Calculation for Needed Cooling Capacity in UDH DCO Battery Room

1
Calculation for needed cooling capacity in UDH DCO battery Room Estimation of total heat gain = 18149 BTU/hr CFM needed: 18149/(1.1*17) = 970.5 CFM Estimation of total heat gain based on temperature measurements 1.1*475*19 = 9930 BTU/hr The idea is that 970.5 – 475 = 500 CFM need to be added to the duct into the battery room So this means 500 CFM need to be added to the indoor unit of the DC room. Also cooling capacity of 1.1*500*17 = 9350 BTU/hr need to be added to the capacity of the indoor unit. Saudi Aramco: Company General Use

description

Estimating the heat gain load for a communication battery room

Transcript of Calculation for Needed Cooling Capacity in UDH DCO Battery Room

Page 1: Calculation for Needed Cooling Capacity in UDH DCO Battery Room

Calculation for needed cooling capacity in UDH DCO battery Room

Estimation of total heat gain = 18149 BTU/hr

CFM needed:

18149/(1.1*17) = 970.5 CFM

Estimation of total heat gain based on temperature measurements

1.1*475*19 = 9930 BTU/hr

The idea is that 970.5 – 475 = 500 CFM need to be added to the duct into the battery room

So this means 500 CFM need to be added to the indoor unit of the DC room. Also cooling capacity of

1.1*500*17 = 9350 BTU/hr need to be added to the capacity of the indoor unit.

Saudi Aramco: Company General Use