Capability Profile - Leap Infraasys · Nelamangala 400kV / 220kV (RTPS, Nagajhari, Sharavati etc....
Transcript of Capability Profile - Leap Infraasys · Nelamangala 400kV / 220kV (RTPS, Nagajhari, Sharavati etc....
Capability Profile
1
An infrastructure advisory firm with focus on Engineering / System designs, Projects / System Studies, Cost Studies / BOQ and Project Formulation
Surging Indian and other regional
Economies needs quality services and local solutions for Projects – that is where LIPL provides value
2
Quality is not an accident; rather Quality is a choice among many alternatives
Quality – upfront in the process – is, more often than not, the most optimized solution
Technology, Innovation and entrepreneurship in every walk of life is the key to development and social upliftment 3
Founded in Oct 2010 by Anil Jangid (ex-Indian
Railway, IRSEE-92)
Shareholding pattern: Anil Jangid 90%;
Poonam Sharma 10%
Currently about 30+ staff strength (10+ senior
professionals, engineers and support staff)
4
Portfolio of Expertise
5
Infrastructure Project studies (Feasibility Studies, Detailed Project Reports …
Project formulation & Structuring and Financial / Investment Analysis
Project program design and management
Specifications, Cost Analysis, BOQ, Tender Documentation & bidding process
6
7
Power load flow studies (AC and DC)
Traction simulation studies
EMC / EMI, Harmonic analysis
Reliability Studies
RAMS studies, Risk Assessment Studies, FMEA studies
‘A’ Peenya RSS
‘B’ Baiyapanhalli
RSS
‘C’ Puttenhalli
RSS
‘D’ Mysore Road
RSS (GIS)
Nelamangala 400kV / 220kV (RTPS, Nagajhari, Sharavati etc.
400 kV HVDC
Kolar / Talcher
220 kV
400 kV
400 kV Peenya GSS
Hoody GSS
HAL GSS
66 kV
66 kV
66 kV
220 kV
66 kV
400 kV
400 kV / 220
kV Somanahalli
220 kV RR Nagar SS
220 kV
Subramaniumpura SS
Khoday GSS
220 kV 220 kV
66 kV 66 kV
66 kV
66 kV
220 kV
220 kV
400 kV
66 kV
220 kV
400 kV
V Valley GSS
REMC
O SS
8
All type of rail systems – Urban, MRTS, Monorail, long distance, freight
Initial concept design to detailed design upto commissioning
25kV AC / 1500V DC flexible and Rigid OCS
750V DC Third Rail system
Traction Substations (25kV AC, 1500V DC, 750V DC)
Control and Monitoring (SCADA system)
earthing, bonding, stray current mitigation
Statutory approval documentation support
Construction support
Concept design, simulation studies to detailed design and commissioning
HT substations (220kV, 132kV, 66kV, kV …
Distribution Substations (415V)
Overhead / cable distribution system
protection design, control and monitoring
Earthing system design
9
LV Distribution system
Emergency power system (DG, UPS)
Lighting design
HVAC design
Pumping installations design
Fire safety system design
Building Management System
Earthing system design
Lightning protection system
10
Alignment design (broad gauge, standard gauge, mainline railways, urban railway system)
Trackwork design – Ballasted and Ballastless
Rail-structure interaction study, noise-vibration study, track stability analysis study etc.
Rails, turnouts, fasteners, sleepers and other component design and specifications
Detailed Specification, cost analysis, BOQ preparation, tender documentation
Construction support
11
Electric Rolling stock specifications (Locomotives, Electric Multiple Units)
Propulsion equipment sizing calculations
Detailed specifications of bogies, propulsion equipment, carbody, brake system and other components
Maintenance planning
Costing of rolling stock – capital and O&M cost study
Interface management (with other systems and infrastructure)
Tender documentation (including long term procurement-cum-maintenance contract structuring
Bidding process assistance
12
Train Control system specification (particular expertise in CBTC)
Preliminary Train operation plan
Detailed specifications metro telecommunication system and subsystem specifications
Cost estimation for train control and telecom systems
Interface management (with other systems and infrastructure)
Tender documentation
Bidding process assistance
13
Comprehensive telecommunication system advisory for railway, metro and other infrastructure
Telecom backbone network, system configuration, detailed specification design etc.
