Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design...

4
Canam-Bridges Long Span Standard Truss Bridge A division of Canam Group

Transcript of Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design...

Page 1: Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design completed per AASHTO and CAN/CSA-S6 specifications includes all bridge …

Canam-BridgesLong SpanStandard Truss Bridge

A division of Canam Group

Page 2: Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design completed per AASHTO and CAN/CSA-S6 specifications includes all bridge …

In an effort to provide innovative solutions to its clients, Canam-Bridges has added to its range of products a durablestandard bridge able to meet the demands of the infrastructuremarket. Designed to have a nominal lifespan of 75 years, thesestandardized bridges are pre-designed and everything is inplace to start production as soon as we receive an order, savingseveral weeks from a usual bridge acquisition schedule. Our all inclusive design completed per AASHTO and CAN/CSA-S6specifications includes all bridge components such as thebridge deck with wearing surface, the safety barrier system, the bearings and an expansion joint.

• Through truss bridge with two lanes• Design standards:-AASHTO, live load vehicle HL-93-CSA-S6, live load vehicle CL-625 and lane loading• Steel ASTM A709 Gr 50, A572 Gr 50 and A992 Gr 50 (CSA G40.21 350 WT)• Hot dip galvanized coating• Orthotropic steel deck units of 6 ft. x 10ft. (1.83 m x 3.05 m) with aggregate anti-skid coating wearing surface (made by Acrow Ltd.)• Easily shipped in standard 40 ft. (10.2 m) containers• Included:- AASHTO TL-4 (CSA PL-2) railing system- Goodco Z-Tech structural bearings and expansion joint- Design and supply of steel- Superstructure drawings sealed by a professional engineer- Installation scheme complete with engineered drawings• 6 to 8 weeks procurement lead time

A turnkey product

Quick and easy constructionDue to its fully bolted components and the lightness of its frames, this bridge is easy to implement. The heaviestcomponent weighs 5 tons (4,500 kg). Its installation requiresno heavy equipment and is designed to be installed by either the launching or conventional method.

Page 3: Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design completed per AASHTO and CAN/CSA-S6 specifications includes all bridge …

Bridge dimensions

Available lengths (feet)240 ft. 280 ft. 320 ft. 360 ft. (73 m) (85 m) (98 m) (110 m)

Clearance(truck):17 ft. 5 in.(5.33 m)

Deck (road width):24 ft.(7.315 m)

Technical support• Included:- Assistance to foundation engineer- Assistance to contractors during bidding

• Optional:- Assistance on site during installation- Final inspection and certification

Page 4: Canam-Bridges Long Span · Canam-Bridges Long Span Standard Truss Bridge ... all inclusive design completed per AASHTO and CAN/CSA-S6 specifications includes all bridge …

Building Better Bridges

CanadaToll free: 1-877-304-2561

United StatesToll free: 1-800-681-4440

canambridges.com ©Canam

Group Inc., 2013

Printed in Canada 05/15