Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the...

49
May 9, 2017 Air Division, Permits Office (Air-3) U.S. EPA, Region 9 75 Hawthorne Street San Francisco, CA 94105 RE: Federal Minor New Source Review Application for Indian Country Yocha Dehe Wintun Nation; The Yocha Dehe Wintun Nation ("Tribe") is a federally recognized Native American Tribe located in Yolo County, California. The Tribe is submitting this application under EPA's Federal Minor New Source Review ("NSR") Program in Indian Country, regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini- Mart/Gas Station, located at 14455 State Highway 16, in Brooks, California. Attached are the U.S. EPA Region 9 Federal Minor New Source Review Program in Indian Country Application for New Construction (EPA Form No. 5900-248) and the Application for Synthetic Minor Limit (EPA Form No. 5900-246), with supporting documentation. Should you have any questions, please contact me directly at 530-796-3400. Emily Drewek Director, Environmental Department Yocha Dehe Wintun Nation Yocha Dehe Environmental Department PO Box 18 Brooks, Ca lifornia 95606 p) 53 0.796.3400 f) 530.796.2143 www.yochadehe.org

Transcript of Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the...

Page 1: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

May 9, 2017

Air Division, Permits Office (Air-3) U.S. EPA, Region 9 75 Hawthorne Street San Francisco, CA 94105

RE: Federal Minor New Source Review Application for Indian Country Yocha Dehe Wintun Nation;

The Yocha Dehe Wintun Nation ("Tribe") is a federally recognized Native American Tribe located in Yolo County, California. The Tribe is submitting this application under EPA's Federal Minor New Source Review ("NSR") Program in Indian Country, regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini­Mart/Gas Station, located at 14455 State Highway 16, in Brooks, California.

Attached are the U.S. EPA Region 9 Federal Minor New Source Review Program in Indian Country Application for New Construction (EPA Form No. 5900-248) and the Application

for Synthetic Minor Limit (EPA Form No. 5900-246), with supporting documentation.

Should you have any questions, please contact me directly at 530-796-3400.

Emily Drewek Director, Environmental Department Yocha Dehe Wintun Nation

Yocha Dehe Environmental Department PO Box 18 Brooks, California 95606 p) 530.796.3400 f) 530.796.2143 www.yochadehe.org

Page 2: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Federal Minor New Source Review Program in Indian Country Application for Synthetic Minor Limit

Submitted by: Yocha Dehe Wintun Nation Environmental Department

P.O. Box 18 Brooks, CA 95606

On behalf of: Cache Creek Casino Resort

14455 State Highway 16 Brooks, CA 95606

Page 3: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

NARRATIVE DESCRIPTION

The Yocha Dehe Wintun Nation (Tribe) owns and operates Cache Creek Casino Resort (CCCR), on federally owned lands in Yolo County that are held in trust by the United States of America for the Tribe. CCCR is located in the Sacramento Valley Air Basin (SVAB), which includes Yolo, Sacramento, Yuba, Sutter, Butte, Tehama, Shasta, Glen, Colusa, and parts of Placer and Solano counties. Yolo County falls under the jurisdiction of the Yolo-Solano Air Quality Management District (YSAQMD). In the area monitored by the YSAQMD, ozone is designated as severe nonattainment for 8-hour ozone, and the major source threshold for oxides of nitrogen (NOx) is 25 tons per year (tpy).

1. FORMS

All units are existing sources; however, the Application for New Construction (Attachment 1) is being submitted along with an Application for Synthetic Minor Limit (Attachment 2) because this is the first time EPA will be reviewing these sources for a permit.

2. EMISSIONS UNITS

CCCR operates the emission sources listed in the table below, all of which are subject to the EPA’s Federal New Source Review Program in Indian Country:

Unit Make Model Model Year

Engine Power/ Output

EPA Certification

Standby Generator Caterpillar C175-16 2009 3,100 kW Tier 2

Standby Generator Caterpillar C175-16 2009 3,100 kW Tier 2

Standby Generator Caterpillar C175-16 2009 3,100 kW Tier 2

Standby Generator Caterpillar C175-16 2009 3,100 kW Tier 2

Standby Generator Caterpillar 3516BDITA 2000 2,000 kW Tier 1 Natural gas-fired boiler Unilux ZF 700 W 7.2 MMBtu/hr -

Natural gas-fired boiler

Unilux ZF 700 W 7.2 MMBtu/hr -

Notes: kW = kilowatts MMBtu/hr = million British thermal units per hour

The engines are located in an existing standby generator facility commissioned in 2011, which provides a centralized system for backup energy supply during emergencies, providing power throughout CCCR, including auxiliary support and commercial facilities. The generators are driven by diesel-fueled reciprocating internal combustion engines (RICE). The emissions of hazardous air pollutants (HAPs) from the engines are insignificant as defined by 40 CFR

Page 4: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

71.5(11)(ii)(B) because the potential to emit (PTE) of any HAP from any single emission unit does not exceed 1,000 pounds per year.

The 2,000 kW generator is used solely for emergencies. The four 3,100 kW Tier 2 rated engines are used for standby power generation and for participation in Peak Day Pricing demand response (DR) program with Pacific Gas & Electric (PG&E). CCCR participates in one DR program that could be called upon a maximum of 60 hours per year. CCCR also participates in the Base Interruptible Program (BIP), which could be called upon a maximum of 180 hours per calendar year; however, is not commonly called upon, and was only called once in 2014. During each DR events, only six megawatts, or two of the generators, are required to meet energy demands. All electrical power generation is used onsite and not sent to the grid. All generators are operated for annual testing and maintenance.

The two 7.2 MMBtu/hr boilers are natural gas fired and are assumed to operate 24 hours per day, year-round.

3. FUELS

The generators are diesel-fueled RICE and use ultra-low sulfur (0.0015% sulfur content) diesel. The diesel fuel is stored in two 20,000-gallon aboveground storage tanks within the standby generator facility. There is a smaller 200 – gallon “day tank” associated with each generator. All fuel storage tanks and an oil storage area are dual-walled for spill containment.

The two boilers use natural gas purchased from PG&E, which is provided via an existing natural gas pipeline.

4. PROPOSED OPERATING SCHEDULE

In order to limit the PTE, the proposed operating schedule for each 12-month period is 480 combined hours for all four standby generators, and 8,760 hours for the two natural gas-fired boilers. The emergency generator would continue to be used as needed during emergencies, and be limited to a maximum of 100 hours of operation for testing and maintenance.

5. CRITERIA POLLUTANT EMISSIONS ESTIMATES

The criteria pollutant estimates for allowable and PTE emissions for all emissions units are included as Attachment 3. The estimates for PTE and proposed allowable emissions are based on calculations provided by the EPA Region 9 Air Division, based on AP-42, and Engine Specification Sheets provided by the engine manufacturer (Attachment 4). No emissions controls are used on the sources. The PTE would be the emissions calculated with a worst-case assumption that all of the non-emergency engines and the boilers operated at 100% load for 8,760 hours per year, and the emergency generator operated at 200 hours per year.

Page 5: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

The estimates for allowable emissions are based on the four standby generators operating at 100% load for a combined total of 480 hours per year, and 8,760 hours per year for each of the two natural gas-fired boilers. Using the most conservative emissions factors from the manufacturer’s specification sheets, the worst-case emissions under these operational limits would be 23.94 tpy of NOx emissions. Since the engines do not operate at 100% load, fuel usage will be tracked to ensure the 12-month rolling average does not exceed 101,136 gallons (4 engines X 210.7 gal/hr X 120 hours).

6. RECORD KEEPING

CCCR will keep records on site to demonstrate that emissions are below these thresholds. These records will include hours of operation for each generator and fuel usage.

7. OPERATING AND FIRING RATES

The proposed operating and firing rates are provided in Attachment 3.

8. MODELING ANALYSIS

An air quality modeling analysis is not provided since these are existing sources and are not believed to cause adverse air quality effects.

9. ENDANGERED SPECIES ACT

Since these are existing sources, there will be no effect on listed species or designated critical habitat. Prior to construction of CCCR, an Environmental Evaluation, dated October 2002, was prepared. The cover sheet is included as Attachment 5.

10. NATIONAL HISTORIC PRESERVATION ACT

Since these are existing sources, there will be no effect on cultural resources. See Attachment 5.

11. PROCESS FLOW DIAGRAMS

The Process Flow Diagrams for the facility’s fuel burning equipment is as follows

Diesel Fuel (ULSD)

Fuel Use Records Generators

Hours of Operation Records

Natural Gas Boilers Hours of

Operation Records

Page 6: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ATTACHMENT 1

APPLICATION FOR NEW CONSTRUCTION: EPA FORM NO. 5900-248

Page 7: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ir I - u

~ -

-

I - -

~

I I I

'----

I, I

OMB Control No. 2060-0003 Approval expires 04/30/2017

United States Environmental Protection Agency Pacific Southwest – Region 9 Federal Minor New Source Review Program in Indian Country

Application for New Construction Please check all that apply to show how you are using this form:

X Proposed Construction of a New Source ☐ Proposed Construction of New Equipment at an Existing Source ☐ Proposed Modification of an Existing Source ☐ Other – Please Explain____________________________

Please submit information to:

U.S. EPA at:

Air Division, Permits Office (Air-3) U.S. EPA, Region 9 75 Hawthorne Street San Francisco, CA 94105

For more information: http://www.epa.gov/caa-permitting/tribal-nsr-permits-region-9, call (415) 972-3974, or email [email protected].

A. General Source Information

Tribe:

The Tribal Environmental Contact for the specific reservation:

Please contact EPA Region 9 if you need assistance in identifying the appropriate Tribal Environmental Contact and address.

1. Company Name

Cache Creek Casino Resort

2. Source Name

Cache Creek Casino Resort 3. Type of Operation

Gaming Facility

4. Portable Source? � Yes X No 5. Temporary Source? � Yes X No

6. NAICS Code

713210

7. SIC Code

7999

8. Physical Address (home base for portable sources) 14455 CA-16, Brooks, CA 95606

9. Reservation* Yocha Dehe Wintun Nation

10. County* Yolo

11a. Latitude* 38°44'3.89"N

11b. Longitude* 122° 8'32.14"W

12a. Quarter-Quarter Section* 12b. Section*

Unsectioned

12c. Township*

10N

12d. Range*

3W

* Provide all locations of operation for portable sources

EPA Form No. 5900-248

Page 8: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

B. Contact Information 1. Owner Name Yocha Dehe Wintun Nation

Title

Mailing Address P.O. Box 18, Brooks CA 95606 Email Address

Telephone Number 530-796-3400

Facsimile Number 530-796-2143

2. Operator Name (if different from owner) Cache Creek Casino Resort

Title

Mailing Address P.O. Box 65, Brooks, CA 95606-0065

Email Address

Telephone Number Facsimile Number

3. Source Contact Mike Hill

Title Facilities Engineering Manager

Mailing Address Cache Creek Casino Resort, P.O. Box 65, Brooks, CA 95606-0065

Email Address [email protected]

Telephone Number 530-796-5276

Facsimile Number 530-796-5277

4. Compliance Contact Emily Drewek

Title Director, Environmental Department

Mailing Address Yocha Dehe Wintun Nation, P.O. Box 18, Brooks CA 95606

Email Address [email protected]

Telephone Number 530-796-3400

Facsimile Number 530-796-2143

EPA Form No. 5900-248 Page 2 of 13

Page 9: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

C. PREVIOUS PERMIT ACTIONS (Provide information in this format for each permit that has been issued to this source. Provide as an attachment if additional space is necessary)

Facility Name on the Permit NO PERMITS ISSUED Permit Number

Date of the Permit Action

Facility Name on the Permit

Permit Number

Date of the Permit Action

Facility Name on the Permit

Permit Number

Date of the Permit Action

Facility Name on the Permit

Permit Number

Date of the Permit Action

Facility Name on the Permit

Permit Number

Date of the Permit Action

EPA Form No. 5900-248 Page 3 of 13

Page 10: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

D. Attachments

Include all of the following information as attachments to this form

X FORM SYNMIN - New Source Review Synthetic Minor Limit Request Form, if synthetic minor limits are being requested.

