Capital Market Day - DOF
Transcript of Capital Market Day - DOF
1
Capital Market Day
October 19th 2007
Radisson SAS Hotel Norge
Mooring Installation
DOF Subsea total capabilities
Managing Director
Harald Vormedal
SEMAR AS
Table of Contents
Short presentation of Semar AS
References in Marin Operation Projects
DOF Group Total Capabilities
2
Presentation of SEMAR
Established 1980
Comprehensive experience in the planning, engineeringand execution of marine operations.
Growing and nurturing of intellectual capital by activetransfer of experience and learning.
Combination of sophisticated marine engineering withexperience from construction and marine operations.
Presentation of SEMAR
The employees (38) consist of graduate Master Engineers and Mariners, working in the same enviroment.
Short distance (same office) between complicated marine and structural computer analyses and long constructionand offshore installation experience.
Concern for HSE (Health, Safety and Environment), developed procedures in safe anchor handling.
Emloyees participated in developing the DNV standard Recommended Practice for Marine Operations'
3
References
Frame Agreements:
StatoilHydro ASA (Subsea engineering and projectassistance)
Shell Norge ASA (Assistance marine operation and rig moves)
Sevan ( Assistance Marine analysis and personnel)
Aker Marine Contractors (Floatover, decommisioning etc)
APL (Installation of mooring systems and loading buoy)
Scana (Installation concepts of loading buoy)
Project ReferencesRig moves
4
Project ReferencesHeavy Lift Vessel, transportation analysis
Project ReferencesSuction anchor design and installation
5
Project ReferencesSuction anchor installation
Project ReferencesSnøhvit project, Cold Box transportation
7
Project ReferencesBrent Spar decommisioningconcept development
Project ReferencesØresund Bridge projectInstallation of high bridge foundation
8
GROUP CAPABILITIES
What can DOF Subsea and SEMAR do together?
ANCHOR AND MOORING SYSTEM INSTALLATION SUBSEA INSTALLATION FLOATOVER/ MATING TOW AND HOOK - UP
FPSOSEMISDrilling rigsLoading Bouy
TemplatesManifoldsJumpersPipesThrees, etc.
Floatover of Topsides Mating of Topsides
FPSOSEMISDrilling rigsLoading Bouy
GROUP CAPABILITIES
Mooring Installation ServicesNew market for DOF Subsea3 New Construction Vessels ordered, 2009 (2) and 2010
9
GROUP CAPABILITIESAlternative metod
Launching method. Suction Anchor and mooring system using 2 Vessels
GROUP CAPABILITIESTowing of FPSO
Towing configuration. Ocean going, 3 Vessels
10
GROUP CAPABILITIES
DOF Subsea and SEMAR co-operation
Overall Project Management - DOF SubseaDesign Engineering - SEMARFabrication - SEMARProcurement - DOF SubseaInstallation Analysis - SEMARInstallation Procedures - DOF Subsea & SEMAROffshore Execution - DOF Subsea & SEMARVessel/ AHT Supply - DOF Subsea
GROUP CAPABILITIESMarket