR46 to NTR), NTR (8th Con to Oldcastle) Road, Water, Sanitary
50 8th Concession Trunk Sanitary & Watermain, Ph2 2016 Oldcastle Road (NTR to Hwy #3) Road, Sanitary
55 Sanitary Meter Station #4 (NTR Flume) 2017 North Talbot Road @ City Limits Repairs
56 Sanitary Meter Station #5 (8th Concession Flume) 2017 8th Concession @ City Limits Repairs
Page 1 of 2
CAPITAL PROJECTS ROAD TOUR WARD 4
Item Project Year Location Works
57 Rossi Drive Sanitary Sewer 2017/2018 Rossi Drive (Pulleyblank to Outer) Road, Water, Sanitary, Storm
58 County Road 11 (North) Sanitary Sewer 2017/2019 County Road 11 (North Talbot Road to Hwy 401) Sanitary, CWATS Multi-Use Pathway
59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs
Storm Sewers
60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary
Drainage Projects
* Various 2016 Various locations Drainage maintenance under the Drainage Act
Tecumseh Fire & Rescue
67 Training Station at Fire Hall #2 2016 Fire Hall #2 - McCord / Walker Rd Construction of Confined SpaceTraining Facility
Planning / Developments
72 Proposed New Employment Lands 2017/2018 8th Concession Rd, Between Highway 401 and CR 46 Justification for Additional Land in Settlement Area
73 Delduca Industrial Subdivision 2017/2018 8th Concession Rd, Between CASO Tracks and NTR Industrial Development