1 6 th December 2012 ASX ANNOUNCEMENT / MEDIA RELEASE CAMPOONA GRAPHITE MAIDEN JORC RESOURCE HIGHLIGHTS Maiden JORC Resource at Campoona of 2.572Mt grading 12.3% TGC with 310,800 tonnes of contained graphite at a lower cutoff grade of 5%TGC. Scoping Study activities underway including environmental baseline studies. Significant progress on defining the optimum processing flow sheet for the extraction of high value graphite product has been achieved. Results to date demonstrate >98%TGC concentrates are reproducible with excellent recoveries. Phase 2 Resource drilling at Central Campoona is scheduled to start February 2013. 80% of the Campoona strike is undrilled. Resource Extension drilling north and south of Campoona Shaft and Central Campoona is planned to commence in April 2013 to define likely Exploration Target for the combined Campoona graphite deposit. Regional drilling targeting multiple EM conductors near Campoona is planned for April 2013. Archer Exploration Limited (ASX: AXE; “Archer”) is pleased to report a Phase 1 JORC Resource for the Campoona graphite deposit as currently drilled. The Campoona Graphite Project is located 15km north of Cleve on Eyre Peninsula, South Australia. The Phase 1 Campoona JORC Resource which has been achieved within 9 months of the discovery drill hole is estimated to contain almost 400,000 tonnes of contained graphite that occurs as highly graphitic, uniform and steeply dipping schist which outcrops in the Campoona Shaft area. Less than 20% of the Campoona shear has been drill tested. Campoona JORC Resource The MiningPlus resource summary for the Project is provided in Appendix 1, including details on the resource calculation used. The Campoona JORC Resource estimation was conducted by MiningPlus, an independent expert resource consultancy with offices in Australia, Canada and South America. Information used in the Resource estimates included five (5) diamond drill holes and thirty seven (37) Reverse Circulation (RC) drill holes completed up to the end of September this year (see Figure 1 below).

Transcript of Campoona Maiden JORC Resource December...

1

 6th December 2012  ASX ANNOUNCEMENT / MEDIA RELEASE 

CAMPOONA GRAPHITE MAIDEN JORC RESOURCE   

HIGHLIGHTS 

• Maiden  JORC  Resource  at  Campoona  of  2.572Mt  grading  12.3%  TGC  with  310,800 tonnes of contained graphite at a lower cut‐off grade of 5%TGC. 

 • Scoping Study activities underway including environmental baseline studies. 

 • Significant progress on defining the optimum processing flow sheet for the extraction of 

high value graphite product has been achieved.  Results to date demonstrate >98%TGC concentrates are reproducible with excellent recoveries.  

 • Phase 2 Resource drilling at Central Campoona is scheduled to start February 2013.  • 80% of the Campoona strike is undrilled.  Resource Extension drilling north and south of 

Campoona Shaft and Central Campoona is planned to commence in April 2013 to define likely Exploration Target for the combined Campoona graphite deposit. 

 • Regional drilling targeting multiple EM conductors near Campoona  is planned for April 

2013. 

 

Archer Exploration Limited (ASX: AXE; “Archer”) is pleased to report a Phase 1 JORC Resource for the Campoona graphite deposit as currently drilled.    The Campoona Graphite Project is located 15km north of Cleve on Eyre Peninsula, South Australia. 

The  Phase  1  Campoona  JORC  Resource  which  has  been  achieved  within  9  months  of  the discovery drill hole  is estimated  to  contain almost 400,000  tonnes of  contained graphite  that occurs as highly graphitic, uniform and steeply dipping schist which outcrops  in the Campoona Shaft area.  Less than 20% of the Campoona shear has been drill tested. 

Campoona JORC Resource 

 The MiningPlus resource summary for the Project is provided in Appendix 1, including details on the resource calculation used. 

The Campoona JORC Resource estimation was conducted by MiningPlus, an independent expert resource consultancy with offices in Australia, Canada and South America.   Information used in the  Resource  estimates  included  five  (5)  diamond  drill  holes  and  thirty  seven  (37)  Reverse Circulation (RC) drill holes completed up to the end of September this year (see Figure 1 below).  

2

The JORC Resource for Campoona is shown in Tables 1 and 2 below. 

