CAPITAL PROGRAMME 2008-12 2J1 ITEM No. I L › media › CommitteeArchive › OldCommit… ·...
Transcript of CAPITAL PROGRAMME 2008-12 2J1 ITEM No. I L › media › CommitteeArchive › OldCommit… ·...
-
2.1
r---2.2
2.3
2.4
2.5
2.6
r---
3.1
POLICY AND RESOURCES COMMITTEE 13 DECEMBER 2007
CAPITALPROGRAMME2008-12 2J1 ITEMNo. I LReport by Director of Finance and Corporate Resources
PURPOSE OF REPORT To provide Members with details of the Outline Project Briefs for NewProjects to be included in the scoring process and with a summary ofthe Outline Project Briefs for Core and Statutory Projects.
1.1
COMPETENCE
The Comhairle's Capital Expenditure is governed by the Local Government (Scotland) Act 1975 andthe Local Government in Scotland Act 2003.
1.2 Local Authorities in Scotland are required to comply with the CIPFA Prudential Code for CapitalFinance under Part 7 of the Local Government in Scotland Act 2003.
SUMMARY
The development of the 2008-12 Capital Programme began in March 2007, after the Policy andResources Committee of 29 March 2007 approved a framework for the process.
The main determining factor in the size of the Capital Programme will continue to be the level ofSupported Borrowing provided by the Executive, and at the time of writing this is still unknown. In themeantime, work has continued on the development of the new Programme, on the basis of the currentlevel of resources. Once the level of Supported Borrowing is known, the Programme will be tailored tofit the available resources.
Outline Project Briefs (OPBs) have now been prepared for new projects. This includes an amended listof those approved by Committees in October 2007 as well as those that it is recommended be addedfollowing a review of the Core and Statutoryprojects. The final list is attached at Appendix A.
Appendices Band C set out the scoring guidance for the programme. It is recommended thatMembers score criteria 1, 2, 3, 5 and 7, and that Officers provide scores for the objective criteria 4, 6and 8. The Director of Finance and Corporate Resources has arranged a scoring workshop forMembers on 12 December 2007.
Appendix D details the OPBs for projects which are classed as Capital Grants. If approved by theComhairle for inclusion in the 2008-12 Programme, consent will then have to be sought from theScottish Government to classify these as capital expenditure.
OPBs have also been prepared for 45 Core and Statutory Projects. It is not proposed that Membersscore these. However, given that the total value of the OPBs is £46m some scaling is required toachieve an affordable programme. Appendix E shows one way that a programme of £27m could beachieved. No decision on this is required at this time and it is recommended that these OPBs beconsidered in the context of the results of the scoring exercise and the Settlement, at a Members'seminar in January 2008.
RECOMMENDATIONS
It is recommended that the Comhairle:
(a) agree the revised list of New Projects prepared for scoring at Appendix A;
(b) approve the scoring guidance and definitions attached at Appendices Band C and delegateto the Director of Finance and Corporate Resources to score criteria 4, 6 and 8 inconsultation with Management Team;
(c) note the projects which are capital grants detailed at Appendix D;
(d) note the Core and Statutory Projects attached at Appendix E; and
(e) agree that a seminar be held in January 2008 to consider the 2008-12 Capital Programme.
