CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C....

10
CAA 10th Cross Calibration Wo rkshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau- Wehrlin, Y. De Conchy, L Mirioni, V. Bouzid. LPP: Laboratoire de Physique des plasmas. 1. Status of data production: STAFF-SC & STAFF-SA. 2. Status of open action items. 3. Data delivery plan for measurements from years 2006- 2010. 4. Documents.

Transcript of CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C....

Page 1: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

CLUSTER / STAFF Action items

C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin, Y. De Conchy,

L Mirioni, V. Bouzid.

LPP: Laboratoire de Physique des plasmas.

1. Status of data production: STAFF-SC & STAFF-SA.

2. Status of open action items.3. Data delivery plan for measurements

from years 2006-2010.4. Documents.

Page 2: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

1. Status of data production:a. STAFF-SC: mode NBR and HBR

Delivered to CAA

Produced to CAA

Num. of files

Level

ContentProduct

Science data

None

Version 0301 Jan. 2001

to31 Sep. 2007

C?_CP_STA_CWF_HB

R

None1 file/

1 sat./24h

2

Calibrated

Waveform

C?_CP_STA_CWF_NB

R

C?_CP_STA_DWF_HB

R

Version 0201 Jan. 2001

to31 Dec. 2006

1 file/1 sat./24h

1Decommutat

edWaveform

C?_CP_STA_DWF_NB

R

Difference between version 3 and 2:New dataset headers (ceh format) have been created to include

caveat files. The laboratory name and emails have been updated.

Jan. 2007 DWF (v. 03) has been already uploaded:Once the integration in the CAA DB checked, the full year will

follow. The production of year 2008 DWF: It will start soon, as

we got 2008 TCOR file recently.

Page 3: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

1. Status of data production:

a. STAFF-SC: mode NBR and HBR

Version 02 01 Jan. 2001 to

31 Jul. 2009

Version 0201 Jan. 2001

to31 Dec.

2005

Produced to CAA

CL_CG_STA_SC_SPECTRO_HBR

Version 02 01 Jan. 2001 to

31 Jul. 2009

1 file/4 sat./

3h3

Spectrogramsplots

CL_CG_STA_SC_SPECTRO_NBR

C?_CP_STA_CS_HBR

Version 0201 Jan. 2001 to

31 Dec. 2005

1 file/1 sat./24h

2Calibrate

d Spectra

C?_CP_STA_CS_NBR

Delivered to CAA

Num. of

files

Level

ContentProduct

A Calibrated Spectra new version (3) : New dataset headers (ceh format) have been created to include

caveat files, name lab, emails have been updated. The SI_CONVERSION metadata has been corrected and this changes is mentioned in the dataset caveat metadata.

The CS production in this new version will re-start: Year 2006/2007/2008.

Page 4: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

1. Status of data production:

Spectrogram plots: Spectrogram plots: produced with a produced with a version 01 software.version 01 software.

New dataset is coming: New dataset is coming:

- Calibrated WaveForms (CWF).- Calibrated WaveForms (CWF).

- We hope to start the production by - We hope to start the production by the end of the year. Still a lot of the end of the year. Still a lot of validation work to do…validation work to do…

- See P. Robert previous presentation.- See P. Robert previous presentation.

a. STAFF-SC

Page 5: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

1. Status of data production:

Delivered

to CAA

Produced

To CAA

Num. of

files

Level

ContentProduct

Science data

Spectral Matrix C?_CP_STA_SM

Power Spectral Density

C?_CP_STA_PSD

Version 301 Jan.

2001 to

31 Aug. 2008

Version 401 Jan. 2001

to 31 Jun. 2009

1 file /1 sat. /

24h2

Automatic Gain control

C?_CP_STA_AGC

Difference between version 3 and 4:Difference between version 3 and 4:- New dataset headers (ceh format) have been created to New dataset headers (ceh format) have been created to

include caveat files, name lab, emails have been updated.include caveat files, name lab, emails have been updated.- PSD negative values have been removed as requested by PSD negative values have been removed as requested by

CAA.CAA. Auxilliary data:Auxilliary data: CAVEATS : new cef files! CAVEATS : new cef files!- SM: PSD negative values and period with no tsrp recorded.SM: PSD negative values and period with no tsrp recorded.- PSD: period with no tsrp.PSD: period with no tsrp.

b. STAFF-SA: All mode

Page 6: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

1. Status of data production:

Polarisation and Propagation Parameter Polarisation and Propagation Parameter (PPP)(PPP)

