Call sheet 2
1
CALL SHEET 2 for 20.03.13 Date and time: 20.03.13 9:14 – 10:25 Location: School Corridor Script scene no.s: 1a We want to get this first shot perfect as it is the first shot and what grabs the attention of the audience. Contributors: Saif Mian Contributors Contact Details: 07581318707 Crew; Rianne Hanooman and Zahra Khan – Camera people Riane Hanooman and Zahra Khan – Directors. Equipment: Trolley, String to make track, Camera, Tripod Travel Arrangements: N/A as we are shooting in school.
-
Upload
zahra-khan -
Category
Documents
-
view
212 -
download
0
description
srgtdtyrtuytyutuuy
Transcript of Call sheet 2
![Page 1: Call sheet 2](https://reader030.fdocuments.in/reader030/viewer/2022020421/568bf2f71a28ab8933988f20/html5/thumbnails/1.jpg)
CALL SHEET 2 for 20.03.13
Date and time: 20.03.13 9:14 – 10:25
Location: School Corridor
Script scene no.s: 1a
We want to get this first shot perfect as it is the first shot and what grabs the
attention of the audience.
Contributors: Saif Mian
Contributors Contact Details: 07581318707
Crew; Rianne Hanooman and Zahra Khan – Camera people
Riane Hanooman and Zahra Khan – Directors.
Equipment: Trolley, String to make track, Camera, Tripod
Travel Arrangements: N/A as we are shooting in school.