CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting -...

15
If you would like to speak before the Canaveral Port Authority Board of Commissioners during Public Comments on a topic relevant to the Canaveral Port Authority Commission Agenda for this meeting, please complete a Public Comment Request card and give the card to the recording secretary. Public Comment Request cards are located near the outside entry doors next to the agenda for this meeting. All persons speaking will follow conduct as set forth by Canaveral Port Authority Policy POL-2016-001-EXE-3, Public Participation and Conduct at Board Meetings. 1. Before approaching the podium, please remove hats and sunglasses and turn all cell phones off or to vibrate. 2. Please proceed to the podium when your name is called by the Commission Chairman and state your name, business affiliation, and city of residency for the recording secretary. 3. You will have THREE MINUTES to speak before the Board of Commissioners. 4. Do not make threats or rude comments, including the use of profanity, to or about members of the Board or Canaveral. Port Authority Employees. 5. All statements are to be directed to the Commission Chairman. You may not address or question Board members or Port Staff individually unlessdirected by the Chairman. 6. Be respectful of other people’s ideas or situation when you talk. Try not to judge them or point fingers. 7. Be patient when listening to others speak and do not interrupt them. No Board action will be taken on requests during Public Comments unless determined by the Commission Chairman to be an emergency. Any other requests for Board action may be placed on the agenda for a subsequent meeting. CANAVERAL PORT AUTHORITY BOARD OF COMMISSIONERS January 8, 2019 Commission Room Port Canaveral, Florida 32920 AGENDA This meeting is open to the public. 9:00 AM Call to Order Pledge of Allegiance Approval of Agenda Public Comment Engineering, Construction and Facilities Consideration of awarding a contract and issuing purchase order to Ivey’s Construction for the Design/Build of Cruise Terminal 3 Parking Garage in the amount of $29,535,932. (Tom Foxhoven/Bill Crowe) PUR-RFP-18-4 Solicitation Summary.pdf PUR-RFP-18-4 Evaluation Scoring Form Spreadsheet-Public Release.pdf PUR-RFP-18-4 Selection Committee Evaluation & Ranking Sheet-Award & Final Price.pdf Consideration of awarding a contract and issuing a purchase order to Ivey’s Construction in the amount of $78,983,620 for the construction of Cruise Terminal 3 to include adjacent site work and utility improvements. PUR-RFP-18-3 Step 2 Selection Committee Ranking.pdf 1

Transcript of CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting -...

Page 1: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

If you would like to speak before the Canaveral Port Authority Board of Commissioners during Public Comments on a topic relevant tothe Canaveral Port Authority Commission Agenda for this meeting, please complete a Public Comment Request card and give the cardto the recording secretary. Public Comment Request cards are located near the outside entry doors next to the agenda for thismeeting. All persons speaking will follow conduct as set forth by Canaveral Port Authority Policy POL-2016-001-EXE-3, PublicParticipation and Conduct at Board Meetings.

1. Before approaching the podium, please remove hats and sunglasses and turn all cell phones off or to vibrate. 2. Please proceed to the podium when your name is called by the Commission Chairman and state your name, business affiliation,

and city of residency for the recording secretary.3. You will have THREE MINUTES to speak before the Board of Commissioners.4. Do not make threats or rude comments, including the use of profanity, to or about members of the Board or Canaveral. Port

Authority Employees.5. All statements are to be directed to the Commission Chairman. You may not address or question Board members or Port Staff

individually unlessdirected by the Chairman.6. Be respectful of other people’s ideas or situation when you talk. Try not to judge them or point fingers.7. Be patient when listening to others speak and do not interrupt them.

No Board action will be taken on requests during Public Comments unless determined by the Commission Chairman to be anemergency. Any other requests for Board action may be placed on the agenda for a subsequent meeting.

CANAVERAL PORT AUTHORITY BOARD OF COMMISSIONERS

January 8, 2019Commission Room

Port Canaveral, Florida 32920AGENDA

This meeting is open to the public.