Table 1.  Campoona JORC Resource (2%TGC lower cut‐off grade) 

Area  Resource Category 

Tonnes (Mt) 

Graphite (% TGC) 

Contained Graphite(tonnes) 

Campoona Shaft  Measured  0.339  14.8  50,200 

  Indicated  1.059  12.7  134,500 

  Inferred  3.475  5.0  173,800 

 Central Campoona* 

Inferred  0.397  10.1  40,100 

Combined  Total Resource  5.270  7.6  397,600 

 

Table 2.  Campoona JORC Resource (5%TGC lower cut‐off grade) 

Area  Resource Category 

Tonnes (Mt) 

Graphite (% TGC) 

Contained Graphite(tonnes) 

Campoona Shaft  Measured  0.339  14.8  50,200 

  Indicated  1.056  12.7  134,100 

  Inferred  0.837  10.7  89,600 

 Central Campoona* 

Inferred  0.295  12.5  36,900 

Combined  Total Resource  2.527  12.3  310,800 

**Central Campoona Resource estimation confined to 200m of known strike of 1,400m 

 

The  Central  Campoona  graphite  pod,  located  just  2km  south  of  Campoona  Shaft,  has  been drilled on a 200m spacing with on‐section drill spacings from 20‐40m.  Central Campoona has a known strike of 1,400m.   Drill density over a  length of 200m of the known strike was deemed sufficient to support an Inferred Resource of 0.295Mt grading 12.5%TGC.   

Archer’s Managing Director, Mr Gerard Anderson,  said:  “The  completion of our Maiden  JORC Resource  is a  landmark event for Archer and provides a strong foundation for what we believe will quickly progress into a quality, long‐life mining operation.” 

“Archer  has  progressed  from  a  virgin  discovery  to  a  substantial  high‐grade  Maiden  JORC Resource  in  less  than  9 months  –  an  outstanding  achievement  by  our  team,” Mr  Anderson continued,  “The Phase I Resource encompasses only the data from Campoona Shaft and a small 

3

portion of Central Campoona.    In‐fill drilling at Central Campoona  is planned  to  commence  in February 2013 with results to be incorporated into the Phase II Resource likely late in the second Quarter of next year.” 

“The  standout  features of Campoona are  the high grades and  the depth of weathering of  the mineralisation.   This combined with the continuous and thick nature of the graphitic schist and the host shear zone makes this a unique and important deposit.” 

“This Maiden  JORC  resource cements Campoona’s position as one of  the most  significant new graphite  discoveries  in  Australia.   With  less  than  20%  of  the  host  shear  drilled  to  date,  the reasonable expectation supported by airborne EM results,  is that further exploration  is  likely to lead  to  much  more  graphite  being  discovered.    The  deposit’s  proximity  to  infrastructure represents a fantastic asset for Archer shareholders that we are confident will continue to grow.” 

“Over  the  last  two  months  we  have  made  significant  progress  on  defining  the  optimum processing flow sheet for the extraction of high value graphite products.  The intense weathering of  the deposit has presented both challenges and opportunities.    I am delighted  to report  that the issues have been successfully eliminated through the application of excellent mineral science led by Dr David Lock.   The rigorous and systematic testing has delivered  invaluable knowledge.  We now know how to treat our ores to achieve ultra‐pure concentrates.  Results to date show us that >98%TGC concentrates are reproducible with excellent recoveries.   No acid was needed or used to achieve this result.  Further grade enhancements are realistically expected.  Testing will now use that knowledge to quantify the product types across the  length, breadth and depth of the deposit with results being progressively announced over the next two months.” 

“We  have  now  turned  our  focus  on  defining  development  options  for  Campoona.   We  have already  completed  the  Environmental  Fauna  and  Flora  Baseline  Studies  to  provide  important Spring season data needed to support a future Mine Lease Proposal.   Over the next quarter we will  commence  Scoping  Studies  which  we  expect  to  lead  directly  into  a  Pre‐Feasibility  and Definitive Feasibility Study commencing in mid‐2013”.   

SCOPING STUDY 

Following completion of the Maiden JORC resource estimate, Archer has initiated key activities as  part  of  a  Scoping  Study  to  assess  potential mine  development  options  for  the  Campoona Project and commenced the project approvals process. This includes: 

• Commencement of  the process  for obtaining key environmental approvals  including the appointment of environmental  consultants  to  conduct baseline  flora and  fauna  surveys and project permitting. 

• Metallurgical characterisation well advanced with the process flow sheet and equipment selection set for completion during the first quarter of 2013. 

• Planning for bulk sampling and pilot‐scale testing well advanced. • Assessment of electricity supply options for the Campoona Project. • Assessment of water supply options for the Campoona Project. 

