Re: NOVA Gas Transmission Ltd. (NGTL) 2021 NGTL System Expansion Project (Project) Order XG-001-2020 (as amended) (Order) Application for Partial Leave to Open (LTO) Nordegg C6 Compressor Station File: OF-Fac-Gas-N081-2018-0303
Pursuant to section 213 of the Canadian Energy Regulator Act, NGTL applies for partial LTO for the Nordegg C6 Compressor Station Unit Addition (Nordegg CS) portion of the Project following completion of the Nordegg CS hydrotest program.
This application includes the following: • High pressure gas piping installed to date including recycle valve, unit valves and relief
valves • Gas vents and hydrocarbon drains • Fuel gas piping
NGTL anticipates filing the final LTO for the balance of the Nordegg CS prior to the end of June 2021.
In it’s Project update filed on August 7, 2020,1 NGTL requested exemption from the requirements of sections 180(1)(b) and 213(1) of the Canadian Energy Regulator Act (CER Act) to obtain leave to open (LTO) from the CER prior to installing tie-in assemblies, utility gas system and auxiliary systems. NGTL’s request for exemption from LTO for the above-mentioned components was approved by the CER. As committed to in NGTL’s exemption request, NGTL provides a copy of the hydrotest information to the CER (Appendix A).
The documents to support this LTO were prepared in accordance with Guide T of the Filing Manual (see Table 1). The supporting documents, contained in Tab A through Tab C, as
1 CER Filing ID: C07711.
May 13, 2021 Mr. Charlebois Page 2 of 2 attached, constitute the materials required by the Canada Energy Regulator (CER) for its review and consideration of NGTL’s LTO Application. NGTL confirms that all pressure tests for this LTO Application were conducted in accordance with Canadian Standards Association Z662-19: Oil and Gas Pipeline Systems (CSA Z662).
Table 1: Supporting Documents for Leave to Open
Tab Contents
A Leave to Open Document: Nordegg C6 Unit Addition
A Guide T Checklist
B Hydrotest Summary Report
B TC Energy Standards, Specifications and Procedures
B Summary of Pipe Manufacturers
B Summary of Piping, Welds and Valves Not Tested Following Installation
B Schematic of Pressure Tested Facility
C TC Energy Pressure Test Report signed by TC Energy representative
C Pressure and Temperature Log Sheets
C Line Lists
C Pressure Recorder Charts
C Piping and Instrumentation Diagram and Isometric Drawings
C Test Equipment Calibration Certificates for the Instruments Used for the Test
NGTL requests the CER’s determination of this LTO Application by June 10, 2021, in order to maintain Project schedule and achieve its in service date. In the event that the installation cannot proceed as planned, the delay may impact current service to existing customers.
If the CER requires additional information with respect to this filing, please contact me by phone at (403) 920-5214 or by email at [email protected].
Yours truly, NOVA Gas Transmission Ltd.
Original signed by
Jaron Dyble Regulatory Project Manager Regulatory Facilities, Canadian Natural Gas Pipelines
Enclosure
cc: Heather Dodds, Canada Energy Regulator
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
TAB A
Leave to Open Document
Guide T Checklist
05/11/2021
05/11/2021
Digitally signed by Andrew WytsmaDN: C=CA, [email protected], O=TransCanada, OU=Compresson Projects, CN=Andrew WytsmaDate: 2021.05.11 09:39:57-06'00'
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (As Amended) Application for Leave to Open Nordegg CS
May 2021 Page 1 of 1
GUIDE T CHECKLIST – FOR A PIPELINE OR PIPELINE SECTION
ITEM REQUIREMENTS WHERE INCLUDED TAB 1.0 NEB certificate or order number under which work was
carried out. Leave to Open Application Letter Cover
2.0 A list of standards, specifications and procedures to and under which the facilities were designed, constructed and tested.
TC Energy Standards, Specifications and Procedures
List
B
3.0 A description of the pressure-tested facilities including:
Hydrotest Summary Report B
3.1 The MOP Leave to Open Document B 3.2 The location Leave to Open Document B 3.3 The piping specifications, including the pipe manufacturer TC Energy Standards,
Specifications, and Procedures Summary of Pipe Manufacturers
B
3.4 A schematic of the pressure-tested facilities Schematic of Pressure Tested Facility
B
3.5 Where applicable, the elevation profile of the test section, including high, low and test point elevations
Not Applicable (N/A) -
4.0 A summary of continuous pressure and temperature readings for the pipeline test section over the test period, including:
Hydrotest Summary Report B
4.1 The date of the test Hydrotest Summary Report B 4.2 The test medium Hydrotest Summary Report B 4.3 The minimum and maximum allowable test pressures Hydrotest Summary Report B 5.0 A summary of all piping, welds, and valves not
subjected to a pressure test following installation (e.g. pre-tested pipe and assemblies) with justification for not pressure testing following installation
Summary of Piping, Welds, and Valves Not Tested Following
Installation
B
6.0 A statement that all control and safety devices were or will be inspected and tested for functionality
Leave to Open Document A
7.0 Confirmation that any permits required for the use and disposal of water was obtained
Leave to Open Document A
8.0 Confirmation that required tests were taken and met requirements
Leave to Open Document A
8.1 Confirmation that all field joints were non-destructively tested
Leave to Open Document A
8.2 Confirmation that the test pressure did not fall below the 97.5% of the minimum strength test pressure
Leave to Open Document A
8.3 Confirmation that pressure testing was performed under the direct supervision of a company representative
Leave to Open Document A
9.0 Test equipment calibration certificates Test Documentation C 10.0 All logs, test charts and other test records, signed and
dated by the company representative Test Documentation C
11.0 Details regarding any unsuccessful pressure tests, including the cause of the test failure
N/A N/A
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
TAB B
Hydrotest Summary Report
TC Energy Standards, Specifications, and Procedures
Summary of Pipe Manufacturers
Summary of Piping, Welds and Valves Not Tested Following Installation
Schematic of Pressure Tested Facility
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 1 of 48
Leave to Open Hydrostatic Test Summary Report
Hydrostatic Test Details Test Number: Test Package No. STRIKEND2-2020S15 Description: High Pressure Gas System Module N-D-03 Spool Control Numbers: D3-011; D3-012; D3-023
Reference Drawings: 0635-01-C6-04-HG-0108-03_01 0635-01-C6-04-HG-0183-03_00
0635-01-C6-04-HG-0158-03_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-108-N C6-3-D1-HG-183-N
C6-2-D1-HG-158-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,032 kPa(g) Actual Maximum: 11,095 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: August 15, 2020 – 14:59 to 16:14 hours Test Ambient Temperature: 27.0 to 25.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 2 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S18 Description: High Pressure Gas System Module N-A-01 Spool Control Numbers:
A1-001; A1-002; A1-003; A1-004; A1-005; A1-006; A1-007; A1-008; A1-009; A1-010; A1-011; A1-012; A1-110; A1-111
Reference Drawings:
0635-01-C6-04-FG-0710-02_00 0635-01-C6-04-FG-0710-04_00 0635-01-C6-04-FG-0712-01_00 0635-01-C6-04-FG-0713-02_01 0635-01-C6-04-FG-0714-02_00 0635-01-C6-04-FG-0716-01_00 STDS-01-MS-03-603_01
0635-01-C6-04-FG-0710-03_01 0635-01-C6-04-FG-0711-01_00 0635-01-C6-04-FG-0713-01_00 0635-01-C6-04-FG-0714-01_00 0635-01-C6-04-FG-0715-01_01 0635-01-C6-04-FG-0716-02_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1-FG-710-N C6-2-D1-FG-712-N C6-4-D1-FG-714-N C6-4-D1-FG-716-N
C6-2-D1-FG-711-N C6-4-D1-FG-713-N C6-4-D1-FG-715-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II NPS 4 x 8.59mm WT, SCH 80, GR.359 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,684 kPa(g) Actual Maximum: 11,200 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: December 3, 2020 – 11:00 to 12:52 hours Test Ambient Temperature: -1.3 to 1.3 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 3 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S19 Description: Fuel Gas System Module N-A-01 Spool Control Numbers:
A1-013; A1-014; A1-015; A1-016; A1-017; A1-018; A1-019; A1-020; A1-021; A1-022; A1-023; A1-024; A1-025
Reference Drawings:
0635-01-C6-04-FG-0717-01_00 0635-01-C6-04-FG-0718-01_01 0635-01-C6-04-FG-0720-01_00 0635-01-C6-04-FG-0721-01_00 0635-01-C6-04-FG-0722-01_01
0635-01-C6-04-FG-0717-02_00 0635-01-C6-04-FG-0719-01_00 0635-01-C6-04-FG-0720-02_00 0635-01-C6-04-FG-0721-02_00 0635-01-C6-04-703_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1-FG-717-N C6-2-D1-FG-719-N C6-4-D1-FG-721-N