X Narrative description of the proposed production processes. This description should follow the flow of the process flow diagram to be submitted with this application.

X Process flow chart identifying all proposed processing, combustion, handling, storage, and emission control equipment.

X A list and descriptions of all proposed emission units and air pollution-generating activities.

X Type and quantity of fuels, including sulfur content of fuels, proposed to be used on a daily, annual and maximum hourly basis.

X Type and quantity of raw materials used or final product produced proposed to be used on a daily, annual and maximum hourly basis.

X Proposed operating schedule, including number of hours per day, number of days per week and number of weeks per year.

X A list and description of all proposed emission controls, control efficiencies, emission limits, and monitoring for each emission unit and air pollution generating activity.

X Criteria Pollutant Emissions - Estimates of Current Actual Emissions, Current Allowable Emissions, Post-Change Uncontrolled Emissions, and Post-Change Allowable Emissions for the following air pollutants: particulate matter, PM10, PM2.5, sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO), volatile organic compound (VOC), lead (Pb) and lead compounds, fluorides (gaseous and particulate), sulfuric acid mist (H2SO4), hydrogen sulfide (H2S), total reduced sulfur (TRS) and reduced sulfur compounds, including all calculations for the estimates.

These estimates are to be made for each emission unit, emission generating activity, and the project/source in total. Note, there are no insignificant emission units or activities in this permitting program, only exempted units and activities. Please see the regulation for a list of exempted units and activities.

X Air Quality Review – See Attached Discussion.

X ESA (Endangered Species Act) – See Attached Discussion.

X NHPA (National Historic Preservation Act) – See Attached Discussion.

EPA Form No. 5900-248 Page 4 of 13

Page 11: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Pollutant Total Actual

Proposed Allowable

Emissions (tpy)

Total Allowable or Potential Emissions

(TPY)

PM - Particulate Matter PM10 - Particulate Matter less than 10

microns in size PM2.5 - Particulate Matter less than 2.5

microns in size SO2 - Sulfur Oxides

NOx - Nitrogen Oxides CO - Carbon Monoxide

VOC - Volatile Organic Compound Pb - Lead and lead compounds

Fluorides - Gaseous and particulates H2SO4 - Sulfuric Acid Mist

H2S - Hydrogen Sulfide TRS - Total Reduced Sulfur

RSC - Reduced Sulfur Compounds

PM 0.83 24.46

PM10 0.83 24.46

PM 2.5 0.83 24.46

SOx 0.05 0.92 NOx 23.94 1234.48 CO 6.72 111.77 VOC 0.53 8.87

Pb 0 0 NH3 0 0

Fluorides 0 0 H2SO4 0 0

H2S 0 0 TRS 0 0

RSC 0 0

OMB Control No. 2060-0003 Approval expires 04/30/2017

E. TABLE OF ESTIMATED EMISSIONS

The following estimates of the total emissions in tons/year for all pollutants contained in your worksheet stated above should be provided.

Emissions calculations must include fugitive emissions if the source is one the following listed sources, pursuant to CAA Section 302(j):

(a) Coal cleaning plants (with thermal dryers); (b) Kraft pulp mills; (c) Portland cement plants; (d) Primary zinc smelters; (e) Iron and steel mills; (f) Primary aluminum ore reduction plants; (g) Primary copper smelters; (h) Municipal incinerators capable of charging more

than 250 tons of refuse per day; (i) Hydrofluoric, sulfuric, or nitric acid plants; (j) Petroleum refineries; (k) Lime plants; (l) Phosphate rock processing plants; (m) Coke oven batteries; (n) Sulfur recovery plants; (o) Carbon black plants (furnace process); (p) Primary lead smelters;

(q) Fuel conversion plants; (r) Sintering plants; (s) Secondary metal production plants; (t) Chemical process plants (u) Fossil-fuel boilers (or combination thereof) totaling

more than 250 million British thermal units per hour heat input;

(v) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels;

(w) Taconite ore processing plants; (x) Glass fiber processing plants; (y) Charcoal production plants; (z) Fossil fuel-fired steam electric plants of more that

250 million British thermal units per hour heat input, and

EPA Form No. 5900-248 Page 5 of 13

Page 12: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

(aa) Any other stationary source category which, as of 111 or 112 of the Act August 7, 1980, is being regulated under section

E(ii) – Proposed New Construction at an Existing Source or Modification of an Existing Source Pollutant Current

Actual Emissions

(tpy)

Current Allowable Emissions

(tpy)

Post-Change Potential Emissions

(tpy)

Post-Change Allowable Emissions

(tpy) PM

PM10

PM 2.5

SO2

NOx

CO

VOC

Pb

Fluorides

H2SO4

H2S

TRS

RSC

PM - Particulate Matter PM10 - Particulate Matter less than 10 microns in size PM2.5 - Particulate Matter less than 2.5 microns in size SO2 - Sulfur Oxides NOx - Nitrogen Oxides CO - Carbon Monoxide VOC - Volatile Organic Compound Pb - Lead and lead compounds Fluorides - Gaseous and particulates H2SO4 - Sulfuric Acid Mist H2S - Hydrogen Sulfide TRS - Total Reduced Sulfur RSC - Reduced Sulfur Compounds

The public reporting and recordkeeping burden for this collection of information is estimated to average 20 hours per response, unless a modeling analysis is required. If a modeling analysis is required, the public reporting and recordkeeping burden for this collection of information is estimated to average 60 hours per response .Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.

EPA Form No. 5900-248 Page 6 of 13

Page 13: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

Instructions (Please do not include a copy of these instructions in the application you submit to us.)

Use of This Form

• Proposed new construction or modifications should first be evaluated to determine if the change is major under the major NSR program using the procedures at 40 CFR 52.21 (i.e., baseline actual to projected actual applicability test). If the proposed construction does not qualify as a major under that test, then it may be subject to the requirements of the minor NSR rule at 40 CFR 49.151.

Helpful Definitions from the Federal Minor NSR Rule (40 CFR 49) – This is not a comprehensive list.

• 40 CFR 49.152(d) - Modification means any physical or operational change at a source that would cause an increase in the allowable emissions of the affected emissions units for any regulated NSR pollutant or that would cause the emission of any regulated NSR pollutant not previously emitted.

The following exemptions apply:

(1) A physical or operational change does not include routine maintenance, repair, or replacement.

(2) An increase in the hours of operation or in the production rate is not considered an operational change unless such increase is prohibited under any federally-enforceable permit condition or other permit condition that is enforceable as a practical matter.

(3) A change in ownership at a source is not considered a modification.

• 40 CFR 49.152(d) - Allowable emissions means ‘‘allowable emissions’’ as defined in §52.21(b)(16), except that the allowable emissions for any emissions unit are calculated considering any emission limitations that are enforceable as a practical matter on the emissions unit’s potential to emit.

• 52.21(b)(16) - Allowable emissions means the emissions rate of a stationary source calculated using the maximum rated capacity of the source (unless the source is subject to federally enforceable limits which restrict the operating rate, or hours of operation, or both) and the most stringent of the following:

(i) The applicable standards as set forth in 40 CFR parts 60 and 61;

(ii) The applicable State Implementation Plan emissions limitation, including those with a future compliance date; or

EPA Form No. 5900-248 Page 7 of 13

Page 14: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

(iii) The emissions rate specified as a federally enforceable permit condition, including those with a future compliance date.

A. General Facility Information

1. Company Name & Operator Name (if the operator of the facility is different than the owner, please provide this information): Provide the complete company and operator names. For corporations, include divisions or subsidiary names, if any.

2. Facility Name: Provide the facility name. Please note that a facility is a site, place, location, etc… that may contain one or more air pollution emitting units.

3. Type of Operation: Indicate the generally accepted name for the operation (i.e., asphalt plant, gas station, dry cleaner, sand & gravel mining, oil and gas wellsite, tank battery, etc.).

4. Portable Source: Will this facility operate in more than one location? Some examples of portable sources include asphalt batch plants and concrete batch plants.

5. Temporary Source: A temporary source, in general, would have emissions that are expected last less than 12 months.

6. NAICS Code: North American Industry Classification System. The NAICS Code for your facility can be found at the following link North American Industry Classification System (http://www.census.gov/epcd/naics/nsic2ndx.htm#S1).

7. SIC Code: Standard Industrial Classification Code. Although the new North American Industry Classification System (NAICS) has replaced the SIC codes, much of the Clean Air Act permitting processes continue to use these codes. The SIC Code for your facility can be found at the following link Standard Industrial Classification Code (http://www.osha.gov/pls/imis/sic_manual.html).

8. Physical Address: Provide the actual address of where you are proposing to construct the new facility, not the mailing address. Include the State and the ZIP Code.

9. Reservation: Provide the name of the Indian reservation within which the facility will be constructed.

10. County: Provide the County within which the source will be constructed.

11a & 11b. Latitude & Longitude: These are GPS (global positioning system) coordinates.

12a – 12d. Section-Township-Range: Please provide these coordinates in 1/4 Section/Section/Township/Range. (e.g., SW ¼, NE ¼ S36/T10N/R21E).

B. Contact Information

Please provide the information, requested, in full.

EPA Form No. 5900-248 Page 8 of 13

Page 15: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

1. Company Contact: Provide the full name of the primary contact for the company that owns the facility.

2. Operator Contact: Provide the name of the primary contact for the company that operates the facility if the company operating the facility is different from the company that owns the facility.

3. Permitting Contact: Provide the name of primary contact, for permitting decisions, at the company that owns the facility or the company that operates the facility.

4. Compliance Contact: Provide the name of primary contact, responsible for compliance of the facility, at the company that owns the facility or the company that operates the facility. If this is the same as the Permitting Contact please note this on the form.

B. Current Permit Information

Provide a list of all air quality permits that have been issued for this facility. This should include any Federal Minor New Source Review (MNSR), Prevention of Significant Deterioration (PSD) or Non-Attainment New Source Review (NA NSR) permits, in addition to the most recent Part 71 permit. The permit number must be included with each permit identified.

C. Attachments

This section lists the information needed to complete the requested approval. This information should be accompanied by the supporting information listed on the form and described below. The information should be presented in enough detail to document how the facility is currently operating and/or how it is proposed to be operated.

FORM SYNMIN

If synthetic minor limits are being requested, a synthetic Minor Limit Application should be included with this application.

Narrative description of the proposed production processes.

1. The narrative description should follow the flow of the process flow diagram to be submitted with this application. This needs to be as comprehensive as possible to help in understanding the proposed facility and how it will be operated. For example:

What are the raw materials? What are the properties of the raw materials? Does the production process include heating, drying, the application of chemicals, etc? How will the raw materials be affected by this process? What are the out puts from each step of the process (i.e., crushed ore, dry gas, water, etc…)? Etc….

EPA Form No. 5900-248 Page 9 of 13

Page 16: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

2. The proposed operating schedule presented in terms of hours per day, days per week, and weeks per year.

3. A list of the type and quantity of fuels and/or raw materials used. Each fuel and raw material should be described in enough detail to indicate its basic chemical components.

A process flow chart identifying all proposed processing, combustion, handling, storage, and emission control equipment. This flow chart should illustrate the detailed narrative description requested above.

