PALM-3000Management Report 2007 Feb 14
Richard Dekany
Associate Director for InstrumentationCaltech Optical Observatories
P3K Project Started Nov 1, 2006
• 3-day Ventura Retreat• Initial considerations of the…
• Science Requirements• Observing Modes (Science Team Report)
• Initial Observing Scenarios• Management Plan
• Budget• Team Meeting Schedule• Overall OSWIFT and P3K upgrade schedule
• Functional and Performance Req’s (Systems Engineering Report)
• TWiki Workspace• Integrated Product Teams
• Composition, Meeting Cadence, Location
P3K Team Meeting Schedule (as of 1/30/07)PALM-3000 Team Meeting ScheduleVersion 0.4 01/30/2007(?)
Science/Management Systems Engineering Optics/Mechanics Electronics/Software WFS/WFP Laser/DM Instrument/Observatory
Milestone Milestone Milestone Milestone Milestone Milestone Milestone
11/1/06 1-Nov-06 1 Ventura Kickoff SRD draft FPRD Draft Review ICD
11/22/06 16-19 Nov 06 CfAO Fall Retreat
12/13/06 11-Dec-06 2 CIT SRD SWIFT CDR 6-9 Dec 06 LGS Run
1/3/07 14-Dec-06 SWIFT FDR
1/24/07
2/14/07 15-Feb-07 3 CIT FPRD SEMP FPRD LOWFS prototyping DM status SWIFT CDR Report
3/7/07 SRD LOWFS Req Draft P3K Laser Options
3/28/07 Error budgets SWIFT Opt Rel re-layout DR
4/18/07 Req./WFP RTC Mgt plan. HOWFS Req Draft
5/9/07
5/30/07
6/20/07 WFP draft Req 18-20 June 07 Vancover, OSA
7/11/07 15-Jul-07 4 JPL CoDR SW Req Draft P3K Optics CoDR Tweeter Cable Management HOWFS CoDR LGS Facil Status 9-14 Jul 07 NGAO 5-day
8/1/07 LOWFS CoDR Cass Cage Plan
8/22/07
9/12/07 1-Oct-07 5 TBD 3-day Retreat LOWFS Req Enclosure Design for SWIFT WFP CoDR DM Status Review ICD
10/3/07 WFP Req
10/24/07
11/14/071-Dec-07 6 CIT pre-SWIFT review HOWFS Req
SWIFT Opt Rel re-layout procedure
startsTweeter Driver Rack
12/5/07 P3K cable routing 12-Dec-07 NGAO 3-day
12/26/07 WFP PDR Recoat Optics
1/16/08
2/6/08
2/27/08 15-Feb-08 7 JPL WFP P3K Laser Strategy LGS Ops Status
3/19/08 SWIFT Arrival
4/9/08 31-Mar-08 NGAO SDR
4/30/08
5/21/08 UI PDR HOWFS PDR SWIFT start I&T with Pal
6/11/08 1-Jun-08 8 CIT PDR Draft Integration Plan P3K Optics PDR DR, AOSRV CDR LOWFS PDR DM Test Plan SWIFT 1st light DM Delivery
7/2/08 Electronics Rack PDR WFP CDR
7/23/08
8/13/08
9/3/08
9/24/08
10/15/08 3-Oct-08 9 TBD 3-day Retreat DM Acceptance Test
11/5/08
11/26/08
12/17/08 5-Dec-08 10 JPL CDR Integration Plan Open-loop Demo P3K Optics CDR Electronics Rack CDR LOWFS CDR
1/7/09 Automations CDR HOWFS CDR
1/28/09
2/18/09 20-Feb-09 11 CIT Performance Update P3K BTO PDR
3/11/09
4/1/09
4/22/09
5/13/09
6/3/09 1-Jun-09 12 CIT Operational Tools DR, AOSRV Complete WFP Complete P3K Laser
6/24/09
7/15/09
8/5/09
8/26/09
9/16/09 UI complete
10/7/09 1-Oct-09 13 JPL Pre-ship Review Commissioning Plan Closed-loop Demo Automations complete P3K BTO
10/28/09
11/18/09
12/9/09P3K Opt re-layout procedure starts
12/30/09
1/20/10
2/10/10
3/3/10
3/24/10 3/24/1014 CIT
Science Readiness
ReviewIntegration Status P3K Laser
4/14/10
5/5/10
5/26/10
6/16/10
7/7/10 Shared-Risk Ops
7/28/10
8/18/10
9/8/10
9/29/10 1-Oct-10 16 TBD 3-day Retreat
Start I&T at JPL of DR,
AOSRV, WFP
Dow
ntim
e
Other EventsDate # Venue Major Meeting Goal
P3K Integrated Product Team Meeting Schedule
PALM-3000 TWiki Sitehttp://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Palomar/Palm3000/WebHome
Personnel DirectoryTeam Meetings
IPT Agenda / MinutesRequirements Documents
Management PlanTechnical Work ProductsLinks to Related Sources