Brookline High SchoolCampus Expansion Update
Feasibility StudyA P R I L 13, 2017
Brookline High SchoolBuilding Committee
H M F H A R C H I T E C T S130 Bishop Allen Drive, Cambridge, MA 02139 617 492 2200 hmfh.com
H M F H A R C H I T E C T SBHS Campus Expansion
Existing
MB
TA G
REE
N L
INE
Massing
H M F H A R C H I T E C T SBHS Campus Expansion
OPTION 4A9th Grade Academy at Cypress St. with BHS-Greenough Renovate Existing Science & New 5-Classroom Addition
Massing
MB
TA G
REE
N L
INE
Renovate Existing Science35,500 sf
New Construction at BHS7,500 sf
New Construction at 9th Grade Academy109,810 sf
H M F H A R C H I T E C T SBHS Campus Expansion
Massing
OPTION 4B9th Grade Academy at Cypress St. with BHS-Greenough New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
MB
TA G
REE
N L
INE
Renovate Existing ScienceInto Classrooms36,500 sf
New Construction at BHS44,100 sf
New Construction at 9th Grade Academy109,810 sf
H M F H A R C H I T E C T SBHS Campus Expansion
OPTION 4C9th Grade Academy at Cypress St. and MBTA with BHS-Greenough Renovate Existing Science & New 5-Classroom Addition
Massing
MB
TA G
REE
N L
INE
Renovate Existing Science35,500 sf
New Construction at BHS7,500 sf
New Construction at 9th Grade Academy112,700 sf
H M F H A R C H I T E C T SBHS Campus Expansion
OPTION 4D9th Grade Academy at Cypress St. and MBTA with BHS-Greenough New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
Massing
MB
TA G
REE
N L
INE
Renovate Existing Scienceinto Classrooms36,500 sf
New Construction at BHS50,400 sf
New Construction at 9th Grade Academy112,700 sf
H M F H A R C H I T E C T SBHS Campus Expansion
OPTION 4A & 4B9th Grade Academy at Cypress St. with BHS-Greenough
MBTA
DINNINGCOMMONS
LIBRARYCOLLAB
CORE ACADEMIC
Massing4A & 4B
Section 4A & 4B
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4A & 4B9th Grade Academy at Cypress plus see BHS-Greenough Options
Lower Level Plan 1st Floor Plan
TAPPAN ST
BRINGTON RD
CYPR
ESS
ST
DIN
NIN
GC
OM
MO
NS
MBTAGREEN LINE
TAPPAN ST
BRINGTON RD
CYPR
ESS
STLIBRARY
COLLAB
MBTAGREEN LINE Plaza
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4A & 4B 9th Grade Academy at Cypress plus see BHS-Greenough Options
2nd Floor Plan 3rd Floor Plan 4th Floor Plan
SCI
SCI
COLLAB
SCI
SCI
MAKER SPACE
COLLAB
SCI
SCI
COLLAB
H M F H A R C H I T E C T SBHS Campus Expansion
LIBRARY
DINNINGCOMMONS
MBTA
CORE ACADEMIC
Massing 4C & 4D
Section 4C & 4D
OPTION 4C & 4D: 9th Grade Academy at Cypress & MBTA plus see BHS-Greenough Options
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4C & 4D: 9th Grade Academy at Cypress & MBTA plus see BHS-Greenough Options
Ground Floor Plan 1st Floor Plan
TAPPAN ST
CYPR
ESS
ST
BRINGTON RD
COLLAB
MBTAGREEN LINE
TAPPAN ST
CYPR
ESS
ST
DIN
NING
COM
MO
NS
MBTAGREEN LINE
BRINGTON RD
MAKERSPACE
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
2nd Floor Plan 3rd Floor Plan 4th Floor Plan
SCICR
SCICR
COLLAB
SCICR
SCICR
COLLAB
LIBRARY
SCICR
SCICR
COLLAB
OPTION 4C & 4D9th Grade Academy at Cypress & MBTA plus see BHS-Greenough Options
H M F H A R C H I T E C T SBHS Campus Expansion
CR
SCI CRSCI CR
Massing 4A & 4C
Section 4A & 4C
OPTION 4A & 4CBHS New 5-Classroom Addition & Renovate Existing Science
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4A & 4CBHS New 5-Classroom Addition & Renovate Existing Science
CR
CR
CR
CR
CR
1st Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4A & 4CBHS New 5-Classroom Addition & Renovate Existing Science
2nd Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4A & 4CBHS New 5-Classroom Addition & Renovate Existing Science
SCI SCICR
SCICR
SCICR
SCICR
SCICR
SCICR
SCI CR
SCICR
SCICR
SCICR
SCI CR
SCI CR
SCI CR
SCI CR
SCI CR
SCI CRSCI CR
SCI CR
3rd Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion
SCISCISCI CR
SCISCISCI CR
COLLAB
Massing 4B & 4D
Section 4B & 4D
OPTION 4B & 4DBHS New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion
SCICR
CULINARY
KITCHENCAFE
CAFE
SCICR
SCICR
SCICR
SCICR
SCICR
50’ 100’
1st Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
OPTION 4B & 4DBHS New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4B & 4DBHS New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
SCICR
MAK
ER S
PACE
COLL
AB
SCICR
SCICR
SCICR
SCICR
SCICR
2nd Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion 50’ 100’
OPTION 4B & 4DBHS New Science at Roberts Wing & Renovate 3rd Floor as Core Academics
SCICR
MAK
ER S
PACE
COLL
AB
SCICR
SCICR
SCICR
SCICR
SCICR
RENO
VATE
INTO
CO
REA
CADE
MIC
SPA
CE
3rd Floor Plan
RENOVATION
EXISTING - NO WORK
EXTENT OF DEMOLITION
H M F H A R C H I T E C T SBHS Campus Expansion
Option 4 Program ComparisonImproving Classroom Spaces
Brookline High School Expansion Feasibility Study HMFH Architects Inc.
