Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

16
Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant

Transcript of Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Page 1: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Calaveras CountyAlternate Care Site Project

Douglas E. BuchananDisaster Preparedness Consultant

Page 2: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Plan: Phase I (2009)

Developed ACS Plan Conducted Site Visit of Calaveras High Developed ACS Site Plan of CHS Conducted Tabletop Exercise

4/28/11 Calaveras ACS Set-up Drill

Page 3: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Plan: Phase II (2010)

Developed Activation Detail– Patient Registration– Clinical Support Services (lab, radiology,etc.)– Environmental Services– Food Services– Security– Materials Tracking– Communications– Pharmacy

4/28/11 Calaveras ACS Set-up Drill

Page 4: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Plan: Phase III (2011)

Update Equipment and Supplies matrix Develop Team Leader Responsibilities Detail Unit/Functional Area Diagrams Equipment and Supply Movement Plan Complete ACS Resource Directory Forms Conduct ACS setup drill

4/28/11 Calaveras ACS Set-up Drill

Page 5: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Set-up Drill Objectives

1. Traffic Flow: Assess planned campus traffic flow for delivery, staging, and set-up of ACS

2. Staging: Determine optimal staging locations, signage, unloading process, & staffing

3. Team Plans: Assess set-up team plans for unit definitions, staffing, logical flow, & time requirements

4/28/11 Calaveras ACS Set-up Drill

Page 6: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Set-up Drill Objectives

4. Floor Plans: Assess draft floor plans for: a)utility, space, & fit of equipment; b) patient flow & patient movement in and out

5. Unit Design: Assess layout and functionality of each area (pt care, nursing, pharmacy, etc)

6. Power: Identify power locations and plan for access or modification of layout

4/28/11 Calaveras ACS Set-up Drill

Page 7: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

ACS Site Plans

Campus Diagram

ACS Diagram

4/28/11 Calaveras ACS Set-up Drill

Page 8: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

4/28/11 Calaveras ACS Set-up Drill

Page 9: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

4/28/11 Calaveras ACS Set-up Drill

Page 10: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Facility Set-up Plan

Defined Set-up Areas Use of Teams with Unit Leader Defined Starting Points

4/28/11 Calaveras ACS Set-up Drill

Page 11: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Scope of Set-up

Item types and amounts Insufficient quantities (alternatives) May not complete

4/28/11 Calaveras ACS Set-up Drill

Page 12: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Schedule for Drill

8:00 Staff report to CHS  8:00 Transport of Equipment/Supplies  8:10 Unloading and Staging of Equipment/Supplies  9:00 Set-up (Teams A, B, C)  1:00 Evaluation (lunch)  2:00 Breakdown & Re-stage  4:00 Reload  4:45 Transport

4/28/11 Calaveras ACS Set-up Drill

Page 13: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Assignments

Set-up Areas Team Leader Responsibilities Team Member Responsibilities

– Pick-up materials from staging area– Internally stage for opening and assembly – Measurement and placement– Set-up– Measurement verification

Demobilization

4/28/11 Calaveras ACS Set-up Drill

Page 14: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Further Training

Unit Leaders: May 5

Practicum: May 12

4/28/11 Calaveras ACS Set-up Drill

Page 15: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

Safety

Items requiring two persons Assembly safety Lifting Pushing Attire

4/28/11 Calaveras ACS Set-up Drill

Page 16: Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.

4/28/11

Thank You.

Calaveras ACS Set-up Drill