- PPP: cef format has been defined.PPP: cef format has been defined.- Some tests have already started to do the Some tests have already started to do the

production.production.- FGM spin resolution have been locally FGM spin resolution have been locally

downloaded from CAA.downloaded from CAA.- Ondrej Santolik will deliver us a module Ondrej Santolik will deliver us a module

to integrate FGM spin resolution data to integrate FGM spin resolution data from CAA in PRASSADCO code to produce from CAA in PRASSADCO code to produce PPP PPP by the end of novemberby the end of november..

b. STAFF-SA: L3 products

Page 7: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

2. Status of open action 2. Status of open action items: items:

Cross- Calibration 8th Action ItemsCross- Calibration 8th Action Items AI-45:AI-45: OPENOPEN, , new date due: 10th Cross-Calibration workshop. new date due: 10th Cross-Calibration workshop. Cross calibration study between STAFF-SA and WBD. STAFF Cross calibration study between STAFF-SA and WBD. STAFF

team had to find the best solution. team had to find the best solution. Ondrej Santolik has been contacted and will work on it. Ondrej Santolik has been contacted and will work on it.

He will give us something by the end of NovemberHe will give us something by the end of November..

AI-1-2:AI-1-2: OPENOPEN, , new date due: 30 Sept. 2009.new date due: 30 Sept. 2009. PSD negative values:PSD negative values: negative values have been negative values have been

replaced by a fillvalue. New products have been produced replaced by a fillvalue. New products have been produced and will be redelivered soon. and will be redelivered soon.

SM/PSD caveat files, concerning no TSRP (Sun SM/PSD caveat files, concerning no TSRP (Sun Reference Pulse):Reference Pulse):

It is under process. It is under process. SM caveat filesSM caveat files, concerning PSD negative values that , concerning PSD negative values that

could be used to calculate the diagonal terms of the could be used to calculate the diagonal terms of the spectral matrix.spectral matrix.

In progress, see previous slide.In progress, see previous slide.

Page 8: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

CAA Operational Review OR4CAA Operational Review OR4R2a. STAFFR2a. STAFF – The board requests that the – The board requests that the

production of search coil CWF and SA production of search coil CWF and SA polarization and propagation data sets is polarization and propagation data sets is undertaken as rapidly as possible to ensure undertaken as rapidly as possible to ensure delivery of all data by May 2010: delivery of all data by May 2010:

All efforts are done for this:All efforts are done for this:Calibrated Wave form data will be Calibrated Wave form data will be

produced and delivered to CAA. The produced and delivered to CAA. The continuous calibration is under study (see continuous calibration is under study (see P. Robert presentation).P. Robert presentation).

STAFF SA polarisation and propagation STAFF SA polarisation and propagation parameters : see previous slide. parameters : see previous slide.

2. Status of open action 2. Status of open action items: items:

Page 9: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

3. 3. Data delivery plan for measurements from years 2006-

2010.

2002-20092001? *SA Polarisation/Propagation New

2009End of 200801/2001

– 08/2008

SA AGC/ PSD / SM

2002 - 2009

Jan. 2001? *SC CWF New

2009200831 Jul. 2009

SC Images

SC Complex spectra

20092007-2008

2006 to 2008

2006 2005

SC DWF

Plans :2010

Plans :2009

DoneYearProduct

* LPP is going to move from Velizy to Palaiseau by the * LPP is going to move from Velizy to Palaiseau by the end of the year.end of the year.

Page 10: CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009. CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov. 2009.

4. Documents4. Documents ICD:ICD: It has been updated but we are waiting for It has been updated but we are waiting for

new updates.new updates.- New datasets headers have been produced and New datasets headers have been produced and

delivered to include easily caveats in the future. delivered to include easily caveats in the future. They are described in the ICD.They are described in the ICD.

- New caveats files (cef format) for SM and PSD New caveats files (cef format) for SM and PSD dataset (STAFF-SA).dataset (STAFF-SA).

- 2 new datasets will be described:2 new datasets will be described: STAFF-SC: Calibrated WaveForm (CWF).STAFF-SC: Calibrated WaveForm (CWF). STAFF-SA: Polarization and Parameterization STAFF-SA: Polarization and Parameterization

Parameter (PPP).Parameter (PPP). User guide:User guide: has to be updated following the has to be updated following the

recommendations of CAA (new CAA website recommendations of CAA (new CAA website interface, new datasets, new caveats).interface, new datasets, new caveats).

Calibration Report:Calibration Report: once tests on the new once tests on the new calibration method will be finished, the CR will calibration method will be finished, the CR will be updated. be updated.