The current Scoping Study  is expected to transition  into a Pre‐Feasibility Study commencing  in mid‐calendar  year  2013,  which  in  turn  will  lead  directly  to  a  Definitive  Feasibility  Study commencing  in  the second half of 2013.   This will provide a strong  foundation  for a potential 

4

mine development process commencing in 2014. 

PHASE 2 CAMPOONA RESOURCE DRILLING 

 Phase 2 Resource drilling set to commence February 2013 will close the drill coverage to 100m x 20m spacings to enable estimation of Resources for the entire strike length of that deposit. 

Graphite at Campoona Shaft and Central Campoona comprise  the same highly graphitic schist made  podiform  through  a  combination  of  cross  faulting  and  boudinaging.    Airborne  EM indicates  strong  extensional  conductors  to  the  north  and  south opening up  the  likelihood of defining  the  same  graphite  horizon  over  a  further  8  kilometres  of  strike  along  with  fold repetitions  to  the  south‐east  (Figure  1).    Drill  testing  of  these  highly  conductive  bodies will immediately follow the Phase 2 Resource drilling at Central Campoona. 

 

Figure 1.  Schematic geology of Campoona Graphite Deposit 

5

All drilling results will be incorporated into the Phase II Campoona Resource estimate expected for release late in the second Quarter of 2013. 

In addition  to drilling  the Campoona  structure, Archer will drill a number of  regional graphite targets commencing in the second Quarter of 2013.   

REGIONAL EXPLORATION 

Archer will soon commence regional drill testing to progressively test a series of known graphite occurrences  and  a  number  of  additional  EM  targets  identified  by  the  regional  airborne  EM surveys  over Archer’s  1,200km2  landholding  at  Cleve  (see  Figure  1  below).    The  objective  of Archer’s  regional  program  is  to  identify  those  graphite  targets  likely  to  translate  into  future resources for any Campoona‐based processing facility.  

   For further information please contact:  Mr Greg English Chairman Archer Exploration Limited Tel: (08) 8272 3288 

   Mr Gerard Anderson Managing Director Archer Exploration Limited Tel: (08) 8272 3288 

 The exploration results reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr. Wade Bollenhagen, Exploration Manager of Archer Exploration Limited.  Mr. Bollenhagen is a Member of the Australasian Institute of Mining and Metallurgy who has more than eighteen years experience in the field of activity being reported.  Mr Bollenhagen has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” relating to the reporting of Exploration Results.  Mr. Bollenhagen consents to the inclusion in the report of matters based on his information in the form and context in which it appears

 

1

Memorandum

To: Wade Bollenhagen

Cc:

From: Bruce Godsmark

Date: 5-12-2012

Subject: Campoona Shaft Resource Estimate

Reference:

The mineral resource estimate presented in this Memo is effective as of 5th December 2012.

Graphite is the target commodity at the Campoona Shaft Project. The Eyre Peninsula has a

demonstrated history of graphite production as evidenced by the Uley graphite mine west of Port

Lincoln where graphite has been produced. The Uley deposit was discovered in the 1910s and has been

worked intermittently since the late 1920s. Exploration during the 1980s led to reopening the mine in

1986 but a sharp decline in world graphite prices in 1992 saw the operation placed on care and

maintenance in 1993.

The graphite mineralisation at Campoona Shaft has been drilled over a strike length of 560m. It has a

strike of approximately 45 degrees and is interpreted to dip very steeply (-85 degrees) to the north-

west. The mineralisation at the Campoona shaft is located within one main large sheet and 5 smaller

sheets. The mineralisation appears to thin at the north-west and south-east extremities of the drilled

area however the mineralisation remains open at depth. There is also potential for the mineralisation

to re-thicken to the north-west and south-east however additional work would be required to provide

evidence of this.

Forty three holes have been drilled at Campoona Shaft and thirty eight have intersected significant

graphite mineralisation. Drilling has been completed on fifteen lines with distances between the lines of

approximately 40 to 50 metres. Two “infill” lines have been completed in the central part of the deposit

the line spacing in this area is approximately 25 metres. Drilling on section has been completed at 20

to 30 metre down dip spacing’s and three drill holes have been drilled down dip for the purpose of

obtaining metallurgical samples.

Figure 1: Representative cross section in the central part of the Campoona Shaft deposit (left) and isometric

view of the six graphite units that comprise the Campoona Shaft deposit (right).

