Calc.sheet Bridge Mockup

download Calc.sheet Bridge Mockup

of 145

Transcript of Calc.sheet Bridge Mockup

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580

    Project No.

    K-1135 Rev. 00 Page No.

    1 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    PPRROOJJEECCTT NNOO.. :: ((KK-- 11113355))

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK CONTRACT

    RA/214

    CCAALLCCUULLAATTIIOONN SSHHEEEETT

    FFOORR

    T I M B E R H 2 0 & S O L D I E R P A N E L S

    F O R B R I D G E M O C K U P

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    2 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    1 - INDEX OF CALCULATION SHEET

    1. Index of Calculation Sheet Page 2 2. Approvals Page 4 3. Regulations and Standards Page 14

    4. Design Brief Page 15 1-Scope of Supplier and Contractor Page 15

    2 -Formwork Material Technical Data Page 16

    3-Preliminary Formwork Shape Page 22

    5. Design Data of Concrete Page 25 5.1 TABLE (01) Typical Table Page 25

    5.2 TABLE (02) Big Web Page 26

    5.3 TABLE (03) Pier Table Page 27

    6. Formwork Design 6.1 - TABLE (01): Page 28

    6.1.1 - Design Loadings: Page 28

    6.1.2 - Check Elements: Page 36

    1- Soldier ][ 10 Page 45

    2- Turnbuckles Page 48

    3- Suppoting System Page 51

    A - Horizontal Side Panels (Platform) Page 52

    B Next to Inclined Web Panels Page 55

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    3 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    C Under Bottom Slab Panels Page 58

    6.2 - TABLE (03) Pier Table: Page 61

    6.2.1 - Design Loadings: Page 61

    6.2.2 - Check Elements: Page 69

    1- Soldier ][ 10 Page 77

    2- Turnbuckles Page 78

    3- Supporting System Page 86

    A Horizontal Side Panels (Platform) Page 87

    B Inclined Side Panels Page 90

    C- Next to Inclined Panels Page 93

    D Under Bottom Slab Panels Page 96

    7. Used Tables & Formulas Page 99

    8. Technical Reports and Tests Page 111

    9. Typical Method of Statement Page 136

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    4 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. APPROVAL

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    5 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    6 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    7 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    8 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    9 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    10 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    11 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    12 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    13 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    14 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. REGULATIONS AND STANDARDS

    1. Project Specification

    2. QCS 2010, Section 5- part 9: Formwork

    3. BS 5975 2008, General Section 1.1: Scope.

    4. BS 5975 2008, General Section 1.2: Normative references.

    5. BS 5975 2008, General Section 1.5: Leglislation.

    6. BS 5975 2008, Section 2: Procedural control of temporary works.

    7. BS 5975 2008, Section 8: Design Brief.

    8. BS 5975 2008, Falsework- Section3 part 16.3: Steel work (other than scaffold

    9. BS 5975 2008, Falsework- Section3 part 16.4: Timber.

    10. BS 5975: 2008, Falsework- Section3 part 17: Loads Applied to False work.

    11. BS 5975: 2008, Annex A Permissible Stresses and Modulus of Elasticity for Steel

    Grades in Falsework.

    12. BS 5975: 2008, Annex D (normative) Data on Material Properties.

    13. BS 5975: 2008, Annex L (informative) Derivation of Simplified Wind Calculations

    For False work

    14. BS 5975: 2008, Annex G (informative) Examples of design brief contents

    15. SAP 2000 : Structural Analysis Program

    16. BS 5950-2000:- Code of Design Steel In SAP 2000.

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    15 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4. Design Brief

    4.1 Scope of Supplier and Contractor:- Refer to Regulations and Standards No. 7

    A) Acrow Qatar Scope of Works :

    1. Supplying of Formwork System (Shoring &Decking)

    2. Supplying Tilting System (Turnbuckle)

    3. Supplying Tying System (Tie Rods &Acrow Bolts &Steel Washers & Wing

    nuts& Splices & Rivet Pins)

    4. Supplying Of Fitting System for Connecting Decking &Shoring

    (Couplers. Scaffolding Tube)

    5. Typical Method of Statement.

    B) Main Contractor Scope of Works :-

    1. Supplying and Designing of R.C Blocks under Shoring.

    2. Supplying and Design of timber used for Top Slab & Boarding.

    3. Supplying of Plywood for Sheeting

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    16 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4.2 FORMWORK MATERIALS

    TECHNICAL DATA

    1) Plywood 18mm: (Supplied by Main Contractor)

    Plywood is subjected to only Lateral force from concrete pressure

    Section Properties: For 1.00 m wide

    Area (A) = 100(1.8) = 180 cm2

    Moment of Inertia (I) = 100(1.8)3/12 = 48.60 cm4

    Section Modules (Z) = 100(1.8)2/6 = 54.00 cm3

    Max. Allowable deflection in whole panel members.

