CALLAWAY COUNTY ROUTE 94 OVER LITTLE TAVERN CREEK
1
PROPOSED BRIDGE TYPICAL SECTION PROPOSED BRIDGE FACTS EXISTING BRIDGE FACTS EXISTING BRIDGE EXISTING BRIDGE WAS CONSTRUCTED IN 1983 BRIDGE A4265 ROUTE 94 - BRIDGE # A4265 ROUTE 94 - BRIDGE # A42651 REHABILITATION YEAR 2020 MATCH EXISTING LENGTH AND WIDTH LENGTH = 121' AND ROADWAY WIDTH = 32'- 10"' CALLAWAY COUNTY ROUTE 94 OVER LITTLE TAVERN CREEK INSTALL BRIDGE DECK OVERLAY TRAFFIC IMPACTS TOTAL PROJECT DURATION WILL BE APROXIMATLEY 2 WEEKS. CONSTRUCTION UTLIZING A TEMPORARY TRAFFIC SIGNAL. BRIDGE WILL BE OPEN TO ONE-WAY TRAFFIC DURING
Transcript of CALLAWAY COUNTY ROUTE 94 OVER LITTLE TAVERN CREEK
![Page 1: CALLAWAY COUNTY ROUTE 94 OVER LITTLE TAVERN CREEK](https://reader030.fdocuments.in/reader030/viewer/2022012121/61dd9db4cded8d542a54770d/html5/thumbnails/1.jpg)
PROPOSED BRIDGE TYPICAL SECTION
PROPOSED BRIDGE FACTSEXISTING BRIDGE FACTS
EXISTING BRIDGE
EXISTING BRIDGE WAS CONSTRUCTED IN 1983
BRIDGE A4265
ROUTE 94 - BRIDGE # A4265 ROUTE 94 - BRIDGE # A42651
REHABILITATION YEAR 2020
MATCH EXISTING LENGTH AND WIDTHLENGTH = 121' AND ROADWAY WIDTH = 32'- 10"'
CALLAWAY COUNTY
ROUTE 94 OVER LITTLE TAVERN CREEK
INSTALL BRIDGE DECK OVERLAY
TRAFFIC IMPACTS
TOTAL PROJECT DURATION WILL BE APROXIMATLEY 2 WEEKS.
CONSTRUCTION UTLIZING A TEMPORARY TRAFFIC SIGNAL.
BRIDGE WILL BE OPEN TO ONE-WAY TRAFFIC DURING