The mineral resource has been calculated using the following software;

Maptek ™ Vulcan ™ 8.1.4 - block modelling,

estimation and Supervisor ™ - geostatistical analysis.

A rotated block model has been used to quantify the tonnage and grade of the Campoona Shaft

Deposit. The block model origin and dimensions are shown in Table 1 and Table 2 respectively.

Table 1: Block model origin

Table 2: Block dimensions and size

The block model was coded with eight 3-D wire frames and four 2-D surfaces as shown in Table 3.

Table 3: Block model coding

x co-ordinate y-co-ordinate z-co-ordinate Bearing Plunge Dip

636200 6289000 150 135 0 0

Block Model Origin Block Model Rotation

Campoona Shaft

Scheme

Start x

offset

Start y

offset

Start z

offset

end x

offset

end y

offset

end z

offset

Block x

size

Block y

size

Block z

size

Blocking x

maximum

Blocking y

Maximum

Blocking z

maximum

Parent 0 0 0 1200 1600 300 10 25 20

Sub 0 0 0 1200 1600 300 1 2.5 2 10 25 20

Triangulation Variable Value Priority Triangulation Variable Value Priority

C_9_to_17_EAST1_trim.00t geo_code 100 100 C_9_to_17_EAST1_trim.00t sg 2.11 100

C_9_to_17_EAST2_trim.00t geo_code 90 90 C_9_to_17_EAST2_trim.00t sg 2.06 100

C_9_to_17_EAST3_trim.00t geo_code 80 80 C_9_to_17_EAST3_trim.00t sg 2.06 100

C_9_to_17_EAST4_trim.00t geo_code 70 70 C_9_to_17_EAST4_trim.00t sg 2.06 100

C_9_to_17_EAST5_trim.00t geo_code 60 60 C_9_to_17_EAST5_trim.00t sg 2.06 100

C_9_to_17_MAIN_trim.00t geo_code 50 50 C_9_to_17_MAIN_trim.00t sg 2.06 100

C_pt7_plus_trim.00t geo_code 10 10 C_pt7_plus_TRIM.00t sg 2.35 50

bm_area.00t geo_code 5 5 bm_area.00t sg 2.01 10

Base_ox_BNG.00t ox_state fr 10 25m_topo.00t sg 0 200

Base_ox_BNG.00t ox_state ox 20 base_inferred.00t resource_base_level 0 1

25m_topo.00t litho rock 1 base_inferred.00t resource_base_level 1 1

25m_topo.00t litho air 2

Estimation of C% has been undertaken using ordinary kriging. The search and estimation parameters are

shown in Table 4 and Table 5 respectively. Density has been assigned to domains rather than estimated.

Table 4: Search parameters

Table 5: Estimation parameters

The resource has been classified based upon criteria including geological and grade continuity, the

quality of the data and the confidence of the estimation. Solid wire frames were then used to impose

classification codes within the block model.

The estimated resources are reported at cut-off grades of 2% C, 5.0 % C and 10% C and are shown in

Table 6 to Table 8 and a grade tonnage graph is included as Figure 2. Long sections showing the

location of the resource categories in relation to drilling is included in Figure 3, Figure 4 and Figure 5.

Major Semi-Major Minor Min MaxMax Samples

per hole

Pass 1 160 60 30 8 32 8 8

Pass 2 160 60 30 5 20 8 5

Pass3 240 90 45 2 16 8 3

Pass 4 480 180 90 2 16 8 1

Search Region Samples

Minimum

Octants

Triangulation Bound_code C0 C1 Bearing Plunge Dip Major Semi Mnor C2 Bearing Plunge Dip Major Semi Mnor

C_9_to_17_EAST1_trim.00t 100 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_9_to_17_EAST2_trim.00t 90 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_9_to_17_EAST3_trim.00t 80 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_9_to_17_EAST4_trim.00t 70 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_9_to_17_EAST5_trim.00t 60 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_9_to_17_MAIN_trim.00t 50 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

C_pt7_plus_trim.00t 10 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

Table 6: Resource at Campoona Shaft at 2 % C cut-off #

Table 7: Resource at Campoona Shaft at 5.0 % C cut-off #

Table 8: Resource at Campoona Shaft at 10.0 % C cut-off #

# in all resource tables tonnage figures are rounded to the nearest 1000

and SG and grade are rounded to one decimal place.