    Shall not exceed 4mm (See Part 3 Clause 3.1 C of Reference No. 1)

    Allowable bending stress in plywood (Fall) = 1.40 KN/cm2

    Modules of Elasticity (E) for plywood = 800.0 KN/cm2

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    17 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2) Timber Beams H20: Refer to Attached Technical Report for H20

    Timber H20 is subjected to only Lateral force from concrete

    pressure

    Section Properties: -

    1. Moment of Inertia (Ix) = [3.20 x 12.03 / 12] + 2 x [(8.0 x 4.03 / 12) + (8.0 x

    4.0 x 8.02)] = 4642.13 cm4 4600.00 cm4

    2. Section Modules (Zx) = Ix / Ymax. = 4600.0/10.0 = 460.00 cm3

    3. Area (A) = 102.40 cm2

    Allowable Bending Moment = 5.0 KN.m

    Allowable Shear Force = 11.0 KN

    Max. Allowable Deflection in whole panel members.

    Shall not exceed 4mm (See Part 3 Clause 3.1 C of Reference No. 1)

    (E) for H20 = 924.50 KN/cm2

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    18 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3) Soldier ][10: Refer to Attached Technical Report for Soldier

    Section Properties: -

    1. Area (A) = 27.00 cm2

    2. Moment of Inertia (I) = 412 cm4

    3. Section Modules (Z) = 82.4 cm3

    Max. Allowable Deflection in whole panel members.

    Shall not exceed 4mm (See Part 3 Clause 3.1 C of Reference No. 1)

    Allowable Bending stress in steel (Fall) = 14.89 KN /cm2

    Modules of Elasticity (E) for steel = 19990.0 KN/cm2

    Permissible Bending Moment = 12.27 KN.m

    50 52 50

    152

    140

    5050

    100

    40

    15

    25

    152

    2626

    9mm

    25252525

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    19 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4) 2- Channel Splice:-

    Section Properties:

    A = 7.96 cm2

    I = 72.78 cm4

    Z = 17.12 cm3

    Allowable bending stress in steel (Fall.) = 0.60 x Fy

    = 1.489 t/cm2

    (E) Modulus of Elasticity for steel = 19990.00 kn/cm

    Max. Allowable Deflection in Plate (68.8x8.0) = 4.00mm

    (According to Project Specification)

    5) Splice 60 :-

    Section Properties:

    A = 12.80 cm2

    I = 68.26 cm4

    Z = 17.06 cm3

    Allowable bending stress in steel (Fall.) = 0.60 x Fy

    = 1.489 t/cm2

    (E) Modulus of Elasticity for steel = 19990.00 kn/cm

    Max. Allowable Deflection in Plate (68.8x8.0) = 4.00mm

    (According to Project Specification)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    20 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6) Ties: (Tie Rod DVD 16.00 mm)

    Tie Rods is subjected to only axial force from concrete pressure.

    Allowable Tensile Force = 90.0 KN

    See Attached Test for DVD TIES

    See Attached Technical Report for DVD TIES

    7) Shore Brace Frame:

    Allowable load on frame = 110.0 KN

    See Attached Test for Shore Brace

    8) Telescopic Frame:-

    Allowable Load on Frame = 110.0 KN

    See Attached Test for Telescopic Frame

    9) Acrow Cross Brace:

    See Attached Techinical Report for Acrow Cross Brace.

