Capital Programs Committee - Granicus

16
Capital Programs Committee November 2014 El Dorado Park & Ride

Transcript of Capital Programs Committee - Granicus

Capital Programs Committee

November 2014

El Dorado Park & Ride

• Project will accommodate demand for commuter bus service to meet growing ridership and parking capacity issues along Gulf Freeway corridor to downtown

o Provide solution to overcrowded Bay Area Park & Ride and Bay Area Park & Pool

o Bay Area Park & Pool is in TXDOT right-of-way and will be closing due to IH-45 construction and existing safety issues

o Relieve capacity constraints at Fuqua Park & Ride lot

• Multiple project sites have been investigated since the late 1990s

• “Gulf Freeway/Clear Lake Park & Ride” was identified in METRO Solutions/2003 referendum

• Current project location – El Dorado Boulevard at Glenwest Drive near IH-45 (Gulf Freeway) 2

Background

• Project scope

o Approximately 22-acre site o Approximately 1,225 parking spaces o Canopied bus platform with 3 bus bays o 15-minute headways during peak periods

• Forecasted ridership:

o 2015 – 900 daily boardings o 2030 – 1,300 daily boardings

3

Background cont’d.

4

Bay Area Park & Pool

• Projected cost of El Dorado Park & Ride - $16M to $18M

o Costs covered by FTA grant funds - $13.8M

o TX-03-0259 - $11.3M in total grant funds (75/25 split) o Cannot be reprogrammed

o TX-90-Y002 - $671K in total grant funds (80/20 split) o Can be reprogrammed for bus facilities only if done by

9/30/2015

o TX-90-Y031 - $1.9M in total grant funds (80/20 split) o Can be reprogrammed for bus facilities only if done by

9/30/2018

5

Project Costs

• El Dorado Boulevard at Glenwest Drive site was environmentally cleared on 7/21/2011

• Property was acquired in July 2012 for approximately $3.7M

• METRO has spent approximately $5.2M (to date)

• Final Design plans are at City of Houston for approval

o Board approved Design Contract in April 2013

• Construction planned for 2nd quarter of FY 2015

6

Current Status

7

Park & Ride Lot

Origins Inside METRO Service

Area

Origins Outside METRO Service

Area Cypress 95% 5% El Dorado (forecast) 55% 45% West Bellfort 30% 70%

Note: Based on METRO 2012 license plate survey – El Dorado is forecasted based on METRO’s long range model

Ridership Comparisons

8

Long Term O&M Costs

• 6 buses will be required to operate the new Park & Ride service • The fully allocated annual operating cost is $3.39M

o The cost includes bus depreciation

9

Fuqua

South Point

El Dorado

Bay Area

Bay Area Park and Pool

Project Location

10

Project Location

11

EL DORADO PARK & RIDE – SITE PLAN

12

EL DORADO PARK & RIDE – BIRD’S EYE VIEW

13

EL DORADO PARK & RIDE – CANOPY STRUCTURE

14

EL DORADO PARK & RIDE – CANOPY INTERIOR

15

EL DORADO PARK & RIDE – WALK-THROUGH

16

Recommendations

• Concurrence from Capital Programs Committee to move project forward in procurement process

• Will come back to Capital Programs Committee for approval of

construction contract