Figure 2: Tonnage grade graph of combined measured, indicated and inferred

Classification Tonnes SG Grade (%C)

Measured 339,000 2.1 14.8

Indicated 1,059,000 2.1 12.7

Inferred 3,475,000 2.3 5.0

4,873,000 2.2 7.4

2% cutoff

TOTAL

Classification Tonnes SG Grade (%C)

Measured 339,000 2.1 14.8

Indicated 1,056,000 2.1 12.7

Inferred 837,000 2.1 10.7

2,232,000 2.1 12.3

5% cutoff

TOTAL

Classification Tonnes SG Grade (%C)

Measured 336,000 2.1 14.9

Indicated 961,000 2.1 13.1

Inferred 610,000 2.1 12.2

1,907,000 2.1 13.1TOTAL

10% cutoff

Cutoff c_pc_ok Tonnage sg

0 6.11 6168310 2.25

1 6.4 5858474 2.25

2 7.38 4872269 2.23

3 8.83 3748557 2.19

4 10.75 2763619 2.14

5 12.25 2231506 2.09

6 12.71 2093257 2.07

7 12.82 2057660 2.07

8 12.86 2041340 2.07

9 12.96 1993469 2.07

10 13.12 1907112 2.07

11 13.54 1637595 2.07

12 14.14 1267075 2.06

13 14.8 901580.1 2.06

14 15.86 502432 2.06

15 16.83 295664.7 2.06

16 17.56 192383 2.06

17 18.19 117433.5 2.06

18 18.76 59721.55 2.06

19 19.32 18954.2 2.06

20 20.78 216.3 2.06

21 21.53 41.2 2.06

22 0 0 0

Figure 3: Inferred blocks

Figure 4: Indicated blocks

Figure 5: Measured blocks

The information in this report that relates to the resource estimation has been prepared by Mr B Godsmark who is a Member of the AusIMM and peer reviewed by Mr G Reed who is also a Member of the AusIMM (CP). Mr Godsmark is a full time employees of Mining Plus Pty Ltd and Mr Reed is a sub-contractor to Mining Plus Pty Ltd, both have more than five years’ experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Godsmark and Mr Reed have consented in writing to the inclusion in this announcement of the mineral resource estimation information in the form and context in which it appears.

1

Memorandum

To: Wade Bollenhagen

Cc:

From: Bruce Godsmark

Date: 5-12-2012

Subject: Campoona Central Resource Estimate

Reference:

The mineral resource estimate presented in this Memo is effective as of 5th December 2012.

Graphite is the target commodity at the Campoona Central Project. The Eyre Peninsula has a

demonstrated history of graphite production as evidenced by the Uley graphite mine west of Port

Lincoln where graphite has been produced. The Uley deposit was discovered in the 1910s and has been

worked intermittently since the late 1920s. Exploration during the 1980s led to reopening the mine in

1986 but a sharp decline in world graphite prices in 1992 saw the operation placed on care and

maintenance in 1993.

The graphite mineralisation at Campoona Central has been drilled over a strike length of 580m. It has a

strike of approximately 45 degrees and is interpreted to dip very steeply (-85 degrees) to the north-

west. Eleven holes have been drilled at Campoona Central and five have intersected graphite

mineralisation. Drilling has been completed on three lines with distances between the lines of 260m ,

140m and 160m. On one line the drilling has demonstrated vertical continuity and the drill holes

intersect the graphite mineralisation 30m apart.

The mineral resource has been calculated using the following software;

Maptek ™ Vulcan ™ 8.1.4 - block modelling,

estimation and Supervisor ™ - geostatistical analysis.

A rotated block model has been used to quantify the tonnage and grade of the Campoona Central

Deposit. The block model origin and dimensions are shown in Table 1 and Table 2 respectively.

Table 1: Block model origin

Table 2: Block dimensions and size

The block model was coded with four 3-D wire frames and two 2-D surfaces as shown in Table 3.

Table 3: Block model coding

Estimation of C% has been undertaken using ordinary kriging. The search and estimation parameters are

shown in Table 4 and Table 5 respectively. Density has been assigned to domains rather than estimated.

Table 4: Search parameters

Table 5: Estimation parameters

The resource has been classified based upon criteria including geological and grade continuity, the

quality of the data and the confidence of the estimation. Solid wire frames were then used to impose

classification codes within the block model.