Fiber optic network design, telephone system, security system, CCTV, wi-fi connectivity, public address system, mobile telecommunication system design etc.
Integrated network management system
14
Depot and yard planning and track alignment design
Maintenance facilities planning
Detailed design (structural, E&M, machinery / plant etc.)
Cost estimation
Interface management (with other systems and infrastructure)
Tender documentation
Bidding process assistance
15
Projects Delivered /
Under Execution
16
System studies, simulation studies, detailed design, BOQ, tender specification … corridors of km 66kV cable feeder system
66kV / 33kV, 2*25 MVA substations (4 nos.)
33kV cable distribution system
Traction substations 33kV/750V dc (29 nos.)
Auxiliary substations 33kV/415V (45 nos.)
Third rail system
SCADA system
Earthing, bonding and stray current mitigation
Note: SREI is main consultant to BMRCL and LIPL is appointed by SREI
17
Alignment design, Trackwork detailed design, BOQ, tender specification … corridors of 41km) Alignment design using BRT software Ballasted and Ballastless (plinth and slab)
tracks Rail-structure interaction study Noise and Vibration Study Track stiffness and Transition (ballasted to
ballastless) designs Track plinth & slab structural designs
Track fastening system & Sleeper designs Stray current mitigation measures design Detailed cost estimation Complete tender documentation and
assistance in bidding process Note: SREI is main consultant to BMRCL and LIPL is appointed by SREI
18
First Monorail Project in India: 20km corridor (Chembur to GMC) with 17 stations 22kV feeder cable, receiving
substations and cable distribution system
22kV / 415V distribution substations (20 nos.)
SCADA system (I/O list)
415V LV Distribution system for stations and Depot
Lighting designs for stations and depot
HVAC designs for stations and depot
Fire safety system design for stations and depot
19
Chennai Metro Phase-1: 42km with 2 corridors – partly underground and elevated
Pre-tender advisory (for OHE only) to M/s TATA Projects for power supply design and build package
25kV flexible catenary system preliminary design for mainlines and depot
Depot sectioning design
BOQ preparation (for OHE only)
RAMS study, fault tree analysis (for OHE only)
Assistance in Bid Preparation
20
Indian Railways intends to enter into a long term (20+ years) procurement-cum-maintenance agreement with private entity for EMUs (Suburban and Intercity)
Procurement-cum-Maintenance Agreement drafting
EMU technical specification review
EMU cost analysis report and financial modeling of the project
Bidding assistance to Indian Railways
Note: Mott MacDonald is main consultant to Ministry of Railways and
LIPL is sub-consultant to Mott MacDonald
21
Mumbai International Airport Limited (MIAL) Master Plan envisage development of state-of-the-art Air Cargo Projects - Total three projects (A, B & C) with foot print of the order of 20000 sqm with 2/3 floors
Concept designing of: MV cable system and substations
LV power supply system,
Emergency power supply system
lighting system,
fire protection system,
HVAC system and
Plumbing system for the three projects
Submission of design report and drawings
Note: AECOM is main consultant to MIAL and LIPL is sub-consultant to AECOM
22
11kV Incomer
from DSS No. 3
11kV Incomer
from DSS No. 3
11kV Ring
Cable
11kV Ring
Cable
Substation
Project A
Substation
Project B
Substation
Project C
NO
Hyderabad Metro Rail project consists of 3 elevated corridors with combined route of about 71km and 66 stations and 3 Depots.
