CALCULATION OF IMPERVIOUS COVERAGE PROJECT INFORMATION Date: Address: Applicant’s Printed Name: Applicant’s Signature: ______________________________ Existing Sq. Ft. Addition Sq. Ft. Final Sq. Ft. 1. Building(s) (e.g., house, garage, storage) + = + 2. Parking Lot + = 3. Driveway/Sidewalk/Patios/Carports + = + 4. Swimming Pool/Detention Ponds + = 5. Others + = sq. ft. B Total Area of Lot: sq. ft. C Percentage Impervious area Calculation ( ÷ ) x 100 = % B C NOTE: Refer to Section 5.7 of The City of El Campo Design Manual for the Approval and Acceptance of Infrastructure for Stormwater Requirements. A + + + Total area of impervious cover (A):
Transcript of CALCULATION OF IMPERVIOUS COVERAGEPROJECT …
CALCULATION OF IMPERVIOUS COVERAGE
PROJECT INFORMATION Date:
Address:
Applicant’s Printed Name:
Applicant’s Signature: ______________________________
Existing Sq. Ft. Addition Sq. Ft. Final Sq. Ft.
1. Building(s) (e.g., house, garage, storage) + = +
2.
Parking Lot
+ =
3.
Driveway/Sidewalk/Patios/Carports
+ = +
4. Swimming Pool/Detention Ponds + =
5. Others + =
sq. ft.
B Total Area of Lot: sq. ft.
C Percentage Impervious area Calculation
( ÷ )x 100 = %B C
NOTE: Refer to Section 5.7 of The City of El Campo Design Manual for the Approval and Acceptance of Infrastructure for Stormwater Requirements.
A
+
+
+
Total area of impervious cover (A):