CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR...

21
CALIBRATION AND RE-PROCESSING STATUS Calibration Status VIS will be completed in September IR will be completed in October Microwave ready back to 98, earlier ??? Re-processing Sequence: Ancillary will be completed in September ISCCP/GPCP will start in November

Transcript of CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR...

Page 1: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

CALIBRATION ANDRE-PROCESSING STATUS

• Calibration Status–VIS will be completed in September– IR will be completed in October–Microwave ready back to 98, earlier ???

• Re-processing Sequence:

Ancillary will be completed in September

ISCCP/GPCP will start in November

SRB will start in January

SeaFlux & LandFlux will start in March

Page 2: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

VIS CAL Evaluation Summary

AVHRR vs MODIS & NOAA Cal

ISCCP Biased LOW by ≤ 3%, RMS ≤ 4%

(Except NOAA-17 at 8% & 9%)

Afternoon Satellites Generally Agree

Some Degradation Trends Need to be Adjusted

(NOAA-7 & 17 but NOT NOAA-9 or 18)

Some Re-evaluations of Degradation Record

(Especially Morning Satellites, NOAA-10 & 12)

Page 3: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

COMPARISONS TO NOAA-9 and NOAA-18

Page 4: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

RE-EVALUATIONS

Page 5: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

RE-EVALUATIONS

Page 6: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

VIS CAL Evaluation Summary

MODIS-DCC Calibration of 12 Geos – Gain

ISCCP Biased LOW by 2-4%, RMS 2-4%

ISCCP Results Noisier than Doelling Results

A Few Degradation Trend Differences

Some “Local” Discrepancies

Page 7: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

VIS CAL Evaluation Summary

Overall Evaluation of Accuracy:

About 3% “ABSOLUTE”

BUT

What is Uncertainty of Moon?

What is Uncertainty of MODIS?

What is Uncertainty of Earth Targets?

Page 8: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

Common Data Format

• 1 Degree Equal-Area Mapping (0,0 is corner)• 3 hr 1 day Time intervals (lowest common?)

– (month/year) file names• Binary – Byte Coding

– reserved missing data code• Fixed Variable Arrays• Area statistics and joint histograms• netCDF4 format

Page 9: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,
Page 10: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

ISCCP Status Overview

• Processing– D-Version Completed: July 1983 – December 2009 (26.5 yr)– B1 Deliveries up to date– Calibration Finished thru December 2009 (SCC ends 2011)

• Revisions– Cloud Detection Algorithm Finished for B1U w polar revision– Cloud Retrieval Revisions Finished (still testing) except for

aerosols & land reflectance

• Re-engineering– Code Modernized, Adapted to B1U/GAC & Ported– NCDC has run complete version– Still have to Revise Ancillary Inputs– New Products (H-Version) Designed

Page 11: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

VIS Monitor PM Orbiters

MODISPOINT

Estimated Relative Uncertainty

Page 12: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

FINAL ISCCP D-VERSION CLIMATOLOGY

CA = 66.3% TAU = 3.9

PC = 572 mb TC = 261.6K

Page 13: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

FINAL ISCCP D-VERSION CLIMATOLOGY

TS = 288.7K RS = 0.14

Page 14: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

NEW DATA PRODUCTS• B1U Radiances

• ANCILLARY: Lnd/Wtr Mask & Topography, Landcover, Ozone, Merged Snow-Ice, Atmospheric Temperature & Humidity

• HXS: high-res, pixel (10 km), single-satellite (like old DX)• HXG: high-res, pixel, global (global-DX reduced to common

variables, in netCDF)

• All gridded products in netCDF• HGS: high-res, gridded (1°), single-satellite (DS-plus)• HGG: high-res, gridded, global (like old D1, merged DS)• HGH: high-res, gridded, hourly-monthly mean (like old D2)• HGM: high-res, gridded, monthly-mean (like old D3)

• FH Radiative Flux Products (INPUT, PROF, TOA, SRF, MON)

Page 15: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

Remaining Tasks & Re-Processing Plan

• IR calibration and/or revise spectral treatment

• Testing whole system

• Reviewing whole record for small glitches -- QC development

• Re-processing plan:– Start with 2009 incorporating FY-2C/E– Re-process in reverse chronological order– Process 2010 incorporating Brazil-GOES as soon as Calibration Ready– Finish whole record adding 2011

• Replace/revise VIS calibration procedures – after start

Page 16: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,
Page 17: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

JOINT PRODUCT DESIGN& SUGGESTED USES

• Joint Product Design (List Contents -- Handout)

• Suggested Uses– Characterize Exchanges (and imbalances) for

• Forced Variability (diurnal, seasonal)• Weather-scale Variability (aka Internal Modes, convective,

baroclinic)• Slow modes (MJO, interannual, ENSO, etc)

– Generation of APE– E&W Transports & their Variations– Exchange Process Studies

Page 18: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,
Page 19: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

POLAR PRIORITIES

• Sea Ice Surface Temperature

• Better Atmospheric Temperature Profiles

• Precipitation

• Cloud Vertical Structure

Page 20: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,
Page 21: CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,

SUGGESTED MODEL DIAGNOSTICS

• Distributions of diabatic heating

• Composite Weather State Variation Statistics

• Forced Modes: Amplitude & Phase

• Internal Modes: Variance with Space-Time Scales

• Slow Modes: Frequencies of Occurrence, Geographic Patterns, Amplitude Distributions