Contact Officer:
Appendix AAppendix B / CAppendix DAppendix E
Mairi Macmillan Tel. 01851-709381
Outline Project Briefs for New ProjectsScoring guidance and definitionsNew Projects which are capital grantsOutline Project Briefs for Core and Statutory Projects
-
CAPITAL PROGRAMME 2008-12NEW PROJECTS OUTLINE PROJECT BRIEF SUMMARY
OPBREF
Project Summary '1 ~1 i)')~
CapitalContribution
from Comhairle£k
Appendix A
35
36
37
38
39
40
41
42
43
44
Environment & Protective Services
1
2
3
4
5
6
7
EPS1
EPS2
EPS3
EPS4
EPS5
EPS6
EPS7
Homeless Hostel
Private Burial Grounds - Development Grant
Replacement of existing and Additional CCTV Cameras
Community Environmental Grant
Public Conveniences - RavenspointIntegrated Coastal Zone Management (ICZM) Activities & Local Actions.Comhairle Contribution to Coastal Protection Schemes
Education & Children's Services
8
9
10
11
12
13
14
15
ECS1
ECS2
ECS3
ECS4
ECS5
ECS6
ECS7
ECS8
Digitising of School Log Books
Primary Schools Remodeling
S1-S6 Improvements - Lionacleit and Castlebay
Active Schools Playground Development Programme
Pre-school Provision - Stornoway Area
High Support Needs Provision
Traffic Management at Schools
Childrenand YoungPeoplewithSpecialNeeds-Residential Respite Service
16
17
18
19
20
21
22
23
Transportation
TR1 Major Harbour Development
TR2 New Footways and Bus Shelters
TR3 Manor Roundabout Improvement
TR4 Spinal Route ImprovementsTR5 Roads to Communities
TR6 Community Accesses: Improvements to adoptable Standards
TR7 Pontoon Development Programme
TR8 Completion of existing programme for new streetlighting
24
25
26
27
28
29
30
31
32
33
34
Sustainable Development - Sport and HealthSD-SH1 Valtos Outdoor Centre
SD-SH2 Castlebay Fitness Suite
SD-SH3 Community Partnership Sport Projects
SD-SH4 Synthetic Pitches - Castlebay & Sir E Scott
SD-SH5 Synthetic Pitches - Bayble and Shawbost
SD-SH6 Regional Facility - Timing and Starting equipment
SD-SH7 Daliburgh Pool
SD-SH8 Community Gameshall and Changing at Stornoway PrimarySD-SH9 Paible Pool
SD-SH10 Liniclate Synthetic Pitch
SD-SH11 Running Track - Regional Facility
Sustainable Development - General
SD-G1 Parks and Open Spaces
SD-G2 Hebridean Hydrogen Strategy Implementation
SD-G3 Marine Renewable Energy Strategy
SD-G4 Sound of Harris Renewable Energy and Fixed Link
SD-G5 Alternative & Renewable Energy Research Support
SD-G6 Outer Hebrides Biomass Project
Sustainable Development - Development Services
SD-DS1 Stornoway Town Hall RedevelopmentSD-DS2 Core Path Infrastructure
SD-DS3 Loch Stiapabhat Development PlanSD-DS4 THI Initiative
2,500
2,200350
5,000
4,200
200
350
80
14,880
1,600200
150
1,25020
700
850
4,770
70
2,325
2,400
200
650
300
500
400
6,845
"'"
600
168
1,500500
600
30
1,400
1,500
1,400250
450
8,398
~
200
700
500
500
250
250
2,400
2,000300
30
302
2,632
-
CAPITAL PROGRAMME 2008-12NEW PROJECTS OUTLINE PROJECT BRIEF SUMMARY
OPBREF
Project Summary 0)1'>'vJCapital
Contributionfrom Comhairle
£k
Appendix A
45
46
47
48
49
50
51
52
53
54
Sustainable Development -Economic DevelopmentSD-EC1 Lochboisdale Harbour Development
SD-EC2 Community Marine Access Scheme (CoMAS)
SD-EC3 Stornoway Inner Harbour Regeneration ProjectSD-EC4 Lews Castle & Museum nan Eilean
SD-EC5 Crofting and Land Resources Development Programme
SD-EC6 Creative Industries and New Media Development Programme
SD-EC7 Community Renewable Support Fund
SD-EC8 Tourism Projects
SD-EC9 Isles FM - Proposed ExpansionSD-EC10 Relocation of Bulk Goods to West Harbour
55
56
57
Sustainable Development -Community SupportSD-CS1 Ravenspoint Centre Development
SD-CS2 Gravir Community Hall
SD-CS3 Community Regeneration Grant Scheme
~ Joint Services
58 JS1 Care Home -Ardseileach Replacement59 JS2 Harris Care Development
60 JS3 Bethesda Care Home Redevelopment
61 JS4 Stornoway Care Development
62 JS5 Lochs Day Care Service
63 JS6 Community Meals Service
64
65
66
67
68
69
70
71
Policy & Resources
PR1 Council Offices Tarbert - ReplacementPR2 Urgha Depot Improvements
PR3 Market Stance Depot Improvements
PR4 Marybank Depot ImprovementsPR5 Extension to Balivanich Office
PR6 New Public Information Variable Message signs
PR7 Council Offices Stornoway: Customer Services and Facilities ManagementPR8 CnES EU Match Fund (Capital) 2008-2012
/""' ICT, Procurement &Asset Mgt7'
-
PROJECT SCORING GUIDANCE APPENDIX B
What is in your bundle of papers? 2 j 4The bundle includes an Outline Project Brief for every project selected to go forward to be scored by Members.The Project Brief contains detailed information to enable the project to be evaluated. There are 8 criteria forevaluating each project and these are listed below. Please consider each of the evaluation criteria and award amark out of 5 for each.