9:00 AMCall to Order

Pledge of Allegiance

Approval of Agenda

Public Comment

Engineering, Construction and Facilities

Consideration of awarding a contract and issuing purchase order to Ivey’sConstruction for the Design/Build of Cruise Terminal 3 Parking Garage in theamount of $29,535,932. (Tom Foxhoven/Bill Crowe)PUR-RFP-18-4 Solicitation Summary.pdfPUR-RFP-18-4 Evaluation Scoring Form Spreadsheet-Public Release.pdfPUR-RFP-18-4 Selection Committee Evaluation & Ranking Sheet-Award & FinalPrice.pdf

Consideration of awarding a contract and issuing a purchase order to Ivey’sConstruction in the amount of $78,983,620 for the construction of Cruise Terminal3 to include adjacent site work and utility improvements. PUR-RFP-18-3 Step 2 Selection Committee Ranking.pdf 1

Page 2: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019

2

PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdfPUR-RFP-18-3 Solicitation Summary.pdf

Adjournment to next meeting scheduled for Wednesday, January 23, 2019, at 9:00 am.

2

Page 3: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Meeting Date

January 8, 2019

AGENDA ITEM REQUEST

Section:

Item Number:

Department: Engineering

Requested Action: Consideration of awarding a contract and issuing purchase order to Ivey’sConstruction for the Design/Build of Cruise Terminal 3 Parking Garage in theamount of $29,535,932. (Tom Foxhoven/Bill Crowe)

Summary Explanation & Background: At the December 5, 2018 Commission meeting the Commission approved to go with the selection committee’srecommendation to meet with Ivey’s Construction to discuss options of value engineering of the new cruiseterminal garage in order to finalize GMP on the cost of the garage.Original Proposal $34,233,932. Subsequent review meetings with internal and external stake holders have yieldedsubstantial savings to the design and construction GMP through modifications to the garage structure and layout. The parking space count will remain at roughly 1800 vehicles. The value engineering modifications have resultedin necessary adjustments to the adjacent site, which is a part of the terminal contract for construction. We arecurrently negotiating a purchase order increase to Bermello Ajamil (BA) to incorporate the required redesign. This request for a purchase order increase for design services to BA will be submitted to the Commission on theregularly scheduled January 23rd meeting.

On November 27, 2018 the Canaveral Port Authority received one proposal for the Construction of Terminal 3Parking Garage (PUR-RFP-18-4). This proposal from Ivey’s Construction included substantial savings in valueengineering that the Staff would like to discuss before entering into a contract.

On June 28, 2017 the Canaveral Port authority Commission approved for the Design of a new CruiseTerminal/Garage/Berth and Roadway Improvements. The staff released PUR-RFP-18-4 for the Design Build ofa New Parking Garage to be designed and built at the existing CT3 site on September 21, 2018. On November27, 2018 the RFP was due and the selection committee reviewed the RFP’s and selected Ivey’s Construction forthe construction of the new 1800 space parking garage.Financial Impact: Yes

Reviewed by General Counsel: No

Reviewed by Port Attorney: No

Financial Review: Due to the reallocations of budget items, the total NTE amount of$29,535,932 is included in the FY19 Capital Budget and no additionalchange is required. [Budget item 2271 - Cruise Terminal 3]

Attachments:

3

Page 5: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

CANVERAL PORT AUTHORITYSOLICITATION SUMMARY

Solicitation Number & Name:PUR-RFP-18-4Terminal 3 Design/Build Parking Garage

Advertising:Florida Today, Brevard Edition - September 22 & 29, October 6, 2019

Posted to Website (http://www.portcanaveral.com/Business-With-Us/Current-Solicitations):September 21, 2018

PublicPurchase.com Details (bid notification service - vendors self register):

Posted September 26, 2018Vendors Notified - 88Notified Vendors Who Acknowledged Notification - 36

e-Builder Registered Vendors: (portal where solicitation documents are downloaded)

71

Bids/Proposals Received:One

Prepared by CPA Purchasing Department

5

Page 6: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority

PUR‐RFP‐18‐4 Terminal 3 D/B Parking Garage

Step 1 Scoring Summary 

Alphabetical Order Proposing Firms

Selection Critieria

Ivey's Construction ‐ 

Merritt Island, FL

Evaluator #1    171

Evaluator #2       169

Evaluator #3   174

Total 514

Ave 171.33

Rank 1

 