C6-4-D1-FG-718-N C6-4-D1-FG-720-N C6-4-D1-FG-722-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II Design Pressure: 6,274 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,684 kPa(g) Actual Maximum: 11,200 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: December 3, 2020 – 11:00 to 12:22 hours Test Ambient Temperature: -1.3 to 1.3 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 4 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA4-2020S20 Description: Fuel Gas System Module N-A-04 Spool Control Numbers: A4-015; A4-016; A4-046; A4-047;
Reference Drawings: 0635-01-C6-04-HG-0183-05_00 0635-01-C6-04-HG-0185-01_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-3-D1-HG-183-N
C6-2-D1-FG-185-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,932 kPa(g) Actual Maximum: 11,027 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 23, 2020 – 10:49 to 12:04 hours Test Ambient Temperature: 7.6 to 8.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 5 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S22 Description: HC System Module N-A-01 Spool Control Numbers: A1-087; A1-088; A1-089; A1-090; A1-091; A1-092; A1-093
Reference Drawings: 0635-01-C6-04-HC-0270-01_00 0635-01-C6-04-HC-0271-05_00 0635-01-C6-04-HC-0272-02_00
0635-01-C6-04-HC-0270-02_00 0635-01-C6-04-HC-0272-01_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-1-D1-HC-270-N C6-2-D1-HC-272-N
C6-1-D1-HC-271-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,684 kPa(g) Actual Maximum: 11,200 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: December 3, 2020 – 11:00 to 12:22 hours Test Ambient Temperature: -1.3 to 1.3 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 6 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S23 Description: GV System Module N-A-01 Spool Control Numbers: A1-025; A1-053; A1-054; A1-063; A1-064; A1-065; A1-066; A1-067
Reference Drawings: 0635-01-C6-04-GV-0217-01_00 0635-01-C6-04-GV-0220-01_01 0635-01-C6-04-GV-0222-01_01 0635-01-C6-04-FG-0722-01_01
0635-01-C6-04-GV-0219-01_00 0635-01-C6-04-GV-0221-01_00 0635-01-C6-04-GV-0222-02_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-3-A1-GV-217-N C6-6-A1-GV-220-N C6-3-A1-GV-222-N
C6-6-A1-GV-219-N C6-3-A1-GV-221-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 6 x 7.11mm WT, SCH 40, GR.359 CAT II Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 3,000 kPa(g) Actual Minimum: 2,723 kPa(g) Actual Maximum: 2,961 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 28, 2020 – 12:15 to 13:25 hours Test Ambient Temperature: -1 to -1.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 7 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S24 Description: GV System Module N-A-01 Spool Control Numbers: A1-057; A1-058; A1-059; A1-060; A1-061
Reference Drawings: 0635-01-C6-04-GV-0218-01_01 0635-01-C6-04-GV-0218-03_01
0635-01-C6-04-GV-0218-02_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-1-E1-GV-218-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,684 kPa(g) Actual Maximum: 11,200kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: December 3, 2020 – 11:00 to 12:22 hours Test Ambient Temperature: -1.3 to 1.3 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 8 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S25 Description: GV System Module N-A-01 Spool Control Numbers: A1-057; A1-058; A1-059; A1-060; A1-061
Reference Drawings: 0635-01-C6-04-GV-0229-03_01 0635-01-C6-04-GV-0230-03_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-2-SA62S-GV-229-N
C6-2-SA62S-GV-230-N
Pipe Data: NPS 2 x 3.91mm WT, SCH 40, A312-TP316/316L Design Pressure: 1,035 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 1,555 kPa(g) Theoretical Maximum: 1,855 kPa(g) Actual Minimum: 1,679 kPa(g) Actual Maximum: 1,714 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 31, 2020 – 11:00 to 12:22 hours Test Ambient Temperature: -1.3 to 1.3 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 9 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA1-2020S26 Description: GV System Module N-A-01 Spool Control Numbers: A1-078
Reference Drawings: 0635-01-C6-04-GV-0232-03_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-4-SA62S-GV-232-N
Pipe Data: NPS 4 x 6.02mm WT, SCH 40, A312-TP316/316L Design Pressure: 1,090 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 1,635 kPa(g) Theoretical Maximum: 2,335 kPa(g) Actual Minimum: 1,679 kPa(g) Actual Maximum: 1,714 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 31, 2020 – 14:03 to 15:13 hours Test Ambient Temperature: 20.1 to 19 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 10 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA5-2020S27 Description: GV System Module N-A-05 Spool Control Numbers: A1-081
Reference Drawings: 0635-01-C6-04-GV-0233-03_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-2-D1-GV-233-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 6,274 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 9,415 kPa(g) Theoretical Maximum: 9,715 kPa(g) Actual Minimum: 9,565 kPa(g) Actual Maximum: 9,673 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 27, 2020 – 12:10 to 13:36 hours Test Ambient Temperature: 15.1 to 16.5 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 11 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA2-2020S29 Description: GV System Module N-A-02 Spool Control Numbers: A2-005
Reference Drawings: 0635-01-C6-04-GV-0225-02_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-6-SA62S-GV-225-N
Pipe Data: NPS 6 x 7.11mm WT, SCH 40, A312-TP316/316L Design Pressure: 1,090 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 1,635 kPa(g) Theoretical Maximum: 2,335 kPa(g) Actual Minimum: 2,130 kPa(g) Actual Maximum: 2,252 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 15, 2020 – 13:51 to 15:07 hours Test Ambient Temperature: 7.7 to 8 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 12 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA3-2020S30 Description: Fuel Gas System Module N-A-03 Spool Control Numbers: A3-001; A3-002
Reference Drawings: 0635-01-C6-04-FG-0710-01_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1-FG-710-N
Pipe Data: NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,133 kPa(g) Actual Maximum: 11,181 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 15, 2020 – 15:15 to 16:20 hours Test Ambient Temperature: 9.1 to 9.8 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 13 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA3-2020S31 Description: HC System Module N-A-03 Spool Control Numbers: A3-008; A3-009
Reference Drawings: 0635-01-C6-04-HC-0272-03_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-2-D1-HC-272-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,133 kPa(g) Actual Maximum: 11,181 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 15, 2020 – 15:15 to 16:20 hours Test Ambient Temperature: 9.1 to 9.8 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 14 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA5-2020S38 Description: GV System Module N-A-05 Spool Control Numbers: A1-069
Reference Drawings: 0635-01-C6-04-GV-0224-03_00
TC Representative: Andy Lewis
Pipe Information:
Line Numbers: C6-3-A1-GV-224-N
Pipe Data: NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 3,000 kPa(g) Actual Minimum: 2,772.1 kPa(g) Actual Maximum: 2,915.5 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 28, 2020 – 11:47 to 13:04 hours Test Ambient Temperature: 18.8 to 17 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Andy Lewis (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 15 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENA4-2020S40 Description: GV System Module N-A-04 Spool Control Numbers: A4-008
Reference Drawings: 0635-01-C6-04-GV-0215-01_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-6-A1-GV-215-N
Pipe Data: NPS 6 x 7.11mm WT, SCH 40, GR.359 CAT II Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 3,000 kPa(g) Actual Minimum: 2,871.1 kPa(g) Actual Maximum: 2,987.6 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 23, 2020 – 14:46 to 16:01 hours Test Ambient Temperature: 24.2 to 21 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 16 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND1-2020S41 Description: HC/HG/UG System Module N-D-01 Spool Control Numbers: D1-001; D1-002; D1-007; D1-008; D1-009; D1-012; D1-013
Reference Drawings: 0635-01-C6-04-HC-0250-06_00 0635-01-C6-04-UG-0801-13_00
0635-01-C6-04-HG-0108-08_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-2-D1-HC-250-12E C6-2-D1-UG-801-N
C6-48-D1-HG-108-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,064 kPa(g) Actual Maximum: 11,162 kPa(g)
Test Medium: Water/Methanol Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 30, 2020 – 12:15 to 13:25 hours Test Ambient Temperature: 12.5 to 13.1 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 17 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND1-2020S42 Description: HG System Module N-D-01 Spool Control Numbers: D1-005; D1-006
Reference Drawings: 0635-01-C6-04-HG-0107-02_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-107-N
Pipe Data: NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,994 kPa(g) Actual Maximum: 11,171 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: September 28, 2020 – 15:10 to 16:20 hours Test Ambient Temperature: 18 to 20.4 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 18 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENE3-2020S44 Description: HG System Module N-E-03 Spool Control Numbers: E3-001; E3-002; E3-003; E3-004
