THE CORPORATION OF THE TOWN OF TECUMSEH Town Council & Administration CAPITAL PROJECTS ROAD TOUR * Original Presented at the special meeng of Council, October 29th, 2016 ** Revised to reflect projects contained in PWES Report No. 54/16 2017 - 2021 PWES Capital Works Plan.

Transcript of CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR...

Page 1: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

THE CORPORATION OF THE TOWN OF TECUMSEH

Town Council

& Administration

CAPITAL PROJECTS

ROAD TOUR * Original Presented at the special meeting of Council, October 29th, 2016

** Revised to reflect projects

contained in PWES Report

No. 54/16 2017 - 2021 PWES

Capital Works Plan.

Page 2: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

NOTES

Page 3: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR Summary

Item Project Year Location Works WARD

Roads

1 Shawnee - Arbour Phase 2 2016 Arbour Street, St Annes Street, Remie Street Road, Water, Sanitary, Storm 1

2 PWES Water Yard - Asphalt Works 2016 Lacasse PWES Yard Parking Lot Modifications 1

3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED 1 thru 4

4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study 1 thru 4

5 Tecumseh Road CIP 2016/2017 Tecumseh Road & Lesperance Road Road, Water, Sanitary, Streetscape 1

6 CR19/Jamsyl Drive Traffic Signal (County Project) 2017 CR19/Jamsyl Drive intersection Construction 2017 3

7 Traffic Signal Reconstruction 2017 Lesperance Road/Riverside Drive Traffic Signal Reconstruction 1

8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020 1 & 2

9 South Talbot Road Reconstruction & Culvert #46 & #47 2017/2018 Section of STR between CR9 and CR11 Engineering 2017 / Construction 2018 4

10 Tar & Chip Program: Sexton Sideroad 2017 HWY #3 to South Talbot Road Tar & Chip 4

11 8th Concession Road 2017 South Talbot Road to County Road 8 Tar & Chip 4

12 Asphalt Program: Juniper Court 2017 Full Length Mill / Pave 1

13 Clarice Avenue 2017 Full Length Mill / Pave 1

14 Outer Drive 2017 Blackacre Drive to Hwy #3 Mill / Pave 4

15 Mack Court 2017 Full Length Mill / Pave 2

16 Burdick Crescent 2017 Full Length Mill / Pave 1

17 Brouillette Court 2017 Full Length Mill / Pave 1

18 Hebert Street 2017 Westlake Drive to Chornoby Crescent Mill / Pave 3

19 Fasan Drive 2017 Full Length Mill / Pave 4

Sidewalks/Pathways

* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks 1 thru 4

20 Riverside Drive Multi-Use Pathway 2017 Riverside Drive (City Limits to Manning Road) Construct new sidewalks 1

Bridges

21 Pike Creek at County Road 2 (County Project) 2016 Connecting Link - Pike Creek Construction 2016 2

22 Pike Creek at 12th Concession Road (Bridge #1002) 2016 Bridge Structure 1002 - Pike Creek Construction 2016 4

23 East Townline Drain at St Thomas Street (Bridge #1028) 2016 Bridge Structure 1028 - East Townline Drain Minor Repairs 2016 1

24 East Townline Drain at Little River Boulevard (Bridge #1029) 2016 Bridge Structure 1029 - East Townline Drain Minor Repairs 2016 1

25 Pike Creek at Baseline Road (Bridge #1005) 2016 Bridge Structure 1005 - Pike Creek Roadside Safety Improvements 4

26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study 1 thru 4

27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study 1 thru 4

28 East Townline Drain at Desro Drive (Culvert #7) 2017 Culvert Structure 7 - East Townline Drain Removal of Structure (County Project) 3

29 East Townline Drain at Jamsyl Drive (Culvert #8) 2017 Culvert Structure 8 - East Townline Drain Replacement of Structure (County Project) 3

30 Riverside Drive Culvert (Culvert #1) 2017 Culvert Structure 1 - Riverside Drive @ City Limits Abandonment (grouting) 1

31 South Talbot Drain at Holden Road/South Talbot Road (Culvert #46) 2017/2018 Culvert Structure 46 - South Talbot Drain Engineering 2017 / Construction 2018 4