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    21 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    10) Post Head Jack:

    Allowable Load on Post= 70.0 KN

    See Attached Test for Post Head Jack

    11) Double Coupler:

    Allowable Slipping Force = 6.0 KN

    See Attached Test for Double Coupler

    12) Scaffolding Tube:

    See Attached Techinical Report for

    Scaffolding Tube

    13) Rivet Pin 17.0 mm, L=12.50 cm (Type I)

    Permissible Shear Force: 80.0 KN

    Dimension L=12.50 cm & Dia =1.70 cm

    Attached Technical Report for Acrow Bolt

    Attached Test for Rivet pin

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    22 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4.3 Preliminary Formwork Shape

    (Not Considered As Shop Drawings)

    Sp

    lice

    60

    cm

    (double

    )

    Sp

    lice

    60

    cm

    (double

    )

    Pu

    sh

    Pu

    ll P

    PS

    25

    2

    Push P

    ull P

    PS

    252

    Pu

    sh

    Pu

    ll PP

    S2

    52

    Push P

    ull P

    PS

    252

    Sp

    lice

    60

    cm

    (double

    )

    Sp

    lice

    60

    cm

    (double

    )

    Push P

    ull P

    PS

    252

    Push P

    ull P

    PS

    252

    Splice

    60cm (d

    ouble)

    Sp

    lice

    60

    cm

    (double

    )

    Sp

    lice

    60

    cm

    (double

    )

    Pu

    sh

    Pu

    ll P

    PS

    25

    2

    Push P

    ull P

    PS

    252

    Pu

    sh

    Pu

    ll PP

    S2

    52

    Push P

    ull P

    PS

    252

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    23 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    24 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    25 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    5 - DESIGN DATA OF FORMWORK

    TABLE(01) : Typical Tables Web Width =0.256/0.362 m

    From Project's drawing for H= 2.50 m

    Total Depth of Deck slab = 250.0 cm

    Slab Thickness of Cant .slab = (45.60 &22.50) cm

    Slab Thickness of Bottom slab = (25.0) cm

    Slab Thickness of Top slab = (25.00) cm

    Thickness of Web Girders = (25.60&36.20) cm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    26 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    TABLE(2) : Web Width=0.462/0.356m

    From Project's drawing for H= 2.50 m

    Total Depth of Deck slab = 250.0 cm

    Slab Thickness of Cant .slab = (45.60 &22.50) cm

    Slab Thickness of Bottom slab = (25.0) cm

    Slab Thickness of Top slab = (25.00/37.10) cm

    Thickness of Web Girders = (35.80&46.20) cm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    27 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Table at Pier TABLE (03):-

    From Project's drawing for H= 2.50 m

    Total Depth of Deck slab = 250.0 cm

    Slab Thickness of Cant .slab = (45.60 &22.50) cm

    Slab Thickness of Bottom slab = (70.0/120.0) cm

    Slab Thickness of Top slab = (48.0) cm

    Thickness of Web Girders = (103.50) cm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    28 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6 - CHECK ELEMENTS

    6.1 TABLE (T1)

    6.1.1 - DESIGN LOADINGS

    1) Dead Load :- Refer to Regulations and Standards No. 10

    Specific Weight of R.C s = 25.0 KN/m3

    2) Live Load :- Refer to Regulations and Standards No. 2

    Live Load = 2.50 KN/m2

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    29 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3) Wind Pressure: - Refer to Regulations and Standards No. 10 & 13

    Assuming Speed Wind on Doha =45 m/s

    Vs is the site wind speed (in m/s)

    Vb is the basic wind speed

    Sa is an altitude factor (see L.3)

    Sd is a direction factor (see L.4) (0.73 < Sd < 1.0)

    Ss is a seasonal factor (see L.5); and (0.71 < Ss < 1.0)

    Sp is a probability factor (see L.6). (0.749 < Sp < 1.263)

    Ve is the effective wind speed

    q is the dynamic wind pressure (N/m2; see 17.5.1.3)

    f is the force on a component (N);

    q is the dynamic pressure (N/m2; see 17.5.1.3);

    cs is the site coefficient (see 17.5.1.10);

    cf is the force coefficient for the component (see 17.5.1.11);

    Ae is the effective area of the component (see 17.5.1.12); and

    h is the shielding factor (see 17.5.1.13).