Weighting the Marks AwardedStaffin the departmentof FinanceandCorporateResourceswill applythe followingweightingsto the marksoutof 5 in accordancewith thepolicyagreedat Policyand ResourcesCommittee.
. Corporate Strategy 5
. Core Business 5
. Service Plan 4
. Revenue Consequences 4
. Outputs Expected 3
. Partnership and Additionality 3
. Value for Money 2
. Completed design 2
""'"
1. Corporate Strategy
The Capital Programme is the means of providing the capital resources for implementingStrategy. Therefore any capital scheme must be clearly linked to the new Corporate Strategy.marks out of 5 based on the following:
the CorporatePlease award
2. Core BusinessThis section includes any legal reasons for having to do the project and the legal consequences for not doing it.Core business also includes projects which are required so that a statutory duty may be undertaken e.g. payroll
~
3. Service PlanThis section asks whether the business need stated, clearly identifies the benefits of carrying out the projectand will allow the Comhairle to continue to provide the service in the future. Do you think that the project helpsthe Comhairle deliver the Committee Service Plan.
0 Project does not contribute to Corporate Objectives.
1 Project will make a minor contribution to a Corporate Objective.
2 Project will make a major indirect contribution to a Corporate Objective.
3 Project indirectly contributes to one or more Corporate Objectives
4 Project directly contributes to one Corporate Objective
5 Project directly contributes to two or more Corporate Objectives
0 Project has no effect on core services
1 Project has a minor effect on core services
2 Project will assist in fulfilling core services
3 Project will contribute to delivering core services
4 Project ought to go ahead to deliver core services.
5 Project is essential to delivering core services
0 Project has no bearing on the delivery of the service plan
1 Project has a minor effect on the delivery of the service plan
2 Project will assist with the delivery of the service plan
3 Project will contribute to the delivery of the service plan
4 Project will significantly improve the delivery of the service plan
5 Project is essential to the delivery of the service plan
-
4. Revenue Consequences 2 ~)5
Have additional revenue costs and their source of funding been identified and are there any revenue savings.You are asked to award a score out of 5 on the basis of whether you think the project contributes to efficiencyby minimising future capital and revenue costs.
5. Outputs ExpectedThis section requiresa scoreout of 5 basedon your opinionon whetherthe projectwill help the Comhairledeliveran improvedserviceanda moremodernandeffectiveservice.
----
6. Partnership and AdditionalityThis section identifies the funding package for the project. Higher scores out of 5 should be given to projectsthat attract funding from sources other than the Comhairle.
r--.7. Value For MoneyDoes the project representa good return for the capital resourcesinvested.Do you think that the projectrepresentsvaluefor moneyin termsof bothcapitalandongoingrevenuecosts
8. Completed DesignHas the design work on the project been completed enabling an immediate or an early start to be made on theproject or is the project at an embryonic stage.