Review of DPR, Concession Agreement, Manual of Specifications and Standards … regarding trackwork
Design Basis Report for ballastless
(mainlines) and ballasted (depots) tracks; Preliminary Design Report for Trackwork
for entire Project Preliminary drawings for trackwork and its
components
Tender specification drafting and tender drawings
Note: AECOM is main consultant to L&T SPV and LIPL is sub-consultant to AECOM
23
L&T has been engaged for electrical EPC package of Vizag Steel Plant expansion
LIPL has been appointed by L&T to perform design engineering and consulting services, including: Design report, SLDs, BOQ (33kV intake
power 100MVA capacity, distribution at 11kV and 415V)
Overall load estimation study
Load flow and Short Circuit studies
Equipment sizing calculations (transformers, busbars, cables, DG, battery, HVAC, earthing etc.)
Earthing & lightning protection system design
Layout designs
Foundation civil designs
24
Delhi Airport Metro Express Private Limited (DAMEPL) engaged LIPL for performing technical audit of the entire project (25km route, 20km+ UG, 5 UG stations, 1 elevated station, 1 train depot) following: Comprehensive review, including feeder wise
analysis from MDB to Sub-DB, of LV power supply system, control power supply system from MDB (ASS) through to sub-DBs etc.
Earthing and Bonding system of all subsystems viz. Power Supply, LV system, HVAC, SIG, COM, PSD , BHS etc. at stations and trainways
Emergency evacuation routes at stations, depot and trainways
Drainage system of stations
Drainage system of tunnels and viaduct
The study also comprised desk review of designs and requirements of concession agreement
LIPL performed the audit and submitted comprehensive Reports duly suggesting remedial measures
25
The scope of work envisaged by Kolkata Metro for rehab of 7 nos. old NGEF rakes included new corten steel shells, replacement of complete pneumatic pipe lines / reservoirs with SS material, complete rewiring, fitment of RMPU, automatic door system, interiors, PA system & CCTV system, static inverters for RMPU & auxiliary power requirement etc.
M/s Titagarh Wagon Limited engaged LIPL for assisting them for preparation of bid for rehabilitation of 7 rakes of Kolkata Metro. The services delivered by LIPL included: Preparation of technical proposal including detailed
comments on the complete tender & particularly on BOQ items,
Technical paper regarding possibility of MA set or inverter s applicability in rehab rakes,
Detailed BOQ preparation (including costing of various technical & commercial conditions not explicitly shown in schedules of Metro Railway),
Cost estimation,
Technical & commercial interactions with equipment vendors etc.
26
RVNL notified three electrification projects (Pune-Guntakal-Wadi-Raichur sections - total of about 380 route-km / 940 track-km) for bidding by eligible firms. The project envisaged 25kV AC electrification of these sections alongwith few big yards. A total of 7 nos. of traction substations and about 15 nos. switching posts were envisaged in the above-mentioned sections.
M/s Elecnor Infrastructures, Spain engaged LIPL
for assisting them for preparation of bid. The services delivered by LIPL included: Preparation of complete Technical proposal
Explanation / description of work Detailed comments on the complete tender Preliminary system drawings Work program in Primavera Resource scheduling and mobilization
scheduled
Technical Particulars of equipment Cost estimation for price bid
27
M/s VEERA Technotrec is an approved supplier of IR for supply of sleepers and other railway materials. For their one African project, dual gauge sleeper design was requested to be performed by LIPL.
LIPL performed the design as per AS 1085.17-2003, which included the following: 10 mn gross tones loading
Ballast depth of 250-300mm
Axle load of 25 t
Design life of sleeper 500 mn gross tone years
Clamping force at rail seat 20 kN
L/V ratio of 0.75 Designs were tested for meeting the
standard requirements and detailed design report was submitted
28
M/s Indian City Properties Limited, a Thaper Group Company, in the business of facility management decided to bid for MEP O&M Contract for Delhi Airport Line
LIPL was engaged to advise on bid preparation, cost estimation, resources requirements and technical due diligence for the following assets: LV power distribution infrastructure
Pumping installations
Lighting system
Earthing system
Ventilation system
Fire fighting system
The bid was successfully submitted by M/s ICPL
29
Metro Link Express for Ahmedabad and Gandhinagar (MEGA) Co Ltd is a special purpose company constituted by Government of Gujarat for implementation of metro rail system .