    Q= f (wind on Soffit)+f(wind on side edge) (N)

    Ww Distributed load on Bridge Deck

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    30 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    P Is Point Load on Soldier

    Sa = 1.0

    Sd = 0.75

    Ss = 0.84 Recommended

    Ranges from 0.71 < Ss < 1.0

    Sp = 1.0 Recommended

    Ranges from 0. 749 < Ss < 1.263

    VS = Vb X Sa X Sd XSs X Sp

    Vs = 45x1.0 x0.84x1.00x1.0

    Vs = 28.35 m/s

    Ve = Vs X Sb

    Sb = 1.78 from table 15

    Ve = 550.46 m/s

    qs =0.613Ve2

    qs = 1561.0 N/m2

    Wind on Side Formwork:-

    cf = 1.80 See Clause 17.5.1.14.3

    Ae = 2.315x1.0 =2.315 m2

    = 1.0 see Table M.1

    Cs = 0.30 Recommended

    ( Cs the site coefficient see Clause 17.5.1.10 mentioning that it Ranges from 0.25 and 1.00 )

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    31 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Q = q x Cs x Cf x Ae x

    =1561.0 x1.8 x 2.315 x0.3

    Q = 1951.40N

    Check for Wind Load

    Max Distance between Soldier on Horizontal Direction (L) = 1.325 m

    Total load on soldiers = Q x L

    = 1951.40x1.325=2.58 KN

    P Is Point Load on Soldier = (2.58)/2

    = 1.29 KN

    Spl

    ice

    60cm

    (do

    uble)

    Splice 60cm (do

    uble)

    Splice 60cm

    (double)

    Splice 60cm (double)

    Pu

    sh

    Pu

    ll P

    PS

    252

    Pu

    sh

    Pu

    ll PP

    S252

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    32 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    ACTING LOADS :-

    W1 Load on Side Walk

    W2, W3 ,W4, W5 Load on Cantilever Slab of Bridge

    W6, W7, W8, Load on Inclined Web

    W9, W10 Load on Bottom Slab

    D = 1.2 Spacing between Soldiers

    - Max span for soldier = 1.325m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    33 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    W1 = [L.L / SIDE WALK] x 1.325

    = [2.50] x 1.325 = 3.31 KN/m

    W2 [ con x (ts = 0.525m) + L.L ] x 1.325

    W2 = [0.525 x25.00+2.50] x 1.325 = 20.70 KN/m

    W3 [ con x (ts = 0.225m) + L.L ] x 1.325

    W3 = [0.225 x25.00+2.50] x 1.325 = 10.76 KN/m

    W4 [ con x (ts = 0.456:0.225 m) + L.L ] 1.325

    W4min = [0.225x25.00+2.50] x 1.325 = 10.76 KN/m

    W4(max) = [0.456x25.00+2.50] x 1.325 = 18.42 KN/m

    W5 [ con x (ts = 0.64 :0.456 m) + L.L ] x 1.325

    W5min = [0.456x25.00+2.50] x 1.325 = 18.42 KN/m

    W5(max) = [0.64x25.00+2.50] x 1.325 = 24.52 KN/m

    W6 [ con x (ts = 1.37: 0.64m) + L.L ] x 1.325 xcos58

    W6(maxt) = [1.37x25.00+2.50] x 1.325x cos 58 = 25.80 KN/m

    W6(min) = [0.64x25.00+2.50] x 1.325 x cos 58 = 9.76 KN/m

    W7 [ con x (ts = 0.73: 0.53 m) + L.L ] x 1.325 x cos 58

    W7(maxt) = [0.73x25.00+2.50] x 1.325 x cos 58 = 14.57 KN/m

    W7(min) = [0.53x25.00+2.50] x 1.325 x cos 58 = 11.05 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    34 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    W8 [ con x (ts = 0.338 : 0.53m) + L.L ] x 1.325

    W8min = [0.338 x25.00+2.50] x 1.325 = 14.50 KN/m

    W8min = [0.53 x25.00+2.50] x 1.325 = 20.86 KN/m

    W9 [ con x (ts = 0.25 :0.338) + L.L ] x 1.325

    W9(min) = [0.25 x25.00+2.50] x 1.325 = 11.59 KN/m

    W9max = [0.338 x25.00+2.50] x 1.325 = 14.50 KN/m

    W10 [ con x (ts = 0.25m) + L.L ] x 1.325

    W10(maxt) = [0.25x25.00+2.50] x 1.325 = 11.59 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    35 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Load From Top Slab (Point Loads ):-

    P from wind load = 1.29 KN

    P1,2,3 con x Area x 1.325

    P1 = 25x0.40x 1.325 = 13.25 KN/m

    P2 = 25x 0.437x 1.325 = 14.47 KN/m

    P3 = 25x 0.355x1.325 = 11.75 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    36 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6.1 TABLE (01)