Reference Drawings: 0635-01-C6-04-HG-0124-02_00 0635-01-C6-04-HG-0126-01_01
0635-01-C6-04-HG-0124-03_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-42-D1-HG-124-N
C6-2-D1-HG-126-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,002 kPa(g) Actual Maximum: 11,190 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 14, 2020 – 12:18 to 13:47 hours Test Ambient Temperature: 4 to 10 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 19 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENE1-2020S45 Description: HC System Module N-E-01 Spool Control Numbers: E1-001
Reference Drawings: 0635-01-C6-04-HC-0250-08_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-2-D1-HC-250-12E
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,044 kPa(g) Actual Maximum: 11,190 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 5, 2020 – 14:35 to 15:50 hours Test Ambient Temperature: 15.9 to 18.1 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 20 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENE1-2020S46 Description: HG System Module N-E-01 Spool Control Numbers: E1-005; E1-006
Reference Drawings: 0635-01-C6-04-HG-0108-09_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-108-N
Pipe Data: NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,784 kPa(g) Actual Maximum: 11,145 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 2, 2020 – 13:17 to 14:34 hours Test Ambient Temperature: 17.1 to 19.4 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 21 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENE1-2020S48 Description: HG System Module N-E-01 Spool Control Numbers: E1-002; E1-003; E1-007; E1-008
Reference Drawings: 0635-01-C6-04-HG-0106-06_01 0635-01-C6-04-HG-0109-03_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-106-N
C6-30-D1-HG-109-N
Pipe Data: NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,044 kPa(g) Actual Maximum: 11,190 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 5, 2020 – 14:35 to 15:50 hours Test Ambient Temperature: 15.9 to 18.1 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 22 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND1-2020S50 Description: HG System Module N-D-01 Spool Control Numbers: D1-010; D1-011
Reference Drawings: 0635-01-C6-04-HG-0109-02_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-30-D1-HG-109-N
Pipe Data: NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,023 kPa(g) Actual Maximum: 11,282 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 3, 2020 – 11:49 to 13:05 hours Test Ambient Temperature: 13.8 to 17.7 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 23 of 48
Test Number: Test Package No. STRIKENE2-2020S51 Description: High Pressure Utility Gas D1 Piping – On-module N-E-02 Spool Control Numbers:
E2-001; E2-002; E2-003; E2-006; E2-007; E2-008; E2-009
Reference Drawings:
0635-01-C6-04-UG-0801-09_00 0635-01-C6-04-UG-0805-05_00 0635-01-C6-04-HG-0106-05_00 0635-01-00-03-036_01
TC Representative: Daniel Hartwick
Pipe Information:
Line Numbers: C6-2-D1-UG-805-N C6-48-D1-HG-106-N Pipe Data: NPS 2 x 8.74mm WT, Sch 160, ATSM A333 Gr 6 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Mod. Design Pressure: 7100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,791 kPa(g) Actual Maximum: 11,080 kPa(g)
Test Medium: Water / Methanol 50/50 Test Location: Strike Whitecourt Fabrication Shop Test Date and Time: October 27, 2020 – 12:05 to 13:17 hours Test Ambient Temperature: 7.3 to 8.2 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Daniel Hartwick (TCE Representative) / Ted Fadish (Strike Representative)
Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 24 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENE2-2020S52 Description: HG System Module N-E-02
Spool Control Numbers: E2-004; E2-005
Reference Drawings: 0635-01-C6-04-HG-0108-10_01 0635-01-C6-04-HG-0129-01_00 0635-01-C6-04-HG-0131-01_00 0635-01-C6-04-HG-0133-01_00
0635-01-C6-04-HG-0108-11_00 0635-01-C6-04-HG-0130-01_00 0635-01-C6-04-HG-0132-01_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-48-D1-HG-108-N C6-16-D1-HG-130-N C6-16-D1-HG-132-N
C6-16-D1-HG-129-N C6-16-D1-HG-131-N C6-16-D1-HG-133-N
Pipe Data: NPS 16 x 7.10mm WT, SAW PIPE GR.414 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure: Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,880 kPa(g) Actual Maximum: 10,934 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 15, 2020 – 12:25 to 13:39 hours Test Ambient Temperature: 2.8 to 5.9 degrees C Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 25 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND2-2020S53 Description: HG System Module N-D-02 Spool Control Numbers: D2-003; D2-004
Reference Drawings: 0635-01-C6-04-HG-0107-03_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-107-N
Pipe Data: NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,828 kPa(g) Actual Maximum: 10,952 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 10, 2020 – 12:30 to 13:40 hours Test Ambient Temperature: -0.1 to -1.8 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 26 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND2-2020S54 Description: HC System Module N-D-02 Spool Control Numbers: D2-001; D2-002
Reference Drawings: 0635-01-C6-04-Hc-0250-04_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-2-D1-HC-250-12E
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,828 kPa(g) Actual Maximum: 10,952 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 10, 2020 – 12:30 to 13:40 hours Test Ambient Temperature: -0.1 to -1.8 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 27 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND2-2020S55 Description: HG System Module N-D-02 Spool Control Numbers:
D2-006; D2-007; D2-008; D2-009; D2-010; D2-012; D2-013; D2-014; D2-015; D2-016
Reference Drawings: 0635-01-C6-04-HG-0108-04_02 0635-01-C6-04-HG-0108-06_01 0635-01-C6-04-HG-0157-01_00 0635-01-C6-04-HG-0158-01_01
0635-01-C6-04-HG-0108-05_02 0635-01-C6-04-HG-0108-07_00 0635-01-C6-04-HG-0157-02_01 0635-01-C6-04-HG-0109-01_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-48-D1-HG-108-N C6-1-D1-HG-157-N
C6-30-D1-HG-109-N C6-2-D1-HG-158-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 1 ½ x 7.14mm WT, SCH 160, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 11,076 kPa(g) Actual Maximum: 11,084 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 3, 2020 – 14:15 to 15:25 hours Test Ambient Temperature: 9.6 to 9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 28 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND2-2020S56 Description: UG/HG System Module N-D-02 Spool Control Numbers: D2-011; D2-021; D2-022
Reference Drawings: 0635-01-C6-04-HG-0109-01_01 0635-01-C6-04-UG-0801-15_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-30-D1-HG-109-N
C6-2-D1-UG-801-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,784 kPa(g) Actual Maximum: 11,320 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 1, 2020 – 11:06 to 12:12 hours Test Ambient Temperature: 13.8 to 15 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 29 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND5-2020S58 Description: GV System Module N-D-05 Spool Control Numbers: D5-008
Reference Drawings: 0635-01-C6-04-GV-0200-01_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-A1-GV-200-N
Pipe Data: NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 3,000 kPa(g) Actual Minimum: 2,806 kPa(g) Actual Maximum: 2,931 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: October 28, 2020 – 11:17 to 12:30 hours Test Ambient Temperature: 22.8 to 23 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 30 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKEND5-2020S59 Description: FG/HC/HG System Module N-D-05
Spool Control Numbers:
D5-001; D5-002; D5-003; D5-004; D5-005; D5-006; D5-007; D5-009; D5-010; D5-011; D5-012; D5-013; D5-014; D5-015; D5-016; D5-017; D5-018; D5-019; D5-020, D5-022; D5-023; D5-024; D5-025; D5-026; D5-027; D5-028; D5-029; D5-031; D5-032; D5-033; D5-034; D5-036; C6-FG-MF-Y01; 1G032 (Y-Strainer)
Reference Drawings:
0635-01-C6-04-FG-0700-01_00 0635-01-C6-04-FG-0701-01_01 0635-01-C6-04-HC-0250-02_00 0635-01-C6-04-HC-0251-02_01 0635-01-C6-04-HC-0107-06_01 0635-01-C6-04-HC-0150-01_00 0635-01-C6-04-HC-0151-02_00 0635-01-C6-04-HC-0152-01_00 0635-01-C6-04-HC-0153-02_01 0635-01-C6-04-HC-0154-02_00 0635-01-C6-04-HC-0155-02_01 0635-01-C6-04-700_00
0635-01-C6-04-FG-0700-02_00 0635-01-C6-04-FG-0702-01_00 0635-01-C6-04-HC-0251-01_00 0635-01-C6-04-HC-0107-05_01 0635-01-C6-04-HC-0107-07_02 0635-01-C6-04-HC-0151-01_00 0635-01-C6-04-HC-0151-03_00 0635-01-C6-04-HC-0153-01_00 0635-01-C6-04-HC-0154-01_00 0635-01-C6-04-HC-0155-01_01 0635-01-C6-04-HC-0156-02_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1-FG-700-N C6-2-D1-FG-702-N C6-1-D1-HC-251-12E C6-48-D1-HG-107-N C6-4-D1-HG-151-N C6-2-D1-HG-153-N C6-1-D1-HG-155-N