32 Dickson Drain at South Talbot Road (Culvert #47) 2017/2018 Culvert Structure 47 - Dickson Drain Engineering 2017 / Construction 2018 4

33 10th Concession Culvert (Culvert #58) 2017 Culvert Structure 58 - 10th Concession Construction 2017 4

34 10th Concession Culvert (Culvert #60) 2017 Culvert Structure 60 - 10th Concession Construction 2017 4

Page 1 of 3

Page 4: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR Summary

Item Project Year Location Works WARD

35 10th Concession Culvert (Culvert #62) 2017 Culvert Structure 62 - 10th Concession Construction 2017 4

36 11th Concession Culvert (Culvert #67) 2017 Culvert Structure 67 - 11th Concession Construction 2017 4

Watermains

37 Elevated Water Tower Lighting 2016 Water Tower on Tecumseh Road (east of Lacasse) Installaton of lighting 1

38 Intersection Road 2016 St Anne St to Lesperance Road Replace Existing Watermain 3

39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain 3 & 4

40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study 1 thru 4

41 Mack Court 2017 Mack Court Replace Existing Watermain 2

42 Lacasse Park 2017 Lacasse Park Replace Existing Watermain 1

43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs 1 thru 4

44 Tecumseh Road Watermain 2017 Arlington Boulevard to 530m westerly Abandonment of Watermain 2

Wastewater Projects

45 8th Concession Trunk Sanitary Sewer EA 2016 8th Concession @ Delduca Drive EA to obtain Sanitary Easement 4

46 Dumochelle Street - Outer Drive 2016 Dumochelle Street, Outer Drive Road, Water, Sanitary, Storm 4

47 Pulleyblank-Crowder-Moro 2016/2017 Pulleyblank-Crowder-Moro Road, Water, Sanitary, Storm 4

48 Oldcastle/8th Concession Sanitary FSR/By-Law 2016/2017 Oldcastle Area Engineering Study 4

49 8th Concession Trunk Sanitary & Watermain, Ph1 2016/2017 8th Concession (CR46 to NTR), NTR (8th Con to Oldcastle) Road, Water, Sanitary 4

50 8th Concession Trunk Sanitary & Watermain, Ph2 2016 Oldcastle Road (NTR to Hwy #3) Road, Sanitary 4

51 Cedarwood Sanitary Pump Station 2017 Cedarwood Sanitary PS Repairs 1

52 Sylvestre Sanitary Pump Station 2017 Sylvestre Sanitary PS Repairs 3

53 St Alphonse Sanitary Pump Station 2017 St Alphonse Sanitary Pump Station Repairs 3

54 Sanitary Meter Station #1 (Cedarwood PS) 2017 Cedarwood Sanitary PS Repairs 1

55 Sanitary Meter Station #4 (NTR Flume) 2017 North Talbot Road @ City Limits Repairs 4

56 Sanitary Meter Station #5 (8th Concession Flume) 2017 8th Concession @ City Limits Repairs 4

57 Rossi Drive Sanitary Sewer 2017/2018 Rossi Drive (Pulleyblank to Outer) Road, Water, Sanitary, Storm 4

58 County Road 11 (North) Sanitary Sewer 2017/2019 County Road 11 (North Talbot Road to Hwy 401) Sanitary, CWATS Multi-Use Pathway 4

59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1, 2, 3 Investigations & Repairs 1 thru 3

Storm Sewers

60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary 1 thru 4

61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study 1 thru 3

62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary 1 & 2

Drainage Projects

* Various 2016 Various locations Drainage maintenance under the Drainage Act 1 thru 4

Page 2 of 3

Page 5: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR Summary

Item Project Year Location Works WARD

Parks & Recreation Projects

63 Lakewood Park Capital Improvements 2016/2017 Manning Road @ Riverside Drive Bridge over Channel / Trail Paving / Exercise Eqp. 2

64 Shawanoe Park 2016 St Gregory Construct New Trail (and Pickleball Courts) 1

65 Multi-Use Sportsplex 2016/2017 McNorton Street Feasibility study update 1

66 Town Hall Trail 2016 McNorton Street & Lesperance Road Construct New Trail 1

Tecumseh Fire & Rescue

67 Training Station at Fire Hall #2 2016 Fire Hall #2 - McCord / Walker Rd Construction of Confined SpaceTraining Facility 4