    Modeling in SAP TABLE (T1) Refer to Regulations and Standards No. 15

    1. Defining Code in SAP

    Conversion Factor from Ton = 10 KN (UK Ton unit of Measure)

    6 - CHECK ELEMENTS

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    37 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Grid in SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    38 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. Defining Sections In SAP 3.1 Timber Beam H20

    3.2 Soldier Beam] [10

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    39 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3.3 Turnbuckle PPS 202 3inch x2.50mm

    3.3 Turnbuckle PPS 252 2inch x2.50mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    40 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4. Statical System of Sections in SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    41 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    5. DefiningDistrbuted Loads In SAP

    6. Defining Concentrated Loads In SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    42 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    7. Release Moment In SAP

    OutPut From SAP

    1.1 Deformed Shape

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    43 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    1.2 Axial Force Diagram

    1.2 Shear force Distribution

    1.3 Moment Distribution

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    44 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Sections Design & Checked by SAP Refer to Regulations and Standards No.16

    Modeling of Soldier in SAP2000 Refer to Regulations and Standards No. 16 As Shown above for (Moment & Shear & Axial Force)

    1. Hl Soldier] [10

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    45 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Inclined Soldier] [10 (1)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    46 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. Inclined Soldier] [10 (2)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    47 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4. Inclined Soldier ][ 10 (3)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    48 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    5. TURNBUKLE PPS(1) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    49 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6. TURNBUKLE PPS(2) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    50 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    7. TURNBUKLE PPS(3) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    51 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. CHECK ON SUPPORT:-

    Modeling of Shore brace in SAP2000 Refer to Regulations and Standards No. 15

    As Shown above

    Reaction from Sap

    Maximum Reaction Load = 39.88 KN

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    52 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    A. HORIZONTAL SIDE PANELS(Platform) : (Not Considered As Shop Drawings)

    Cantilever Slab Panel

    A.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.479 m

    Wmax. = (Ts x 25 +2.5) = 0.525x25+2.50 = 15.625 KN/m2

    Check for moment :

    M = W L2 / 10

    = 15.625 (0.479)2 / 10 = 0. 358 m.KN

    Zreq = M / fall = 0. 358x 100 / 1.40 = 25.57 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 47.90 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 15.625 x (47.9)4 x 10 / 100 x 800x 48.60

    = 1.43mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    53 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    A. 2. SECONDARY BEAMS (TIMBER H20, L=2.50 m):-

    W = Spacing x Wmax.

    W = 15.625 x 0.479

    W = 7.48 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    54 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 1.98 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 5.46 KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 1.811 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K. Safe

    A.3Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    55 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    B. INCLINED SIDE PANEL: (Not Considered As Shop Drawings)

    Inclined Slab Panel

    B.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.405 m

    Wmax. = (Ts x 25 +2.5) = 0.445x25+2.50 = 13.625 KN/m2

    Check for moment :

    M = W L2 / 10

    = 13.625 (0.405)2 / 10 = 0. 22 m.KN

    Zreq = M / fall = 0. 22x 100 / 1.40 = 15.96 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 40.50 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 13.625 x (40.5)4 x 10 / 100 x 800x 48.60

    = 0.64mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    56 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    B. 2. SECONDARY BEAMS (TIMBER H20, L=2.50 m):-

    W = Spacing x Wmax.

    W = 13.625 x 0.405

    W = 5.52 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

    H20 Connection

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    57 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 1.46 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 4.04KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 1.339 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K. Safe

    A.3Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    58 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    C. UNDER BOTTOM SLAB PANELS: (Not Considered As Shop Drawings)

    C.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.521m

    Wmax. = (Ts x 25 +2.5) = 0.25 x25+2.50 = 8.75KN/m2

    Check for moment :

    M = W L2 / 10

    = 8.75 x (0.521)2 / 10 = 0. 238 m.KN

    Zreq = M / fall = 0.238x 100 / 1.40 = 17 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 55.3 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 8.75 x (52.1)4 x 10 / 100 x 800x 48.60

    = 1.13 mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    59 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    C. 2. SECONDARY BEAMS (TIMBER H20, L=2.50 m):-

    W = Spacing x Wmax.

