Strategies, is a leading international consultant firm and
developer of visual collaborative document and contend
management software, for various industries
By using innovative integrated and collaborative solution
Strategies ‘s solutions, enable organizations around
the world to strategically manage theirs physical
infrastructure by improving the performance of theirs
processes.
STRATEGIES
Suite of Physical Infrastructure
Management System for Office
buildings, Campus, Health Care
Facilities, Municipality
DATA CENTRES SPECIAL EDITIONA collaborative suite of design and
Product management software
for the leather industry.
n order to create a dynamic
3DRadioA specific application for
the maintenance of nuclear power
plants.
SOLUTIONS
BUSINESS GOALS
• In this context
– Buildings owners
– Data Center
Managers
– Occupier Manager
– Facilities Manager.
– Service Manager
– Energy Manager
– Must improve the
productivity of their
processes, in order to
reduce costs improve
service, and create value
BUSINESS CONTEXT
External Forces
• Green Grid
• Leed.
• Energy Costs
• Profit Center.
• Service Levels
• Disaster
recovery plan
Internal Forces
• Churn Rate
• Watts/M2
• Occupants/M2
• Intelligent
Buildings
• Cost Control
• Internal clients
satisfaction.
Unprecedented Pressure on the physical infrastructures
• ISLAND OF PRODUCTIVITY
• No Integration
– Many databases
– Difficult to maintain.
– Lack of collaboration
– No economy of scale
– Accurate indicators
difficult to obtain.
BUSINESS CONTEXT
SOLUTION INTEGRATION
• Services, Improve customers relationshipPeople
• Improve capacityProcess
• Maintain the physical infrastructure.
Techno
BENEFIT OF INTEGRATION
• A visual and integrated repository of all physical and data centerinfrastructure information.
• The visual repository aggregates :
– configuration information on all spaces and equipment in a hierarchy of scaled drawings
– maintains the relationships between assets from the physical, logical and spatial perspectives down to the detail.
– Define business process easily.
CADWIN FM for Healthcare Facilities Copyright Strategies 2009
INFORMATIONS
PORTAL
IT FM
EQUIPMENTS/DC
CHURN
REAL ESTATE
PORTFOLIO
MAINTENANCE
SERVICES and BUILDING
OPERATIONS
PREVENTIVE
MAINTENANCE
NETWORKMAC
WORKPLACE
SPACE ALLOCATION
CABLING
PORTAL
PORTAL SERVICES
SLA
CADWIN FM
REAL ESTATE PORTOLIO
• Identify Property information– Address, Code, Photo
– Rent lease
– Name of tenants
• Key information– Major repairs
– Green Performances
– Maintenance
–
• Space classification
• Cost. center , utilisation.
• Project management
• Revision control
• Reports against: • Space usage
• Space allocation
• Occupancy ratio
SPACE PROJECT
WORKPLACE
• Manage workplace and
personnel
• Directory integration
• Move and change of
personnel
• Locate personnel on
drawings
• Integration with LDAP
• Integration with HR
CABLING AND DATA CENTRES
• Catalogues 2D 3D
• Création
automatique de la
vue 3D
• Visualisation de la
réalité.
• Visite virtuelle pour
hébergeur.
• Servers, racks
• Cabling copper
fiber.
• Power
• Documentations
• Localization
• Integration
monitoring.
• Localize
• Allocate resources
• Manage availabilities
• Define SLA
• Optimize preventive
and predictive
maintenance
• Control costs.
EQUIPMENTS
BUILDING MAINTENANCE
• Capital maintenance
• Major renovations
• Audit
• Mandatory control
• Scheduling
• Reports.
17
SERVICE DESK
• Place geo referenced tickets.
• Route tickets to IT team, FM
team, (externals, internals.
• Build catalogue of services
• Control Service Level
agreements
REPORTS
• Space Planning.
• Cost Center.
• Ratio per Occupant.
• Move and Change.
• Maintenance
• Major repairs
• Energy
DATA CENTER EXTENSION
• CFMASSET
• Real Time (Vertelis Intel)
MONITOR
• Ticketing CFM others.SERVICES
• Capacity planning
• Space
– Per rack
– Per user
– Per row
• Cooling
• Power
• IT/Power trace
– Failure analysis.
24/07/2014 CADWIN FM for Data Centre
copyright Stratégies 2011
22
DATA CENTER
POWER CHAIN
• Consequence of failure
• Power chain
– Generate power trace.
– Display values at all
levels
– Generate impacted
equipment
– Generate reports.
CREDIT LYONNAIS
• Space planning
• Document Management
• Workplace
Management.
• Portal of services
– 500 00M2 Back Office
Buildings
– 2200 Branches
• Cost Center
• Disaster Recovery
• Integration with Active
Directory
• Request Tickets
• SLA.
• Internal Service
• Management of FM
subcontractors.
MINISTER OF FINANCE BELGIUM
– Today 550 Sites
• 1 Million M2
• 30 000 Occupants
– 2012
• 250
• 700 000M2
• 25 000 Occupants
HOSPITAL
• NANTES HOSPITAL
– 3100 beds
– Health, research, university, risk assessment
– 3 sites
– 6000 users for request
• 250 Technicians CMMS
• 100 drawings
• 50 mobile devices
COLLABORATIVE SOLUTION
• Over these years STRATEGIES has acquired an
unique experience in delivering robust solutions
integrating , 3D CAD and alphanumerical datas
• Oracle
• Java Based
• Windows client web client.
• Embedded 3D CAD for
dynamic editing.
• Cad on the web
• Reporting
• Web services.
• Snmtp.
24/07/2014
CADWIN FM for Data Centre copyright Stratégies 2013
32
• Admin
• Tech
• Clients
.