Planning / Developments

68 Arbour Grove, Valente Townhome Development 2015-2016 Former St. Anne's High School / Carmelita Court Housing/Townhouse Development 1

69 Estates of Lakewood Park Development 2015-2016 South Area of Lakewood Park (Hayes Ave) Housing/Townhouse Development 1

70 MRSPA Lands, Area Specific DC 2017 Location Specific - Development Lands Dev. Lands, SWM Facility, Ph1 Valente/Zohil 3

MRSPA Lands, Area Specific DC Continued… 2017 Westlake Drive, CR 22 Westlake Dr. Extension, CR22 Flyoff improvements 3

71 Tecumseh Hamlet Secondary Plan Lands 2017/2018 Banwell Corridor, SWM facilities wrt upper LR SWM Study Facility and Improvement Studies 3

72 Proposed New Employment Lands 2017/2018 8th Concession Rd, Between Highway 401 and CR 46 Justification for Additional Land in Settlement Area 4

73 Delduca Industrial Subdivision 2017/2018 8th Concession Rd, Between CASO Tracks and NTR Industrial Development 4

Page 3 of 3

Page 6: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

¬«64

¬«8¬«

¬«

¬«

¬«

¬«

ROADS

SIDEWALK/PATHWAY PROJECT

WATER PROJECTSWASTEWATER PROJECTSSTORM PROJECTS

BRIDGES¬«

¬« PARKS & RECREATION¬« PLANNING/DEVELOPMENT

¬«68

¬«7

¬«37¬«2

¬«42

¬«5

¬«51

¬«24

¬«23

¬«20

¬«16

¬«13

¬«17

¬«12

¬«30

¬«54 ¬«62

¬«65¬«66

¬«1

¬«*

MANN

INGLESPERANCE

LACASSE

DILLON

TECUMSEH

RIVERSIDE

LANOUE

ST THOMAS

COUNTY RD 22

LITTLE RIVER

ARBOUR

GRAC

E

MICHAEL

GAUTHIER

ST PIERRE

REVLAND

WILLIAM

CHENE

DESRO

BARRY

ST GREGORYS

CENTENNIALWOODRIDGE

RENAUD

MCNORTON

LEMIRESHAWNEE

WESTLAKE

KEITH

CLAPPPOISSON

GREE

N VA

LLEY

SOUTHFIELD

HEBERT

BEDELL

OLIVER

FIRST

ST DENIS

SYLVESTRE

NORTHFIELD

CHORNOBY

OAKPARK

ORCHARD

LABUTE

HAYES

KIMBERLY

JACIE

SHAW

NDUBE

CORT

INA

EVERGREEN

BRENDA

HORWOOD

AMBERLY

CEDARWOOD

PAPINEAU

HEATHERGLEN

BAILLARGEON BRUN

ELLE

SOMERVILLE

PERCY

JAMES

MEANDERROXBURY

LESSARD

APPLETREE

DOVE

WOOD

PARKLAND

HAWK

AMANDA

JELSO

RYEGATE

SHELLEY

CARDINAL

VALENTE

MEADOWLAND

HARVEST

CALVARY

KENNY

SHANNON

PRIM

ROSE

WEDGEWOOD

BORDER

DONA

LDA

SALICH

MICKAILA

LACHANCE

SIMARD

MULBERRY

JASPER

CATALINA

CORONADO

WINCLARE

VILLA

GE G

ROVE

VERONICA

RIDEAU

PAISLEY

SHAWNEE

DILLON

WOODRIDGE

BRENDA

LITTLE RIVER

ST PIERRE

SYLV

ESTR

E

MICH

AEL

JAMES

WARD 1 2 0 1 72 0 1 7C a p i t a l P r o j e c t s C a p i t a l P r o j e c t s

R O A D TO U RR O A D TO U R

µ

Page 7: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 1

Item Project Year Location Works

Roads

1 Shawnee - Arbour Phase 2 2016 Arbour Street, St Annes Street, Remie Street Road, Water, Sanitary, Storm

2 PWES Water Yard - Asphalt Works 2016 Lacasse PWES Yard Parking Lot Modifications

3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED

4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study

5 Tecumseh Road CIP 2016/2017 Tecumseh Road & Lesperance Road Road, Water, Sanitary, Streetscape

7 Traffic Signal Reconstruction 2017 Lesperance Road/Riverside Drive Traffic Signal Reconstruction

8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020

12 Asphalt Program: Juniper Court 2017 Full Length Mill / Pave

13 Clarice Avenue 2017 Full Length Mill / Pave

16 Burdick Crescent 2017 Full Length Mill / Pave