List and describe all proposed units, emission units and air pollution-generating activities. At a minimum, provide the following:

1. The hourly, daily and annual maximum operating rates for each operating unit, production process, and activity.

2. The hourly, daily and annual maximum firing rates for each fuel and combustion equipment.

3. The capacity for storage units and the hourly, daily and annual maximum throughput of material in the storage units.

4. Material and product handling equipment and the hourly, daily and annual maximum throughput of material and product.

5. Tank designs, tank storage capacities, hourly, daily and annual maximum throughput of material and product.

Type and quantity of fuels, including sulfur content of fuels, proposed to be used on a daily, annual and maximum hourly basis.

Type and quantity of raw materials used or final product produced proposed to be used on a daily, annual and maximum hourly basis.

Proposed operating schedule, including number of hours per day, number of days per week and number of weeks per year.

A list and description of all proposed emission controls, control efficiencies, emission limits, and monitoring for each emission unit and air pollution generating activity.

1. Include manufacturer specifications and guarantees for each control device.

Criteria Pollutant Emissions Estimates

Estimates of Current Actual Emissions, Current Allowable Emissions, Post-Change Uncontrolled Emissions, and Post-Change Allowable Emissions for the following air pollutants: particulate matter, PM10, PM2.5, sulfur oxides (SO2), nitrogen oxides (NOx), carbon monoxide (CO), volatile organic compound (VOC), lead (Pb) and lead compounds, ammonia (NH3), fluorides (gaseous and particulate), sulfuric acid mist (H2SO4), hydrogen sulfide (H2S), total reduced sulfur (TRS) and reduced sulfur compounds, including all calculations for the estimates.

EPA Form No. 5900-248 Page 10 of 13

Page 17: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

1. These estimates are to be made for each emission unit, emission generating activity, in addition to total emissions.

2. The information should include all of the supporting calculations, assumptions and references. Emission estimates must address all emission units and pollutants proposed and/or affected by the limitation and be presented in short term (e.g. pounds per hour) as well as annual (tons per year) units.

3. Any emission estimates submitted to the Regional Administrator must be verifiable using currently accepted engineering criteria. The following procedures are generally acceptable for estimating emissions from air pollution sources:

• Unit-specific emission tests; • Mass balance calculations; • Published, verifiable emission factors that are applicable to the unit. (i.e. manufacturer

specifications) • Other engineering calculations; or • Other procedures to estimate emissions specifically approved by the Regional

Administrator.

4. Guidance for estimating emissions can be found at http://www.epa.gov/ttn/chief/efpac/index.html.

Current Actual Emissions: Current actual emissions for a pollutant is expressed in tpy and generally is calculated by multiplying the actual hourly emissions rate in pounds per hour (lbs/hr) times actual hours operated (which is the number of hours in a year) and dividing by 2,000 (which is the number of pounds in a ton).

1. For an existing air pollution source (permitted and unpermitted) that operated prior to the application submittal, the current actual emissions are the actual rate of emissions for the preceding calendar year and must be calculated using the actual operating hours, production rates, in-place control equipment, and types of materials processed, stored, or combusted during the preceding calendar year. The emission estimates must be based upon actual test data or, in the absence of such data, upon procedures acceptable to the Regional Administrator.

Current Allowable Emissions: Current allowable emissions for a pollutant is expressed in tpy and generally is calculated by multiplying the allowed hourly emissions rate in pounds per hour (lbs/hr) times allowed hours (which is the number of hours in a year) and dividing by 2,000 (which is the number of pounds in a ton).

1. “Allowed” means the source is restricted by permit conditions that limit its emissions and are enforceable as a practical matter (i.e., allowable emissions). The allowable emissions for any

EPA Form No. 5900-248 Page 11 of 13

Page 18: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

emissions unit are calculated considering any emissions limitations that are enforceable as a practical matter on the unit’s PTE.

2. For an existing permitted air pollution source that operated prior to the application submittal, the current allowable emissions are the allowable rate of emissions for the preceding calendar year and must be calculated using the permitted operating hours, production rates, in-place control equipment, and types of materials processed, stored, or combusted during the preceding calendar year.

3. For an existing air pollution source that does not have an established allowable emissions level prior to the modification must report the pre-change uncontrolled emissions.

Post-Change Potential Emissions (Potential uncontrolled emissions from proposed project): This is the maximum capacity of a source to emit a pollutant under its physical and operational design. This is expressed in tpy and generally is calculated by multiplying the maximum hourly emissions rate in pounds per hour (lbs/hr) times 8,760 hours (which is the number of hours in a year) and dividing by 2,000 (which is the number of pounds in a ton).

Post-Change Allowable Emissions: A source’s allowable emissions for a pollutant is expressed in tpy and generally is calculated by multiplying the allowed hourly emissions rate in pounds per hour (lbs/hr) times allowed hours (which is the number of hours in a year) and dividing by 2,000 (which is the number of pounds in a ton).

1. Unless the source is restricted by permit conditions or other requirements that are enforceable as a practical matter, the post-change allowable emissions would be equivalent to post-change uncontrolled emissions. For the post-change allowable emissions a lower level of allowable emissions may be proposed.

2. For physical or operational changes at minor sources and for minor physical or operational changes at major sources, the total increase in allowable emissions resulting from your proposed change would be the sum of following:

• For each new emissions unit that is to be added, the emissions increase would be the potential to emit of each unit.

• For each emissions unit with an allowable emissions limit that is to be changed or replaced, the emissions increase would be the allowable emissions of the emissions unit after the change or replacement minus the allowable emissions prior to the change or replacement. However, this may not be a negative value. If the allowable emissions of an emissions unit would be reduced as a result of the change or replacement, use zero in the calculation.

• For each unpermitted emissions unit (i.e., a unit without any emissions limitations before the change) that is to be changed or replaced, the emissions increase would be the allowable emissions of the unit after the change or replacement minus the potential to emit prior to the change or replacement. However, this may not be a negative value. If

EPA Form No. 5900-248 Page 12 of 13

Page 19: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

the allowable emissions of an emissions unit would be reduced as a result of the change or replacement, use zero in the calculation.

Air Quality Review

Provide a narrative description of the current air quality conditions and the expected impact the permitted source would have on that air quality. Factors to include in the qualitative discussion are meteorology, terrain, elevation, distance to ambient air, expected emissions, stack heights, etc…

Your reviewing authority may require you to provide additional information used to determine impacts that may result from your new source or modification. You may be required to conduct and submit an Air Quality Impact Analysis (AQIA) using dispersion modeling in accordance with 40 CFR part 51, Appendix W. If required, and the AQIA demonstrates that construction of your source or modification would cause or contribute to a NAAQS or PSD increment violation, you will also required to further reduce its impact before you could obtain a permit.

ESA

The Endangered Species Act requires us, in consultation with the U.S. Fish and Wildlife Service and/or the NOAA Fisheries Service, to ensure that actions we authorize are not likely to jeopardize the continued existence of any listed species or result in the destruction or adverse modification of designated critical habitat of such species.

To expedite the approval of your proposed construction, we encourage you to identify any listed species that you may be readily aware of that could be affected by your proposal. The following website has been provided to assist you: http://www.fws.gov/endangered/

Simply enter the State and County in which you propose to construct to obtain a general listing.

NHPA

The National Historic Preservation Act requires us, in consultation with State and/or Tribal Historic Preservation Officers to ensure that actions we authorize are not likely to affect cultural resources.

To expedite the approval of your proposed construction, we encourage you to identify any cultural resources that you may be readily aware of that could be affected by your proposal. The following website has been provided to assist you: http://nrhp.focus.nps.gov/natreghome.do?searchtype=natreghome

Simply enter the State and County in which you propose to construct to obtain a general listing.

EPA Form No. 5900-248 Page 13 of 13

Page 20: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ATTACHMENT 2

APPLICATION FOR SYNTHETIC MINOR LIMIT: EPA FORM NO. 5900-246

Page 21: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

I l

.__

'-- -

'

I -

OMB Control No. 2060-0003 Approval expires 04/30/2017

United States Environmental Protection Agency Pacific Southwest - Region 9 Federal Minor New Source Review Program in Indian Country

Application for Synthetic Minor Limit

Please submit information to:

U.S. EPA at:

Air Division, Permits Office (Air-3) U.S. EPA, Region 9 75 Hawthorne Street San Francisco, CA 94105

For more information: http://www.epa.gov/caa-permitting/tribal-nsr-permits-region-9, call (415) 972-3974, or email [email protected].

A. General Source Information

B. Attachments

Tribe:

Yocha Dehe Environmental Department PO Box 18 Brooks, CA 95606

(530) 796-3400 [email protected]

Company Name Yocha Dehe Wintun Nation Source Name Cache Creek Casino Resort Contact Information (name, title, phone number, email) Mike Hill Facilities Engineering Manager, Cache Creek Casino Resort 530-796-5276 [email protected] Mailing Address P.O. Box 65 Brooks, CA 95606-0065

For each criteria air pollutant, hazardous air pollutant and for all emission units and air pollutant-generating activities to be covered by a limitation, include the following:

X Item 1 - The proposed limitation and a description of its effect on current actual, allowable and the potential to emit. See Attachment 4. X Item 2 - The proposed testing, monitoring, recordkeeping, and reporting requirements to be used to demonstrate and assure compliance with the proposed limitation. See Narrative Description. X Item 3 - A description of estimated efficiency of air pollution control equipment under present or anticipated operating conditions, including documentation of the manufacturer specifications and guarantees. N/A. X Item 4 - Estimates of the Post-Change Allowable Emissions that would result from compliance with the proposed limitation, including all calculations for the estimates. N/A. X Item 5 – Estimates of the potential emissions of Greenhouse Gas (GHG) pollutants. See Attachment 4.

EPA Form No. 5900-246

Page 22: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

The public reporting and recordkeeping burden for this collection of information is estimated to average 6 hours per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.

Instructions

Submit this form in addition to FORM NEW.

1. Who Can Request Federally-Enforceable Limitations Under the Tribal NSR Authority?

The Tribal NSR Rule applies only to sources located within the exterior boundaries of an Indian reservation in the United States of America or other lands as specified in 40 CFR part 49, collectively referred to as “Indian country”. So, to use the authority in the Tribal NSR Rule to create federally-enforceable limitations, a source must be located within Indian country. Land ownership status (for example, whether the land is owned by a Tribal member or whether the land is owned in fee or in trust) does not affect how the rule applies.

2. Who Might Want to Request Federally-Enforceable Limitations?

The primary reason for requesting federally-enforceable limitations is to avoid an otherwise applicable federal Clean Air Act program, rule or requirement. Many federal Clean Air Act programs use a source’s “potential to emit” (PTE) air pollution to determine which rules or requirements apply. A source’s PTE is based on the maximum annual operational (production, throughput, etc) rate of the source taking into consideration the capacity and configuration of the equipment and operations. Emission or operational limits can also be taken into consideration as maximums if they are federally enforceable. So, using a synthetic minor NSR permit to establish federally enforceable limitations can lower a source’s PTE and possibly allow the source to avoid certain federal Clean Air Act requirements.

Three examples of federal Clean Air Act programs that use PTE to determine whether they apply are (1) the Prevention of Significant Deterioration (PSD) construction permitting program, (2) the Title V operating permit program, and (3) the Maximum Achievable Control Technology (MACT) program. For example, existing sources that are considered “major” for Title V (meaning they have the potential to emit air pollution at levels defined in that rule as “major”) must apply for a Title V operating permit. If a source accepts a federally-enforceable limitation through a synthetic minor NSR permit that reduces their PTE to below the “major” threshold, and the source does not meet any of the other requirements that would trigger applicability to the part 71 program, then the source no longer needs a Title V operating permit. When planning for the construction of a new source or expansion of an existing source, a source can also accept limitations on PTE (using a synthetic minor NSR permit) that allow the source to avoid PSD. Limitations on PTE can similarly help a source to avoid new MACT standards that would otherwise apply to the source.