C6-4-D1-FG-701-N C6-2-D1-HC-250-12E C6-2-D1-HG-150-N C6-3-D1-HG-152-N C6-3-D1-HG-154-N C6-3-D1-HG-156-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 1 ½ x 7.14mm WT, SCH 160, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,997 kPa(g) Actual Maximum: 11,009 kPa(g)
Test Medium: Water/Methanol 50/50 Mix Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: November 26, 2020 – 10:15 to 11:25 hours Test Ambient Temperature: -1.3 to -0.1 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 31 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB4-2021S62 Description: GV System Field Piping/N-A-01/N-A-02 Spool Control Numbers:
A1-073; A1-074; A1-076; A1-077; A1-079; A1-080; A2-006; A2-007; 000055; 000056; 000057; 000058; 000059; 000060; 000061; 000065
Reference Drawings:
0635-01-C6-04-GV-0225-01_01 0635-01-C6-04-GV-0225-04_01 0635-01-C6-04-GV-0226-02_01 0635-01-C6-04-GV-0229-02_01 0635-01-C6-04-GV-0229-05_01 0635-01-C6-04-GV-0230-02_01 0635-01-C6-04-GV-0230-05_01 0635-01-C6-04-GV-0232-04_01
0635-01-C6-04-GV-0225-03_01 0635-01-C6-04-GV-0226-01_01 0635-01-C6-04-GV-0229-01_01 0635-01-C6-04-GV-0229-04_01 0635-01-C6-04-GV-0230-01_01 0635-01-C6-04-GV-0230-04_01 0635-01-C6-04-GV-0232-02_01 0635-01-C6-04-GV-0232-05_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-6-SA62S-GV-225-N C6-2-SA62S-GV-229-N C6-4-SA62S-GV-232-N
C6-2-SA62S-GV-226-N C6-2-SA62S-GV-230-N
Pipe Data: NPS ½ x 3.73mm WT, SCH 80, A312-TP316/316L NPS 2 x 3.91mm WT, SCH 40, A312-TP316/316L NPS 4 x 6.02mm WT, SCH 40, A312-TP316/316L NPS 6 x 7.11mm WT, SCH 40, A312-TP316/316L Design Pressure: 1,035/1,090 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 1,635 kPa(g) Theoretical Maximum: 1,855 kPa(g) Actual Minimum: 1,738 kPa(g) Actual Maximum: 1,744 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: February 10, 2021 – 14:10 to 15:20 Test Ambient Temperature: 21.9 to 19.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Brent Adams (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 32 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB7-2021S64 Description: GV/HC System Field Piping/N-A-01/N-A-04 Spool Control Numbers:
A1-055; A1-056; A1-070; A1-071; A1-085; A1-086; A4-009; 052; 053; 054; 068; 069; 070; 071; 072; 073; 074; 075; 076; 077; 091
Reference Drawings:
0635-01-C6-04-GV-0201-01_01 0635-01-C6-04-GV-0203-01_00 0635-01-C6-04-GV-0205-01_00 0635-01-C6-04-GV-0207-01_00 0635-01-C6-04-GV-0209-01_00 0635-01-C6-04-GV-0212-01_00 0635-01-C6-04-GV-0217-02_00 0635-01-C6-04-GV-0224-01_00 0635-01-C6-04-GV-0224-04_00 0635-01-C6-04-GV-0234-01_00 0635-01-C6-04-HC-0252-02_01
0635-01-C6-04-GV-0202-01_00 0635-01-C6-04-GV-0204-01_00 0635-01-C6-04-GV-0206-01_00 0635-01-C6-04-GV-0208-01_00 0635-01-C6-04-GV-0211-01_00 0635-01-C6-04-GV-0215-02_00 0635-01-C6-04-GV-0217-03_00 0635-01-C6-04-GV-0224-02_00 0635-01-C6-04-GV-0224-05_00 0635-01-C6-04-GV-0234-02_00
TC Representative: Bernie Tabaka/Dan Hartwick
Pipe Information:
Line Numbers: C6-4-A1-GV-201-N C6-10-A1-GV-203-N C6-10-A1-GV-205-N C6-10-A1-GV-207-N C6-10-A1-GV-209-N C6-10-A1-GV-212-N C6-10-A1-GV-217-N C6-10-A1-GV-234-N
C6-10-A1-GV-202-N C6-10-A1-GV-204-N C6-10-A1-GV-206-N C6-10-A1-GV-208-N C6-10-A1-GV-211-N C6-10-A1-GV-215-N C6-10-A1-GV-224-N C6-4-A1-HC-252-12E
Pipe Data: NPS ½ x 3.73mm WT, SCH 80, ASTM A106B NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II NPS 6 x 7.11mm WT, SCH 40, GR.359 CAT II Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 2,900 kPa(g) Actual Minimum: 2,776 kPa(g) Actual Maximum: 2,791 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: February 23, 2021 – 12:22 to 13:32 Test Ambient Temperature: 12.0 to 14.0 degrees C
Fabricator/Contractor: Strike Group
Testing Supervisor: Bernie Tabaka/Dan Hartwick (TCE Representative) Justin Pierce/Ted Fadish (Strike Representative)
Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 33 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB8.5-2021S65 Description: FG System Field Piping Spool Control Numbers: 006; 007; 008; 009; 010; 011; 012; 241
Reference Drawings: 0635-01-C6-04-FG-0724-01_02 0635-01-C6-04-FG-0725-01_01
0635-01-C6-04-FG-0724-02_01 0635-01-C6-04-FG-0726-01_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1S-FG-724-N C6-1-D1S-FG-726-N
C6-1-D1S-FG-725-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, A312-TP316/316L NPS 2 x 5.54mm WT, SCH 80, A312-TP316/316L NPS 4 x 6.02mm WT, SCH 40, A312-TP316/316L Design Pressure: 6,274 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 9,415 kPa(g) Theoretical Maximum: 10,115 kPa(g) Actual Minimum: 9,610kPa(g) Actual Maximum: 9,680kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: January 24, 2021 - 15:28 to 16:38 Test Ambient Temperature: 16.5 to 20.7 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Brent Adams (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 34 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB8-2021S66 Description: FG/GV System Field Piping/N-A-01 Spool Control Numbers: A1-082; A1-083; A1-084; 002; 003; 004; 005; 066; 067
Reference Drawings: 0635-01-C6-04-FG-0721-03_00 0635-01-C6-04-FG-0721-05_00 0635-01-C6-04-GV-0233-01_00 0635-01-C6-04-GV-0233-04_00
0635-01-C6-04-FG-0721-04_00 0635-01-C6-04-FG-0723-01_01 0635-01-C6-04-GV-0233-02_00 0635-01-C6-04-GV-0233-05_00
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-4-D1-FG-721-N C6-2-D1-GV-233-N
C6-1-D1-FG-723-N
Pipe Data: NPS ½ x 3.73mm WT, SCH 80, ASTM A106B NPS 1 x 4.55mm WT, SCH 80, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II Design Pressure: 6,274 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 9,415 kPa(g) Theoretical Maximum: 9,715 kPa(g) Actual Minimum: 9,572 kPa(g) Actual Maximum: 9,630 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: January 20, 2021 – 13:53 to 15:03 hours Test Ambient Temperature: 19.0 to 19.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 35 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB9A-2021S67 Description: GV/HC/HG/UG System Field Piping/N-A-01/N-A-04/M-D-02/N-D-06
Spool Control Numbers:
A1-062; A4-017; D2-025; D2-026; D6-010; 078; 079; 080; 081; 082; 083; 084; 085; 086; 087; 093; 096; 102; 103; 104; 138; 209; 210; 211; 212; 213; 214; 215; 216; 217; 218; 219; 220; 221; 222; 223; 224; 225; 226; 227;
Reference Drawings:
0635-01-C6-04-GV-0218-04_01 0635-01-C6-04-HC-0250-03_00 0635-01-C6-04-HC-0250-07_00 0635-01-C6-04-HC-0271-01_01 0635-01-C6-04-HC-0271-03_00 0635-01-C6-04-HG-0150-02_00 0635-01-C6-04-HG-0158-04_01 0635-01-C6-04-HG-0182-02_00 0635-01-C6-04-HG-0184-02_01 0635-01-C6-04-UG-0801-02_00 0635-01-C6-04-UG-0801-04_00 0635-01-C6-04-UG-0801-06_00 0635-01-C6-04-UG-0801-08_00 0635-01-C6-04-UG-0801-12_00 0635-01-C6-04-UG-0801-16_00 0635-01-C6-04-UG-0801-20_00 0635-01-C6-04-UG-0805-02_00 0635-01-C6-04-UG-0805-04_00
0635-01-C6-04-HC-0250-01_01 0635-01-C6-04-HC-0250-01_00 0635-01-C6-04-HC-0250-09_00 0635-01-C6-04-HC-0271-02_00 0635-01-C6-04-HC-0271-04_00 0635-01-C6-04-HG-0158-02_01 0635-01-C6-04-HG-0182-01_00 0635-01-C6-04-HG-0182-03_00 0635-01-C6-04-HG-0185-02_00 0635-01-C6-04-UG-0801-03_00 0635-01-C6-04-UG-0801-05_00 0635-01-C6-04-UG-0801-07_00 0635-01-C6-04-UG-0801-10_00 0635-01-C6-04-UG-0801-14_00 0635-01-C6-04-UG-0801-17_00 0635-01-C6-04-UG-0803-02_00 0635-01-C6-04-UG-0805-03_00 0635-01-C6-04-UG-0807-02_00
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-3-D1-HG-152-N C6-2-D1-HG-182-N C6-2-D1-HG-185-N C6-2-D1-HC-250-12E C6-2-D1-UG-801-N C6-2-D1-UG-805-N
C6-2-D1-HG-158-N C6-2-D1-HG-184-N C6-1-E1-GV-218-N C6-1-D1-HC-271-N C6-2-D1-UG-803-N C6-2-D1-UG-807-N
Pipe Data: NPS 1-1/2 x 7.13mm WT, SCH 160, ASTM A106B NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,704 kPa(g) Actual Maximum: 10,870 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: February 21, 2021, 12:25 – 13:35 hours Test Ambient Temperature: 12.6 to 13.7 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 36 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB9B-2021S68 Description: FG/HC/HG System Field Piping/N-D-02 Spool Control Numbers:
D2-023; D2-024; 001; 088; 089; 090; 094; 095; 097; 098; 099; 100; 101; 133; 134; 239; 240
Reference Drawings:
0635-01-C6-04-FG-0700-03_00 0635-01-C6-04-HC-0252-01_00 0635-01-C6-04-HG-0135-01_02 0635-01-C6-04-HG-0156-01_00 0635-01-C6-04-HG-0180-02_01 0635-01-C6-04-HG-0183-01_01 0635-01-C6-04-HG-0183-04_00
0635-01-C6-04-HC-0250-09_00 0635-01-C6-04-HG-0134-01_02 0635-01-C6-04-HG-0152-02_00 0635-01-C6-04-HG-0180-01_00 0635-01-C6-04-HG-0180-03_00 0635-01-C6-04-HG-0183-02_01 0635-01-C6-04-HG-0184-01_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-16-D1-HG-134-N C6-3-D1-HG-152-N C6-3-D1-HG-180-N C6-2-D1-HG-184-N C6-4-D1-FG-700-N
C6-16-D1-HG-135-N C6-3-D1-HG-156-N C6-3-D1-HG-183-N C6-4-D1-HC-252-12E
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II NPS 8 x 8.18mm WT, SCH 40, GR.359 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,831 kPa(g) Actual Maximum: 10,837 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: February 22, 2021, 14:18 to 15:28 hours Test Ambient Temperature: 14.1 to 18.2 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 37 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB10-2021S69 Description: HG System Field Piping/N-D-01/N-D-02/N-D-05/N-E-01 Spool Control Numbers: D1-003; D1-004; D2-005; D5-021; E1-004; 119; 121