0 Revenue consequences can not be quantified
1 Revenue consequences have been quantified and are significant
2 Revenue consequences would have to be funded from growth.
3 Revenue consequences can be partially met from existing resources.
4 Revenue consequences can be met from existing resources.
5 There are no revenue consequences or they can be met by external organisations
0 Project will have no effect on the service
1 Project will have a minor impact on the service
2 Project will assist deliver an improved service
3 Project will contribute to the modernisation of the service
4 Project is necessary to deliver a modern & effective service
5 Project will deliver an improved, modern and effective service
0 Match funding is zero
1 Match funding is 10% of the project cost
2 Match funding is 20% of the project cost
3 Match funding is 30% of the project cost
4 Match funding is 40% of the project cost
5 Match funding is 50% or greater of the project cost
0 No
1
2
3
4
5 Yes
0 Idea only
1 Feasibility study completed
2 Sketch
3 Outline
4 Detailed design
-
CAPITAL PROGRAMME SCORING PROCESS
CORPORATE STRATEGY SCORING GUIDANCE
Citiil {>';l'JGrowing Prosperity in a Growing Economy
APPENDIX C
We will lead the delivery of the"Creating Communities of the Future"Regeneration Strategy.We will support or lobby for measuresthat support business growth andcompetitive advantage.
Increased Gross Regional Domestic The project relates to one of theProduct following drivers:
Increased average wage levels in the. Renewable Energyeconomy Innovation, especially theGrowth in the private sector development of a sub-sea
Growth in emerging sectors cable for exporting energygenerated from renewable
Increased land resources in sources.community ownership
Strong Communities, Strong Roots, Strong Culture
. Broadband Capacity for theIslands.
Promotion and Developmentof Culture and Heritage,particularly Gaelic
Enhanced Business Supportand Infrastructure.
University of the Highlandsand Islands MillenniumInstitute
Jobs Dispersal
.
.
.
.
Will the project support businessgrowth or competitive advantage?
Does the project contribute tocommunity land ownership?
We will direct investment to maintainand improve local infrastructure andthe built environment.
We will support communities to Increased range and usage of facilitiesdeliver an accessible, affordable and Increased attendance at events andsustainable range of community activitiesamenities.
We will support the strengthening ofGaelic as a language in the familyand community
We will lead support for culture andheritage
Does the project enhance thelook of a settlement?
Does the project support thcommunity to develop facilities?Does the project increase therange of facilities available ratherthan replicating what is alreadyavailable within reasonabletravelling time?
Will the project increase thenumber of people attendingevents or activities?
Will the project increase thenumber of Gaelic speakers or
Gaelic I learners?who
Increased number of Gaelic speakersin the Outer HebridesIncreased number of nonspeaking new employeesundertake classes
Increased number of events andactivities
Increased support for voluntaryorganisations involved in culture andheritage
Will the project enable moreevents and activities to takeplace?
Does the project support avoluntary organisation involved inculture or heritage?
-
yuallty t:aucatlon m \oluallty tSullamgs (,~ :J ,
We will deliver a sustainableeducation service throughout theOuter Hebrides.
We will lead and support the deliveryof lifelong learning opportunities forall ages and throughout the islands.
Green Council, Green Islands
Improved attainment and examinationresults
Improved accreditation rates in thecontext of school/college partnershipsImproved attainment in literacy andnumeracy in Gaelic and EnglishMaintained or improved levels ofattendance and inclusion
Improved annual condition andsuitability ratings for the school estate
Increased participation in lifelonglearning opportunities
Will the project enhanceattainment, examination results,literacy or numeracy?Will the project help to improveschool attendance or inclusionlevels?
Will the project improve thecondition of the school estate?
Will the project provide facilitiesor equipment to support lifelonglearning?
We will lead the development anddelivery of a strategy to ensure thatthe Outer Hebrides, and theComhairle, are carbon neutral.
A reduction in the Comhairle's carbonfootprintReduced consumptionbased resources
A reduction in the percentage of totalwaste that is landfilled
We will procure goods and servicesI
Increasing the number of localin the most sustainable way suppliers who win contracts awarded
through competitive tender.
/'
Will the project reduce resource orenergy use?
of carbon IWill the project reduce, reuse orrecycle waste products?