17 Brouillette Court 2017 Full Length Mill / Pave

Sidewalks/Pathways

* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks

20 Riverside Drive Multi-Use Pathway 2017 Riverside Drive (City Limits to Manning Road) Construct new sidewalks

Bridges

23 East Townline Drain at St Thomas Street (Bridge #1028) 2016 Bridge Structure 1028 - East Townline Drain Minor Repairs 2016

24 East Townline Drain at Little River Boulevard (Bridge #1029) 2016 Bridge Structure 1029 - East Townline Drain Minor Repairs 2016

26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study

27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study

30 Riverside Drive Culvert (Culvert #1) 2017 Culvert Structure 1 - Riverside Drive @ City Limits Abandonment (grouting)

Watermains

37 Elevated Water Tower Lighting 2016 Water Tower on Tecumseh Road (east of Lacasse) Installaton of lighting

40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study

42 Lacasse Park 2017 Lacasse Park Replace Existing Watermain

43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs

Wastewater Projects

51 Cedarwood Sanitary Pump Station 2017 Cedarwood Sanitary PS Repairs

54 Sanitary Meter Station #1 (Cedarwood PS) 2017 Cedarwood Sanitary PS Repairs

59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs

Storm Sewers

60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary

61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study

Page 1 of 2

Page 8: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 1

Item Project Year Location Works

62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary

Drainage Projects

* Various 2016 Various locations Drainage maintenance under the Drainage Act

Parks & Recreation Projects

64 Shawanoe Park 2016 St Gregory Construct New Trail (and Pickleball Courts)

65 Multi-Use Sportsplex 2016/2017 McNorton Street Feasibility study update

66 Town Hall Trail 2016 McNorton Street & Lesperance Road Construct New Trail

Planning / Developments

68 Arbour Grove, Valente Townhome Development 2015-2016 Former St. Anne's High School / Carmelita Court Housing/Townhouse Development

Page 2 of 2

Page 9: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

¬«15

¬«44

¬«8

¬«41

¬«

¬« ¬«

ROADS

WATERMAINSSTORM SEWERS

BRIDGES¬«

¬« PARKS & RECREATION

¬«69

¬« PLANNING/ DEVELOPMENT

¬«63

¬«21

¬«62

Beachgrove Golf and Country Club

LAKEWOOD PARK

GREEN ACRES PARK

LESSOR SOCCER FIELDS

LAKEWOOD PARK

PEACE PARK

DRESDEN PARK

DORSET PARK

PETER CECILE PARK

ST. MARK'S BEACH PARK

SCULLEY BEACH PARKEDGEWATER BEACH PARK

BRIGHTON BEACH PARK

MANN

ING

RIVERSIDE

TECUMSEH

HAYES

ARLIN

GTON

CADA

ST M

ARK'S

ST GREGORYS

PENT

ILLY

EDGE

WATE

R

KENSINGTON

GRAN

T

FAIR

WAY

DORSET

DRESDEN

DAVID

ESTATE

GORD

ON

ESSE

X

BRIG

HTON

WARW

ICK

ALOHA

COVE

RUTLAND

DERB

Y

JASON

BURLINGTO

N

LEXH

AM

CHRISTY

MARI

NE

CLOVELLY

STARWOOD

SOUTHWIND

TALT

HORP

EREGE

NT

COLL

IER

LAKE

WOO

D LENORE

BEACH GROVE

JEFF

REY

TUSCANY

MEI-LIN

CARI

TAS

VILLAGE GROVECEDAR

ROST

REVO

R

WILLOW

OAKF

IELD

CAMB

RIDG

E

CANT

ERBE

RRY

BRIG

HTON

DAVID

TECUMSEH

CLOVELLY

WARD 220 1 720 1 7

C ap i t a l P r o j e c ts C ap i t a l P r o j e c ts R O A D TO U RR O A D TO U R µ

