1.0 GOAL

Working in a group to complete the refixation task.

To strengthen the knowledge of refixation works and applying the theories in the field.

Share knowledge and collaborate in dealing with problems and challenges in the course

of refixation survey.

Practice the field work in accordance with circulars Director General of survey and

mapping.

Practice of recording method using the external workbook.

Practice in computation work.

Practice in computing the offset distance and bearing for refixation.

Familiarize in providing the Calculation Volume (CV) and Certified Plan (CP)

2.0 OBJECTIVE

To describes the purpose and requirements of conducting refixation.

To understand more about the exact terms in the traversing work.

To explain the rules in carrying out the refixation work.

To show the calculation of the external workbook data with the way it has been set up.

To provide the CV and CP in accordance with the prescribed format.

3.0 AREA THE PRACTICAL WAS CONDUCTED

Traversing and refixation work at LOT 28-31, 346-365 Seksyen 2, Bandar Shah Alam, Daerah

Petaling, Selangor Darul Ehsan.

The solar observation was conducted at station 2 besides the lot 364.

Latitude of station 2 : 30 04’ 4.47”

KEY PLAN

The area shaded dark gray

LOCATION PLAN

Seksyen 2, Shah Alam

4.0 INSTRUMENTS USED

Total Station – To measure bearing and distance

Prism – To target the next point

Tripod – To stand the total station and prism at a proper height

Picket – To mark a station that was established

5.0 THEORIES

Refixation is defined as putting back or re-establishing the boundary marks which are out

of position to their original positions. Replacing the boundary marks which are missing or lost or

broken to their original positions based on the refixation calculations.

Two basic assumpations are to be taken into account before starting to refix the boundary

marks; A boundary mark which is found to be upright, firm and projecting at the correct height

above the ground level is assumed to be in its original position until it is proved otherwise; and

the position of the base of a slanting boundary mark must be assumed to be in its original

position until proven otherwise. Therefore, the boundary mark should be set upright to its proper

level before any measurements or observations are taken to or from it.

Refixation is a very costly process and therefore the land surveyor must consider the

following factors before deciding to refix the boundary marks; the amount of displacement, the

location of the land, the value of the land, the effects to the land owner if the boundary mark is

not refixed, the significant of the boundary mark to be used in future datum.

The displacement limits for refixation are as follows;

I. For boundary line less than 40 meters

Bearing not exceeds 01’

Distance not exceeds 0.015m

II. For boundary line more than 40 meters

Bearing not exceeds 30”

Distance not exceeds 0.006m for every 20m with maximum displacement of

0.050m

Criteria have to be considered whether to carry out refixation or not for town, residential,

built up and industrial areas, refixation is required if the displacement is more than 0.050m and

for rural areas where previously second class survey were carried out and for paddy cultivation

areas, refixation is only needed if the displacement exceeds 0.100m

The basic principle in refixation is in computation for refixation, the old values are

adjusted to the new values as the old values physically do not exist. The boundary marks are

placed to its original positions based on offset values computed from nearby traverse stations.

There are exceptional cases for refixation. First for areas which have been previously

surveyed by third class or lower, the boundary marks are accepted as in their original positions

except if there are significant differences with the previous values. Second for areas which have

been previously surveyed by demarcation survey, boundary marks are considered to be in their

original positions provided; for undeveloped areas, boundary marks found in good condition are

considered to be in their original positions, whereas for developed areas, boundary marks found

in good condition are considered to be in their original positions, if they agree with occupation.

6.0 PROCEDURE

6.1 Traversing

1. Before starting the work, we recon the site to familiarize the place.

2. Then, we searched the boundary marks that are suitable for the survey work.

3. After that, we sketched the plan location of the site and designed the traverse plan

for ease the work.

4. Established stations using picket for traversing.

5. Set up the total station at station 2, one prism at the back station, that is station 1,

and another one at forward station, station 3.

6. The prism at backsight station was observed and the estimated datum bearing was

set as 1600 00 00.

7. The total station was swing in clockwise direction to observe station 3. The value

of FL for bearing and distance of line 1-3 was recorded in fieldbook.