MEGA have appointed LIPL as their
Consultant for :
Appointment of General Consultants
Management of Interfaces across all systems and infrastructure
Preparation of standard bid documentations
Preliminary design of trackwork and traction system
Operation Planning
Train Control System preliminary design
Rolling stock preliminary design
30
SMEC is an internationally renowned firm in the areas of engineering and project management for infrastructure sectors. SMEC intended to develop rail business in India and engaged LIPL as advisor.
LIPL developed a comprehensive business plan for SMEC for rail sector in India.
The business plan covered: Mass transit systems
Urban rail systems
Mainline railways
High speed railways
Freight railways The business plan covered the
scenario, competitors, SWOT, organization / resources building, Key Actions etc. with a time frame.
31
L&T Construction (formerly ECC) is trackwork contractor for Hyderabad Metro Rail Project.
L&T engaged LIPL for detailed design of Alignment for first section of about 9km.
LIPL delivered the detailed design of alignment which included: Preparation of detailed report of
test of various alignment criteria
Alignment designed using alignment software and output provided in CAD form including horizontal and vertical profiles
32
L&T Railway Division submitted bid for Riyadh Metro . For trackwork system, L&T engaged LIPL for rendering pre-bid services.
LIPL rendered the following services: Evaluation of bid documents prepared
by L&T
Architectural Description including Safety and Reliability Design
Sketch Principle along with Photos and Schematics
Input for Reliability figures observed during the last 5 years for guide way system
33
Overall maintenance planning for full 82km odd network
Overall operational planning for full network.
Detailed design of maintenance depots (Indroda and Motera depots): Layout design
Architectural &Structural design
M&P specification / procurement
Electrical design
Fire system design
HVAC design
Security system design
Interface elaboration
Procurement documentation
Specifications, BOQ and cost estimation
34
Patil Rail Infrastructure Pvt Ltd (PRIL) is a prominent firm in India in the area of rail track system.
PRIL engaged LIPL for advising them for trackwork pre-tender design for Navi Mumbai metro rail project.
LIPL performed the following activities: Detailed study of alignment (about
12km) and depot
Estimation of quantities of various track components (rails, fastening, check rails, sleepers, turnouts etc.)
Preparation of detailed BOQ for entire trackwork
Preparation of interface drawings
35
Kochi Metro Rail Limited (KMRL) or
KOMET engaged LIPL for review and up
gradation of the complete RFP including
detailed specifications of rolling stock
and Signaling & Telecom prepared by
DMRC.
LIPL performed the following activities:
Detailed review of technical and general specifications
Upgrading the specifications to DTO/UTO conformance
Detailed review of other parts of tender documents (ITT, Pricing Document, Tech proposal requirements etc.)
Updation of interfaces definition with other
systems and infrastructure
Assistance during bidding process regarding technical clarifications
36
General Electric (GE) engaged LIPL for advising them regarding metro railway systems. )dentifying GE s fit in the
various systems of metro railway
Market assessment of the opportunities for GE in the metro railway sector
Advise regarding the procurement processes adopted by various metros in India
Advise regarding entry strategy into the metro railways for the products that have fit
37
Kochi Metro Rail project is 26km elevated with
22 stations and one depot. DMRC is the executing agency.