Rank Order Proposing Firms

Selection Critieria

Ivey's Construction ‐ 

Merritt Island, FL

Evaluator #1    171

Evaluator #2       169

Evaluator #3   174

Total 514

Ave 171.33

Rank 1

6

Page 7: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority

PUR‐RFP‐18‐4 Terminal 3 D/B Parking Garage

Step 1 Scoring Detail

Evaluator #1

Selection Criteria

Maximum 

PointsIvey's Construction ‐ 

Merritt Island, FL

Tab 1 ‐ General Information and Table of Contents non‐scored Y

Tab 2 ‐ Letter of Introduction 9 9

Tab 3 ‐ Previous Collaboration 4 4

Tab 4 ‐ Qualification Date ‐ Similar Experience 15 15

Tab 5 ‐ Local Knowledge 8 7

Tab 6 ‐ Consultants 4 4

Tab 7 ‐ Current Workload 4 3

Tab 8 ‐ Organizational Chart 5 5

Tab 9 ‐ Methodology 9 9

Tab 10 ‐ Resumes 14 12

Tab 11 ‐ Licenses 3 3

Tab 12 ‐ References 6 6

Tab 13 ‐ Litigation 5 4

Tab 14 ‐ Safety 3 3

Tab 15 ‐ Insurance 4 4

Tab 16 ‐ Business Structure 3 3

Tab 17 ‐ Non‐Collusion Affidavit 2 2

Tab 18 ‐ Public Entity Crimes 2 2

Tab 19 ‐ Conflict of Interest Disclosure Form 2 2

Tab 20 ‐ Certificate Regarding Debarment 2 2

Tab 21 ‐ WOTC & WTW 2 2

Tab 22 ‐ Bid Bond non‐scored Y

Tab 23 ‐ Proposal non‐scored Y

Tab 24 ‐ Technical Submittals 8 8

Tab 25 ‐ Design Layout, Features and Curb Appeal 17 14

Tab 26 ‐ Architectural and Engineering Innovations 4 4

Tab 27 ‐ Base Bid Price with Detailed Cost Estimate 16 16

Tab 28 ‐ Value Engineering 5 4

Tab 29 ‐ Design and Construction Schedule 8 8

Tab 30 ‐ Maintenance of Traffic and Construction Phasing Plan 3 3

Tab 31 ‐ Local Participation 8 8

Tab 32 ‐ Schematic Design GMP & General Conditions Pricing 5 5

Tab 33 ‐ Financial Statement non‐scored Y

TOTAL POINTS 180 171

Evaluator #2

Selection Criteria

Maximum 

PointsIvey's Construction ‐ 

Merritt Island, FL

Tab 1 ‐ General Information and Table of Contents non‐scored Y

Tab 2 ‐ Letter of Introduction 9 9

Tab 3 ‐ Previous Collaboration 4 4

Tab 4 ‐ Qualification Date ‐ Similar Experience 15 15

Tab 5 ‐ Local Knowledge 8 8

Tab 6 ‐ Consultants 4 4

Tab 7 ‐ Current Workload 4 3

Tab 8 ‐ Organizational Chart 5 5

Tab 9 ‐ Methodology 9 9

Tab 10 ‐ Resumes 14 14

Tab 11 ‐ Licenses 3 3

Tab 12 ‐ References 6 6

Tab 13 ‐ Litigation 5 4

Tab 14 ‐ Safety 3 2

Tab 15 ‐ Insurance 4 4

Tab 16 ‐ Business Structure 3 3

Tab 17 ‐ Non‐Collusion Affidavit 2 2

Tab 18 ‐ Public Entity Crimes 2 2

Tab 19 ‐ Conflict of Interest Disclosure Form 2 2

Tab 20 ‐ Certificate Regarding Debarment 2 2

Proposing Firm

Proposing Firm

7

Page 8: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority

PUR‐RFP‐18‐4 Terminal 3 D/B Parking Garage

Step 1 Scoring Detail

Tab 21 ‐ WOTC & WTW 2 2

Tab 22 ‐ Bid Bond non‐scored Y

Tab 23 ‐ Proposal non‐scored Y

Tab 24 ‐ Technical Submittals 8 8

Tab 25 ‐ Design Layout, Features and Curb Appeal 17 16

Tab 26 ‐ Architectural and Engineering Innovations 4 4

Tab 27 ‐ Base Bid Price with Detailed Cost Estimate 16 10

Tab 28 ‐ Value Engineering 5 4

Tab 29 ‐ Design and Construction Schedule 8 8

Tab 30 ‐ Maintenance of Traffic and Construction Phasing Plan 3 3

Tab 31 ‐ Local Participation 8 8

Tab 32 ‐ Schematic Design GMP & General Conditions Pricing 5 5

Tab 33 ‐ Financial Statement non‐scored Y

TOTAL POINTS 180 169

Evaluator #3

Selection Criteria

Maximum 

PointsIvey's Construction ‐ 

Merritt Island, FL

Tab 1 ‐ General Information and Table of Contents non‐scored Y

Tab 2 ‐ Letter of Introduction 9 9

Tab 3 ‐ Previous Collaboration 4 4

Tab 4 ‐ Qualification Date ‐ Similar Experience 15 15

Tab 5 ‐ Local Knowledge 8 8

Tab 6 ‐ Consultants 4 4

Tab 7 ‐ Current Workload 4 4

Tab 8 ‐ Organizational Chart 5 5

Tab 9 ‐ Methodology 9 9

Tab 10 ‐ Resumes 14 14