8. The same process was repeated in FR but the bearing set up was added up 1800.

9. The instrument station now moved to station 3 as follow the clockwise direction.

10. The same observation procedures were followed but the backsight bearing was set

up by using last mean bearing ±1800.

11. The whole processes were repeated until the closed traverse is formed.

12. The solar observation for determining azimuth was conducted at station 2 to get

the real bearing to use in the M correction.

13. The correction processes in fieldbook were followed using the rule of corrections.

14. The offset observation and recording was conducted using prism pole as a

replacement to the prism and tripod.

15. The offset was for doing the baselining work.

16. The values of bearing and distance of offsets were taken by a face only.

17. The values of bearing of the offsets are recorded to the nearest 1’.

6.2 Refixation (Pre-comp plan)

1. After all the C and M corrections have been done, we proceed to computation

work.

2. The traverse work that had been done was drawn in the P.O plan of the site in the

microstation.

3. The suitable baseline was calculated.

4. The baseline of New and P.O was compared. From the value calculated, we

corrected the boundary mark of the lot.

5. Then, the offset from the station to the boundary mark that need to be fixed was

calculated.

6. From that value, we can proceed to the refixation work at the site.

6.3 Refixation (on the site)

1. Offset distance less than 1 meter

a. Set total station at a station.

b. Set back bearing to reference station.

c. Open bearing at calculated offset bearing.

d. Plant a picket at station 100 on the offset bearing (about 4m) and measure

the distance.

e. By using another reference station, perform angle and distance checking to

station 100

f. Measure distance from station 100 to the mark to be refixed at.

g. Plant boundary mark according to the distance deduced.

h. Re-measure the distance.

2. Offset distance More than 1 meter

a. Set total station at a station.

b. Set back bearing to reference station.

c. Open bearing at calculated offset bearing.

d. Measure offset distance to the mark to be refixed at and plant the

boundary mark.

e. Perform angle checking to the boundary mark by using another reference

station.

f. Re-measure the distance for checking.

7.0 ACCURACY OF WORK AND PRECAUTION

1. The observations were made in morning and evening day to avoid from the mirage and

the refractive that can produce error. The observation also stop when the weather in the

bad condition to reduce error.

2. The data recorded in the observations were recorded using permanent ink to avoid the

confusion.

3. The reading of the bearing and distance was repeated couple of time to have the mean

value.

4. Explanation of the readings and data were made clearly.

5. The safety of self and instrument are to be priority when doing this observation.

8.0 RESULTS AND ANALYSIS

8.1 Linear Misclosure

Line Bearing Distance Latid Depart

2-3 60 21 06 66.794 33.041 58.049

3-4 44 02 07 79.012 56.803 54.921

4-5 52 27 25 91.846 55.969 72.822

5-6 138 02 41 49.908 -37.115 33.366

6-7 217 55 49 49.136 -38.756 -30.204

7-8 225 05 54 162.212 -114.504 -114.898

8-1 249 27 59 57.413 -20.138 -53.765

1-2 342 35 40 67.795 64.691 -20.280

∑d = 624.116 ∑ = -0.009 ∑ = 0.011

Linear Misclosure = (ℯN)2 + (ℯE)2 = 0.0142

Fractional Linear misclosure = 1 : 44000

8.2 Baseline

The figure below shows the lot from CP and the new traverse at the site. We decided to choose

line 10 to 15 as the baseline for the refixation as it comply all the requirements as a baseline.

BKL 10 to 15 – Measured 550 40’ 29” 369.017m

PO 550 38’ 45” 368.943m

Correction bearing : +1’44”

Distance : x 1.000m

8.3 Calculation for refixation

Refix at BKB A

Line Distance Bearing Latid Depart

1- 10 7.035 94 21 13 -0.534 7.015

10 - BKB A 20.653 325 16 50 16.976 -11.763

BKB A - 1 16.442 -4.748

Pol(16.442,-4.748)

Distance : 17.114

Bearing : 1630 53’ 34”

Refix at BKB B

Line Distance Bearing Latid Depart

2-1 67.795 162 35 40 -64.691 20.280

1-BKB A 17.114 343 53 34 16.442 -4.748

BKB A - BKB B 51.517 343 06 23 49.294 -14.971

BKB B – 2 1.045 0.561

Pol(1.045,0.561)