Reference Drawings: 0635-01-C6-04-HG-0106-07_01 0635-01-C6-04-HG-0107-04_01 0635-01-C6-04-HG-0107-10_00
0635-01-C6-04-HG-0107-01_01 0635-01-C6-04-HG-0107-08_00 0635-01-C6-04-HG-0108-04_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-48-D1-HG-106-N C6-48-D1-HG-108-N
C6-48-D1-HG-107-N
Pipe Data: NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,997 kPa(g) Actual Maximum: 10,999 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: January 26, 2021, 12:35 to 13:45 hours Test Ambient Temperature: 11.7 to 14.0 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 38 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB11-2021S70 Description: HG System Field Piping Spool Control Numbers: 106; 107; 108; 238
Reference Drawings: 0635-01-C6-04-HG-0186-01_01 0635-01-C6-04-HG-0186-03_01
0635-01-C6-04-HG-0186-02_01 0635-01-C6-04-HG-0186-04_01
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-1-SF6S-HG-186-N
Pipe Data: NPS 1 x 4.55mm WT, SCH 80, A312-TP316/316L Design Pressure: 15,000 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 22,500 kPa(g) Theoretical Maximum: 23,200 kPa(g) Actual Minimum: 22,823 kPa(g) Actual Maximum: 22,887 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: January 25, 2021 – 13:55 to 15:05 hours Test Ambient Temperature: 20.6 to 21.2 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Logan Dirk (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 39 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKENFAB13-2021S72 Description: GV System Field Piping Spool Control Numbers: CN A4-009
Reference Drawings: 0635-01-C6-04-GV-0215-02_02 0635-01-C6-05-200_02 0635-01-C6-02-004_03
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-6-A1-GV-215-N
Pipe Data: NPS 6 x 7.11mm WT, SCH 40, GR.359 CAT II Design Pressure: 1,800 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 2,700 kPa(g) Theoretical Maximum: 2,900 kPa(g) Actual Minimum: 2,755 kPa(g) Actual Maximum: 2,835 kPa(g)
Test Medium: Water Test Location: Strike Group Fabrication Shop, Whitecourt, AB Test Date and Time: March 2, 2021 – 14:00 to 15:10 hours Test Ambient Temperature: 17.0 to 20.0 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Ted Fadish (Strike Representative)
Comments: No leaks were observed throughout the duration of this test. GV-0215 re-tested after addition of pup and o’let
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 40 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKE-2021S76 Description: HG System Field Piping Spool Control Numbers: 130; 131; 132
Reference Drawings: 0635-01-C6-04-HG-0124-01 _00 0635-01-C6-05-100_01 0635-01-C6-02-003_02
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-42-D1-HG-124-N
Pipe Data: NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,978 kPa(g) Actual Maximum: 11,229 kPa(g)
Test Medium: Water / Methanol Test Location: Nordegg CS C6 Unit Addition Test Date and Time: March 24, 2021, 12:35 to 16:41 hours Test Ambient Temperature: 3.2 to 9.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Noel Harvey (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 41 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKE-2021S77 Description: HG System Field Piping – Compressor Discharge to Pipeline Spool Control Numbers:
124; 125; 126; 127; 128; 129; 235; F1-001; F1-002; F1-003; F1-004; F2-008; F2-009; F2-010; F2-012; F2-013; F2-014; F2-0015
Reference Drawings:
0635-01-C6-04-HG-0108-12_01 0635-01-C6-04-HG-0108-13_01 0635-01-C6-04-HG-0134-01_02 0635-01-C6-04-HG-0135-01_02 0635-01-C6-04-HG-0139-01_00 0635-01-C6-04-HG-0139-02_00 0635-01-C6-04-HG-0139-03_01 0635-01-C6-04-HG-0141-01_00 0635-01-C6-04-HG-0141-02_00
0635-01-C6-04-HG-0141-03_01 0635-01-C6-04-HG-0143-01_00 0635-01-C6-04-HG-0143-02_00 0635-01-C6-04-HG-0143-03_01 0635-01-C6-05-100_01 0635-01-C6-02-002_02 0635-01-C6-02-006_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-3-D1-HG-108-N C6-3-D1-HG-141-N C6-3-D1-HG-143-N C6-16-D1-HG-134-N
C6-16-D1-HG-135-N C6-16-D1-HG-139-N C6-42-D1-GP-144-N C6-48-D1-HG-108-N
Pipe Data: NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 16 x 7.10mm WT, SAW PIPE GR.414 CAT II NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,811 kPa(g) Actual Maximum: 11,123 kPa(g)
Test Medium: Water Test Location: Nordegg CS C6 Unit Addition Test Date and Time: April 20, 2021, 13:05 to 16:05 hours Test Ambient Temperature: 12.9 to 16.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Noel Harvey (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 42 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKE-2021S78 Description: HG System Field Piping – Compressor Suction to Pipeline Spool Control Numbers:
109; 110; 111; 112; 113; 114; 115; 116; 117; 118; F3-001; F3-002; F3-003; F3-004; F4-001; F4-002; F4-003; F4-004; F4-005; F4-006; F4-007 ;F4-008
Reference Drawings:
0635-01-C6-04-HG-0101-01_00 0635-01-C6-04-HG-0101-02_00 0635-01-C6-04-HG-0101-03_01 0635-01-C6-04-HG-0103-01_00 0635-01-C6-04-HG-0103-02_00 0635-01-C6-04-HG-0103-03_01 0635-01-C6-04-HG-0105-01_00 0635-01-C6-04-HG-0105-02_00
0635-01-C6-04-HG-0105-03_01 0635-01-C6-04-HG-0106-01_01 0635-01-C6-04-HG-0106-02_01 0635-01-C6-04-HG-0106-03_00 0635-01-C6-04-HG-0106-04_00 0635-01-C6-05-100_01 0635-01-C6-02-001_02 0635-01-C6--02-003_02
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-3-D1-HG-101-N C6-3-D1-HG-103-N C6-3-D1-HG-105-N C6-30-D1-GP-104-N
C6-42-D1-HG-100-N C6-42-D1-GP-102-N C6-48-D1-HG-106-N
Pipe Data: NPS 1-1/2 x 7.13mm WT, SCH 160, ASTM A106B NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,811 kPa(g) Actual Maximum: 11,123 kPa(g)
Test Medium: Water / Methanol Test Location: Nordegg CS C6 Unit Addition Test Date and Time: April 20, 2021, 13:05 to 16:05 hours Test Ambient Temperature: 12.9 to 16.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Noel Harvey (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 43 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKE-2021S89
Description: HG System – Interconnect Line Between Compressor Bldg Suction and C6-PV-2708
Spool Control Numbers: 101; 246
Reference Drawings: 0635-01-C6-04-HG-0180-03_00 0635-01-C6-04-HG-0188-01_00
0635-01-C6-05-101_02 0635-01-C6-02-004_03
TC Representative: Dan Hartwick
Pipe Information:
Line Numbers: C6-2-D1-HG-188-N C6-3-D1-HG-180-N
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,997 kPa(g) Actual Maximum: 10,999 kPa(g)
Test Medium: Water / Methanol Test Location: Nordegg CS C6 Unit Addition Test Date and Time: January 26, 2021, 12:35 to 13:45 hours Test Ambient Temperature: 11.7 to 14.0 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Dan Hartwick (TCE Representative) / Justin Pierce (Strike Representative) Comments: No leaks were observed throughout the duration of this test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 44 of 48
Hydrostatic Test Details Test Number: Test Package No. STRIKE-2021S90 Description: HC System – HC Line to the Drain Tank Spool Control Numbers: CN 088; CN 089
Reference Drawings: 0635-01-C6-04-HC-0252-01_00, 0635-01-C6-04-HC-0250-09_00
0635-01-C6-02-003_02 0635-01-C6-05-250_01
TC Representative: Bernie Tabaka
Pipe Information:
Line Numbers: C6-4-D1-HC-252-I2E
Pipe Data: NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II Design Pressure: 7,100 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 10,650 kPa(g) Theoretical Maximum: 11,350 kPa(g) Actual Minimum: 10,978 kPa(g) Actual Maximum: 11,229 kPa(g)
Test Medium: Water Test Location: Nordegg CS C6 Unit Addition Test Date and Time: March 24, 2021, 13:45 to 15:05 hours Test Ambient Temperature: 3.2 to 9.9 degrees C
Fabricator/Contractor: Strike Group Testing Supervisor: Bernie Tabaka (TCE Representative) / Noel Harvey (Strike Representative)
Comments: No leaks were observed throughout the duration of this test. HC-0252 re-tested after field modification for alignment
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 45 of 48
Hydrostatic Test Details Test Number: Test Package No. PEERLESS C6-HG-MS-Y01 (8258-1) Description: Scrubber and Drain Piping Spool Control Numbers:
8258-1; 8258-1U; 8258-1S; 8258-1R; 8258-1Q; 8258-1P; 8258-1N; 8258-1M; 8258-1L; 8258-1K; 8258-1J; 8258-1T; 8258-1B; 8258-1C
Reference Drawings: 8258-1; 8258-1U; 8258-1S; 8258-1R; 8258-1Q; 8258-1P; 8258-1N; 8258-1M; 8258-1L; 8258-1K; 8258-1J; 8258-1T; 8258-1B; 8258-1C
0635-01-C6-02-003_02
TC Representative: Dean Labbe (Velosi Third Party Inspector)
Pipe Information:
Line Numbers: N/A
Pipe Data: NPS 1/2 x 4.75mm WT, SCH 160, ASTM A333 GR.6 NPS 1 x 6.35mm WT, SCH 160, ASTM A333 GR.6 NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 NPS 4 x 8.56mm WT, SCH 80, ASTM A333 GR.6 Design Pressure: 7,100/9,560 kPa(g)
Test Achieved Pressure:
Theoretical Minimum: 15,040 kPa(g) Theoretical Maximum: 15,175 kPa(g) Actual Minimum: 15,058 kPa(g) Actual Maximum: 15,175 kPa(g)
Test Medium: Water Test Location: Braeside Fabricators, Calgary Alberta Test Date and Time: September 28, 2020, 08:15 to 12:45 hours Test Ambient Temperature: 24 to 26 degrees C