Design Alternate Comparisons April 13, 2017
Improving Classroom Spaces
New 9th Grade Academy
BHS - Greenough Renovated Science
Classrooms
BHS - Greenough New Science Wing
Classrooms
Existing to Remain 65 Classrooms 56 Classrooms
Renovated Classrooms 12 Classrooms
New Classrooms 26 Classrooms 5 Classrooms 2 Classrooms
Science Classrooms/Labs
New Science Classrooms/Labs 6 Classrooms/Labs 18 Classrooms/Labs
Renovated Science Classrooms/Labs
18 Classrooms/Labs
Special Education
Self-Contained Classrooms, Learning Centers, Resource Rooms
6 New Existing to Remain Existing to Remain
OT/PT 1 New Existing to Remain Existing to Remain
H M F H A R C H I T E C T SBHS Campus Expansion
Brookline High School Expansion Feasibility Study HMFH Architects Inc.
Design Alternate Comparisons April 13, 2017
Program Expansion
New 9th Grade Academy
BHS - Greenough Renovated Science
Classrooms
BHS - Greenough New Science Wing
Cafeteria New Existing to Remain Existing to Remain
Library / Media Center New Existing to Remain Existing to Remain
Collaborative Learning
Small Group Rooms 1 New 6 New
Maker Space 1 New 1 Existing to Remain2 New/
1 Existing to Remain
Learning Commons 5 New MLK Room to Remain2 New/
MLK Room to Remain
Language/ Computer Labs In New Classrooms 3 Existing to Remain 3 Existing to Remain
Teacher Planning 3 New Existing to Remain6 New/
Existing to Remain
Administration / Guidance Medical / Nurse
New Existing to Remain Existing to Remain
Option 4 Program ComparisonProgram Expansion
H M F H A R C H I T E C T SBHS Campus Expansion
Brookline High School Expansion Feasibility Study HMFH Architects Inc.
Design Alternate Comparisons April 13, 2017
Program Expansion
New 9th Grade Academy
BHS - Greenough Renovated Science
Classrooms
BHS - Greenough New Science Wing
Career Education & Technology At UAB & BHS Existing to RemainNew Culinary Arts Café/
Existing to Remain
Performing Arts
Music/ Performance Space 1 New Existing to Remain Existing to Remain
Ensemble and Music Practice 3 New Existing to Remain Existing to Remain
Visual Arts : Studios 1 New/ and at UAB Existing to Remain at UAB Existing to Remain at UAB
Physical Education
Health Classroom 2 NewExisting to Remain for
OT/PTExisting to Remain for
OT/PT
Schluntz Gym Keep Existing Keep Existing Keep Existing
Tappan Facility Refer to Tappan Options Refer to Tappan Options Refer to Tappan Options
Option 4 Program Comparison
H M F H A R C H I T E C T SBHS Campus Expansion
Option 4 Summary and Cost
$105,342,903 $131,117,378 $110,838,332 $136,612,807
Renovate Existing Science35,500 sf
New Construction at BHS7,500 sf
New Construction at 9th Grade Academy109,810 sf
Renovate Existing Scienceinto Classrooms36,500 sf
New Construction at BHS44,100 sf
New Construction at 9th Grade Academy109,810 sf
Renovate Existing Science35,500 sf
New Construction at BHS7,500 sf
New Construction at 9th Grade Academy112,700 sf
Renovate Existing Scienceinto Classrooms36,500 sf
New Construction at BHS50,400 sf
New Construction at 9th Grade Academy112,700 sf
Option 4A Option 4B Option 4C Option 4D