EPA Form No. 5900-246 Page 2 of 3

Page 23: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OMB Control No. 2060-0003 Approval expires 04/30/2017

3. Section B. Attachments

This section lists the information that must be attached to the application form for each requested limitation. The requested limitation(s) must be described for each affected emissions unit (or pollutant-generating activity) and pollutant and must be accompanied by the supporting information listed on the form and described below. Note that applicability of many federal Clean Air Act requirements (such as Title V, PSD and MACT) is often based on source-wide emission levels of specific pollutants. In that case, all emissions units at a source and all pollutants regulated by that given rule or regulation must be addressed by this section of the application form.

Item 1 – The requested limitation and its effect on actual emissions or potential to emit must be presented in enough detail to document how the limitation will limit the source’s actual or potential emissions as a legal and practical matter and, if applicable, will allow the source to avoid an otherwise applicable requirement. The information presented must clearly explain how the limitation affects each emission unit and each air pollutant from that emission unit. Use the information provided in response to Item 4 below to explain how the limitation affects emissions before and after the limitation is in effect.

Item 2 – For each requested limitation, the application must include proposed testing, monitoring, recordkeeping and reporting that will be used to demonstrate and assure compliance with the limitation. Testing approaches should incorporate and reference appropriate EPA reference methods where applicable. Monitoring should describe the emission, control or process parameters that will be relied on and should address frequency, methods, and quality assurance.

Item 3 – The application must include a description and estimated efficiency of air pollution control equipment under present or anticipated operating conditions. For control equipment that is not proposed to be modified to meet the requested limit, simply note that fact; however, for equipment that is proposed to be modified (e.g. improved efficiency) or newly installed to meet the proposed limit, address both current and future descriptions and efficiencies. Include manufacturer specifications and guarantees for each control device.

Items 4 – Any emission estimates submitted to the Reviewing Authority must be verifiable using currently accepted engineering criteria. The following procedures are generally acceptable for estimating emissions from air pollution sources:

(i) Source-specific emission tests; (ii) Mass balance calculations; (iii) Published, verifiable emission factors that are applicable to the source. (i.e., manufacturer specifications). (iv) Other engineering calculations; or (v) Other procedures to estimate emissions specifically approved by the Reviewing Authority.

Post-Change Allowable Emissions: A source’s allowable emissions for a pollutant is expressed in tpy and generally is calculated by multiplying the allowed hourly emissions rate in pounds per hour (lbs/hr) times allowed hours (which is the number of hours in a year) and dividing by 2,000 (which is the number of pounds in a ton).

EPA Form No. 5900-246 Page 3 of 3

Page 24: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ATTACHMENT 3

FACILITY EMISSION ANALYSIS: PROPOSED ALLOWABLE; POTENTIAL TO EMIT; AND

OPERATING AND FIRING RATES

Page 25: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

FACILITY EMISSION ANALYSIS

PROPOSED ALLOWABLE @ 120 HOURS/YEAR FOR EACH NON-EMERGENCY GENERATOR

Pollutant (tons/year)

Unit NOx VOC SO2 PM PM10 PM2.5 CO

CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu/hr 4.20 0.03 0.00 0.08 0.08 0.08 0.36 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 4.20 0.03 0.00 0.08 0.08 0.08 0.36 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 4.20 0.03 0.00 0.08 0.08 0.08 0.36 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 4.20 0.03 0.00 0.08 0.08 0.08 0.36 CAT 3516 Emergency Generator, 2,876 bhp; 20.47 MMBtu /hr 4.79 0.08 0.00 0.03 0.03 0.03 0.07 Boiler #1 – 7.2 MMBtu/hr - Natural Gas 1.17 0.17 0.02 0.23 0.23 0.23 2.60 Boiler #2 – 7.2 MMBtu/hr - Natural Gas 1.17 0.17 0.02 0.23 0.23 0.23 2.60

Total 23.94 0.53 0.05 0.83 0.83 0.83 6.72

POTENTIAL TO EMIT @ 8,760 HOURS/YEAR FOR EACH NON-EMERGENCY GENERATOR

Pollutant (tons/year)

Unit NOx VOC SO2 PM PM10 PM2.5 CO

CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 306.84 2.11 0.22 5.99 5.99 5.99 26.63 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 306.84 2.11 0.22 5.99 5.99 5.99 26.63 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 306.84 2.11 0.22 5.99 5.99 5.99 26.63 CAT C175 Non-Emergency Generator, 4,376 bhp; 31.73 MMBtu /hr 306.84 2.11 0.22 5.99 5.99 5.99 26.63 CAT 3516 Emergency Generator, 2,876 bhp; 20.47 MMBtu /hr 4.79 0.08 0.00 0.03 0.03 0.03 0.07 Boiler #1 – 7.2 MMBtu /hr - Natural Gas 1.17 0.17 0.02 0.23 0.23 0.23 2.60 Boiler #2 – 7.2 MMBtu /hr - Natural Gas 1.17 0.17 0.02 0.23 0.23 0.23 2.60

Total 1234.48 8.87 0.92 24.46 24.46 24.46 111.77

Yocha Dehe Wintun Nation – Cache Creek Casino Resort Facilities Emissions Estimates

Page 26: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Pollutant

Emission Factor (g/bhp-hr)

Emission Factor (lb/kW) Emissions (lb/hr)

Potential to Emit/Proposed Allowable Emissions @ 200 hours per year (tons/year)

NOx 47.9000 4.7900 VOC 0.7600 0.0760

CO 0.6900 0.0690 PM 2.5 0.3400 0.0340

PM 10 0.3400 0.0340 PM 0.3400 0.0340

SO2 0.0052 0.0000 0.0324 0.0032

CALCULATIONS

CAT C175 Standby Generator Notes: Emissions factors from Manufacturer’s Spec Sheet

Engine Power: 3100 ekW; Base Horsepower Rating: 4,376 bhp

Pollutant Emission Factor

(g/bhp-hr) Emission Factor

(lb/kW) Emissions (lb/hr) Potential to Emit @ 8,760 hours per

year (tons/year) Proposed Allowable Emissions @

120 hours per year (tons/year) NOx 7.2600 0.0226 70.0546 306.8391 4.2033 VOC 0.0500 0.0002 0.4825 2.1132 0.0289 CO 0.6300 0.0020 6.0791 26.6265 0.3647 PM 2.5 0.1417 0.0004 1.3673 5.9889 0.0820 PM 10 0.1417 0.0004 1.3673 5.9889 0.0820 PM 0.1417 0.0004 1.3673 5.9889 0.0820 SO2 0.0052 0.0000 0.0502 0.2198 0.0030

CAT 3516 Emergency Generator Notes: Emissions factors from Manufacturer’s Spec Sheet

Engine Power: 2000 ekW; Base Horsepower Rating: 2,876 bhp Emergency use only

Yocha Dehe Wintun Nation – Cache Creek Casino Resort Facilities Emissions Estimates

Page 27: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Unilux Model #ZF700W; Heat Input Rate 7.2 MMBtu

Pollutant Emission Factor (lb/MMscf) Emissions (lb/hr) Potential to Emit/Proposed Allowable Emissions @ 8,760 hours per year (tons/year)

NOx 37.7400 0.2664 1.1668 VOC 5.5000 0.0388 0.1700 CO 84.0000 0.5929 2.5971 PM 2.5 7.6000 0.0536 0.2350 PM 10 7.6000 0.0536 0.2350 PM 7.6000 0.0536 0.2350 SO2 0.6000 0.0042 0.0186

HAP Analysis for One Engine Source EPA AP-42, Tables 3.4-3 and 3.4-4, Engine > 600 hp

Pollutant Emission Factor (lb/MMBtu) Emissions (lb/hr) Potential to Emit @ 8,760 hours

per year (lbs/year) Proposed Allowable Emissions @ 120

hours per year (lbs/year)

Benzene 0.000776 0.0246 215.6929 2.9547 Toluene 0.000281 0.0089 78.1053 1.0699 Xylenes 0.000193 0.0061 53.6453 0.7349 Propylene 0.002790 0.0885 775.4939 10.6232

Formaldehyde 0.0000789 0.0025 21.9306 0.3004 Acetaldehyde 0.0000252 0.0008 7.0045 0.0960 Acrolein 0.00000788 0.0003 2.1903 0.0300 Total PAH 0.00021200 0.0067 58.9264 0.8072

Yocha Dehe Wintun Nation – Cache Creek Casino Resort Facilities Emissions Estimates

Page 28: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

OPERATING AND FIRING RATES

Unit Make Model Size (kW)

Size (bhp) Type

Fuel Use (gph or

scfh)

Heat input (MMBtu/

hr)

Proposed Operating Schedule Operating Rates (Hours) Max Firing Rates (gallons or scf)

Daily (Hrs)

Hrs/ Week

Weeks / Yr Hourly Daily Annual Hourly Daily Annual

Standby Generator #1

Caterpillar C175-16 3,100 4,376 Diesel 210.7 31.73 24 168 52 1 24 120 210.7 5,056.8 25,284.0

Standby Generator #2

Caterpillar C175-16 3,100 4,376 Diesel 210.7 31.73 24 168 52 1 24 120 210.7 5,056.8 25,284.0

Standby Generator #3

Caterpillar C175-16 3,100 4,376 Diesel 210.7 31.73 24 168 52 1 24 120 210.7 5,056.8 25,284.0

Standby Generator #4

Caterpillar C175-16 3,100 4,376 Diesel 210.7 31.73 24 168 52 1 24 120 210.7 5,056.8 25,284.0

Emergency Generator

Caterpillar 3516BDITA 2,000 2,876 Diesel 135.84 20.47 24 168 52 1 24 200 135.8 3,260.2 27,168.0

Boiler #1 Unilux ZF 700 W Natural Gas

6,857.14 7.2 24 168 52 1 24 8760 6,857.1 164,571.4 60,068,571.4

Boiler #2 Unilux ZF 700 W Natural Gas

6,857.14 7.2 24 168 52 1 24 8760 6,857.1 164,571.4 60,068,571.4

Yocha Dehe Wintun Nation – Cache Creek Casino Resort Facilities Emissions Estimates

Page 29: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ATTACHMENT 4

ENGINE SPECIFICATION SHEETS

Page 30: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

PERFORMANCE DATA {WYB00206] JANUARY 14, 2016 (WYB00206}•ENGINE (G8C00073}•GENERATOR For Help Desk Phone Numbers ~

PcrfNo: DM84SS Change Le\'el: 07 T

General Heat Rejection Sound Emissions Regulatory Altitude Oerate Cross Reference Pert Param Ref

View PDF

SALES MODEL:

ENGINE POWER (BHP): GEN POWER W /0 FAN (EKW):

COMPRESSION RATIO: RATING LEVEi.:

PUMP QUANTITY: FUEL TYPE: MANIFOLD TYPE: GOVERNOR TYPE:

ELECTRONICS TYPE: CAMSHAFT TYPE: IGNmON TYPE:

INJECTOR TYPE:

FUEi. INJECTOR: REF EXH STACK DIAMETER (IN):

INDUSTRY

ELECTRIC POWER

C175-16

4,376 3,100.0

15.3 STANDBY

2

DIESEL DRY ADEM4 ADEM4

STANDARD Cl CR

3492522

14

COMBUSTION:

ENGINE SPEED (RPM): HERTZ:

A.~PJRATION: AFTERCOOLER 1YPE: AFTERCOOLER CIRCUIT TYPE: AFTERCOOLER TEMP (F): JACKET WATER TEMP (F):

TIIRBO CONFIGURATION: n,RBO QUANTITY: TURBOCHARGER MODEL:

CERTIFICATION YEAR:

CRANKCASE BLOWBY RATE (FT3/HR):

FUEL RATE (RATED RPM) NO LOAD (GAL/HR): PISTON SPD ORATED ENG SPD (FT/MIN):

SUB INDUSTRY

STANDARD

APPUCATION

GENERATOR SET

DI

1,800

60 TA

SCAC JW+OC+ lAC, 2AC.

