Canadian Division | CUTBANK RIDGE & BIGHORN Mike McAllister, Vice-President, Canadian Deep Basin Business Unit The New Encana: the clear energy choice

Transcript of Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep...

Page 1: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

Canadian Division | CUTBANK RIDGE & BIGHORNMike McAllister, Vice-President, Canadian Deep Basin Business Unit

The New Encana:the clear energy choice

Page 2: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Canadian Deep Basin

Page 3: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

• ~1,800 producing wells

• 3,754 km of pipelines

• ~630 MMcf/d processing capacity

Canadian Deep BasinOverview

Land holdings• ~1,872,000 net acres • 2,925 net sections

0

100

200

300

400

500

600

2004 2005 2006 2007 2008 2009 2010F

Cutbank Bighorn Montney

Key Resource Play ProductionMMcfe/d

Bighorn KRP

Cutbank KRP

Page 4: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Canadian Deep BasinResource AreaMassive Resource Opportunity

Bighorn KRP: Cretaceous Cutbank KRP: Montney

Extensive Location Inventory

Montney Tight Gas Fairway ~ 475 Twp.*

100100

5050

150150

200200

200200

200200

150150

100100

200200

Montney

Subcrop

Edge

Deformation

Front

British Columbia

AlbertaMontney Shale Gas Fairway ~ 40 Twp.*

Total Resource

Reserves (Tcfe)

1P 2P 3P

2.36 3.32 3.97

Economic Contingent Resources (Tcfe)

1C 2C 3C

2.62 7.78 11.8

Page 5: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com20mi

32km

*1 Twp ~ 23,040 acres

Montney Shale Gas Covers 40 Twps. Total estimated NGIP

87 Tcfe*

Montney Tight Gas Covers 475 Twps. Total mapped NGIP

900 Tcfe*

Montney Tight Gas/Shale Gas Play Total Resource

Highgraded Fairway: 170 Twp (~600 Tcf NGIP)

Bcf/sec

*Encana estimates

Page 6: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

GR_1GAPI0 200

2500

2550

2600

2650

2700

2750

2451.5

2754.0

MD

2451.5

2754.0

NPSS_1V/V0.45 -0.15

RHOB_2K/M31950 2950

EVAL_MONTNEY.PHIT_1V/V0.15 0

EVAL_MONTNEY.PHIT_1V/V0.15 0

EVAL_MONTNEY.VOL_UWAT_NEW_V/V0.15 0

GR Porosity

Upper Montney

Neutron/Porosity

Lower Montney

Por. & BVW

Cutbank Ridge Portfolio of Montney Assets

Page 7: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.comHydraulic Open-Hole Packers: Courtesy of WeatherfordHydraulic Open-Hole Packers: Courtesy of Weatherford

Cutbank Ridge

• Enhancing Horizontal Drilling Technology• Improved repeatability

• Upper Montney Sand Plug Design• Lower Montney OH Packer Design

• Increased HZ length & fracs per well (fpw)• Executed 2400m laterals with up to 14 fpw

• Leveraging experience into other plays

Cobramax Sand Plugs: Courtesy of Halliburton

P99P98P95P90

P80P70P60

P2P5P10

P20P30P40P50

P1

1.00 10.00 100.00Total Burnable Well Rate (mmcf/d - pressure normalized)

Potential B-A83-B Results

13mmcf/d

Total Gas Result

Page 8: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Cutbank RidgeCost Improvement Initiatives

• Execution excellence

• Load leveled-operations

• Repeatable well designs

• Optimizing frac design

• Continuous improvement

• Drilled longer wells

• More intervals/well

• Economies of scale

• Lower service costs

• Net impact

• Reduced per well costs by $1 million in 2009

• Lowered supply cost by 48% since 2006

9.9 9.1

3.2

$0.65 $0.61

$1.50$0.95 $0.79

10

8

46

9

0.00.51.01.52.02.53.03.5

2006Vertical

2006 2007 2008 2009 2010F0

3

6

9

12Cost/Interval Intervals/well

Capital per Completed IntervalDawson Montney

$MM Intervals

Page 9: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Bighorn Total Cretaceous Resource

Red RockKakwa

Resthaven

Carrot Ck.

Aurora

Ansell

460,000 Net Acres

Cretaceous NGIP (TCF)

Cretaceous Fairway

Deep Basin Cretaceous Tight Gas

•Total mapped NGIP 500 Tcfe*

•40 Tcfe* on Encana lands

*Encana estimate

Page 10: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Bighorn Cretaceous Stack

Alberta

• Vertical wells• Focus on entire Cretaceous stack

• Up to 20+ zones per well

• High heat content, liquids rich

• Hz wells in thick sections of stack• Resource play within a resource play

Page 11: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Gething5%

Bluesky2%

Dunvegan17%

Cadotte22%

Falher46%

Other8%

Kakwa NGIP

Distributed Temperature SensorVerifying Production from All Zones in Stack

• All pay zones contributing• Increased confidence in resource capture• Influence completion design

Gething9%

Bluesky15%

Dunvegan26%

Cadotte12%

Falher30%

Other8%

Average Flow Contribution

Page 12: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Bighorn Cost Improvement Initiatives

• Execution excellence

• Load leveled-operations

• Concurrent completions

• Optimized frac designs

• Continuous improvement

• Lower service costs

• Net impact

• Reduced per well costs by $1 million in 2009

• Lowered supply cost by 30% since 2006

10.3 9.1

7.5

6.2 5.94.9 4.7

$5.03

$4.24 $4.08$3.57 $3.50

$0

$2

$4

$6

$8

2006 2007 2008 2009 2010F$0

$2

$4

$6

$8

Well Cost Supply Cost

Vertical Well - DC&T Capital

$MM $/MMBtu

Page 13: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Bighorn – The Next Phase Horizontal Drilling

• Apply Cutbank KRP technology & experience

• Target thick sections of the stack • Dunvegan, Falher, Cadotte• >20 Bcf/Section NGIP

• AB deep gas royalty holiday• $3+ MM credit for wells >4,000m MD

• Encouraging results to dateKakwa 14-28 Falher HZ

0

2

4

6

8

10

12

0 20 40 60Days

MMcfe/d

Page 14: Canadian Division CUTBANK RIDGE & BIGHORN Mike McAllister, … · 2010-03-16 · Canadian Deep Basin Resource Area Massive Resource Opportunity Bghori n KRP Cretaceous Cutbank KRP

www.encana.com

Canadian Deep Basin Disciplined Growth

0

100

200

300

400

500

600

2004 2005 2006 2007 2008 2009 2010F

Cutbank Bighorn Montney

MMcfe/d• Resource knowledge

• Resource capture

• Supply cost reduction

• Execution excellence

• Extensive Well Inventory

KRP Production Growth