Tab 11 ‐ Licenses 3 3

Tab 12 ‐ References 6 6

Tab 13 ‐ Litigation 5 5

Tab 14 ‐ Safety 3 3

Tab 15 ‐ Insurance 4 4

Tab 16 ‐ Business Structure 3 3

Tab 17 ‐ Non‐Collusion Affidavit 2 2

Tab 18 ‐ Public Entity Crimes 2 2

Tab 19 ‐ Conflict of Interest Disclosure Form 2 2

Tab 20 ‐ Certificate Regarding Debarment 2 2

Tab 21 ‐ WOTC & WTW 2 2

Tab 22 ‐ Bid Bond non‐scored Y

Tab 23 ‐ Proposal non‐scored Y

Tab 24 ‐ Technical Submittals 8 8

Tab 25 ‐ Design Layout, Features and Curb Appeal 17 17

Tab 26 ‐ Architectural and Engineering Innovations 4 4

Tab 27 ‐ Base Bid Price with Detailed Cost Estimate 16 10

Tab 28 ‐ Value Engineering 5 5

Tab 29 ‐ Design and Construction Schedule 8 8

Tab 30 ‐ Maintenance of Traffic and Construction Phasing Plan 3 3

Tab 31 ‐ Local Participation 8 8

Tab 32 ‐ Schematic Design GMP & General Conditions Pricing 5 5

Tab 33 ‐ Financial Statement non‐scored Y

TOTAL POINTS 180 174

Proposing Firm

8

Page 9: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

CANAVERAL PORT AUTHORITY SELECTION COMMITTEE EVALUATION & RANKING/SELECTIONS/FINAL PRICING

======================================================================================================== PROJECT: PUR-RFP-18-4

Terminal 3 Design/Build Parking Garage

Selection Committee Meeting Date & Time: VE Discussion Meeting Date & Time:

11/30/18 @ 10:00 AM 12/13/18 @ 8:30 AM

========================================================================================================

COMPANY

FINAL PRICING AFTER VE DISCUSSION

Ivey’s Construction – Merritt Island, FL

$29,535,932.00

THIS IS TO AWARD A CONTRACT AND APPROVE THE FINAL PRICING POST VE DISCUSSIONS AS AUTHORIZED BY COMMISSION ON DECEMBER 5, 2018. THIS AWARD WILL BE PRESENTED TO THE CANAVERAL PORT AUTHORITY BOARD OF COMMISSIONERS FOR APPROVAL AT THEIR SPECIAL MEETING SCHEDULED ON JANUARY 8, 2019. POSTED: DATE January 2, 2019 TIME 12:00 PM BY Karen Pappas, Director Procurement ******************************************************************************************************************************************************************************************** APPROVED BY THE CANAVERAL PORT AUTHORITY

POSTED: DATE TIME BY

9

Page 10: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Meeting Date

January 8, 2019

AGENDA ITEM REQUEST

Section:

Item Number:

Department: Engineering

Requested Action: Consideration of awarding a contract and issuing a purchase order to Ivey’sConstruction in the amount of $78,983,620 for the construction of CruiseTerminal 3 to include adjacent site work and utility improvements.

Summary Explanation & Background: On December 21, 2018 the selection committee met for the selection of the Firm for the construction of CruiseTerminal 3. The committee has recommended that Ivey’s Construction be awarded the project. Because of timeconstraints we are asking the Commission to approve the amount on the proposal as shown, less the valueengineering savings for the Tier 2 generator. The staff will continue to discuss with Ivey’s on value engineeringto reduce cost. The original bid price from Ivey’s Construction was $79,436,770. We have taken the valueengineering option of reducing the cost of the facility back up generator from a tier 4 to a tier 2 for a savings of$453,150. Further value engineering based discussions are currently ongoing that will yield substantial savings tothe project GMP. Port Canaveral staff will be meeting with Carnival Corporation representatives to discussthese changes. The cost savings resulting from the pending value engineering discussions will be evaluatedagainst additional design costs that may result from Bermello Ajamil.