H M F H A R C H I T E C T SBHS Campus Expansion
TRAINMULTI-PURPOSE
WRSTL
DANCESTUDIO LKRM
LKRM
LKRM
OFF
OFF
TRAIN
SHWR
KIRRANEPOOL
MECH ACCESS
LKRM LKRMLKRM
DANCESTUDIO
FITNESSCENTER
OFF
OFF
OFF
OFF
OFF KIRRANEPOOL
GYMNASIUM
GYMNASIUM
POOLOPEN TOBELOW M
ULT
I-PU
RPO
SE
INDOORPLAYINGFIELD
POOLROOF
ExistingTappan Gym
Basement Plan First Floor Plan
Second Floor Plan Third Floor Plan
Mezzanine Plan
50’ 100’
H M F H A R C H I T E C T SBHS Campus Expansion
DANCE
LKRM
LKRM
TEAM LKRM
TT
STOR
WRSTL
TEAMKIRRANE
POOL
MECH ACCESS
DANCEBELOW
TRAI
NER
&A
DMIN
WEL
L-N
ESS
DANCE
FITNESSTT
NEW CANOPY AND ENTRY PLAZA
LOBBY
KIRRANEPOOL
TT
LARGE GYM
SMALL GYM
POOLOPEN TOBELOW M
ULT
I-PU
RPO
SE
PAVILION
POOLROOF
Option 1Tappan Gym Renovation
Basement Plan First Floor Plan
Second Floor Plan Third Floor Plan
Mezzanine Plan
50’ 100’
H M F H A R C H I T E C T SBHS Campus Expansion
POOLLOCKERROOMS
DANCE
FITNESSLOBBY
KIRRANEPOOL
HEALTH
Vest.
ADMIN
OPENTO
BELOW
A
A
BBLKRMS
DANCE
KIRRANEPOOLWREST.
TRAING
MECH ACCESSLOBBY
A
A
BB
POO
LM
ECH
Basement Plan First Floor Plan
Second Floor Plan Third Floor Plan
PRACTICEGYM
GYM
LKRM
GYM
POOLOPEN TOBELOW
T
LOBBYA
A
BB
T
PAVILION
POOLROOF
GYMROOF
LKRMT
Mech
LOBBYA
A
BB
T
Option 2.1Tappan Gym Renovation & Addition
50’ 100’
WELL-NESST
LOBBY
GYMOpen toBelow
Mech
Mezzanine Plan
H M F H A R C H I T E C T SBHS Campus Expansion
Option 2.1Tappan Gym Renovation & Addition
PRACTICE GYMWELLNESS
LKRM
LKRMLKRMLKRM
LOBBY
B
B
PRACTICEGYM POOLLKRMLKRM
A
A
32’ 64’
H M F H A R C H I T E C T SBHS Campus Expansion | Cypress Playground
Cypress Field Open Space : Renovation Project Goals and Features
• Synthetic Turf Field with Organic Infill for Soccer, Football
Practice only, and Softball
• New Perimeter Fencing and Lighting
• Improve Pedestrian Circulation
• Improve/New Basketball Court
• New Stadium Bleacher Seating
• New Playground and Splash Pad
• New Picnic Area and Shelter
• Improve/New Utilities and Drainage
• New Site Furniture, Accessories such as Trash Recycling, Water
Fountains Bottle Refill
• Plantings, Lawn Area
Other: Below Grade Storm-water Retention
Optional: Below Grade Parking Structure
H M F H A R C H I T E C T SBHS Campus Expansion
ExistingCypress Field and Playground
100’ 200’
H M F H A R C H I T E C T SBHS Campus Expansion
Option 1Cypress Field and Playground Renovation
100’ 200’
H M F H A R C H I T E C T SBHS Campus Expansion
Option 2Pedestrian Raised Crossing and Vehicle Access at Plaza
100’ 200’
H M F H A R C H I T E C T SBHS Campus Expansion
Option 1 Below Grade Plan Diagram
Below Cypress Park Turf Field - Storm-Water Retention System & Parking Structure @ +/- 100 Cars per Level
H M F H A R C H I T E C T SBHS Campus Expansion
Existing Conditions
Greenough St & BHSCypress St
Site Section & Underground Parking
MWRA Easement
MWRA Easement
Parking - Level 1
Cypress St Greenough St & BHS
Parking Structure Below Cypress Park - Field @ +/- 100 Cars per Level
RAMPParking - Level 2
Parking - Level 3
MWRA & EASEMENT LAYOUT VARIES SEE PLAN
MWRA & EASEMENT LAYOUT VARIES SEE PLAN
Storm-water Retention System