Page 10: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 2

Item Project Year Location Works

Roads

3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED

4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study

8 Manning Road Improvements, Ph3 2017/2020 Manning Road (Riverside Drive to St Gregory's) Engineering 2017 / Construction 2020

15 Asphalt Program: Mack Court 2017 Full Length Mill / Pave

Sidewalks/Pathways

* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks

Bridges

21 Pike Creek at County Road 2 (County Project) 2016 Connecting Link - Pike Creek Construction 2016

26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study

27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study

Watermains

40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study

41 Mack Court 2017 Mack Court Replace Existing Watermain

43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs

44 Tecumseh Road Watermain 2017 Arlington Boulevard to 530m westerly Abandonment of Watermain

Wastewater Projects

59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs

Storm Sewers

60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary

61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study

62 Manning Road Improvements, Ph2 2017/2018 Manning Road (Riverside Drive to St Gregory's) Storm,Water, Sanitary

Drainage Projects

* Various 2016 Various locations Drainage maintenance under the Drainage Act

Parks & Recreation Projects

63 Lakewood Park Capital Improvements 2016/2017 Manning Road @ Riverside Drive Bridge over Channel / Trail Paving / Exercise Eqp.

Planning / Developments

69 Estates of Lakewood Park Development 2015-2016 South Area of Lakewood Park (Hayes Ave) Housing/Townhouse Development

Page 1 of 1

Page 11: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

¬«38

¬«

¬«

¬«

¬«

ROADS

WATERMAINS

WASTEWATER PROJECTSSTORM SEWERS

BRIDGES¬«

¬«28

¬«53

¬«71¬« PLANNING / DEVELOPMENT

¬«39

¬«70 ¬«6¬«18

¬«29

¬«52

¬«71¬«70

MANN

ING

LESPERANCE

COUNTY RD 42

HEBERT

COUNTY RD 22

BANWELL

SHAWNEE

GOUIN

COUNTY RD 43

CORBI

SYLVESTRE

INTERSECTION

DESRO

ST ALPHONSE

ARBOUR

JAMSYL

RENAUD

LANOUE

ST ANNE

WESTLAKE

DIMU

SHIFF

12TH

CON

CESS

ION

MAISONNEUVE

CHORNOBY

DESLIPPE

CHARLENE

MECONIMURRAY

SHIELDS

STRAWBERRY

SOUTHFIELD

NORTH PACIFIC FUNARO

POISSON

WILDBERRY

DOCHERTY

11TH

CON

CESS

ION

CANDLEWOOD

CORT

INA

CALVARY

ST AGNES

NORTHFIELD

LE BOEUF

EUGENI

CARMELITA HEAT

HERG

LEN

ODESSA

LESSARD

VICKERY

BROUILLETTE

RYEGATE

KAVANAGH

GREEN

ROXANNE

CARDINAL

HOLMES

ELDERBERRY

EMMA MARIA

ST MARTIN

CHAMP

SOUTH PACIFIC

MAYRAND

BORDER

DEMARSEMICKAILA

FIELDCREST

ST ANNE

SHAWNEE

ST ANNE

SHIELDS

SHAWNEE

WARD 32 0 1 72 0 1 7

C a p i t a l P r o j e c t s C a p i t a l P r o j e c t s R O A D T O U RR O A D T O U R

µ

Page 12: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 3

Item Project Year Location Works

Roads

3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED

4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study

6 CR19/Jamsyl Drive Traffic Signal (County Project) 2017 CR19/Jamsyl Drive intersection Construction 2017

18 Asphalt Program: Hebert Street 2017 Westlake Drive to Chornoby Crescent Mill / Pave

Sidewalks/Pathways

* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks

Bridges

26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study

27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study

28 East Townline Drain at Desro Drive (Culvert #7) 2017 Culvert Structure 7 - East Townline Drain Removal of Structure (County Project)

29 East Townline Drain at Jamsyl Drive (Culvert #8) 2017 Culvert Structure 8 - East Townline Drain Replacement of Structure (County Project)