On June 28, 2017, the commission approved staff to go issue a formal solicitation for the design of a new cruiseterminal facility, garage, site work, roadway and utility improvements. On September 22, 2017, the selectioncommittee, after reviewing step 2 proposals, conceptual designs and sitting in on presentations ranked BermelloAjamil (B&A) & Partners as the #1 firm.

The Construction will include complete building architecture and mechanical, electrical and plumbing, low voltagefor the terminal building. In addition, construction for adjacent site work and utility improvements, off site utilitycapacity improvements, widening and signalization improvements to George King Boulevard and the rework ofsome boat trailer parking spaces at Freddy Patrick Park. The Construction is anticipated to run through May of2020.Financial Impact: Yes

Reviewed by General Counsel: No

Reviewed by Port Attorney: No

Financial Review: The total NTE amount of $78,983,620 will exceed the Capital Budget forthis project by $12.2 million. If approved, the following funds will bereallocated between capital projects in FY 19: 2273 Contingency for newprojects ($2 million); 1340 Maintenance Dredging ($2 million); 1842 NorthCargo Berth 8 ($2 million); 2128 WTB Channel Entrance Phase 2 (1

10

Page 11: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

million). FY20 1842 North Cargo Pier 8, phase 2 ($5,250 million). Theresulting increase will be to 2271 Cruise Terminal 3. There will be nochange to the overall total Capital Budget.

Attachments:

PUR-RFP-18-3 Step 2 Selection Committee Ranking.pdf

PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf

PUR-RFP-18-3 Solicitation Summary.pdf

11

Page 12: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

CANAVERAL PORT AUTHORITY SELECTION COMMITTEE EVALUATION & RANKING/SELECTIONS

======================================================================================================== PROJECT: PUR-RFP-18-3 Terminal 3

Improvements (Construction) Step 1 – Final Ranking

Selection Committee Meeting Date & Time:

December 21, 2018 11:00 AM

========================================================================================================

COMPANY/TEAMS

RANKING/SELECTIONS

Ivey’s Construction-Merritt Island, FL 1 Suffolk-West Palm Beach, FL/ H.J. High Construction-Orlando, FL 2 THIS RANKING WILL BE PRESENTED TO THE CANAVERAL PORT AUTHORITY BOARD OF COMMISSIONERS FOR APPROVAL AT THEIR SPECIAL MEETING SCHEDULED ON JANUARY 8, 2019. POSTED: DATE January 2, 2019 TIME 1:30 PM BY Karen Pappas, Director Procurement ******************************************************************************************************************************************************************************************** THIS IS NOTICE OF THE DECISION OF THE CANAVERAL PORT AUTHORITY TO AWARD THE CONTRACT FOR: TO: POSTED: DATE TIME BY

12

Page 13: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority

PUR‐RFP‐18‐3 Terminal 3 Improvements (Construction)

Step 2 Scoring Summary 

Alphabetical Order

Selection Critieria

Ivey's Construction, Inc   

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Evaluator #1    98 89

Evaluator #2       86 78

Evaluator #3   100 97

Evaluator #4   97 90

Evaluator #5   88 77

Total 469 431

Ave 93.80 86.20

Rank 1 2

 

Rank Order

Selection Critieria

Ivey's Construction, Inc   

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Evaluator #1    98 89

Evaluator #2       86 78

Evaluator #3   100 97

Evaluator #4   97 90

Evaluator #5   88 77

Total 469 431

Ave 93.80 86.20

Rank 1 2

Proposing Firms

Proposing Firms

13

Page 14: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

Canaveral Port Authority

PUR‐RFP‐18‐3 Terminal 3 Improvements (Construction)

Step 2 Scoring Detail

Evaluator #1

Selection Criteria

Maximum 

PointsIvey's Construction, Inc  

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Tab 20 ‐ Letter of Confirmation non‐scored Y Y

Tab 21 ‐ Bid Bond 5 5 5Tab 22 ‐ GMP & General Conditions Pricing 30 30 25Tab 23 ‐ Value Engineering 10 10 8