Fabricator/Contractor: Braeside Fabricators Testing Supervisor: Dean Labbe (TCE Representative) / (Braeside Representative) Comments:
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 46 of 48
Hydrostatic Test Details
Test Number: MICROWATT C6-FE-3021
Description: Unit C6 NPS 2 Fuel Gas meter C6-FE-3021 – Factory Pressure Test
Spool Control Numbers: N/A
Reference Drawings: 0635-01-C6-02-101_02 0635-01-C6-04-FG-0710-03_01
TC Energy Representative:
-
Pipe Information: Line Numbers: C6-1-D1-FG-710-N
Valve Data: NPS 2, PN100, Flow meter
Design Pressure: 9998 kPa(g)
Test Pressure: 14997 kPa(g)
Test Achieved Pressure: 14997 kPa(g)
Test Medium: Water
Test Location: -
Test Date and Time: October 15, 2020; 1 hour
Test Ambient Temperature: - deg C
Fabricator/Contractor: Yokogawa
Testing Supervisor: D Cheaves (Yokogawa) / Doug Wall (Microwatt Quality Representative)
Comments: 1 hour
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 47 of 48
Hydrostatic Test Details
Test Number: Test for Valve Serial Number F002442652
Description: Unit C6 NPS 30 Hot Recycle Valve C6-FBV-2800 – Factory Valve Test
Spool Control Numbers: N/A (Factory Valve Test)
Reference Drawings: 0635-01-C6-02-004_03 0635-01-C6-04-HG-0109-01_01
TC Energy Representative:
E. Robert Fraser (Velosi Third Party Inspector)
Pipe Information: Line Numbers: C6-30-D1-HG-109-N
Valve Data: NPS 30, PN100, Globe Valve
Design Pressure: 10,343 kPa(g)
Test Pressure: 15,513 kPa(g)
Test Achieved Pressure: 15,513 kPa(g)
Test Medium: Water
Test Location: Spartan Shop
Test Date and Time: September 8, 2020 – 08:50 to 13:02 hours
Test Ambient Temperature: 21.7 – 22.3 deg C
Fabricator/Contractor: Spartan Controls
Testing Supervisor: Dixie Crompton (Spartan) / E. Robert Fraser (Velosi)
Comments: No leak on Hydrostatic Test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021 Page 48 of 48
Hydrostatic Test Details
Test Number: Test for Valve Serial Number F002440969
Description: Unit C6 NPS 3 Compressor Vent Valve C6-FBV-2709 – Factory Valve Test
Spool Control Numbers: N/A (Factory Valve Test)
Reference Drawings: 0635-01-C6-02-004_03 0635-01-C6-04-HG-0183-05_00
TC Energy Representative:
E. Robert Fraser (Velosi Third Party Inspector)
Pipe Information: Line Numbers: C6-3-D1-HG-183-N
Valve Data: NPS 3, PN100, Control Valve
Design Pressure: 10,343 kPa(g)
Test Pressure: 15,513 kPa(g)
Test Achieved Pressure: 15,513 kPa(g)
Test Medium: Water
Test Location: Spartan Shop
Test Date and Time: February 6, 2020 – 19:36 to 20:37 hours
Test Ambient Temperature: 21.9 – 22.2 deg C
Fabricator/Contractor: Spartan Controls
Testing Supervisor: Bill McFarland (Spartan) / E. Robert Fraser (Velosi)
Comments: No leak on Hydrostatic Test.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (As Amended) Application for Leave to Open Nordegg CS
May 2021 Page 1 of 1
Standards and Specifications List
Name EDMS No. TEN-CP-BUILD-GL Corrosion Prevention Construction Standard (CAN-US-MEX) 1003439376 TEN-CP-DESGN-GL TEN Corrosion Prevention Design (CAN-US-MEX) 1003455877 TEN-MATL Materials Standard 1001755803 TEN-ME-HGCS-G Compressor Station High Pressure Gas Piping Design Standard (CAN US MEX) 1006335523
TEN-ME-OPPCS-G Compressor Station OPP Standard (CAN-US-MEX) 1006158290 TEN-NDT NDT Standard (CDN-US-MEX) 1001828336 TEN-PRES Pressure Testing Standard (CDN) 1001810598 TES-CO-EPU-GL Field-Applied External Liquid Coating Systems for Steel Pipe Specification (CAN-US-MEX) 3671710
TES-CO-FBE-GL External Fusion Bond Epoxy For Steel Pipe Specification (CAN-US-MEX) 3670892 TES-CO-PAINT-GL Paint Systems For Above Ground Facilities (Coastal And Non-Coastal) Specification (CAN-US-MEX) 3694704 TES-CT-EXC-GLE Excavation Specification (CDN-US-MEX) 5890120 TES-FITG-CIF Contoured Insert Fittings Specification (CDN-US-MEX) 4424021 TES-FITG-EC1 End Closures Specification (CDN-US-MEX) 3779256 TES-MA-EWPI-GL Electric-Welded Pipe Specification (CAN-US-MEX) 3670788 TES-MA-FITG-GL Carbon Steel Butt-Welding Fittings Specification (CAN-US-MEX) 3671270 TES-MA-FLGEC-GL Carbon Steel Butt-Welding Flanges Specification (CAN) 3671966 TES-MA-SAWPI-GL Double Submerged Arc Welded Pipe Specification (CAN-US-MEX) 3776714 TES-MATL-COMP Materials Requirements of Pressure Containing Equipment Components Specification (CAN-US-MEX) 8071725
TES-MATL-MD1 Piping System Materials for Pipeline, Compression and Metering Facilities (CDN-US-MEX) 3764909 TES-MA-VALV-G Steel Valves for Gas Service Specification (CAN-US-MEX) 1001891682 TES-ME-CV-GL Control Valve Equipment and Design Specification (CAN-US-MEX) 1001969647 TES-ME-PV1-GLE Pressure Vessels Specification (CAN-US-MEX) 6406 TES-ME-STRCO-G Pipe Stress Engineering Analysis and Design of Compressor Stations (CAN-US-MEX) 7697565
TES-NDT-RT Radiographic Examination of Welds Specification (CDN) 3671368 TES-WELD-PL Welding of Pipelines and Tie-ins Specification (CDN) 3670960 TES-WL-AS-GL Welding of Assemblies and Station Piping Specification (CAN) 3670962
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (As Amended) Application for Leave to Open Nordegg CS
May 2021
Page 1 of 2
Summary of Pipe Manufacturers
Pipe Size Pipe Description Pipe Heat No. Pipe Manufacturer
NPS ½ NPS ½ x 3.73mm WT, SCH 80, ASTM A106B 607182 BENTELER
NPS ½ NPS ½ x 3.73mm WT, SCH 80, ASTM A106B 617308 BENTELER
NPS ½ NPS ½ x 3.73mm WT, SCH 80, A312-TP316/316L 130508D02 CHANGSHU WALSIN
NPS 1 NPS 1 x 4.55mm WT, SCH 80, ASTM A106B 618591 BENTELER NPS 1 NPS 1 x 4.55mm WT, SCH 80, A312-TP316/316L 11U730 CHANGSHU
WALSIN
NPS 1 ½ NPS 1 ½ x 7.14mm WT, SCH 160, ASTM A106B 179084 VALLOUREC
NPS 1 ½ NPS 1 ½ x 7.14mm WT, SCH 160, ASTM A106B 619103 BENTELER
NPS 2 NPS 2 x 5.54mm WT, SCH 80, A312-TP316/316L 11V382 CHANGSHU WALSIN
NPS 2 NPS 2 x 3.91mm WT, SCH 40, A312-TP316/316L F727142 NSSMC NPS 2 NPS 2 x 3.91mm WT, SCH 40, A312-TP316/316L F727143 NSSMC NPS 2 NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 182281 VALLOUREC NPS 2 NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 11914 TENARIS NPS 2 NPS 2 x 8.74mm WT, SCH 160, ASTM A333 GR.6 11915 TENARIS NPS 3 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 48666 TENARIS NPS 3 NPS 3 x 5.49mm WT, SCH 40, ASTM A333 GR.6 144837 VALLOUREC NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 144837 VALLOUREC NPS 4 NPS 4 x 6.02mm WT, SCH 40, A312-TP316/316L 11V381 CHANGSHU
WALSIN NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 96804 TENARIS NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 92426 TENARIS NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 61F08014 THAI BENKAN
NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 49004 VALLOUREC
NPS 4 NPS 4 x 8.59mm WT, SCH 80, GR.359 CAT II 181837 TENARIS
NPS 4 NPS 4 x 6.02mm WT, SCH 40, ASTM A333 GR.6 183244 VALLOUREC
NPS 4 NPS 4 x 6.02mm WT, SCH 40, GR.359 CAT II 182281 VALLOUREC
NPS 6 NPS 6 x 7.11mm WT, SCH 40, A312-TP316/316L 11V778 CHANGSHU WALSIN
NPS 6 NPS 6 x 7.11mm WT, SCH 40, GR.359 CAT II 181281 VALLOUREC
NPS 12 NPS 12 x 10.31mm WT, SCH 40, GR.359 CAT II 96510 TENARIS NPS 12 NPS 12 x 10.31mm WT, SCH 40, GR.359 CAT II 97015 TENARIS NPS 16 NPS 16 x 7.10mm WT, SAW PIPE GR.414 CAT II ZZ1633 NPS 30 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II G01354 NIPPON STEEL
CORP NPS 30 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II G01355 NIPPON STEEL
CORP
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (As Amended) Application for Leave to Open Nordegg CS
May 2021
Page 2 of 2
NPS 30 NPS 30 x 11.40mm WT, SAW PIPE GR.483 CAT II G01356 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G07311 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G08190 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G17840 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G01207 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G01206 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G00440 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II G00438 NIPPON STEEL CORP
NPS 42 NPS 42 x 26.20mm WT, SAW PIPE GR.483 CAT II 9212426 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211423 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211426 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211427 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211433 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211435 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211501 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211515 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211517 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211521 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211522 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9211530 NIPPON STEEL CORP
NPS 48 NPS 48 x 26.20mm WT, SAW PIPE GR.483 CAT II 9212023 NIPPON STEEL CORP
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021
Page 1 of 2
Summary of Piping, Welds, and Valves Not Tested Following Installation
For a summary of piping, welds and valves not subject to pressure testing following installation, please see below. There was no non-pressure tested welds associated with this LTO Application.