Watermains

38 Intersection Road 2016 St Anne St to Lesperance Road Replace Existing Watermain

39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain

40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study

43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs

Wastewater Projects

52 Sylvestre Sanitary Pump Station 2017 Sylvestre Sanitary PS Repairs

53 St Alphonse Sanitary Pump Station 2017 St Alphonse Sanitary Pump Station Repairs

59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs

Storm Sewers

60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary

61 Storm Water Master Plan 2017 Storm PS & Associated Storm Sewer Networks Engineering Study

Drainage Projects

* Various 2016 Various locations Drainage maintenance under the Drainage Act

Planning / Developments

70 MRSPA Lands, Area Specific DC 2017 Location Specific - Development Lands Dev. Lands, SWM Facility, Ph1 Valente/Zohil

MRSPA Lands, Area Specific DC Continued… 2017 Westlake Drive, CR 22 Westlake Dr. Extension, CR22 Flyoff improvements

71 Tecumseh Hamlet Secondary Plan Lands 2017/2018 Banwell Corridor, SWM facilities wrt upper LR SWM Study Facility and Improvement Studies

Page 1 of 1

Page 13: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

¬«

¬«

¬«

¬«14

¬«10

¬«25

¬«11

¬« ¬« ¬«

¬«22

¬«23

¬«67

¬«72

¬«39

¬«

¬«

¬«

¬«

¬«

ROADSSIDEWALK/PATHWAYS

WATERMAINSWASTEWATER PROJECTSSTORM SEWERS

DRAINAGE PROJECTS

BRIDGES¬«

¬« PLANNING / DEVELOPMENT¬« FIRE & RESCUE

¬«49

¬«19¬«9¬«31

¬«32

¬«46 ¬« ¬« ¬« ¬«47

¬« ¬« ¬«46

¬« ¬«50

¬«55¬«56

¬« ¬« ¬« ¬«57¬« ¬«58

¬«73

¬«33

¬«36¬«34¬«35

Tecumseh

Windsor

Lakeshore

EssexAmherstburg

MANN

ING

HIGHWAY 3

WALK

ER

COUNTY RD 8

SOUTH TALBOT

MALDEN

HOWA

RD

COUNTY RD 46

HOLD

EN

SNAK

ESEXTON

BASELINE

HIGHWAY 401

NORTH TALBOT

OLDC

ASTL

E

COUNTY RD 42

9TH

CONC

ESSI

ONCOUNTY RD 34

10TH

CON

CESS

ION

12TH

CON

CESS

ION

11TH

CON

CESS

ION

BLACKACREO'

NEIL

ROSSIMORO

12TH

CON

CESS

ON

RUSTON

HENN

IN

BRENDANOLYMPIA

ODESSA

HIGHWAY 401HIGHWAY 401

9TH

CONC

ESSI

ON

HIGHWAY 401HIGHWAY 401

HIGHWAY 401

HIGHWAY 401

HIGHWAY 401HIGHWAY 401

WARD 420 1 720 1 7

C ap i t a l P r o j e c ts C ap i t a l P r o j e c ts R O A D TO U RR O A D TO U R µ

Page 14: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 4

Item Project Year Location Works

Roads

3 LED Street Lighting 2016 Town Wide Replacement of HPS Light Fixtures with LED

4 Transportation Master Plan 2016 Town Wide Finalization of Engineering Study

9 South Talbot Road Reconstruction & Culvert #46 & #47 2017/2018 Section of STR between CR9 and CR11 Engineering 2017 / Construction 2018

10 Tar & Chip Program: Sexton Sideroad 2017 HWY #3 to South Talbot Road Tar & Chip

11 8th Concession Road 2017 South Talbot Road to County Road 8 Tar & Chip

14 Asphalt Program: Outer Drive 2017 Blackacre Drive to Hwy #3 Mill / Pave

19 Fasan Drive 2017 Full Length Mill / Pave

Sidewalks/Pathways

* Sidewalk repair program 2017 Various locations - to be announced Repair sidewalks