Strengthening Connections, Strengthening Communities
We will lead the delivery of a roadand transport network within andbetween the islands that allowsaffordable access to jobs, servicesand facilities.
We will lobby for the continueddevelopment of affordable andaccessible transport links to themainland.
r--
Increased length of the spinal routethat is double track
Improved annual condition andsuitability ratings of the road network
Maintained or increased affordabilityand availability of bus, air and ferryservices
Does the project increase thelength of double track roads?
Will the project improve the roadnetwork condition and suitabilityratings?
Will the project reduce the cost ofbus, air or ferry travel?
Will the project increase theavailability of bus, air or ferryservices?
-
Appendix DCAPITAL PROGRAMME 2008-12
CAPITAL GRANTS
"" c:\0LJO
CapitalContribution
fromComhairle
£kOPBREF
12
Environment & Protective ServicesEPS3 Private BurialGrounds Grant SchemeEPS5 CommunityEnvironmentalGrants
2001,250
3Sustainable Development- Sport and HealthSD-SH4 CommunityPartnership Sport Projects 1,500
456
Sustainable Development- Leisure and LearningSD-G1 ParksandOpenSpacesSD-G5 Alternative& Renewable Energy Research SupportSD-G6 Outer Hebrides Biomass Project
200250250
7Sustainable Development- Development ServicesSD-DS3 LochStiapabhatDevelopmentPlan 30
89
10111213
Sustainable Development -Economic DevelopmentSD-EC1 LochboisdaleHarbour DevelopmentSD-EC2 CommunityMarineAccess Scheme (CoMas)SD-EC5 Crofting&Land Resource Development ProgrammeSD-EC7 CommunityRenewable Support FundSD-EC9 Isles FM- Proposed ExpansionSD-EC10 Relocationof BulkGoodsto WestHarbour
1""""\
1,250150
1,0001,000
1502,500
1415
Sustainable Development- Community SupportSD-CS2 GravirCommunityHallSD-CS3 CommunityRegeneration Grant
400
2,200
16Joint ServicesJS3 Bethesda Care Home Redevelopment 250
17Policy and ResourcesPR8 CnESEUMatchFund(Capital)2008-2012 3,000
15,580
CAPITAL GRANT CONDITIONS /""""0.
Consent may be granted by Scottish Ministers to borrow under para 1(2) of schedule 3 of the Local Government (Scotland)Act 1975
if all the following conditions are met:
The Comhairle will identify the statutory function under which it has the power to incur expenditure and confirm that the borrowing for
this expenditure is not prohibited by or under any other legislation.
2 The Grant must be made to a properly constituted community group and not a Local Authority controlled company, trust or partnership,housing association or other public body.
3 The Grant must be for work which if carried out by the Comhairle would result in a Fixed Asset in the Comhairle's Balance Sheet
4 The Grant must not meet the full cost of the project but shall provide capital investment as leverage for additional funding fromother sources.
5 The Comhairle shall not be liable for ongoing or future maintenance of any facility or infrastructure produced with the aid of theGrant assistance.