Summary of Piping, Welds and Valves Not Subjected to a Pressure Test Following Installation and Justification for Not Pressure Testing
Item Rationale Control Valve C6-FBV-2800 (Unit C6 Hot Recycle Valve)
Item has been shop (Manufacturer) tested in test “Spartan_C6-FBV-2800” and a field hydrotest is considered redundant to the shop test as it will not provide additional information. Due to the sensitivity and complexity of the item/assembly, a field hydrotest would negatively affect the devices, components calibration or damage to the components. No modifications were made to the assembly and/or single item after testing was completed.
Control Valve C6-FBV-2709 (Unit C6 Vent Valve)
Item has been shop (Manufacturer) tested in test “Spartan_C6-FBV-2709” and a field hydrotest is considered redundant to the shop test as it will not provide additional information. Due to the sensitivity and complexity of the item/assembly, a field hydrotest would negatively affect the devices, components calibration or damage to the components. No modifications were made to the assembly and/or single item after testing was completed.
Untested Spacer Rings: SN:4500284822/12/2 ISO:0635-01-00-04-GP-0104-03 SN:4500284822/1/4 ISO:0635-01-00-04-GP-0100-03 SN:4500284822/12/1 ISO:0635-01-00-04-GP-0138-01 SN:4500284822/1/3 ISO:0635-01-00-04-GP-0140-01 SN:4500284822/1/2 ISO:0635-01-00-04-GP-0142-01 SN:4500296169/2/2 ISO:0635-01-C6-04-HG-0106-04 SN: 4500284822/12/4 ISO: 0635-01-C6-04-HG-0109-01 SN:4500296169/2/1 ISO:0635-01-C6-04-HG-0108-12
Testing of this item has been accounted for in the calculation and/or burst design of the product. The component carries a pressure rating established through applicable CSA, API, ASME/ANSI standards, Manufacturers Standardization Society of the Valve and Fittings Industry, Inc. (MSS) or by pressure design requirements as described in 4.3.12.1 of CSA Z662.
NOVA Gas Transmission Ltd. 2021 NGTL System Expansion Project
Order XG-001-2020 (as amended) Application for Leave to Open Nordegg CS
May 2021
Page 2 of 2
Item Rationale PSV list C6-PSV-0050 C6-PSV-0061 C6-PSV-0062 C6-PSV-0063 C6-PSV-0064 C6-PSV-0065 C6-PSV-3004 C6-PSV-3019 C6-PSV-3017 C6-PSV-3021 C6-PSV-3027 C6-PSV-3029 C6-PCV-3013 C6-PCV-3015
Engineering Assessment as per CSA Z662_2019 Clause 8.1.7
Restriction Orifice C6-FO-2709
Testing of this instrumentation related item has been accounted for in the calculation and/or burst design of the product. The component carries a pressure rating established through applicable CSA, API, ASME/ANSI standards, Manufacturers Standardization Society of the Valve and Fittings Industry, Inc. (MSS) or by pressure design requirements as described in 4.3.12.1 of CSA Z662.
Field Fit Piping - within test packs: STRIKE_2021S25 STRIKE_2021S26 STRIKE_2021S62 STRIKE_2021S64 STRIKE_2021S65 STRIKE_2021S66 STRIKE_2021S67 STRIKE_2021S68 STRIKE_2021S69 STRIKE_2021S70 STRIKE_2021S72 STRIKE_2021S76 STRIKE_2021S90
Piping has been shop tested and a field hydrotest after installation would not provide additional information. No modifications were made to the assembly and/or single item after testing was completed. This piping is field fit piping. It connects the piping modules used to assemble the majority segment of this Project.
Fuel Gas Meter C6-FE-3021 Item has been shop (Manufacturer) tested in test “Microwatt Yokogawa_C6-FE-3021” and a field hydrotest is considered redundant to the shop test as it will not provide additional information. Due to the sensitivity and complexity of the item/assembly, a field hydrotest would negatively affect the devices, components calibration or damage to the components. No modifications were made to the assembly and/or single item after testing was completed.
STRIKE GROUPRECEIVED
MAY 15, 2020
N-F-04
N-F-04
N-F-03
N-F-03
N-F-04 N-F-04TEST PACK STRIKEFAB9A_2021S67
STRIKE_2021S78
STRIKE_2021S73
STRIKE_2021S75
STRIKE_2021S74
STRIKE_2021S78
STRIKE_2021S78
STRIKE_2021S78
Included in testDouble faced blindsSN: 4500284822/11/1Spacer rings untested to be installedSN:4500284822/12/2ISO:0635-01-00-04-GP-0104-03
Included in testDouble faced blindsSN: 4500284822/2/3Spacer rings untested to be installedSN:4500284822/1/4ISO:0635-01-00-04-GP-0100-03
Included in testDouble faced blindsSN: 4500284822/2/1Spacer rings tested with STRIKENE3_2020S44SN:4500284822/8/1ISO:0635-01-00-04-GP-0102-03
The piping in the following tests are covered under Exemption Orders XG-001-2020 and AO-001-XG-001-2020:
STRIKE_2021S73 STRIKE_2021S74 STRIKE_2021S75
STRIKE GROUPRECEIVED
MAY 15, 2020
N-F-01
N-F-01
N-F-02 N-F-02
N-F-02
N-F-02
N-E-02
STRIKE_2021S77
STRIKENF1-2-3-4_2020S37
STRIKENE2_2020S51STRIKEFAB9A_2021S67
STRIKE_2021S77
STRIKE_2021S77
STRIKE_2021S77
STRIKE_2021S77
STRIKE_2021S73
STRIKE_2021S74
STR
IKEN
F2_2
020S
61
STRIKE_2021S75
STR
IKEN
F2_2
020S
61
STRIKE_2021S91
STRIKE_2021S91
Included in testDouble faced blindsSN: 4500284822/2/2Spacer rings untested to be installedSN:4500284822/1/3ISO:0635-01-00-04-GP-0140-01
Included in testDouble faced blindsSN: 4500284822/10/1Spacer rings untested to be installedSN:4500284822/1/2ISO:0635-01-00-04-GP-0142-01
Included in testDouble faced blindsSN: 4500284822/4/1Spacer rings untested to be installedSN:4500284822/12/1ISO:0635-01-00-04-GP-0138-01
STRIKE_2020S61
The piping in the following tests are covered under Exemption Orders XG-001-2020 and AO-001-XG-001-2020:
STRIKE_2021S73 STRIKE_2021S74STRIKE_2021S75
STRIKE GROUPRECEIVED
MARCH 31, 2020
1
1 00798-STR-DM-RFI-0232
RL_05
2
2 00798-STR-DM-RFI-0198
Vessel and bridle insulation revised per vendor drawings50 50
Y02 3
00798-STR-DM-RFI-02903
1/2 1/23 3
STRIKE GROUPRECEIVED
MARCH 31, 2020
N-D-01N-D-01 Mod N-D-1 STRIKEND1 - 2020S42
Mod N-D-1 STRIKEND1 - 2020S50
Mod N-E-1 STRIKENE1 - 2020S48
Mod N-E-2 STRIKENE2 - 2020S51
Mod N-D-2 STRIKEND2 - 2020S53
N-E-
01
N-D-01N-D-01N-
E-01
N-E-
01
N-E-2
N-D-
02
STRIKEFAB10-2021S69
STRIKEFAB7_2020S64
STRIKEFAB10_2021S69
STRIKEFAB7-2021S64
STR
IKEF
AB7_
2021
S64
STRIKEFAB9A-2021S67
STRIKEFAB9A_2021S67
STRIKEFAB9B_2021S68
STRIKEFAB9B-2020S68STRIKE_2021S76STRIKE_2021S78