Bridges

22 Pike Creek at 12th Concession Road (Bridge #1002) 2016 Bridge Structure 1002 - Pike Creek Construction 2016

25 Pike Creek at Baseline Road (Bridge #1005) 2016 Bridge Structure 1005 - Pike Creek Roadside Safety Improvements

26 Bridge & Culvert Needs Study (>3m span) 2016 Town Wide Engineering Study

27 Bridge & Culvert Condition Assessment (<3m span) 2016 Town Wide Engineering Study

31 South Talbot Drain at Holden Road/South Talbot Road (Culvert #46) 2017/2018 Culvert Structure 46 - South Talbot Drain Engineering 2017 / Construction 2018

32 Dickson Drain at South Talbot Road (Culvert #47) 2017/2018 Culvert Structure 47 - Dickson Drain Engineering 2017 / Construction 2018

33 10th Concession Culvert (Culvert #58) 2017 Culvert Structure 58 - 10th Concession Construction 2017

34 10th Concession Culvert (Culvert #60) 2017 Culvert Structure 60 - 10th Concession Construction 2017

35 10th Concession Culvert (Culvert #62) 2017 Culvert Structure 62 - 10th Concession Construction 2017

36 11th Concession Culvert (Culvert #67) 2017 Culvert Structure 67 - 11th Concession Construction 2017

Watermains

39 County Road 42 2016 Lesperance Road to County Road 19 (Manning Road) Replace Existing Watermain

40 Water & Wastewater Master Plan Update 2016 Town Wide Engineering Study

43 Water Metering Facilities 2017 Town Wide Maintenance and Repairs

Wastewater Projects

45 8th Concession Trunk Sanitary Sewer EA 2016 8th Concession @ Delduca Drive EA to obtain Sanitary Easement

46 Dumochelle Street - Outer Drive 2016 Dumochelle Street, Outer Drive Road, Water, Sanitary, Storm

47 Pulleyblank-Crowder-Moro 2016/2017 Pulleyblank-Crowder-Moro Road, Water, Sanitary, Storm

48 Oldcastle/8th Concession Sanitary FSR/By-Law 2016/2017 Oldcastle Area Engineering Study

49 8th Concession Trunk Sanitary & Watermain, Ph1 2016/2017 8th Concession (CR46 to NTR), NTR (8th Con to Oldcastle) Road, Water, Sanitary

50 8th Concession Trunk Sanitary & Watermain, Ph2 2016 Oldcastle Road (NTR to Hwy #3) Road, Sanitary

55 Sanitary Meter Station #4 (NTR Flume) 2017 North Talbot Road @ City Limits Repairs

56 Sanitary Meter Station #5 (8th Concession Flume) 2017 8th Concession @ City Limits Repairs

Page 1 of 2

Page 15: CAPITAL PROJECTS ROAD TOUR - Tecumseh Capital Projects Road Tour... · CAPITAL PROJECTS ROAD TOUR ... Bridges. 21. Pike Creek at County Road 2 (County Project) 2016. ... S T T H O

CAPITAL PROJECTS ROAD TOUR WARD 4

Item Project Year Location Works

57 Rossi Drive Sanitary Sewer 2017/2018 Rossi Drive (Pulleyblank to Outer) Road, Water, Sanitary, Storm

58 County Road 11 (North) Sanitary Sewer 2017/2019 County Road 11 (North Talbot Road to Hwy 401) Sanitary, CWATS Multi-Use Pathway

59 Sanitary Sewer Rehabilitation (I&I Removal) 2017 Sanitary Sewers within Wards 1,2,3 Investigations & Repairs

Storm Sewers

60 Pump & Metering Station Condition Assessments 2016 Town Wide Engineering Study - Storm, Water, Sanitary

Drainage Projects

* Various 2016 Various locations Drainage maintenance under the Drainage Act

Tecumseh Fire & Rescue

67 Training Station at Fire Hall #2 2016 Fire Hall #2 - McCord / Walker Rd Construction of Confined SpaceTraining Facility

Planning / Developments

72 Proposed New Employment Lands 2017/2018 8th Concession Rd, Between Highway 401 and CR 46 Justification for Additional Land in Settlement Area

73 Delduca Industrial Subdivision 2017/2018 8th Concession Rd, Between CASO Tracks and NTR Industrial Development

Page 2 of 2