    W = 8.75 x 0.521

    W = 4.56 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    60 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    1. Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 1.21KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 3.34KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 1.10 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K.. Safe

    C.3.Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    61 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6 - CHECK ELEMENTS

    6.2 TABLE (T2)

    6.2.1 - DESIGN LOADINGS

    1) Dead Load :- Refer to Regulations and Standards No. 10

    Specific Weight of R.C s = 25.0 KN/m3

    2) Live Load :- Refer to Regulations and Standards No. 2

    Live Load = 2.50 KN/m2

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    62 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3) Wind Pressure: - Refer to Regulations and Standards No. 10 & 13

    Assuming Speed Wind on Doha =45 m/s

    Vs is the site wind speed (in m/s)

    Vb is the basic wind speed

    Sa is an altitude factor (see L.3)

    Sd is a direction factor (see L.4) (0.73 < Sd < 1.0)

    Ss is a seasonal factor (see L.5); and (0.71 < Ss < 1.0)

    Sp is a probability factor (see L.6). (0.749 < Sp < 1.263)

    Ve is the effective wind speed

    q is the dynamic wind pressure (N/m2; see 17.5.1.3)

    f is the force on a component (N);

    q is the dynamic pressure (N/m2; see 17.5.1.3);

    cs is the site coefficient (see 17.5.1.10);

    cf is the force coefficient for the component (see 17.5.1.11);

    Ae is the effective area of the component (see 17.5.1.12); and

    h is the shielding factor (see 17.5.1.13).

    Q= f (wind on Soffit)+f(wind on side edge) (N)

    Ww Distributed load on Bridge Deck

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    63 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    P Is Point Load on Soldier

    Sa = 1.0

    Sd = 0.75

    Ss = 0.84 Recommended

    Ranges from 0.71 < Ss < 1.0

    Sp = 1.0 Recommended

    Ranges from 0. 749 < Ss < 1.263

    VS = Vb X Sa X Sd XSs X Sp

    Vs = 45x1.0 x0.84x1.00x1.0

    Vs = 28.35 m/s

    Ve = Vs X Sb

    Sb = 1.78 from table 15

    Ve = 550.46 m/s

    qs =0.613Ve2

    qs = 1561.0 N/m2

    Wind on Side Formwork:-

    cf = 1.80 See Clause 17.5.1.14.3

    Ae = 2.315x1.0 =2.315 m2

    = 1.0 see Table M.1

    Cs = 0.30 Recommended

    ( Cs the site coefficient see Clause 17.5.1.10 mentioning that it Ranges from 0.25 and 1.00 )

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    64 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Q = q x Cs x Cf x Ae x

    =1561.0 x1.8 x 2.315 x0.3

    Q = 1951.40N

    Check for Wind Load Max Distance between Soldier on Horizontal Direction (L) = 1.325 m

    Total load on soldiers = Q x L

    = 1951.40x1.875=3.60 KN

    P Is Point Load on Soldier = (3.60)/2

    = 1.80 KN

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    65 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    ACTING LOADS :-

    W1 Load on Side Walk

    W2, W3 , W4, W5 Load on Cantilever Slab of Bridge

    W6, W7, W8 Load on Inclined Web

    W9, W10 , W11 Load on Bottom Slab

    D = 1.80 Spacing between Soldiers

    - Max span for soldier = 1.875m

    W1 = [L.L / SIDE WALK] x 0.975

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    66 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    = [2.50] x 1.875 = 4.68 KN/m

    W2 [ con x (ts = 0.525) + L.L ] x 1.875

    W2 = [0.525x25.00+2.50] x 1.875 = 29.30 KN/m

    W3 [ con x (ts = 0.225) + L.L ] x 1.875

    W3 = [0.45x25.00+2.50] x 1.875 = 15.23 KN/m

    W4 [ con x (ts = 0.459:0.225 m) + L.L ] 1.875

    W4min = [0.225x25.00+2.50] x 1.875 = 15.23 KN/m

    W4(max) = [0.459x25.00+2.50] x 1.875 = 26.20 KN/m

    W5 [ con x (ts = 0.459 : 0.688 m) + L.L ] x 1.875

    W5min = [0.459 x25.00+2.50] x 1.875 = 26.20 KN/m

    W5(max) = [0.688x25.00+2.50] x 1.875 = 36.93 KN/m

    W6 [ con x (ts = 0.688: 2.24 m) + L.L ] x 1.875x cos 58

    W6(maxt) = [2.24x25.00+2.50] x 1.875 x cos 58 = 58.1 KN/m

    W6(min) = [0.688x25.00+2.50] x 1.875 x cos 58 = 19.57 KN/m

    W7 [ con x (ts = 2.24 m) + L.L ] x 1.875 x cos 58

    W7(maxt) = [2.50x25.00+2.50] x 1.875 x cos 58 = 58.12 KN/m

    W8 [ con x (ts = 1.84: 2.50m) + L.L ] x 1.875

    W8max = [2.5 x25.00+2.50] x 1.875 = 121.87 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    67 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    W8min = [1.84 x25.00+2.50] x 1.875 = 90.93 KN/m