1 1/2"
STRIKEND1_2020S50
STRIKEFAB10_2021S69STRIKEFAB10_2021S69
STRIKEND1_2020S48 STRIKEND1_2020S42
STRIKE_2021S76
STRIKE_2021S78
STRIKE_2021S90
STRIKE_2021S90
Included in testDouble faced blindsSN: 4500296169/3/1Spacer rings untested to be installedSN:4500296169/2/2ISO:0635-01-C6-04-HG-0106-04
UntestedSpacer ringsSN: 4500284822/12/40635-01-C6-04-HG-0109-01
PEERLESS C6-HG-MS-Y01 (8258-1)
³
STRIKE GROUPRECEIVED
OCTOBER 30, 2020
1-D1T1"
RL_03
C6ZSC2708
C6ZSO2708
C6-2-D1-HG-187-N2"
NO
3x2
C6PV
2708
C6FN
2708
2x3/4
2x1
2x1FC
C6-
2-D
1-H
G-1
88-N
PRESSURIZATION
1/2-D1T
1/2"
3X2
NO2"
C6FO
2708 1/2-D1T
BAROMETRIC DAMPER(PROVIDE BY SITE
CONTRACTOR)
PSV SHALL BE VENTED TO A SAFE LOCATION5
TEST PACK STRIKEFAB9B-2021S68
X
X
00798-STR-DM-RFI-0179
00798-STR-DM-RFI-01781
2
2
00798-STR-DM-RFI-0123
3
1
1
1
3
33
33
3
3
4
4
13
13
4 00798-STR-DM-RFI-024800798-TC-Z-DCN-0040500798-TC-M-DCN-00546
6
5
5
1" 1"
3"x1" 3"x1"
7 AS PER ISOMETRIC
7
333
STRIKEFAB9A_2021S67
STRIKEFAB9A_2021S67
STRIKEFAB9A_2021S67
STRI
KEFA
B9A_
2021
S67
STRI
KEFA
B9A_
2021
S67
STRI
KEFA
B9A_
2021
S67
STRIKEFAB7_2021S64
STRI
KEFA
B7_2
021S
72
STRIKENA4_2020S40
STRI
KENA
4_20
20S4
0
STRIKENA4_2020S20
STRIKENA4_2020S20 STRIKENA4_2020S20
STRIKEND2_2020S55STRIKEND2_2020S56
STRIKEND2_2020S55
STRIKEND2_2020S56
STRIKEND2_2021S57
STRIKEFAB9B_2021S68
STRIKEFAB9B_2021S68
STRIKEFAB9B_2021S68
STRIKEFAB9B_2021S68
"
STRIKEFAB9B_2021S68
STRIKEFAB9B_2021S68
STRIKEND3_2020S15
STRIKEND3_2020S15
STRIKEND3_2020S15
STRIKEND5_2020S59
212
STRIKE_2021S79
STRIKEFAB10_2021S69
STRIKEFAB10_2021S69
STRIKEFAB10_2021S69
STRIKEFAB10_2021S69
STRIKEFAB10_2021S69
STRIKEFAB10_2021S69
STRIKE_2021S80
STRIKE_2021S80STRIKE_2021S80
STRIKE_2021S80
STRIKE_2021S89
Included in testSpacer ringSN: 4500284822/12/50635-01-C6-04-HG-0109-01
Included in testSpacer ringSN: 4500284822/12/30635-01-C6-04-HG-0109-01
Tested Spec BlindHT: DZV0635-01-C6-04-HG-0154-01
Tested Spec BlindHT: DZV0635-01-C6-04-HG-0153-01
Tested Spec BlindHT: DZV0635-01-C6-04-HG-0184-01
Test"SPARTAN_C6-FBV-2709"
Test"SPARTAN_C6-FBV-2800"
The piping in the following tests will be covered in the final LTO Application:
STRIKE_2021S79STRIKE_2021S80STRIKE_2021S89
STRIKEFAB10_2021S72STRIKE_2021S89
SS
STRIKE GROUPRECEIVED
MARCH 31, 2020
1
00798-STR-DM-RFI-01791
RL_02
2
2 00798-STR-DM-RFI-0199
STRIKENE3_2020S44STRIKENE1_2020S46
STRI
KENE
3_20
20S4
4
STRI
KENE
1_20
20S4
6
STRIKEND1_2020S41
STRIKEND1_2020S41
Tested Spacer Ring untested installedSN:4500284822/1/1ISO:0635-01-C6-04-HG-0124-02
STRIKE GROUPRECEIVED
MARCH 31, 2020
N-E-
02
N-E-02
N-E-
02
N-E-
02
N-E-
02
N-E-
02
N-E-02
11
1
STRIKE_2021S77
00798-STR-DM-RFI-0001
STRIKEFAB9_2021S68
STRIKEFAB9_2021S68
STRIKEFAB9_2021S68
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
STRIKENE2_2020S52
RL_01
Included in testDouble faced blindsSN: 4500296169/3/2Spacer ring untested to be installedSN:4500296169/2/1ISO:0635-01-C6-04-HG-0108-12
STRIKE GROUPRECEIVED
MARCH 31, 2020
1
00798-STR-DM-RFI-01791
RL_01
STRIKEND5_2020S58 STRIKEND5_2020S59
STRIKEND5_2020S59
STRIKEND5_2020S59
STRIKEND5_2020S59
STRIKEND5_2020S58
STRIKEND2_2020S54
STRIKEND2_2020S54
STRIKEFAB9A_2021S67 STRIKEFAB9A_2021S67
STRIKENE1_2020S45
STRIKEFAB9A_2021S67
STRIKEFAB9A_2021S67
STRIKENE1_2020S45
STRIKEFAB9A_2021S67
STRIKEFAB9A_2021S67
STRIKEND1_2020S41
STRIKEND1_2020S41
STRIKE GROUPRECEIVED
MAY 15, 2020
1
22
BA-1
1
1/2"
4
3
00798-STR-DM-RFI-0207
00798-STR-DM-RFI-017900798-STR-DM-RFI-0194
1
2
00798-STR-DM-RFI-01963
NE-
14
NE-
14
C6PI
3013
NE-
14
NO
1/2"
NE-
14
NE-
14
C6PI
3015
NE-
14
NO
1/2"
4
4
4
44
4
N-A-01
N-A-01
N-A-01
N-A-
01
N-A-
01
N-A-
01
NO
N-A-01
N-A-01
N-A-01
N-A-01NO
N-A-01
N-A-
01
N-A-
01
N-A-01
N-A-01
STRIKEFAB7_2021S64
STRIKEFAB7-2021S64
STR
IKEF
AB9B
_202
1S68
STRIKEFAB9B-2021S68
STR
IKEN
A3_2
020S
30
RL_01
STRIKENA1_2020S18STRIKENA1_2020S19
1
STRIKENA1_2020S23STRIKENA1_2020S24STRIKENA1_2020S30
Tested "Microwatt Yokogawa_C6-FE-3021"
The Auxiliary piping is coveredunder Exemption Orders XG-001-2020 andAO-001-XG-001-2020.
N-A-
01
N-A-
01
N-A-
01
N-A-
01
N-A-
01
N-A-
01 N-A-
01
N-A-
01
N-A-01
N-A-
03
N-A-
03
N-A-01
N-A-
01
N-A-01
N-A-
01
N-A-01N-A-
01
N-A-
01
N-A-
01N
N
N-A-01N-A-01
N-A-
01
N-A-01
VALVE BODY BLEEDS IN GAS PIPING ARE NOT REQUIRED TO BE VENTED OUTSIDE.
00798-STR-DM-RFI-017200798-STR-DM-RFI-0179
1
1
2
00798-STR-DM-RFI-01673
2
BA-92
3
N-A-
05
N-A-
05N-A-
01
44
4 00798-STR-DM-RFI-0168
41/2"
1/2"1/2"
1/2"4
1/2"
4
STRIKEFAB8.5_2021S65
STRIKEFAB8_2021S66
N-A-
05
N-A-
05
STRIKEFAB7_2021S64
STRIKEFAB7_2021S64
1
TEST PACK STRIKEFAB9A_2021S68
STRIKEFAB9B-2021S68
STRIKENA1-2020S23
STRIKENA1-2020S22
STRIKEFAB8-2021S66 STRIKEFAB8.5-2021S65
STRIKEFAB7-2021S64
STRIKENA1-2020S19
TEST PACK STRIKEFAB9B_2021S68
STRIKEFAB9A-2021S67
RL_01
STRIKEFAB7_2021S64
test of bleedring to beprovided infinal LTO
The Auxiliary piping is covered underExemption Orders XG-001-2020 and AO-001-XG-001-2020.
Field
Pipin
g
N-A
-04
Field
Pipin
g
N-A-04
N-A-02
N-A-02
N-A
-04
Field
Pipin
g N
-A-0
4
N-A
-04
Field
Pipin
g
N-A-04Field Piping
Field
Pipin
g N
-A-0
4
N-A-04 N-A-04
Mod N-A-2 STRIKENA2 - 2020S29
Shop STRIKEFAB4 - 2021S62
STRIKEFAB4_202S01
STR
IKEF
AB4_
2021
S62
STRIKEFAB4_2021S62
The Auxiliary piping is covered under Exemption Orders XG-001-2020 and AO-001-XG-001-2020.(lines highlighted here are vents, labelled "GV," off auxiliary pipingsystems but are included in this LTO because all "GV", ie gas ventpiping is included)
N-A
-04
N-A
-04
N-A
-04
N-A
-04
N-A-04
N-A-04
N-A
-04
N-A
-04
Mod N-A-1 STRIKENA1 - 2020S25
Mod N-A-1 STRIKENA1 - 2020S26
Mod N-A-5 STRIKENA5 - 2020S27
N-A-05
N-A-05
N-A
-01 N-A
-01
N-A
-01
N-A
-01
N-A
-01
N-A
-01
FIELD STRIKEFAB4-2021S62
STR
IKEF
AB4_
2021
S62
STR
IKEF
AB8.
5_20
21S6
5
FIELD STRIKEFAB8.5-2021S65
FIELD STRIKEFAB8-2021S66
STRIKEFAB8_2021S66
FIELD STRIKEFAB11-2021S70
STR
IKEF
AB11
_202
1S7
0
STR
IKEF
AB4_
2021
S62
STR
IKEF
AB4_
2021
S62
STR
IKEF
AB4_
2021
S62
STR
IKEF
AB4_
2021
S62
STRIKEFAB8_2021S66
STR
IKEF
AB8.
5_20
21S6
5
STRIKEFAB8.5_2021S65
The Auxiliary piping is covered underExemption Orders XG-001-2020 and AO-001-XG-001-2020.