Kochi Metro Rail Limited engaged appointed
an IQSC (consortium of DBI, LIPL and SMEC
for three year tenure) to oversee the entire
delivery of project. LIPL is responsible for the following services:
Leading the team of IQSC (30+)
Power supply and traction system
including control and automation
(SCADA)
Intelligent transport system i.e. CBTC
Open loop multimodal automatic ticketing
system for all modes of city transport
Smart Operation Control Centre
Wi-fi on moving trains an other modes of
city transport
Civil works quality and safety supervision
support 38
Eastern Dedicated Freight Corridor is an iconic project in India. ALSTOM is a pre-qualified bidder for system package of Bhaupur-Khurja section (350km).
The DFC project employs 2*25kV electrification system with heavy axle load. ALSTON engaged LIPL for rendering following pre-bid technical services: Overhead collection system design and
BOQ
Pegging plans of OCS system
Traction installations (TSS, SP, SSP) design and BOQ
SCADA system design and BOQ
Building services (E&M, BMS, HVAC, Fire system etc.) design and BOQ
39
Mumbai Metro Line 3 is one of the most challenging project with 33km underground route length and 26 UG stations.
LIPL has been engaged by one of the pre-qualified bidders for tunnel packages for rendering E&M technical services. The scope of LIPL includes (for 23 UG stations, one tunnel vent shaft and connecting tunnels): LV power distribution design Emergency power supply system design Earthing system design
Lighting system design Cable system design and cable support
infrastructure Fire detection and fire fighting system
design Building management system design BOQ and cost estimation
Pre-bid support services
40
Chennai Monorail project is 20.7km route length all elevated with 16 stations and a depot. The project is being implemented by GOTN on PPP format.
LIPL has been engaged by one pre-qualified bidder for rendering following bid stage technical services: Preliminary design of power supply
(receiving substations, 33kV cable distribution, substations) and traction system (1500V dc)
Half height platform screen door system design and specification
Communication system preliminary design (DTS, CCTV, PAS, PIDS, Radio, telephone, BMS etc.)
E&M system design (LV distribution, lighting, cabling, HVAC, fire detection & fighting, water supply etc.)
BOQ and cost estimation
41
ALSTOM has established a rolling stock manufacturing plant at Sri City near Chennai
Currently the plant has testing facility for 25kV ac stock only and ALSTOM planned to augment the facility for 1500V dc and 750V dc stock testing
ALSTOM engaged LEAP for the above and the scope included: Power supply scheme conceptualization
covering 25kV ac OCS, 1500V dc OCS / third rail / stinger and 750V dc third rail / stinger
Detailed design of dual voltage (1500V / 750V dc) substation
Protection and control scheme
OCS, third rail and stinger scheme
Specification, BOQ, cost estimation and assistance for engaging contractors
42
Kalindee Rail Nirman Limited is one of reputed rail sector construction company in India
Kalindee engaged LEAP for advising them regarding telecom system of Eastern DFC package CP203 during tender stage
The section is 400km route length and the scope included: Preliminary design of telecom
subsystems viz. FOTS, GSM-R, Network Management System, Master Clock System, Telephone system, 48V PS system etc.
BOQ and cost estimation
Assistance during bidding process
Bid level SHE documentation
Technical proposal
43
DFCCIL has awarded the P-5 (S&T) package to Hitachi and Texmaco consortium; the section is about 930km with 31 stations and OCC
Texmaco has engaged LEAP for managing the detailed designs of complete telecom subsystems comprising: Fiber Optic Transmission network
Data networking system, wifi system
GSM-R system
Telephone systems
48V dc power supply system
CCTV system for OCC In addition to telecom subsystems,
LEAP role extend for managing all SHE related documentations
44
Nagpur Metro Rail Corporation Limited (NMRCL) is a 50:50 SPV of GOI and GOM mandated to implement the metro rail project
The metro rail project comprises of two corridor with combined route of 38km.
LEAP has been appointed by NMRCL for rendering preliminary design and procurement advisory (tender documentation) services for: Rolling stock
Power supply system Traction System
45
SEC Railway (a zone of Indian Railways), has decided to engage an EPC Contractor for construction of 4th line between Bilaspur & Raigad (133 km) including civil work, trackwork, electrification and signaling & telecom work; the project cost of about Rs 1000 crore.