    W9 [ con x (ts = 1.84:1.20) + L.L ] x 1.875

    W9(max) = [1.84 x25.00+2.50] x 1.875 = 90.93 KN/m

    W9(min) = [1.20 x25.00+2.50] x 1.875 = 60.93 KN/m

    W10 [ con x (ts = 0.70 :1.20 m) + L.L ] x 1.875

    W10(min) = [1.20x25.00+2.50] x 1.875 = 60.93 KN/m

    W10(min) = [0.70x25.00+2.50] x 1.875 = 37.0 KN/m

    W11 [ con x (ts = 0.70 m) + L.L ] x 1.875

    W11(maxt) = [0.70x25.00+2.50] x 1.875 = 37.0 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    68 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Load From Top Slab (Point Loads):-

    P from wind load = 1.80 KN

    P1,2,3,4 con x Area x 1.40

    P1 = 25 X 0.698 X 1.40 = 24.43 KN/m

    P2 = 25 X 0.675X 1.40 = 23.625 KN/m

    P3 = 25 X 0.688 X 1.40 = 24.08 KN/m

    P4 = 25 X 0.33X 1.40 = 11.55 KN/m

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    69 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6.2 TABLE (02)

    Modeling in SAP TABLE (T2) Refer to Regulations and Standards No. 15

    1. Defining Code in SAP

    Conversion Factor from Ton = 10 KN (UK Ton unit of Measure)

    6 - CHECK ELEMENTS

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    70 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Grid in SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    71 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. Defining Sections In SAP 3.1 Timber Beam H20

    3.2 Soldier Beam] [10

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    72 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3.3 Turnbuckle PPS 2.0inch x2.50mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    73 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4. Statical System of Sections in SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    74 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    5. DefiningDistrbuted Loads In SAP

    6. Defining Concentrated Loads In SAP

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    75 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    7. Release Moment In SAP

    OutPut From SAP

    1.1 Deformed Shape

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    76 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    1.2 Axial Force Diagram

    1.3 Shear force Distribution

    1.4 Moment Distribution

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    77 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    1. Sections Design & Checked by SAP Refer to Regulations and Standards No.16

    Modeling of Soldier in SAP2000 Refer to Regulations and Standards No. 16 As Shown above for (Moment & Shear & Axial Force)

    1. Hl Soldier] [10

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    78 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Inclined Soldier] [10 (1)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    79 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. Inclined Soldier] [10 (2)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    80 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    4. Inclined Soldier] [10 (3)

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    81 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    5. TURNBUKLE PPS (1) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    82 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    6. TURNBUKLE PPS (2) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    83 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    7. TURNBUKLE PPS (3) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    84 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    8. TURNBUKLE PPS (4) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    85 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    9. TURNBUKLE PPS (5) 2.0 INCHX2.50MM

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    86 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    3. CHECK ON SUPPORT:-

    Modeling of Shore brace in SAP2000 Refer to Regulations and Standards No. 15

    As Shown above

    Reaction from Sap

    Maximum Reaction Load = 56.57 KN

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    87 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    A. HORIZONTAL SIDE PANELS(Platform) : (Not Considered As Shop Drawings)

    A.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.479 m

    Wmax. = (Ts x 25 +2.5) = 0.525x25+2.50 = 15.625 KN/m2

    Check for moment :

    M = W L2 / 10

    = 15.625 (0.479)2 / 10 = 0. 358 m.KN

    Zreq = M / fall = 0. 358x 100 / 1.40 = 25.57 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 47.90 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 15.625 x (47.9)4 x 10 / 100 x 800x 48.60

    = 1.43mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    88 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    A. 2. SECONDARY BEAMS (TIMBER H20, L=3.60m):-

    W = Spacing x Wmax.