The estimated resources are reported at cut-off grades of 2% C, 5.0 % C and 10% C and are shown in

Table 6 to Table 8 and a grade tonnage graph is included as Figure 1. A long sections showing the

location of the inferred resource in relation to drilling is included as Figure 2 and a long section showing

the location of the exploration target is shown in Figure 3

Additional exploration target is considered to exist along strike of the existing inferred resource and

this is considered to be in the range of 500,000 to 700,000 tonnes at a grade of 12 % C to 14 % C.

x co-ordinate y-co-ordinate z-co-ordinate Bearing Plunge Dip

634600 6286500 150 135 0 0

Block Model Origin Block Model Rotation

Campoona Central

Scheme

Start x

offset

Start y

offset

Start z

offset

end x

offset

end y

offset

end z

offset

Block x

size

Block y

size

Block z

size

Blocking x

maximum

Blocking y

Maximum

Blocking z

maximum

Parent 0 0 0 1200 1800 300 10 25 20

Sub 0 0 0 1200 1800 300 1 2.5 2 10 25 20

Triangulation Variable Value Priority Triangulation Variable Value Priority

South_C9_C17_E_TRIM_INF.00t geo_code 95 95 South_C9_C17_E_TRIM_INF.00t sg 2.1 95

South_C9_C17_W_TRIM_INF.00t geo_code 85 85 South_C9_C17_W_TRIM_INF.00t sg 2.1 85

South_C5_C9_TRIM_INF.00t geo_code 75 75 South_C5_C9_TRIM_INF.00t sg 2.1 100

South_BM_AREA.00t geo_code 5 5 South_BM_AREA.00t sg 2.3 10

25m_topo.00t litho rock 1 south_base_inferred.00t resource_base_level 0 1

25m_topo.00t litho air 2 south_base_inferred.00t resource_base_level 1 1

Major Semi-Major Minor Min MaxMax Samples

per hole

Pass 1 160 60 30 8 32 8 8

Pass 2 160 60 30 5 20 8 5

Pass3 240 90 45 2 16 8 3

Pass 4 480 180 90 2 16 8 1

Search Region Samples

Minimum

Octants

Triangulation Bound_code C0 C1 Bearing Plunge Dip Major Semi Mnor C2 Bearing Plunge Dip Major Semi Mnor

South_C9_C17_E_TRIM_INF.00t 95 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

South_C9_C17_W_TRIM_INF.00t 85 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

South_C5_C9_TRIM_INF.00t 75 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

South_BM_AREA.00t 5 0.16 0.36 45 5 90 16 5 25 0.48 45 5 90 241 87 44

Table 6: Resource at Campoona Central at 2 % C cut-off #

Table 7: Resource at Campoona Central at 5.0 % C cut-off #

Table 8: Resource at Campoona Central at 10.0 % C cut-off #

# in all resource tables tonnage figures are rounded to the nearest 1000

and SG and grade are rounded to one decimal place.

Figure 1: Tonnage grade graph of combined inferred resource

Figure 2: Inferred resource blocks

Classification Tonnes SG Grade (%C)

Inferred 397,000 2.1 10.1

397,000 2.1 10.1TOTAL

2% cutoff

Classification Tonnes SG Grade (%C)

Inferred 295,000 2.1 12.5

295,000 2.1 12.5TOTAL

5% cutoff

Classification Tonnes SG Grade (%C)

Inferred 274,000 2.1 13.0

274,000 2.1 13.0TOTAL

10% cutoff

Cutoff c_pc_ok Tonnage sg

0 10.13 397656 2.1

1 10.13 397656 2.1

2 10.13 397425 2.1

3 11.17 349660.5 2.1

4 11.94 318118.5 2.1

5 12.53 294882 2.1

6 12.94 278890.5 2.1

7 12.98 277116 2.1

8 12.98 276979.5 2.1

9 12.98 276927 2.1

10 13.02 273640.5 2.1

11 13.17 257701.5 2.1

12 13.76 187204.5 2.1

13 14.79 104128.5 2.1

14 15.44 69090 2.1

15 16.06 42378 2.1

16 16.62 20107.5 2.1

17 17.38 4273.5 2.1

18 18.22 115.5 2.1

19 0 0 0

Figure 3: Exploration Target

The information in this report that relates to the resource estimation has been prepared by Mr B Godsmark who is a Member of the AusIMM and peer reviewed by Mr G Reed who is also a Member of the AusIMM (CP). Mr Godsmark is a full time employees of Mining Plus Pty Ltd and Mr Reed is a sub-contractor to Mining Plus Pty Ltd, both have more than five years experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Godsmark and Mr Reed have consented in writing to the inclusion in this announcement of the mineral resource estimation information in the form and context in which it appears.