Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report...

5
Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany Associate Director for Instrumentation Caltech Optical Observatories

Transcript of Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report...

Page 1: Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany ... 7/11/07 15-Jul-074 JPL CoDR SW Req Draft P3K Optics

CaltechOpticalObservatories

PALM-3000Management Report 2007 Feb 14

Richard Dekany

Associate Director for InstrumentationCaltech Optical Observatories

Page 2: Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany ... 7/11/07 15-Jul-074 JPL CoDR SW Req Draft P3K Optics

P3K Project Started Nov 1, 2006

• 3-day Ventura Retreat• Initial considerations of the…

• Science Requirements• Observing Modes (Science Team Report)

• Initial Observing Scenarios• Management Plan

• Budget• Team Meeting Schedule• Overall OSWIFT and P3K upgrade schedule

• Functional and Performance Req’s (Systems Engineering Report)

• TWiki Workspace• Integrated Product Teams

• Composition, Meeting Cadence, Location

Page 3: Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany ... 7/11/07 15-Jul-074 JPL CoDR SW Req Draft P3K Optics

P3K Team Meeting Schedule (as of 1/30/07)PALM-3000 Team Meeting ScheduleVersion 0.4 01/30/2007(?)

Science/Management Systems Engineering Optics/Mechanics Electronics/Software WFS/WFP Laser/DM Instrument/Observatory

Milestone Milestone Milestone Milestone Milestone Milestone Milestone

11/1/06 1-Nov-06 1 Ventura Kickoff SRD draft FPRD Draft Review ICD

11/22/06 16-19 Nov 06 CfAO Fall Retreat

12/13/06 11-Dec-06 2 CIT SRD SWIFT CDR 6-9 Dec 06 LGS Run

1/3/07 14-Dec-06 SWIFT FDR

1/24/07

2/14/07 15-Feb-07 3 CIT FPRD SEMP FPRD LOWFS prototyping DM status SWIFT CDR Report

3/7/07 SRD LOWFS Req Draft P3K Laser Options

3/28/07 Error budgets SWIFT Opt Rel re-layout DR

4/18/07 Req./WFP RTC Mgt plan. HOWFS Req Draft

5/9/07

5/30/07

6/20/07 WFP draft Req 18-20 June 07 Vancover, OSA

7/11/07 15-Jul-07 4 JPL CoDR SW Req Draft P3K Optics CoDR Tweeter Cable Management HOWFS CoDR LGS Facil Status 9-14 Jul 07 NGAO 5-day

8/1/07 LOWFS CoDR Cass Cage Plan

8/22/07

9/12/07 1-Oct-07 5 TBD 3-day Retreat LOWFS Req Enclosure Design for SWIFT WFP CoDR DM Status Review ICD

10/3/07 WFP Req

10/24/07

11/14/071-Dec-07 6 CIT pre-SWIFT review HOWFS Req

SWIFT Opt Rel re-layout procedure

startsTweeter Driver Rack

12/5/07 P3K cable routing 12-Dec-07 NGAO 3-day

12/26/07 WFP PDR Recoat Optics

1/16/08

2/6/08

2/27/08 15-Feb-08 7 JPL WFP P3K Laser Strategy LGS Ops Status

3/19/08 SWIFT Arrival

4/9/08 31-Mar-08 NGAO SDR

4/30/08

5/21/08 UI PDR HOWFS PDR SWIFT start I&T with Pal

6/11/08 1-Jun-08 8 CIT PDR Draft Integration Plan P3K Optics PDR DR, AOSRV CDR LOWFS PDR DM Test Plan SWIFT 1st light DM Delivery

7/2/08 Electronics Rack PDR WFP CDR

7/23/08

8/13/08

9/3/08

9/24/08

10/15/08 3-Oct-08 9 TBD 3-day Retreat DM Acceptance Test

11/5/08

11/26/08

12/17/08 5-Dec-08 10 JPL CDR Integration Plan Open-loop Demo P3K Optics CDR Electronics Rack CDR LOWFS CDR

1/7/09 Automations CDR HOWFS CDR

1/28/09

2/18/09 20-Feb-09 11 CIT Performance Update P3K BTO PDR

3/11/09

4/1/09

4/22/09

5/13/09

6/3/09 1-Jun-09 12 CIT Operational Tools DR, AOSRV Complete WFP Complete P3K Laser

6/24/09

7/15/09

8/5/09

8/26/09

9/16/09 UI complete

10/7/09 1-Oct-09 13 JPL Pre-ship Review Commissioning Plan Closed-loop Demo Automations complete P3K BTO

10/28/09

11/18/09

12/9/09P3K Opt re-layout procedure starts

12/30/09

1/20/10

2/10/10

3/3/10

3/24/10 3/24/1014 CIT

Science Readiness

ReviewIntegration Status P3K Laser

4/14/10

5/5/10

5/26/10

6/16/10

7/7/10 Shared-Risk Ops

7/28/10

8/18/10

9/8/10

9/29/10 1-Oct-10 16 TBD 3-day Retreat

Start I&T at JPL of DR,

AOSRV, WFP

Dow

ntim

e

Other EventsDate # Venue Major Meeting Goal

Page 4: Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany ... 7/11/07 15-Jul-074 JPL CoDR SW Req Draft P3K Optics

P3K Integrated Product Team Meeting Schedule

Page 5: Caltech Optical Observatories PALM-3000...Caltech Optical Observatories PALM-3000 Management Report 2007 Feb 14 Richard Dekany ... 7/11/07 15-Jul-074 JPL CoDR SW Req Draft P3K Optics

PALM-3000 TWiki Sitehttp://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Palomar/Palm3000/WebHome

Personnel DirectoryTeam Meetings

IPT Agenda / MinutesRequirements Documents

Management PlanTechnical Work ProductsLinks to Related Sources