Tab 24 ‐ Construction Schedule 15 14 14

Tab 25 ‐ Maintenance of Traffic & Construction Phasing Plan 10 9 8Tab 26 ‐ Not Used 0 0 0Tab 27 ‐ Proposal Form non‐scored Y YTab 28 ‐ Financial Statement non‐scored Y YPresentations 30 30 29

TOTAL POINTS 100 98 89

Evaluator #2

Selection Criteria

Maximum 

PointsIvey's Construction, Inc  

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Tab 20 ‐ Letter of Confirmation non‐scored Y Y

Tab 21 ‐ Bid Bond 5 5 5Tab 22 ‐ GMP & General Conditions Pricing 30 26 23Tab 23 ‐ Value Engineering 10 8 5

Tab 24 ‐ Construction Schedule 15 13 11

Tab 25 ‐ Maintenance of Traffic & Construction Phasing Plan 10 9 9Tab 26 ‐ Not Used 0 0 0Tab 27 ‐ Proposal Form non‐scored Y YTab 28 ‐ Financial Statement non‐scored Y YPresentations 30 25 25

TOTAL POINTS 100 86 78

Evaluator #3

Selection Criteria

Maximum 

PointsIvey's Construction, Inc  

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Tab 20 ‐ Letter of Confirmation non‐scored Y Y

Tab 21 ‐ Bid Bond 5 5 5Tab 22 ‐ GMP & General Conditions Pricing 30 30 30Tab 23 ‐ Value Engineering 10 10 8

Tab 24 ‐ Construction Schedule 15 15 14

Tab 25 ‐ Maintenance of Traffic & Construction Phasing Plan 10 10 10Tab 26 ‐ Not Used 0 0 0Tab 27 ‐ Proposal Form non‐scored Y YTab 28 ‐ Financial Statement non‐scored Y YPresentations 30 30 30

TOTAL POINTS 100 100 97

Evaluator #4

Selection Criteria

Maximum 

PointsIvey's Construction, Inc  

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Tab 20 ‐ Letter of Confirmation non‐scored Y Y

Tab 21 ‐ Bid Bond 5 5 5Tab 22 ‐ GMP & General Conditions Pricing 30 30 25Tab 23 ‐ Value Engineering 10 9 8

Tab 24 ‐ Construction Schedule 15 15 14

Tab 25 ‐ Maintenance of Traffic & Construction Phasing Plan 10 10 10Tab 26 ‐ Not Used 0 0 0Tab 27 ‐ Proposal Form non‐scored Y YTab 28 ‐ Financial Statement non‐scored Y YPresentations 30 28 28

TOTAL POINTS 100 97 90

Evaluator #5

Selection Criteria

Maximum 

PointsIvey's Construction, Inc  

Merritt Island, FL

Suffolk ‐ West Palm 

Beach, FL               

HJ High Constrcuction ‐ 

Orlando, FL

Tab 20 ‐ Letter of Confirmation non‐scored Y Y

Tab 21 ‐ Bid Bond 5 5 4Tab 22 ‐ GMP & General Conditions Pricing 30 28 24Tab 23 ‐ Value Engineering 10 8 6

Tab 24 ‐ Construction Schedule 15 14 14

Tab 25 ‐ Maintenance of Traffic & Construction Phasing Plan 10 8 7Tab 26 ‐ Not Used 0 0 0Tab 27 ‐ Proposal Form non‐scored Y YTab 28 ‐ Financial Statement non‐scored Y YPresentations 30 25 22

TOTAL POINTS 100 88 77

Proposing Firm

Proposing Firm

Proposing Firm

Proposing Firm

Proposing Firm

14

Page 15: CANAVERAL PORT AUTHORITY BOARD OF ......Canaveral Port Authority Board of Commissioners Meeting - January 8, 2019 2 PUR-RFP-18-3 Evaluation Scoring Form-Public Release.pdf PUR-RFP-18-3

CANVERAL PORT AUTHORITYSOLICITATION SUMMARY

Solicitation Number & Name:PUR-RFP-18-3Terminal 3 Improvements - Construction

Advertising:Florida Today, Brevard Edition - April 28, May 4 & 11, 2018

Posted to Website (http://www.portcanaveral.com/Business-With-Us/Current-Solicitations):April 30, 2018

PublicPurchase.com Details (bid notification service - vendors self register):

Posted May 4, 2018Vendors Notified - 42Notified Vendors Who Acknowledged Notification - 22

e-Builder Registered Vendors: (portal where solicitation documents are downloaded)

64

Bids/Proposals Received:Two

Prepared by CPA Purchasing Department

15