115 210.2 PARALLEL 4

GTB6251BN-48T-1,38

2008 2,436.4

25.1

2,598.4

General Performance Data Top

GENSET POWER WITHOUT FAN PERCENT LOAD ENGINE POWER BRAKE MEAN EFF PRES (BMEP) BRAKE SPEC FUB. CONSUMPTN (BSFC) VOL FUEL CONSUMPTN (VFC) INLET MFLD PRES INLET MFLD TEMP EXH MFLD TEMP EXH MFLD PRES ENGINE ounET TEMP

EKW % BHP PSI LB/BHP-HR. GAL/HR IN-HG DEGF DEGF IN-HG DEG F 3,100.0 100 4,376 373 0,337 210.7 90.7 121.5 1,204.7 62.l 892.7 2,790.0 90 3,938 335 0.334 188.1 80,7 121.3 1,155.4 53.8 873,9 2,480.0 80 3,501 298 0.337 168.4 72.6 121.1 1,116.8 47,3 859,2

2,325.0 75 3,282 279 0.341 159.8 69.4 121.1 1,102.6 44.8 853.8 2,170,0 70 3,063 261 0.349 152.7 67.4 121.2 1,093.5 43.3 850.2 1,860.0 60 2,626 224 0.371 139.3 63.4 121.4 1,079.0 40.8 844.7 1,550.0 so 2 ,188 186 0.400 125.1 57.9 121.S 1,063.1 37.5 839.3

1,240.0 40 1,750 149 0.427 106.9 46.6 121.1 1,034.3 30.4 830.3 930.0 30 1,313 112 0.460 86.2 34.S 120.7 998.5 23.2 819.5 775.0 25 1,094 93 0.480 75.0 28.2 120.7 974.l 19.6 810.6 620.0 20 875 75 0.504 63.1 21.9 120.8 902.3 15.9 766.3 310.0 10 438 37 0.599 37.4 8.9 121.4 706.0 8.7 640.0

GENSET POWER PERCENT ENGINE COMPRESSOR COMPRESSOR WET INLET AlR VOL ENGINE ounET WET EXH GAS WET INLET AlR MASS WET EXH GAS MASS WET EXH VOL FLOW RATE (32 DEG F DRY EXH VOL FLOW RATE (32 DEG F WITHOUT FAN LOAD POWER OUTLET PRES ounETTEMP FLOW RATE VOL FLOW RATE FLOW RATE FLOW RATE AND 29.98 IN HG) AND 29.9B IN HG)

EKW % BHP lN•HG DEGF CFM CFM LB/HR LB/ HR FT3/MIN FTJ/MIN 3,100.0 100 4,376 90 445.6 9,273.3 24,296.2 40,791.3 42,266.1 8,833.4 8,053.0

,2,790.0 90 3,938 80 408.8 8,581.1 22,048.1 37,500.0 38,818.1 8,129.1 7,426.2

2,480.0 80 3,501 72 379.4 8,017.1 20,236.9 34,828.9 36,008.9 7,544.3 6,908.9

2,325.0 75 3,282 69 368.S 7,806.4 19,559.6 33,830.6 34,950.7 7,322.0 6,714.9

2,170.0 70 3,063 67 362.0 7,678.5 19,133.1 33,216.8 34,286.4 7,182.0 6,597.4

1,860.0 60 2,626 63 350.0 7,429.0 18,357.1 32,048.0 33,022.1 6,919.7 6,378.1

1,550.0 so 2,188 58 332.S 7,035.8 17,288.9 30,262.9 31,137.8 6,543.9 6,049.9

1,240.0 40 1,750 47 296.6 6,180.3 15,170.1 26,388.4 27,142.7 5,782.1 5,350.6

930.0 30 1,313 35 251.1 5,230.5 12,595,9 22,202.2 22,809.7 4,841.3 4,490.0

775.0 25 1,094 28 224.9 4 ,722.5 11,143.7 20,000.1 20,524.8 4,313.3 4,008.9

620.0 20 875 22 197.1 4 ,216.9 9,643.8 17 ,813.6 18,255.1 3,867.8 3,607.2

310.0 10 438 135.1 3,161.9 6,371.4 13,304.1 13,565.9 2,848.7 2,681.3

Page 31: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

2,325.0 75 3,282 126.1 88.7 104.5 97.8 98.8 101.9 107.3 111.0 111.1 111.7 112.5

2,170.0 70 3,063 126.3 B6.5 104.2 97.6 98.0 101.5 106.8 111.0 110.6 111.S 112.0

1,860.0 60 2,626 126.S 88.0 103.S 97.8 96.5 100.7 105.8 111.0 109,5 111.1 111.2

1,550.0 50 2,188 126,8 87,6 102,8 97,8 95,0 99.9 104,8 111,0 108.5 110.8 110.3

1,240,0 40 1,750 127.0 87.2 102.2 97,7 93.5 99.2 103 ,8 110,9 107.5 110.s 109,5

930.0 30 1,313 127,3 86.7 101.S 97,7 92.0 98.4 102.8 110.9 106.5 110.1 108.6

775.0 25 1,094 127.4 86,5 101.1 97.7 91.2 98.0 102.3 110.9 105.9 109.9 108.2

620.0 20 875 127.5 86.3 100.8 97.7 90.5 97.6 101.8 110.9 105.4 109.8 107.8

310.0 10 438 127.8 85.9 100.1 97.7 89.0 96.8 100.8 110.9 104.4 109.4 106.9

MECHANICAL: Sound Power (1/3 Octave Frequencies) GENSET POWER WITHOUT FAN PERCENT LOAD ENGINE POWER 1000 HZ 1250 HZ 1600 HZ 2000 HZ 2500 HZ 3150 HZ 4000 HZ 5000 HZ 6300 HZ 8000 HZ 10000 HZ

EKW % BHP dB(A) dB(A) dB(A) dB(A) dB(A) dB(A) dB(A) d8(A) dB(A) dB(A) dB(A)

3,100.0 100 4,376 112.7 113.9 114.6 115.3 114.9 112.7 110.8 111.8 114.2 113.3 117.9

2,790.0 90 3,938 112.5 113.7 114.4 114.9 114.4 112.2 110.3 111.0 113.6 112.8 119.5

-2,480.0 80 3,501 112.1 113.1 113.7 114.3 114.2 111.8 109.9 110.6 113.1 112.6 121.8

2,325.0 75 3,282 111.9 112.8 113.3 113.9 114.1 111.6 109.8 110.4 112.9 112.S 123.1

2,170.0 70 3,063 111.7 112.5 112.8 113.6 114.0 111.4 109,6 110.3 112.6 112.4 124.3

1,860.0 60 2,626 111.2 111.9 112.0 112.9 113.8 110.9 109.2 109.9 112.2 112.2 126,8

1,550.0 so 2,188 110.8 111.3 111.1 112.2 113.7 110.5 108.9 109.6 111.8 112.1 129.3

1,240.0 40 1,750 110.4 110.7 110.3 111.5 113.5 110.1 108.5 109.2 111.3 111.9 131.8

930.0 30 1,313 110.0 110.1 109.4 110.8 113.3 109.6 108.2 108.8 110.9 111.7 134.2

775.0 25 1,094 109.7 109.8 109.0 110.5 113.2 109.4 108.0 108.7 110.7 111.6 135.5 620,0 20 875 109.5 109.S 108.6 110.2 113.1 109.2 107.8 108,5 110.S 111.5 136.7

310.0 10 438 109.1 108.9 107.8 109.5 112.9 108.8 107.S 108.1 110 .0 111.3 139.2

Emissions Data Top

RATED SPEED POTENTIAL SITE VARIATION: 1800 RPM

GENSET POWER WITHOUT FAN ENGINE POWER

PERCENT LOAD

TOTAL NOX (AS N02) TOTAL CO TOTALHC PART MATTER TOTAL NOX (AS N02) TOTAL CO TOTALHC PART MATTER TOTAL NOX (AS N02) TOTAL CO TOTALHC .TOTAL NOX (AS N02) TOTAL CO TOTALHC PART MATTER 'TOTAL NOX (AS N02) TOTAL CO TOTAL HC PART MATTER

RATED SPEED NOMINAL DATA: 1800 RPM

GENSET POWER WITHOUT FAN ENGINE POWER

PERCENT LOAD

TOTAL NOX (AS N02) TOTAL CO TOTAL HC TOTAL CO2 PART MATTER TOTAL NOX (AS N02) TOTAL CO TOTALHC PART MATTER TOTAL NOX (AS N02) TOTAL CO TOTAL HC TOTAL NOX (AS N02) TOTAL CO TOTALHC PART MATTER TOTAL NOX (AS NOZ) TOTAL CO TOTALHC TOTAL CO2 PART MATTER OXYGEN IN EXH DRY SMOKE OPACITY

(CORR5%02) (CORRS%02} (CORRS% 02) (CORRS%02) {CORR5%02) (CORR5%02) (CORR5% 02)

(CORR5%02) (CORR5% 02) (CORR.5%02) (CORR5% 02) (CORR5%02) (CORR5%02) (CORR5%02)

Units Filter All Units T

EKW 3,100.0 BHP 4,376

% 100 G/HR 31,683 G/HR 2,743 G/HR 238 G/HR 162.5 MG/NM3 3,729.4 MG/NM3 2843 MG/NM3 203 MG/NM3 14.4 PPM 1,817 PPM 227 PPM 38 G/HP•HR 7.26 G/HP·HR 0.63 G/HP·HR 0.05 G/HP·HR 0.04 LB/HR 69.85 LB/HR 6.05 LB/HR 0.52 LB/HR 0.36

EKW 3,100.0 BHP 4,376

% 100

G/HR 26,403 G/HR 1,524 G/ HR 179 KG/HR 2,206 G/HR 116,1 MG/NM3 3,107.8 MG/NM3 157.9 MG/NM3 lS.2 MG/NM3 103 PPM 1,514 PPM 126 PPM 28 G/HP-HR 6.05 G/HP·HR 0.35 G/ HP-HR 0.04 G/HP·HR 0.03 LB/HR 58.21 LB/HR 3.36 LB/HR 0,39 LB/HR 4,863 LB/HR 0.26 % 9.6 % 0.7

2,325.0 3,282

75 20,556 3,359 195 167.1 3,245.7 453.8 23.4 19.7 1,581 363 44 6,28 1.03 0.06 0.05 45.32 7 .41 0.43 0.37

2,325.0 3,282

75 17,130 1,866 147 1,619 119.3 2,704.7 252,1 17.6 14,0 1,317 202 33 5.23 0.57 0.04 0 .04 37.76 4.11 032 3,570 0 .26 10.3 0.9

1 ,550.0 775.0 310.0 2,188 1,094 438

50 25 10

8,412 3,523 3,586 1,704 1,822 1,827 372 378 330 120,5 135.6 125.3 1,732.0 1,314.5 2,738.0 295.6 579.5 1,199.1 57.6 103.9 188.1 18.8 38.6 76.0 844 640 1,334 236 464 959 108 194 351 3.85 3.22 8.18 0.78 1.66 4,17 0.17 0.35 0.75 0,06 0.12 0 .29 18.54 7.77 7.91 3.76 4.02 4.03 0.82 0.83 0.73 0,27 0.30 0.28

1,550.0 775.0 310.0 2,188 1,094 438

50 25 10 7,010 2,936 2,988 947 1,012 1,015 279 284 248 1,240 696 327 86.1 96.8 89.5 1,443,3 1,095.5 2,281.7 164.2 321.9 666.1 43.3 78.1 141.4 13.4 27.5 54.3 703 534 1,111 131 258 533 81 146 264 3.21 2.68 6.82 0.43 0.92 2.32 0.13 0 .26 0 .57 0.04 0.09 0.20 15.45 6.47 6.59 2.09 2.23 2.24 0.62 0.63 0.55 2,735 1,535 720 0.19 0.21 0.20 11,7 12.9 15,2 0.3 0.9 2.3

Page 32: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

BOSCH SMOKE NUMBER 0.26 0.34 0.12 0 .35 0.74

----------·---·- - · ·--

Regulatory Information Top

EPA TIER 2 2006 -2010

GASEOUS EMISSIONS DATA MEASUREMENTS PROVIDED TO THE EPA ARE CONSISTENT WITH THOSE DESCRIBED IN EPA 40 CFR PART 89 SUBPART D AND ISO 8178 FOR MEASURING HC, CO, PM, ANO NOX. THE "MAX LIMITS" SHOWN BELOW ARE WEIGHTED CYCLE AVERAGES AND ARE IN COMPLIANCE WITH THE NON-ROAD REGULATIONS.