    W = 15.625 x 0.479

    W = 7.48 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    89 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 3.05 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 6.78 KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 1.39 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K. Safe

    A.3Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    90 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    B. INCLINED SIDE PANEL: (Not Considered As Shop Drawings)

    Inclined Slab Panel

    B.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.405 m

    Wmax. = (Ts x 25 +2.5) = 0.445x25+2.50 = 13.625 KN/m2

    Check for moment :

    M = W L2 / 10

    = 13.625 (0.405)2 / 10 = 0. 22 m.KN

    Zreq = M / fall = 0. 22x 100 / 1.40 = 15.96 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 40.50 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 13.625 x (40.5)4 x 10 / 100 x 800x 48.60

    = 0.64mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    91 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    B. 2. SECONDARY BEAMS (TIMBER H20, L=3.60 m):-

    W = Spacing x Wmax.

    W = 13.625 x 0.405

    W = 5.52 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

    2. D

    e

    f

    i

    n

    i

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    92 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 2.26 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 5.01KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 2.62 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K. Safe

    B.3Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    93 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    C. NEXT TO INCLINED WEB PANELS: (Not Considered As Shop Drawings)

    D.1Plywood 18.00 mm:-

    Avg. Spacing between Acrow H20 Super (L) = 0.25 m

    Wmax. = (Ts x 25 +2.5) = 1.20 x25+2.50 = 32.50 KN/m2

    Check for moment :

    M = W L2 / 10

    = 32.50 X (0.25)2 / 10 = 0. 20m.KN

    Zreq = M / fall = 0. 20x 100 / 1.40 = 14.28 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 25.0 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 32.50 x (25.0)4 x 10 / 100 x 800x 48.60)

    = 0.22mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    94 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    C. 2. SECONDARY BEAMS (TIMBER H20, L=3.60 m):-

    W = Spacing x Wmax.

    W = 32.50 x 0.25

    W = 8.125 5KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    95 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Loads in SAP

    Deformed Shape

    Check For Moment :-

    M = 3.31 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 7.36KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 3.85 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K.. Safe

    C.3.Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    96 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    D. UNDER BOTTOM SLAB PANELS: (Not Considered As Shop Drawings)

    D.1Plywood 18.00 mm:-

    Max. Spacing between Acrow H20 Super (L) = 0.35m

    Wmax. = (Ts x 25 +2.5) = 0.70 x25+2.50 = 20.0 KN/m2

    Check for moment :

    M = W L2 / 10

    = 20.0 x (0.35)2 / 10 = 0. 245m.KN

    Zreq = M / fall = 0.245x 100 / 1.40 = 17.50 cm3 < 54.0 cm3 O.K. Safe

    Check For deflection :

    L = 0.35 cm

    = 0.0068 WL4 / EI

    = 0.0068 x 20 x (35.0)4 x 10 / 100 x 800x 48.60

    = 0.525 mm

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    97 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    D. 2. SECONDARY BEAMS (TIMBER H20, L=3.60 m):-

    W = Spacing x Wmax.

    W = 20.0 x 0.35

    W = 7.0 KN/m

    Modeling in SAP Refer to Regulations and Standards No. 15 1. Defining Grid in Sap

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    98 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

    2. Defining Loads In SAP

    Deformed Shape

    Check For Moment :-

    M = 2.86 KN.m' < 5.0 KN.m' O.K... Safe

    Check For Shear :-

    Q = 6.35KN < 11.0 KN O.K. Safe

    Check For deflection :-

    = 3.32 mm < 4 mm See Part 3 Clause 3.1 C of Reference No. (1) O.K.. Safe

    D.3.Check on main Soldier] [10 AS Shown Above

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    99 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    100 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    101 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    102 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    103 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    104 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION

    SHEET

    SUBCONTRACTOR

    CONTRACTOR

    GS ENGINEERING &

    CONSTRUCTION CO.

    SHEIKH JABER AL AHMAD AL SABAH

    CAUSEWAY PROJECT - DOHA LINK

    CONTRACT RA/214

    SUBCONTRACTOR

    Issue date

    20.09.2015 Doc. No.

    AC-00-CV-CAL-5580 Project No.

    K-1135 Rev. 00

    Page No.

    105 of 145

    CHECKED BY: Eng. M. ABD EL RASOUL CALCULATED BY: Eng. M. AHMED

    DOCUMENT TITLE

  • CALCULATION