Distance : 1.186

Bearing : 208013’44”

2

1

BKB A

BKB 2

1 10

BKB A

Refix at BKB C

Line Distance Bearing Latid Depart

3-2 67.794 240 21 06 -33.041 -58.049

2 – BKB B 1.186 28 13 44 1.045 0.561

BKB B – BKB C 38.950 75 32 50 9.721 37.717

BKB C – 3 -22.275 -19.771

Pol(-22.275,-19.771)

Distance : 29.784

Bearing : 41035’31”

Refix at BKB D

Line Distance Bearing Latid Depart

5-4 91.847 232 27 25 -55.968 -72.825

4-3 79.012 224 02 07 -56.803 -54.921

3-BKB C 29.784 221 35 31 -22.275 -19.771

BKB C- BKB D 199.886 47 55 21 133.951 148.363

BKB D – 5 -1.095 0.846

Pol(-1.095,0.846)

Distance : 1.384

Bearing : 322018’37”

BKB C

BKB D

5

4

3

2

3

BKB B

BKB C

Refix at BKB E

Line Distance Bearing Latid Depart

6-5 49.908 318 02 41 37.115 -33.366

5-BKB D 1.384 142 18 37 -1.095 0.846

BKB D – BKB E 50.158 140 02 33 -38.447 32.212

BKB E – 6 -2.427 -0.308

Pol(-2.427,-0.308)

Distance : 2.446

Bearing : 7013’57”

Refix at BKB F

Line Distance Bearing Latid Depart

8-7 162.212 45 05 54 114.504 114.898

7-6 49.136 37 55 49 38.756 30.204

6-BKB E 2.446 187 13 57 -2.427 -0.308

BKB E-BKB F 208.334 227 25 15 -140.961 -153.405

BKB F-8 9.872 -8.611

Pol(9.872,-8.611)

Distance : 13.100

Bearing : 138054’11”

8

7

6 BKB E

BKB F

5

6

BKB D

BKB E

9.0 CONCLUSION

During the task is carried out, many errors have been made and this things should be

prevented because it will waste time and will corrupted all project of surveying. From this task

we have learn how to reduce the error and the data that we collected was accepted. The result of

the traverse project should be accurate with the small error.

The cooperation and patience of each group members should be praised because without

all of group members’ participation in this project, it could not be successful. If the procedures of

refixation that we have learned are followed, the field work can be done faster and the result will

be accurate.

After this practical was done, I have acquired many lessons in completing a refixation

work. Without the help from the lecturer, we won’t be able to finish this field work completely. I

have learned how to reduce errors in carrying out traverse survey. I went through a lot with my

team. We learn from wrong to right.

10.0 REFERENCES

10.1 Survey regulations 1976

10.2 Peraturan Ukur Kadaster 2002

10.3 Circular Kpup bil. 3/2003

UITM SHAH ALAM

STN BERING JARAK(M) BUKU

KERJA

LUAR

KOORDINAT

U(+)/S(-) T(+)/B(-)

LOT 28-31

LOT 346-

365

2 -11667.59 -21544

3 60 21 06 66.795 -11632.47 -21484

4 44 02 07 79.012 -11574.38 -21426

5 52 27 25 91.846 -11516.92 -21350

6 138 02 41 49.908 -11553.22 -21315

7

8

1

2

217 55 49

225 05 54

249 27 59

323 35 40

49.137

162.212

57.413

67.795

-11591.18

-11703.05

-11722.26

-11666.59

-21344

-21454

-21506

-21544

JUMLAH

624.118

TIKAIAN LURUS 1 : 27898 LUAS = (17028.588 METER PERSEGI)

DIPROSES OLEH : MFNZ TARIKH: 20.06.2013 FAIL UKUR :

P.U.BL.SEL. 39.71

DISEMAK OLEH : IZZATY TARIKH: 29.11.2012 DIUKUR OLEH : SAFWAN

DILULUSKAN OLEH : PROF RAHMAN TARIKH: 29.11.2012

NEGERI : SELANGOR DAERAH: PETALING JAYA MUKIM : SHAH ALAM