Locality Agency Regulation Tier/Stage Max Limits - G/BICW - HR U.S. (INCL CALIF) EPA NON-ROAD TIER2 CO: 3.5 NOx + HC: 6.4 PM: 0.20

EPA EMERGENCY STATIONARY 2011--

GASEOUS EMISSIONS DATA MEASUREMENTS PROVIDED TO THE EPA ARE CONSISTENT WITH THOSE DESCRIBED IN EPA 40 CFR PART 60 SUBPART IIII ANO ISO 8178 FOR MEASURING HC, CO, PM, AND NOX. THE "MAX LIMITS" SHOWN BELOW ARE WEIGHTED CYCLE AVERAGES AND ARE IN COMPLIANCE WITH THE EMERGENCY STATIONARY REGULATIONS.

Locality Agency Regulation Tier/Stage Max Limits - G/BKW - HR U.S. (INCL CALIF) EPA STATIONARY EMERGENCY STATIONARY CO: 3.5 NOx + HC: 6.4 PM: 0.20

----------·-----· ···--··~- ·--- --- - ------------------·-------- "··---·------- ------

Altitude Derate Data Top

Note(s)

ALTITUDE DERATE DATA IS BASED ON THE ASSUMPTION OF A 20 DEGREES CELSIUS(36 DEGREES FAHRENHEIT} DIFFERENCE BETWEEN AMBIENT OPERATING TEMPERATURE AND ENGINE INLET MANIFOLD TEMPERATURE (IMAT). AMBIENT OPERATING TEMPERATURE IS DEFINED AS THE AIR TEMPERATURE MEJ

ALTITUDE CORRECTED POWER CAPABILITY (BHP}

AMBIENT OPERAnNG TEMP (F) 30 40 50 so 70 80 90 100 110 120 130 140 NORMAL

ALTITUDE (FT)

0 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376

1,000 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,362 4,376

2,000 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,376 4,323 4,233 4,376

3,000 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,359 4,294 4,200 4,107 4,360

4,000 4,185 4,185 4,185 4,185 4,185 4,185 4,184 4,183 4,181 4,139 4,080 4,021 4,185

5,000 4,019 4,019 4,019 4,019 4,019 4,019 4,018 4,016 4,013 3,992 3,964 3,935 4,019

6,000 3,867 3,867 3,867 3,867 3,867 3,867 3,866 3,862 3,859 3,853 3,846 3,839 3,867

7,000 3,747 3,747 3,747 3,747 3,747 3,747 3,745 3,741 3,737 3,732 3,725 3,719 3,747

8,000 3,626 3,626 3,626 3,626. 3,626 3,626 3,624 3,620 3,616 3,610 3,604 3,598 3,626

9,000 3,514 3,514 3,514 3,514 3,514 3,514 3,512 3,508 3,504 3,498 3,493 3,487 3,514

10,000 3,409 3,409 3,409 3,409 3,409 3,409 3,407 3,403 3,399 3,394 3,389 3,383 3,409

11,000 3,304 3,304 3,304 3,304 3,304 3,304 3,302 3,298 3,294 3,289 3,285 3,280 3,304

12,000 3,199 3,199 3,199 3,199 3.199 3,199 3,197 3,193 3,189 3,185 3,181 3,176 3,199 13,000 3,113 3,113 3,113 3,113 3,113 3,113 3,111 3,108 3,105 3,101 3,098 3,095 3,113

14,000 3,030 3,030 3,030 3,030 3,030 3,030 3,029 3,027 3,025 3,022 3,020 3,018 3,030 15,000 2,948 2,948 2,948 2,948 2,948 2,948 2,947 2,946 2,944 2,943 2,942 2,940 2,948

------- --r•-----•~·----- •---r -----.- -----·- ---·---.·---

Cross Reference Top

Engine Arrangement

Arrangement Number

Effec:tlve Serial Number

Engineering Model

Engineering Model Version

3079788 WYB00620 GS265

Test Specification Data

Test Spec Setting Effective Serial Number

Engine Arrangement

OK9167 LL6027 WYB00620 3079788

Performance Parameter Reference Top

Page 33: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

0 ;;-;E;O~~E~A;OARD EXECUTIVE ORDER U-R-001-0367 CATERPILLAR INC. New Off-Road

Compression-Ignition Engines

Pursuant to the authority vested in the Air Resources Board by Sections 43013, 43018, 43101, 43102, 43104 and 43105 of the Health and Safety Code; and

Pursuant to the authority vested in the undersigned by Sections 39515 and 39516 of the Health and Safety Code and Executive Order G-02-003;

IT IS ORDERED AND RESOLVED: That the following compression-ignition engine and emission control system produced by the manufacturer are certified as described below for use in off-road equipment. Production engines shall be in all material respects the same as those for which certification is granted.

MODEL ENGINE FAMILY DISPLACEMENT FUEL TYPE USEFUL LIFE

YEAR (liters) (hours)

2009 .9CPXL 106.T2E 84.7 Diesel 8000 . _·,·,··· ·'" .·:- ·"· er ,, . ··~ .. ,. '

SPECIAL FEATURES & EMISSION CONTROL SYSTEMS TYPICAL EQUIPMENT APPLICATION

Direct Diesel Injection, Turbocharger, Charge Air Cooler, Generator Smoke Puff Limiter and Engine Control Module

The engine models and codes are attached.

The following are the exhaust certification standards (STD) and certification levels (CERT) for hydrocarbon (HC), oxides of nitrogen (NOx), or non-methane hydrocarbon plus oxides of nitrogen (NMHC+NOx), carbon monoxide (CO), and particulate matter (PM) in grams per kilowatt-hour (g/kw-hr), and the opacity-of-smoke certification standards and certification levels in percent(%) during acceleration (Accel), lugging (Lug), and the peak value from either mode (Peak) for this engine family (Title 13, California Code of Regulations, (13 CCR) Section 2423):

RATED EMISSION EXHAUST (g/kw-hr) OPACITY(%) POWER STANDARD CLASS CATEGORY HC NOx NMHC+NOx co PM ACCEL LUG PEAK

KW> 560 Tier 2 STD N/A N/A 6.4 3.5 0.20 N/A N/A N/A CERT -- -- 6.2 1.9 0.16 -- -- --

BE IT FURTHER RESOLVED: That for the listed engine models, the manufacturer has submitted the information and materials to demonstrate certification compliance with 13 CCR Section 2424 (emission control labels), and 13 CCR Sections 2425 and 2426 (emission control system warranty).

Engines certified under this Executive Order must conform to all applicable California emission regulations.

This Executive Order is only granted to the engine family and model-year listed above. Engines in this family that are produced for any other model-year are not covered by this Executive Order.

Executed at El Monte, California on this __ zc::' _____ day of January 2009.

~~ Annette Hebert, Chief Mobile Source Operations Division

SUBMITTAL PAGE #5

Page 34: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

~ Engine Family 1.Engine Code 2.Engine Model

Engine Model Summary Template IA-(Z-OOl-0367

4.Fuel Rate: 5.Fuel Rate: 7.Fuel Rate: 3.BHP@RPM (SAE Gross)

mm/stroke@ peak HP (lbs/hr)@ peak HP 6.Torque@ RPM mmtstroke@peak B.Fuel Rate: 9.Emission Control (for diesel only) (for diesels only) (SEA Gross) torque (lbs/hr)@peak torqueoevice Per SAE J t 930

8CPXL106 .T2E ___j_ C175-16 4422@ 1800 935.8 _ _ 1..c.5_11_.5 _ _ _ 1_2_90_2'-.4_@. . ..... _ N.c..A _____ N_A _ &_.J:YEM,Dl,TA ~('_}. ... _

_ 8C_ P_X_.L'-1_0_5._T_2E __ __- _ _ 2 ____ C175-16. ___ 4034@_1800 _.. 837 .0 ____ 1_3_5_1._9 _ ___ .. 11770.3@ _. ·-·---N.~--- -·-· -· -- NA_. __ Zfci'l{EM,Dl,TA ; Sfl..

_8G_- _PX_L_·:_0_6._T_2E _____ _.c.3 ____ C_1_75_·_16'--__ 3_7_17___.,.@ 1800_·- ·- .J-'6_4._7 ____ 1_23_5_.2 ___ 1_08_4_5_.4~@ NA N..~ __ __ _i3-"f ~ EM,D1,TA 1$.tL,,

SUBMITTAL PAGE #6

Page 35: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

l I

SUBMITTAL PAGE #7

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF TRANSPORTATION AND AIR QUALITY

WASHINGTON, DC 20460

CERTIFICATE OF CONFORMITY 2009 MODEL YEAR

Manufacturer: CATERPILLAR, INC. Engine Family: 9CPXL106.T2E Certificate Number: CPX-NRCI-09-23 Intended Service Class: NR 9 (>560) Fuel Type: DIESEL FELs: NMHC+NOx: N/A NOx: N/A PM: N/A Effective Date: 1/30/2009 Date Issued: 1/30/2009

Karl J. Simon, Director Compliance and Innovative Strategies Division Office of Transportation and Air Quality

Pursuant to Section 111 and Section 213 of the Clean Air Act (42 U.S.C. sections 7411 and 7547) and 40 CFR Part 60 and Part 89, and subject to the terms and conditions prescribed in those provisions, this certificate of conformity is hereby issued with respect to the test engines which have been found to conform to applicable requirements and which represent the following stationary and nonroad engines, by engine family, more fully described in the documentation required by 40 CFR Part 60 and 89, and produced in the stated model year.

This certificate of conformity covers only those new stationary and nonroad compression-ignition engines which conform in all material respects to the design specifications that applied to those engines described in the documentation required by 40 CFR Part 60 and 89 and which are produced during the model year stated on this certificate of the said manufacturer, as defined in 40 CFR Part 60 and 89.

It is a term of this certificate that the manufacturer shall consent to all inspections described in 40 CFR 89.129-96 and 89.506-96 and authorized in a warrant or court order. Failure to comply with the requirements of such a warrant or court order may lead to a revocation or suspension of this certificate for reasons specified in 40 CFR Part 89. It is also a term of this certificate that this certificate may be revoked or suspended or rendered void ab initio for other reasons specified in 40 CFR Part 89.

This certificate does not cover stationary and nonroad engines sold, offered for sale, or introduced, or delivered for introduction, into commerce in the U.S. prior to the effective date of the certificate.