6 Borrowing to provide Grant assistance will only be used when there is no revenue (CFCR) available.
7 The Comhairle will keep appropriate records of all borrowing incurred under this consent for audit purposes.
-
CAPITAL PROGRAMME2008-12 Appendix EOUTLINEPROJECTBRIEFSUMMARY.CORE& STATUTORY c-
') i:\ g OriginalMoved to Potential Amended / RevisedOPB
Project Title t.J V .. Capital Bid £k New Prudential Scaled BidsREFProjects Borrowing
Environment & Protective Services1 CS-EPS1 CCTV System 100 (100) (100) 02 CS-EPS2 Upgrade to Homeless Units: Disabled Access 40 403 CS-EPS3 Mandatory works associated with Waste Managementto maintain existing service 5,400 (2,400) 3,0004 CS-EPS4 Cyclical Vehicle Replacement: Cleansing Section 1,320 (1,320) (1,320) 05 CS-EPS5 Metal Baler, Maintenance of Civic Amenity Skips & Community RecyclingCentres 1,650 (200) 1,4506 CS-EPS6 Comhairle Cemeteries - Enhancing Capacity 415 (311) 1047 CS-EPS7 Coastal Defences Repair and ImprovementProgramme2008-2012 250 (188) 63
9,175 4,656Education & Children's Services
8 CS-ECS1 Upgrading of Schools ICT Network 1,000 (250) 7509 CS-ECS2 Core Capital Improvements 4,500 (1,125) 3,37510 CS-ECS3 Schools Energy Efficiency Programme 500 (125) 37511 CS-ECS4 Contribution to WISP 4,600 4,600
10,600 9,100Transportation
12 CS-TR1 Bridge Strengthening & Replacement Programme 1,400 (600) 80013 CS-TR2 Road Strengthening Programme 3,500 (2,333) 1,16714 CS-TR3 Road Safety and Minor Improvements 2,500 (1,667) 83315 CS-TR4 Streetlighting and Amenity Lighting Programme 1,000 (667) 333
,)Q CS-TR5 Traffic Management 400 (267) 133CS-TR6 Replacement of Emergency Vehicles 60 60
10 CS-TR7 Piers and Harbours Improvement Programme2008-2012 300 (200) 1009,160 3,426
Sustainable Development -Sport and Health19 CS-SD-SH1 DDA Access Work to Leisure and Learning Properties 1,000 (500) 50020 CS-SD-SH2 Pitch Development Programme 1,300 (975) 32521 CS-SD-SH3 Leisure and Learning Capital Repairs & Maintenance 400 (300) 10022 CS-SD-SH4 Liniclate Synthetic Pitch 250 (250) (250) 023 CS-SD-SH5 Running Track - Regional Facility 450 (450) (450) 0
Sustainable Development -General (Premises, Parks & Open Spaces)24 CS-SD-G1 Playareas 400 (300) 100
3,800 1,025Sustainable Development -Economic Development
25 CS-SD-EC1 Lews Castle (Essential Repairs) 400 (300) 10026 CS-SD-EC2 Investment in Existing ED Infrastructure re H&S, Building Regs& DDA 650 (325) 325
1,050 425Joint Services
27 CS-JS1 Ardseileach Residential Resource Upgrade 1,500 1,50028 CS-JS2 9 Care units conversion 800 (400) 40029 CS-JS3 Faire Community Careline Service 90 90
CS-JS4 Harris House Replacement 3,000 3,000CS-JS5 Statutory Compliance Work ( residential & Day Care facilities) 900 (450) 450
32 CS-JS6 Dun Berisay - Extension and Modernisation 1,000 (250) 750
- 7,290 6,190Policy & Resources
33 CS-PR1 Resurfacing Car Park, Council Offices, Stornoway 130 (98) 3334 CS-PR2 Replacement of 503 Windows and Screens, Council Offices 484 (363) 12135 CS-PR3 Electrical Upgrading Programme- Council Offices 120 (90) 3036 CS-PR4 Replacement of Existing Emergency Generator, Council Offices, Stornoway 61 6137 CS-PR5 Fire Precaution Works Programme- Council Offices 112 (56) 5638 CS-PR6 Roof Replacement, Council Offices Sandwick Road 950 95039 CS-PR7 Water Services Improvements Programme-Legionella statutory 650 (325) 32540 CS-PR8 Alteration Works Programme- Council Offices 140 (105) 3541 CS-PR9 Disabled Adaptation Works Programme- Council Offices 140 (105) 35
ICT, Procurement &Asset Mgt42 CS-ICT1 IT Infrastructure (FMS/CRM/Firewall/DisasterRecovery/email/videoconf/EDM/etc,) 1,430 (450) 98043 CS-ICT2 Voice over JP(VoIP) 400 (400) (400) 0
Commercial Operations Unit44 CS-COU1 Modernisation of Diagnostic and Air Extraction Equipment at COU Garages 130 (98) 3345 CS-COU2 Cyclical Vehicle Replacement: All Comhairle Operational Fleet (excl Sus Com) 120 (120) (120) 0
4,867 658
Total Bids Received 45,942 (1,200) (1,440) (18,461) 27,481