C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked...

13
better together ... we deliver C3 Stabilisation Project

Transcript of C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked...

Page 1: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver

C3 Stabilisation Project

Page 2: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 2

The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility.

This included the fabrication and installation of six of the largest pressure vessels ever fabricated in South Africa, consisting of one de-propaniser drum and five propylene storage bullets. The five bullets measure approximately 60 metres in length and six metres in diametre, weighing in at a hefty 500 tons.

Page 3: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included
Page 4: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 4

The C3 stabilisation project will stabilise the C3 valve chain at the Sasol Secunda plant by de-linking the extremely tight integration between the upstream synthol reactors, propylene extraction units and the downstream chemical plants with the appropriate buffer and storage facilities.

This involved the construction of new process structures, equipment, vessels and piping on the site, new off-plot pipe racks, piping to the new buffer storage facilities and tie-ins at the existing plant.

Page 5: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included
Page 6: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 6

The main objective of the project was two-fold: To increase the extraction of propylene and increase the availability of propylene feed for beneficiation in the downstream units.

With this new capacity, Sasol aims to reach 85% extraction and monetise an additional 58 000 tons per annum propylene.

Page 7: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 7

Safety

Total Hours Worked : 2 078 440.

Total RC Free Hours: 1 130 740.

Manpower Peak: 1001 people on site.

RCR: 0.19.

Page 8: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included
Page 9: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 9

Overall Progress

TCCC (Total Care Custody and Control): 7 April 2014.

Ready for Commissioning (RFC): 30 May 2014.

Ready for Operation (RFO): 22 June 2014.

Beneficial Operation (BO): 27 June 2014 (Board Commitment: 30 June 2014).

Page 10: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included
Page 11: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 11

The project made history on a number of fronts. The team installed five of the largest pressurised vessels ever constructed on South African soil and the foam glass fire proofing on the bullets has never been applied on this scale before.

Page 12: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver 12

Page 13: C3 Stabilisation Project...better together ... we deliver 2 The C3 stabilisation project was tasked with the construction of a propylene feed stabilisation facility. This included

better together ... we deliver

Group Technology Project of the Year 2014 C3 Stabilisation Project