Page 36: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

SUBMITTAL PAGE #9

DM8448 C175 3000kW

RATED SPEED "Nominal Data"

GEN PWR EKW

PERCENT LOAD

ENGINE POWER

BKW

TOTAL NOX (AS NO2)

G/HR

TOTAL CO G/HR

TOTAL HC G/HR

TOTAL CO2 KG/HR

PART MATTER

G/HR

OXYGEN IN EXHAUST PERCENT

ENGINE POWER

BHP 3,000.00 100 3,298.00 22,715.00 2751 433 146.9 4422.6906 2,250.00 75 2,508.00 16,131.00 3275 419 175.1 3363.2832 1500 50 1719 6,719.00 1665 725 122.2 2305.2168 750 25 929 2,794.00 1,278.00 796 12.6 1245.8094 300 10 456 1,683.00 1591 872 193.4 611.50603

D2 Cycle Calculations LOAD WEIGHT BHP NOX CO HC PM

100% 5% 221.1345 1135.75 137.55 21.65 7.345 75% 25% 840.8208 4032.75 818.75 104.75 43.775 50% 30% 691.565 2015.7 499.5 217.5 36.66 25% 30% 373.7428 838.2 383.4 238.8 3.78 10% 10% 61.1506 168.3 159.1 87.2 19.34

D2 BHP 2188.414 TOTAL G/HR 8190.7 1998.3 669.9 110.9

NOX + HC TOTAL G/HP-HR 3.743 0.913 0.306 0.051 4.049

TIER 2 LIMITS 2.6 0.15 4.8

Page 37: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

SUBMITTAL PAGE #10

THIS PAGE LEFT BLANK INTENTIONALLY

Page 38: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

----

OS-I (oCATERPILL,AR®

GEN SET PACKAGE PERFORMANCE DATA [7RN01569] JANUARY 14, 2016 For Help Desk Phone Numbers Click here

Performance Number: DM4505 Change Level: Q?____ _..,

Sales Model: 35 l 6BDITA

Engine Power:

2000W/FEKW 2060W/OFEKW

2,876 HP

Nfanirold Type: DRY

Turbo Quantity: 4

Hertz: 60

Rating Type: ST AND BY

Combustion: DI

Speed: 1,800 RPM

Governor Type: ADEM

Engine App: GP

Application Type: PACKAGE-DIE

Certification: 2000 EPA

Aspr:TA

After Cooler: SCAC

After Cooler Temp(F): 140

Turbo Arrangement: Parallel

Engine Rating: PGS Strategy:

General Performance Data

GEN W/F EKW

PERCENT LOAD

ENGINE POWER

BHP

ENGINE BMEP

PSI

FUEL BSFC

LB/BHP-HR

FUEL RATE GPH

INTAKE MFLD TEMP DEGF

INTAKE MFLD P IN-HG

INTAKE AIR

FLOW CFM

EXH MFLD TEMP DEGF

EXH STACK TEMP DEGF

EXH GAS FLOW CFM

2,000 100 2848 297.62 0.33 135.84 180.68 80.25 6,112.98 1,165.1 846.5 15,471.37

1,800 90 2565 268.03 0.33 121.81 175.28 72.97 5,777.49 1,101.74 804.56 14,132.94

1,600 80 2286 238.88 0.34 109.37 170.24 65.62 5,417.27 1,056.2 777.74 12,971.09

1,500 75 2146 224.23 0.34 103.45 168.44 62.07 5,237.17 1,037.12 767.48 12,427.24

1,400 70 2007 209.73 0.34 97.53 166.46 58.55 5,050 1,018.4 759.02 11 ,883.4

1,200 60 1730 180.72 0.35 85.35 161.96 49.31 4,545 981.5 750.92 10,654.45

1,000 50 1454 151.86 0.35 72.99 157.28 39.89 4,018.81 944.96 743.72 9,354.86

800 40 1183 123.57 0.36 60.68 153.14 30.74 3,503.22 901.4 731.12 8,012.91

600 30 908 94.86 0.37 48.13 149.54 21.68 2,980.56 835.7 701.24 6,632.1

500 25 769 80.35 0.38 41.79 148.1 17.21 2,712.17 794.84 679.82 5,932.87

400 20 629 65.7 0.39 35.4 146.84 13.09 2,454.37 744.8 649.4 5,230.11

200 IO 346 36.26 0.46 22.53 145.58 6.87 1,981.15 604.22 546.8 3,824.58

Page 39: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

General Performance Data 2

GEN COMPRESS PERCENT ENGINE OUT COMPRESS

W/F LOAD POWER PRESS IN- OUT TEMP EKW BHP HG DEG F

2,000 100 2848 80.34 446

1,800 90 2565 73.03 416.12

1,600 80 2286 65.77 390.02

1,500 75 2146 62.28 377.42

1,400 70 2007 58.78 364.64

1,200 60 1730 49.57 333.32

1,000 50 1454 40.16 298.22

800 40 1183 31.03 259.7

600 30 908 22.15 219.38

500 25 769 17.8 198.86

400 20 629 13.8 179.06

200 10 346 7.58 144.5

Engine Heat Rejection Data

GEN W/F PERCENT

EKW LOAD

REJ TO JW

BTU/MN

REJTO ATMOS BTU/MN

REJTO EXHAUST BTU/MN

EXH FROM RCOV TO OIL CLR

350F BTU/MN BTU/MN

FROM AFT CLR

BTU/MN

WORK ENERGY BTU/MN

LHVENERGY BTU/MN

HHVENERGY BTU/MN

2,000 100 43,505.5 8,246.1 109,133.3 56,869.9 14,558.7 28,776.2 120,734.8 291,458.1 310,452.7

1,800 90 40,320.8 7,677.4 97,418.1 48,908.1 13,080.1 24,852.1 108,792.1 261,885.8 279,003.6

1,600 80 37,192.9 7,279.3 87,636.5 42,936.8 11,715.2 21,155.6 96,906.3 234,815.7 250,170.6

1,500 75 35,657.4 7,108.7 82,973.2 40,434.5 11,089.6 19,335.8 90,991.8 221,621.9 236,066.9

1,400 70 34,121.9 6,938.1 78,309.8 38,102.8 10,464.1 17,515.9 85,134.2 208,428.1 222,020.0

1,200 60 30,994.1 6,596.9 69,040.0 33,553.2 9,156.0 14,046.9 73,362.1 182,097.4 193,983.2

1,000 50 27,695.6 6,255.7 59,770.2 29,060.5 7,848.0 10,691.5 61,646.9 155,880.3 166,060.0

800 40 24,283.4 5,914.5 50,557.3 24,454.1 6,483.2 7,563.7 50,159.2 130,004.5 138,478.2

600 30 20,530.0 5,573.2 40,889.4 19,051.4 5,175.2 4,777.1 38,500.9 103,446.3 110,213.8

500 25 18,482.7 5,345.8 35,884.9 16,207.9 4,492.7 3,469.1 32,643.3 89,968.1 95,882.6

400 20 16,435.4 5,175.2 30,766.6 13,250.7 3,810.3 2,217.9 26,672.0 76,319.4 81,323.9

200 10 11,942.7 4,720.2 20,075.1 6,881.3 2,445.4 170.6 14,672.4 48,396.3 51,581.0

Page 40: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

EXHAUST Sound Data: 4.92 FEET

GEN W/F EKW

PERCENT LOAD

OVERALL SOUND DB(A)

OBCF 63HZ DB

OBCF 125HZ DB

OBCF 250HZ DB

OBCF 500HZ DB

OBCF 1000HZ DB

OBCF 2000HZ DB

OBCF 4000HZ DB

OBCF 8000HZ DB

2,000 100 116 107 121 117 109 108 109 109 107 1,800 90 115 106 120 116 108 107 108 108 106 1,600 80 114 105 119 115 107 106 107 107 105 1,500 75 114 104 119 115 107 105 107 106 105 1,400 70 113 104 118 114 106 105 106 106 104 1,200 60 112 102 117 113 105 104 105 105 103 1,000 50 111 101 116 112 104 102 104 103 102

800 40 110 100 115 111 103 101 102 102 100 600 30 108 98 113 109 101 99 101 I01 99 500 25 107 97 112 108 100 99 100 100 98 400 20 106 96 111 107 99 98 99 99 97 200 10 104 94 109 105 97 95 97 97 95

EXHAUST Sound Data: 22.97 FEET OVERALLGEN W/F PERCENT OBCF 63HZ OBCF OBCF OBCF OBCF OBCF OBCF OBCFSOUNDEKW LOAD DB 125HZ DB 250HZ DB 500HZ DB 1000HZ DB 2000HZ DB 4000HZ DB 8000HZ DB DB(A)

2,000 100 103 94 111 105 97 95 96 96 93 1,800 90 102 93 110 104 96 94 95 95 92 1,600 80 101 92 109 103 95 93 94 94 91 1,500 75 100 92 108 103 94 92 93 93 90 1,400 70 100 91 108 102 93 92 93 92 90 1,200 60 99 90 107 101 92 91 91 91 89 1,000 50 97 89 105 100 91 89 90 90 87

800 40 96 88 104 98 90 88 89 89 86 600 30 95 86 103 97 88 87 87 87 84 500 25 94 85 102 96 87 86 86 86 84 400 20 93 84 101 95 86 85 85 85 83 200 10 91 82 99 93 84 83 83 83 80

Page 41: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

EXHAUST Sound Data: 49.21 FEET

GEN W/F EKW

PERCENT LOAD

OVERALL SOUND DB(A)

OBCF 63HZ DB

OBCF 125HZ DB

OBCF 250HZ DB

OBCF 500HZ DB

OBCF 1000HZ DB

OBCF 2000HZ DB

OBCF 4000HZ DB

OBCF S000HZ DB

2,000 100 96 88 104 99 90 88 89 89 86 1,800 90 95 87 103 98 89 87 88 88 85 1,600 80 94 86 102 97 88 86 87 87 84 1,500 75 94 85 102 96 87 86 87 86 84

1,400 70 93 85 101 95 87 85 86 86 83 1,200 60 92 84 100 94 86 84 85 85 82 1,000 50 91 82 99 93 84 83 84 83 81

800 40 90 81 98 92 83 82 82 82 79 600 30 88 79 96 90 82 80 81 81 78 500 25 87 79 95 89 81 79 80 80 77 400 20 86 78 94 88 80 78 79 79 76 200 10 84 75 92 86 77 76 77 76 74

MECHANICAL Sound Data: 3.28 FEET

GEN W/F EKW

PERCENT LOAD

OVERALL SOUND DB(A)

OBCF 63HZ DB

OBCF 125HZ DB

OBCF 250HZ DB

OBCF 500HZ DB

OBCF 1000HZ DB

OBCF 2000HZ DB

OBCF 4000HZ DB

OBCF S000HZ DB

2,000 100 111 113 123 114 105 101 101 99 103 1,800 90 111 113 123 114 105 101 101 99 103 1,600 80 111 113 123 114 105 101 101 99 103

1,500 75 111 113 123 114 105 101 101 99 103 1,400 70 111 113 123 114 105 101 101 99 103

1,200 60 111 113 123 114 105 101 101 99 103 1,000 50 111 113 123 114 105 101 101 99 103

800 40 111 113 123 114 105 101 101 99 103 600 30 111 113 123 114 105 101 101 99 103 500 25 111 113 123 114 105 101 101 99 103 400 20 111 113 123 114 105 101 101 99 103 200 10 111 113 123 114 105 101 101 99 103

Page 42: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

MECHANICAL Sound Data: 22.97 FEET OVERALLGEN W/F PERCENT OBCF 63HZ OBCF OBCF OBCF OBCF OBCF OBCF OBCJSOUNDEKW LOAD DB 125HZ DB 250HZ DB S00HZ DB 1000HZ DB 2000HZ DB 4000HZ DB 8000HZ DBDB(A)