EY India has been appointed as transaction advisor for the project by SEC Railway. LEAP is working with EY for traction electrification and signaling & telecom parts and the scope briefly includes the following:
Review of project report and cost estimates
Assistance for drafting of RFQ and RFP Documents
Preparing technical schedules
Bidding process assistance
46
As per DPR of Vizag Metro Rail project, it consist of three elevated corridors with combined route length of about 40 km. UMTC was engaged by AMRC for advising on project implementation / transaction advisory. LEAP was engaged by UMTC for rendering the following services: Review of DPR for technical / system
parameters viz. alignment, track, stations, power supply, traction, rolling stock, signaling, telecom, AFC, PSD etc.
Optimization strategies for capital costs and O&M costs
Project phasing
Review and updating of cost estimates
Comprehensive Review Report of the above
47
M/s Sterlite Power has engaged EY for railway electrification market assessment and stakeholder engagement
One of the key intents of the engagement is technology led railway electrification . LEAP has been associated with EY and the scope incudes: Study of railway electrification process,
time frame for various activities etc.
Exploring possibilities of technology solutions and innovative methods for productivity enhancement and reduction of speed of construction
Model organizational set up on EPC contractor end for railway electrification
Suggestions on clauses for incorporation in EPC/PPP tenders enabling / mandating technology led solutions
48
Nagpur Metro Rail project involves about 38 rkm elevated metro corridors.
LEAP has been enagged by NMRCL for preparation of detailed LOP for OHE system using appropriate software Bentley s PROL .
The scope involves Reach 1
and Reach 3 sections of Nagpur Metro; totaling to about 18 route-km or about 38 track-km
49
Financials
50
51
Parameter 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
Gross Revenue
(Rs Lakh)
58 104 480 428 440 645
Net Profit
(after tax) (Rs
Lakh)
14 23 113 32 106 122
Net Worth (Rs
Lakh)
15 38 151 182 288 410
Head count 6 6 25 18 25+ 25+
Resources (Engineers & Design Facilities)
52
53
Rolling stock experts
E&M engineers
Signaling & Train control expert
Operation experts
Civil and safety experts
O&M experts
Trackwork and alignment experts
SCADA expert
Power supply and traction experts
IT Infrastructure HP Server for data management
A0 size HP plotter
Five Laser printers
30+ nos. computers (desktop and laptops)
Software ETAP for load flow study, electrical system designs
Bentley Rail for track alignment design
HAP for HVAC designs
CAD for all drawings / designs
In-house excel programs for earthing, cable sizes, OHE etc. designs
Note: Availability of ETAP and Bentley Rail is based on understanding with others on project basis
54
SREI Infrastructure Finance
Limited (Ultimate Client: Bangalore Metro Rail Corporation)
L&T (Mumbai Monorail Project, RINL Vizag Steel Project)
TATA Projects Limited Mott MacDonald (Ultimate Client:
Ministry of Railways) AECOM (MIAL Cargo Projects,
Hyderabad Metro Project) DAMEPL (Reliance ADAG Group) Titagarh Wagons Limited Elecnor Infrastructures, Spain MEGA (Ahmedabad Metro SPV) PRIL Kochi Metro Rail Limited General Electric (GE) ALSTOM India ILFS Transportation Kalindee Rail
Nagpur Metro Rail Corporation Urban Mass Transit Limited
(UMTC) EY India (Ernst Young)
55
We believe Asian economies need home grown solutions in addition to international best practices for conceptualization and implementation of large scale infrastructure projects
We wish to create a world class design, engineering and management capability through continuous development of human and knowledge resources
We wish to contribute our bit to economic and social development of our country and region
56
Contact:
LEAP Infraasys Private Limited
#25, Sector-21A HUDA Market
Faridabad 121002 URL: www.leapinfraasys.com
57