Cable Burying in Vung Tau Project_fni

download Cable Burying in Vung Tau Project_fni

of 36

Transcript of Cable Burying in Vung Tau Project_fni

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    1/36

    1FVS

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    2/36

    SEATRENCH CO.,

    LTD Skogveien 19, 1672Krakeroy, Norway

    Tel : +47 952 43 407

    F.V.S Float Vehicle

    Services J.S Company 1428/24, 30/4 Road,12 Ward, Vung Tau

    Province, VietnamTel : + 84.64. 3627611Fax: + 84.64. 3627612

    2

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    3/36

    33

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    4/36

    Launching and recoverysystem

    Electric motor: MitsubishiJIS C 4004Working load 1.5 tonMax load 3.0 tonDivercage with capacity

    for two diversA-frame hydraulicallycontrolled

    44

    Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    5/36

    Recompression Chamber

    Manufacture: Jamakuni Japan

    Capacity: 2600 liters Working pressure: 6 barsProduction date: 2004Production code: 080 2KS

    SX10 TYPETesting date: 2008

    5

    Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    6/36

    Underwater camera & CCTV systemSONY HDR- XR500E HANDYCAM AND HOUSINGOLYMPUS TOUGH 8100 AND HOUSING

    6

    Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    7/36

    Item Discription

    Communication control The AMCOM II 2820 Systems

    Full face mark KMB-BandMask 18 (Q.ty 03)Kirby Morgan EXO-26 Balanced Regulator Full Face Mask(Q.ty 04)

    High pressure compressor

    (The MC1A air compressor)

    Kirby Morgan Air Control System 5 (KMACS 5) is a

    lightweight, portable control box for use in surfacesupplied air diving operations.

    Air control system Kirby Morgan Air Control System 5 (KMACS 5) is alightweight, portable control box for use in surfacesupplied air diving operations.

    Diving umbilical Design pressure: 30psiWorking pressure: 14psi

    Scuba Design pressure: 207barWorking pressure: 203bar

    7

    Other Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    8/36

    Underwater Marine Construction

    8

    Services

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    9/36

    Underwater Welding & Construction

    9

    Services

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    10/36

    ( ABS / DNV) Vessel Inspection, Repair & Maintenance

    10

    Services

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    11/36

    Burying the optical cable

    11

    Services

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    12/36

    Submarine Cable & Pipeline Installation & Repair Works

    12

    Services

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    13/36

    Burying the optical cable atVung Tau sea area

    Burial and survey about5000 meters optical cableat Vung Tau Long Hai seaarea.Water depth: 30 85 fsw.

    13

    Diving Work Records

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    14/36

    Survey the seabed around theHamrong-1X & Yentu-2XBoreholes

    Max water depth is about 30meters.FVS diving team dive to takesurvey camera around the

    borehole with 50 metersradius.

    14

    Diving Work Records

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    15/36

    Survey the seabed around the Doson-1x & Hamrong-2x boreholes

    FVS diving team dive to takesurvey camera around theborehole with 50 metersradius.

    Max water depth is about30 meters

    15

    Diving Work Records

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    16/36

    Additional support forboatlanding at PLDP-A

    Total weight of all partswhich will be attached toBoatlanding of the rig isabout 15,250kgs, whichis combined of manyparts. The biggest part isabout 4,966kgs

    16

    Diving Work Records

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    17/36

    Removing finishing net andnet-chain at Ruby field

    Remove the fishing net andnet-chain stuck/cover tothe PLEMs (No.4 & No.7) atRuby Field.Survey and film the PLEMs

    (No.1 to No.7) before/afterremoved the fishing netand net-chain.

    17

    Diving Work Records

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    18/36

    18

    Diving Work Records

    Underwater surveys forMV Lady Valisia 20/06/2010

    MV Posh Venture 06/12/2010

    MV Posh Verdant 22/01/2010

    MV VTC Globe 21/01/2011

    MV Bremen 20/05/2011

    MV SANTIAGO 11/05/2011

    MV Lewek Penguin 04/05/2011

    MV Lewek Stork 01/11/2011

    MV ALAMO H188 13/12/2011

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    19/36

    19

    Our Clients

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    20/36

    20

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    21/36

    Marine Trench AS & Subsea Trenching Services AS mergedops 2009

    All contracts & operation will be performed in Seatrench AS20 years of experience from trenching worldwideMain office in Norway, sales offices in UK, Thailand andBrazil

    21

    History of Seatrench

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    22/36

    Oil & Gas, Infrastructure, Offshore & Inshore projectsSeatrench operate a fleet of 4 trenching rigs and pumpbargesThe Seatrench concept consist of: Trenching Machine,Pump Barge, Operational crew, Diving crewDedicated crew with more than 20 years experiencearound the world. More than 5000 diving hours on the

    equipmentFast mobilisation at site. Important in areas with strongcurrent and harsh weather conditions.

    22

    Service of Seatrench

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    23/36

    Trenchers2 off Double Pump Trenchers. Soil conditions max 350 - 400 KPA

    23

    Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    24/36

    24

    Equipments

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    25/36

    The advantages with the Seatrench concept for shallow watertrenching can be summarized as follows:

    High efficient equipment with documented performance.Ensuring fast mobilisation to reasonable cost worldwideIndependent rigs with less requirements for support vessels

    Minimized number of personnelPowerful and light weight design.A staff of experienced and well qualified operators.Self designed and produced equipment

    Environmentally friendly processOur equipment is designed to minimize the impact on the subseaenvironment. Due to oil free operation, the system has zeropollution to the sea.

    25

    Advantages

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    26/36

    26

    Work Records

    Projects performed in 2010Comorro Island 1000 mtr FO cable for Alcatel LucentCork Bay Irland 14000 mtr Power cable for Nexans

    Wave hub England 2000 mtr Power cable for CTC Marine

    Abu Dhabi 60 km FO cable for E MarineAbu Dhabi 6000 mtr FO cable for E MarineLebanon Beirut 16 Steel Pipeline for Total (400mmincluding concreteinsulation)

    Projects to be performed in 2011

    34 km FO cable in Brazil for GrupoSchahin & Petrobras (Ongoing)

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    27/36

    27

    Process of Cable Burying

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    28/36

    28

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    29/36

    29

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    30/36

    30

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    31/36

    31

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    32/36

    32

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    33/36

    33

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    34/36

    34

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    35/36

    35

  • 8/2/2019 Cable Burying in Vung Tau Project_fni

    36/36