2,000 100 98 100 109 100 89 90 8792 91 1,800 90 98 100 109 100 89 90 8792 91 1,600 80 98 100 109 100 89 90 8792 91 1,500 75 98 100 109 100 92 89 90 87 91 1,400 70 98 100 109 100 89 90 8792 91 1,200 60 98 100 109 100 89 90 8792 91 1,000 50 98 100 109 100 92 89 90 87 91

800 40 98 100 109 100 92 89 90 87 91 600 30 98 100 109 100 92 89 90 87 91 500 25 98 100 109 100 92 89 90 87 91 400 20 98 100 109 100 92 89 90 87 91 200 10 98 100 109 100 92 89 90 87 91

MECHANICAL Sound Data: 49.21 FEET OVERALLGEN W/F PERCENT OBCF 63HZ OBCF OBCF OBCF OBCF OBCF OBCF OBCFSOUNDEKW LOAD DB 125HZ DB 250HZ DB S00HZ DB 1000HZ DB 2000HZ DB 4000HZ DB 8000HZ DBDB(A)

2,000 100 92 94 103 94 86 84 84 82 86 1,800 90 92 94 103 94 86 84 84 82 86 1,600 80 92 94 103 94 84 84 82 86 86 1,500 75 92 94 103 94 84 84 8286 86 1,400 70 92 94 103 94 86 84 84 82 86 1,200 60 92 94 103 94 86 84 84 82 86 1,000 50 92 94 103 94 86 84 84 82 86

800 40 92 94 103 94 86 84 84 82 86 600 30 92 94 103 94 86 84 84 82 86 500 25 92 94 103 94 86 84 84 82 86 400 20 92 94 103 94 86 84 84 82 86 200 10 92 94 103 94 86 84 84 82 86

EMISSIONS DATA Certification: 2000 EPA

Page 43: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

REFERENCE EXHAUST STACK DIAMETER 8 IN

WET EXHAUST MASS 27,844.4 LB/HR

WET EXHAUST FLOW (845 .60 F STACK TEMP) 15,481.96 CFM

WET EXHAUST FLOW RA TE ( 32 DEG F AND 29.98 IN HG) 5,836.00 STD CFM

DRY EXHAUST FLOW RA TE ( 32 DEG F AND 29 .98 IN HG) 5,346.65 STD CFM

FUEL FLOW RA TE 136 GAL/HR

RATED SPEED "Potential site variation"

GEN PWR EKW

PERCENT LOAD

ENGINE POWER

BHP

TOTAL NOX(AS

NO2) LB/HR

TOTAL co

LB/HR

TOTAL HC

LB/HR

OXYGEN DRYPART BOSCHIN SMOKE MATTER EXHAUST OPACITY SMOKE

LB/HR PERCENT PERCENT NUMBER

2,000 100 2848 57.4800 1.2400 1.0100 .4700 10.5000 1.4000 1.2800

1,500 75 2146 36.5700 1.0100 .9800 .5100 11.7000 1.5000 1.2800

1,000 50 1454 19.5400 1.3200 .8100 .4500 12.5000 2.3000 1.2800

500 25 769 10.1500 1.4300 .5600 .3100 13.8000 2.1000 1.2800

200 10 346 6.8600 2.0000 .5100 .1900 15 .8000 1.6000 1.2800

RATED SPEED "Nominal Data" TOTAL OXYGEN DRYGEN ENGINE TOTAL TOTAL TOTAL PART BOSCHPERCENT NOX(AS IN SMOKEPWR POWER co HC CO2LOAD NO2) MATTER EXHAUST OPACITY SMOKE

EKW BHP LB/HR LB/HR LB/HRLB/HR LB/HR PERCENT PERCENT NUMBER

2,000 100 2848 47.9000 .6900 .7600 2,839.5 .3400 10.5000 1.4000 1.2800

1,500 75 2146 30.4700 .5600 .7300 2,154.3 .3600 11.7000 1.5000 1.2800

1,000 50 1454 16.2800 .7300 .6100 1,511.1 .3200 12.5000 2.3000 1.2800

500 25 769 8.4600 .8000 .4200 865.4 .2200 13.8000 2.1000 1.2800

200 10 346 5.7200 1.1100 .3900 454.9 .1300 15.8000 1.6000 1.2800

Page 44: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Altitude Capability Data(Corrected Power Altitude Capability) Ambient Operating Temp. 50 F 68 F 86 F 104 F 122 F NORMAL

Altitude

OFT 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp

984.25 FT 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp

1,640.42 FT 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,876.49 hp

3,280.84 FT 2,876.49 hp 2,876.49 hp 2,876.49 hp 2,868.44 hp 2,779.93 hp 2,876.49 hp

4,921.26 FT 2,876.49 hp 2,876.49 hp 2,787.98 hp 2,698.13 hp 2,614.99 hp 2,876.49 hp

6,561.68 FT 2,805.41 hp 2,710.2 hp 2,620.35 hp 2,537.21 hp 2,458.09 hp 2,734.34 hp

8,202.1 FT 2,636.45 hp 2,546.6 hp 2,462.11 hp 2,382.99 hp 2,309.24 hp 2,597.56 hp

9,842.52 FT 2,475 .52 hp 2,391.04 hp 2,311 .92 hp 2,238.16 hp 2,168.43 hp 2,466.14 hp

10,498.69 FT 2,412.49 hp 2,330.69 hp 2,252.91 hp 2,181.84 hp 2,113.45 hp 2,416.52 hp

The powers listed above and all the Powers displayed are Corrected Powers

Identification Reference and Notes Engine Arrangement: 1736942 Lube Oil Press @Rated Spd(PSI): 55.8

Effective Serial No: 7RN01092 Piston Speed @Rated Eng SPD(FT/Min): 2,244.1

Primary Engine Test Spec: OK2409 Max Operating Altitude{FT): 4,921 .3

Performance Parm Ref: TM5739 PEEC Elect Control Module Ref

Performance Data Ref: DM4505 PEEC Personality Cont Mod Ref

Aux Coolant Pump PerfRef: DM1286

Cooling System PerfRef: DM1299 Turbocharger Model BTV8501-l.23

Certification Ref: EPA Fuel Injector 1008774

Certification Year: 2000 Timing-Static (DEG):

Compression Ratio: 14.0 Timing-Static Advance (DEG):

Combustion System: DI Timing-Static (MM):

Aftercooler Temperature (F): 140 Unit Injector Timing (MM): 64.3

Crankcase Blowby Rate(CFH): 2,874.6 Torque Rise (percent)

Fuel Rate (Rated RPM) No Load(Gal/HR): 14.5 Peak Torque Speed RPM

Lube Oil Press @ Low Idle Spd(PSI): 20.0 Peak Torque (LB.FT):

Page 45: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Reference Number: DM4505

Parameters Reference: TM5739

GEN SET - PACKAGED - DIESEL

TOLERANCES: AMBIENT AIR CONDITIONS AND FUEL USED WILL AFFECT THESE VALUES. EACH OF THE VALUES MAY VARY IN ACCORDANCE WITH THE FOLLOWING TOLERANCES.

Power +/-3%

Exhaust Stack Temperature +/-8%

Generator Power +/-5%

Inlet Airflow +/-5%

Intake Manifold Pressure-gage +/- I 0%

Exhaust Flow +/- 6%

Specific Fuel Consumption +/-3%

Fuel Rate +/-5%

Heat Rejection +/- 5%

Heat Rejection - Exhaust Only +/- 10%

T4i Tolerance Exceptions C15: Power Tolerance +4%, -0% C27: Power Tolerance +0%, -4%

CONDITIONS: ENGINE PERFORMANCE IS CORRECTED TO INLET AIR STANDARD CONDITIONS OF 99 KPA (29.31 IN HG) AND 25 DEG C (77 DEG F).

THESE VALUES CORRESPOND TO THE STANDARD ATMOSPHERIC PRESSURE AND

Page 46: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Unilux Advanced Manufacturing, LLC

HOT WATER BOILERS

Specification Data

“From commercial comfort to industrial process”

Fax: (518) 344-7495 E-mail: [email protected]

Web Site: www.uniluxam.com

30 Commerce Park Drive Niskayuna, NY 12309

518.344.7490

Page 47: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

~ M·~ ~ . . . ·.·· l , . . '.

:t:L t • · .. :. - . . - . . 1-' .. ··. ® ..... ··- ·····

300

UNILUX HOT WATER BOILER CAPACITIES:

BOILER MODEL

W

100 150 200 250 300 350 400 500 600 700 800 900

1000 1200 1400 1600 1800 2000 2500 2900 3000 3500

MAXIMUM FUEL INPUT BTU/HR IN

THOUSANDS 1250 1750 2200 2750 3000 3750 4300 5400 6250 7235 8270 9300 10330 12400 14470 16530 18600 20670 25000 29000 34000 38000

BOILER OUTPUT

BTU/HR IN THOUSANDS

1062 1488 1870 2338 2550 3188 3655 4590 5313 6150 7030 7905 8780 10540 12300 14050 15810 17570 21250 24650 28900 32300

APPROX. BOILER HORSE POWER

31.5 44.5 56 70 76

95.2 109 137 159 184 210 236 262 315 367 420 472 525 635 736 863 965

SHIPPING WEIGHT

LBS

3290 3800 4400 5000 5600 6100 6800 8200 9000 10000 11400 12140 13200 15480 16600 18800 20960 22700 28500 30800 43160 49000

OPERATING WEIGHT

LBS

3790 4380 5035 5750 6410 6985 7800 9660

10625 11820 13650 14580 15870 18625 20100 22680 25210 27290 35000 38000 53880 61340

WATER CONTENT U.S.

GALLONS

60 70 76 90 97 106 120 175 195 218 270 293 320 377 420 465 510 550 776 865 1285 1480

ORDER NUMBER PROCEDURE: Example – ZF 300WG

BOILER MODEL WATER (W) LOW PRESSURE STEAM (LS) HIGH PRESSURE STEAM (HS)

NAT. GAS, MIXED OR LP (G) NO. 2 OR LIGHTER OILS (L) COMB. GAS/LIGHT OIL (LG)

W G

ZW – Welded Boiler Tube ZF – Ferrule Boiler Tube

SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.

DIMENSIONS MUST BE CONFIRMED FOR CONSTRUCTION.

UNILUX REPRESENTATIVE:

STANDARD EQUIPMENT: • PRESSURE GAUGE • THERMOMETER • LWCO • RELIEF VALVES • BURNER OPERATING AND SAFETY TEMPERATURE CONTROLS

ALL BURNER EQUIPMENT UL, CSA APPROVED

Page 48: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

ATTACHMENT 5

2002 ENVIRONMENTAL EVALUATION REPORT COVER PAGE

Page 49: Cache Creek Casino Resort: Minor NSR Review Application ......May 09, 2017  · regarding the sources at the Cache Creek Casino Resort and the Cache Creek Mini Mart/Gas Station, located

Cache Creek Indfan Bingo & Casino Expansion Proj·€ct · ·

Final Environ1llental Eval~ation

October 2002

Prepared for;

The Rumsey'.Band ·of'-Wihrunlndi!n'Js .,• ', .

, P;O. Bo>< 1-·8 Brooks, CA :95~6

l .,\../, .t, :1· ,.1

X

··''

p~~:by: , . .a l;"S,_.

ANALYTICAL ENVIRONMJiNrtS.t'sE~· 2021.''"ft.lltst.rett,"$tli·te 20{J · ·..·s~;rnento, 'cA ·. 9581"4

' {916) 447~)479